CN210767854U - Pouring template with good sealing performance - Google Patents
Pouring template with good sealing performance Download PDFInfo
- Publication number
- CN210767854U CN210767854U CN201920992726.6U CN201920992726U CN210767854U CN 210767854 U CN210767854 U CN 210767854U CN 201920992726 U CN201920992726 U CN 201920992726U CN 210767854 U CN210767854 U CN 210767854U
- Authority
- CN
- China
- Prior art keywords
- template
- fixed
- cope match
- plate pattern
- main part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a pouring template that sealing performance is good, including the template main part, the inside of template main part is provided with pours the notch, and the upper surface of template main part is fixed mutually with the cope match-plate pattern through the riveting piece, the upper surface of template main part is provided with the location slightly, the cope match-plate pattern lower surface is provided with the fixed slot, and fixed slot internally mounted has fixed guide pillar, the both ends of cope match-plate pattern are fixed with the card strip, and card strip surface is provided with the fixed orifices, the fixed slot surface is provided with the mounting hole, the top of cope match-plate pattern is fixed mutually with the cope match-plate pattern lid through the screw, and the cope match-plate. The utility model discloses a to pouring to carry out swift formula installation between each subassembly of template fixed, utilize two prefabricated cope match-plates pattern and lower bolster, can carry out fixed seal to the template main part, be provided with the sealing ring at zero device connection position simultaneously, ensure the compactness of junction.
Description
Technical Field
The utility model relates to a pour template technical field, specifically be a casting mold board that sealing performance is good.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. The civil engineering construction covers the construction of buildings, structures and engineering works in facilities and places in engineering ranges such as buildings, roads, railways, airports, bridges, water conservancy, ports, tunnels, water supply and drainage, protection and the like in all categories such as the ground, the underground, the land, the water, the underwater and the like, and comprises various technical activities such as surveying, designing, constructing, maintaining, managing and the like in the engineering construction process. And pouring the mixed concrete material into a bin, leveling the bin and tamping the concrete material to be compact in the concrete pouring process. The pouring is required to be continuous and uniform, and the concrete is prevented from being separated; the leveling is to evenly spread the whole poured bin surface and fill the concrete material by a manual or mechanical method; tamping compaction is also called vibration tamping, and is divided into two types, namely manual tamping and mechanical vibrating tamping, and a mechanical vibrating method is generally adopted in hydraulic engineering.
The existing pouring template has the defects that the connection is not tight, the loose condition is easy to occur at the joint, and the concrete leakage phenomenon is caused, so that the market urgently needs to develop a novel pouring template with good sealing performance.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a casting mold board that sealing performance is good to the casting mold board that proposes in solving above-mentioned background possesses to connect inseparably, and the not hard up condition easily appears in junction, leads to concrete seepage phenomenon to take place the scheduling problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a casting template that sealing performance is good, includes the template main part, the inside of template main part is provided with pours the notch, and the upper surface of template main part is fixed with the cope match-plate pattern through the riveting piece, the upper surface of template main part is provided with the location slightly, the cope match-plate pattern lower surface is provided with the fixed slot, and fixed slot internally mounted has fixed guide pillar, the both ends of cope match-plate pattern are fixed with the card strip, and block the strip surface and be provided with the fixed orifices, the fixed slot surface is provided with the mounting hole, the top of cope match-plate pattern is fixed mutually with the upper die cover through the screw, and the upper.
Preferably, the bottom end of the template main body is fixed with the lower template through a fastening stud.
Preferably, a sealing ring is arranged at the hinged position of the fastening stud and the template main body.
Preferably, the bottom of the lower template is provided with a fixed base.
Preferably, the fixing base is connected with the sealing plate through a bolt, and a screw hole is formed in the surface of the sealing plate.
Preferably, the diameter of the pouring notch is 30 cm.
Compared with the prior art, the beneficial effects of the utility model are that:
the upper surface of the template main body is fixed with the upper template through the riveting piece, the bottom end of the template main body is fixed with the lower template through the fastening stud, the upper end and the lower end of the template main body can be assembled and fixed by matching the prefabricated slotted hole with spare parts such as the riveting piece, and the like, so that the template main body has the advantage of tight connection; the hinge joint of the fastening stud and the template main body is provided with the sealing ring, and the connecting part is provided with structures such as the sealing ring, so that the phenomena of looseness and leakage at the connecting part can be effectively prevented, and the sealing performance of the connecting part is guaranteed; the upper surface of template main part is provided with the location slightly, and the location is used for playing the fixed action slightly, prevents to appear size deviation in the installation, makes things convenient for to assemble the counterpoint between template main part and the cope match-plate pattern.
Drawings
FIG. 1 is a schematic view of the overall exploded structure of the present invention;
FIG. 2 is a schematic structural view of the main body of the template of the present invention;
FIG. 3 is a schematic diagram of the upper plate structure of the present invention;
fig. 4 is a schematic structural view of the fixing base of the present invention.
In the figure: 1. putting a mold cover; 2. mounting a template; 3. a template body; 4. a lower template; 5. a slot; 6. pouring a notch; 7. a seal ring; 8. fastening a stud; 9. a fixed base; 10. positioning the tip; 11. riveting a connecting piece; 12. fixing grooves; 13. fixing the guide post; 14. mounting holes; 15. clamping the strip; 16. a fixing hole; 17. a sealing plate; 18. and a screw hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: a casting template with good sealing performance comprises a template main body 3, wherein a casting notch 6 is arranged inside the template main body 3, the upper surface of the template main body 3 is fixed with an upper template 2 through a riveting piece 11, the upper end and the lower end of the template main body 3 can be assembled and fixed by utilizing a prefabricated slotted hole to match with spare parts such as the riveting piece 11 and the like, the casting template has the advantage of tight connection, the upper surface of the template main body 3 is provided with a positioning pin 10, the positioning pin 10 is used for fixing, the size deviation in the installation process is prevented, the assembly and alignment between the template main body 3 and the upper template 2 are convenient, the lower surface of the upper template 2 is provided with a fixing groove 12, a fixing guide post 13 is arranged inside the fixing groove 12, two ends of the upper template 2 are fixedly provided with clamping strips 15, the surfaces of the clamping strips 15 are provided with fixing holes 16, the surfaces of the fixing grooves 12 are provided with mounting holes 14, the, and the surface of the upper die cover 1 is provided with a slotted hole 5.
Further, the bottom end of the template main body 3 is fixed with the lower template 4 through a fastening stud 8.
Furthermore, the hinge joint of the fastening stud 8 and the template main body 3 is provided with a sealing ring 7, and the connecting part is provided with structures such as the sealing ring 7, so that the phenomena of looseness and leakage at the connecting part can be effectively prevented, and the sealing performance of the connecting part is guaranteed.
Further, the bottom of the lower template 4 is provided with a fixed base 9.
Further, the fixing base 9 is connected to the sealing plate 17 by a bolt, and the surface of the sealing plate 17 is provided with a screw hole 18.
Further, the diameter of the casting notch 6 is 30 cm.
The working principle is as follows: when in use, the upper surface of the template main body 3 is fixed with the upper template 2 through the riveting piece 11, the bottom end of the template main body 3 is fixed with the lower template 4 through the fastening stud 8, the upper end and the lower end of the template main body 3 can be assembled and fixed through utilizing the prefabricated slotted holes to match with zero devices such as the riveting piece 11 and the like, the template main body has the advantage of tight connection, the upper surface of the template main body 3 is provided with the positioning tip 10, the positioning tip 10 is used for fixing, the size deviation in the installation process is prevented, the assembly and alignment between the template main body 3 and the upper template 2 are convenient, the hinge joint of the fastening stud 8 and the template main body 3 is provided with the sealing ring 7, and the like at the connecting part, the phenomena of looseness and leakage at the joint can be effectively prevented, the sealing performance of the joint is ensured, the utility model discloses a fast installation and fixation is carried, the two prefabricated upper templates 2 and the lower template 4 are utilized to fix and seal the template main body 3, and meanwhile, the sealing ring 7 is arranged at the connecting part of a part to ensure the tightness of the connecting part.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides a pouring template that sealing performance is good, includes template main part (3), its characterized in that, the inside of template main part (3) is provided with pours notch (6), and the upper surface of template main part (3) is fixed mutually with cope match-plate pattern (2) through riveting piece (11), the upper surface of template main part (3) is provided with location slightly (10), cope match-plate pattern (2) lower surface is provided with fixed slot (12), and fixed slot (12) internally mounted has fixed guide pillar (13), the both ends of cope match-plate pattern (2) are fixed with card strip (15), and card strip (15) surface is provided with fixed orifices (16), fixed slot (12) surface is provided with mounting hole (14), the top of cope match-plate pattern (2) is fixed mutually with cope match-plate pattern lid (1) through the screw, and cope match-plate pattern lid (1) surface is provided with slotted hole (5).
2. The pouring template with good sealing performance according to claim 1, characterized in that: the bottom end of the template main body (3) is fixed with the lower template (4) through a fastening stud (8).
3. The pouring template with good sealing performance according to claim 2, characterized in that: and a sealing ring (7) is arranged at the hinged part of the fastening stud (8) and the template main body (3).
4. The pouring template with good sealing performance according to claim 2, characterized in that: and a fixed base (9) is arranged at the bottom of the lower template (4).
5. The pouring template with good sealing performance according to claim 4, wherein: the fixing base (9) is connected with the sealing plate (17) through bolts, and a screw hole (18) is formed in the surface of the sealing plate (17).
6. The pouring template with good sealing performance according to claim 1, characterized in that: the diameter of the pouring notch (6) is 30 cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920992726.6U CN210767854U (en) | 2019-06-28 | 2019-06-28 | Pouring template with good sealing performance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920992726.6U CN210767854U (en) | 2019-06-28 | 2019-06-28 | Pouring template with good sealing performance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210767854U true CN210767854U (en) | 2020-06-16 |
Family
ID=71046320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920992726.6U Expired - Fee Related CN210767854U (en) | 2019-06-28 | 2019-06-28 | Pouring template with good sealing performance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210767854U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112497445A (en) * | 2020-11-30 | 2021-03-16 | 铭际建筑科技(泰兴)有限公司 | Quick-drying pouring device for concrete prefabricated wall panel |
-
2019
- 2019-06-28 CN CN201920992726.6U patent/CN210767854U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112497445A (en) * | 2020-11-30 | 2021-03-16 | 铭际建筑科技(泰兴)有限公司 | Quick-drying pouring device for concrete prefabricated wall panel |
CN112497445B (en) * | 2020-11-30 | 2022-04-01 | 铭际建筑科技(泰兴)有限公司 | Quick-drying pouring device for concrete prefabricated wall panel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102943565B (en) | Construction method of large-sized arc-shaped wall | |
CN109024870A (en) | The connection structure and its construction method of assembled underground structure vertical member | |
CN210767854U (en) | Pouring template with good sealing performance | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
CN106988339B (en) | Sandy gravel stratum piping lane construction technology | |
CN108086341A (en) | Assembled is adjustable basis | |
CN208395694U (en) | A kind of pile foundation reinforcement structure | |
CN207813019U (en) | A kind of UHPC non-dismantling formworks of casting concrete column | |
CN107299640A (en) | A kind of variable cross-section well shaft type ground continuous wall base and its construction method | |
CN107724419B (en) | Equipment prefabricated foundation positioner and using method thereof | |
CN110499752A (en) | Assembled underground continuous wall | |
CN203701145U (en) | Underground pipe network inspection well concrete assembly | |
CN113028139B (en) | Combined type connector of rain and sewage pipe and construction method | |
CN208472747U (en) | A kind of prefabricated after-pouring formula open caisson | |
CN210767503U (en) | Hard crossbeam steel column convenient to installation | |
CN212714949U (en) | Quick bored concrete pile foundation concrete device | |
CN209129260U (en) | Prestressing force assembly concrete beam | |
CN211922151U (en) | Connection structure of crashproof kerbstone and lane board in shield tunnel | |
CN207862963U (en) | Assembled is adjustable basis | |
CN113833033A (en) | Anti-seepage anti-floating dismantling-free construction process for building in area close to water area | |
CN209114492U (en) | Caisson structure applied to 500kV power tunnel engineering | |
CN206801597U (en) | A kind of flood mine chamber waterproof construction | |
CN208633134U (en) | A kind of construction formwork based on electric welding net isolated gate basis | |
CN106480875B (en) | For constructing the rectangular concrete pile of piping lane side wall | |
CN209397605U (en) | A kind of structure for laying basic joint bar using consolidation grouting hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200616 Termination date: 20210628 |
|
CF01 | Termination of patent right due to non-payment of annual fee |