CN208395694U CN201820742055.3U CN201820742055U CN208395694U CN 208395694 U CN208395694 U CN 208395694U CN 201820742055 U CN201820742055 U CN 201820742055U CN 208395694 U CN208395694 U CN 208395694U
Authority
CN
China
Prior art keywords
steel bushing
pile foundation
reinforcement structure
curved plate
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820742055.3U
Other languages
Chinese (zh)
Inventor
李祥
王长安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Ridge Construction Engineering Technology Co Ltd
Original Assignee
Nanjing Ridge Construction Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Ridge Construction Engineering Technology Co Ltd filed Critical Nanjing Ridge Construction Engineering Technology Co Ltd
Priority to CN201820742055.3U priority Critical patent/CN208395694U/en
Application granted granted Critical
Publication of CN208395694U publication Critical patent/CN208395694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of pile foundation reinforcement structures, it applies in bridge reinforced structure field, it is larger to solve prior art pile foundation, sleeve is covered when in pile foundation, in the presence of the technical problem that construction is inconvenient, its key points of the technical solution are that including for covering the sleeve in pile foundation periphery, sleeve includes the end to end steel bushing of several sections and the adjusting steel bushing that is connected to above steel bushing, steel bushing includes the curved plate that several are mutually clamped, connector is equipped between adjacent curved plate, several curved plates are mutually clamped, enclose steel bushing, then steel bushing is further consolidated using connector, cement mortar is poured into the gap between steel bushing and pile foundation, according to different pile foundation height, it repeats the above steps and the steel bushing of different number is installed, last installation and adjustment steel bushing, to complete strengthening construction work, be conducive to improve property easy for construction.

Description

A kind of pile foundation reinforcement structure
Technical field
The utility model relates to bridge reinforced structure, in particular to a kind of pile foundation reinforcement structure.
Background technique
At present in China, a large amount of bridge carries busy friendship as the aortic important component of national communication Logical pressure the problems such as bridge will appear necking down, expanding, distortion, leads to large quantities of bridges due to water pollution, river channel erosion etc. Maintenance, maintenance, strengthening reconstruction ranks are entered, for not adapting to the bridge of Modern Traffic transport, are rebuild if all removed, Not only capital expenditure is huge, but also does not also allow in time.Therefore, reinforce the maintenance of existing highway bridge, maintenance, reinforce and change It makes, designs bearing capacity or raising load standard to restore it, extend bridge service life, be the sustainable of guarantee highway construction Development is used as an important measures.
Currently, the Chinese patent that Authorization Notice No. is CN205223836U in existing patent discloses one kind for underwater pier Column reinforces glass sleeve, including bridge pier, and the lower end two sides of bridge pier pass through pier stud and are fixedly installed with pile foundation, the outside socket of pile foundation There is glass sleeve, the bottom end of glass sleeve lining is respectively mounted compressible seal, and epoxy is filled between glass sleeve and pile foundation Grouting material, the upper end of glass sleeve lining have been mounted equidistant limiter, and the upper end of glass sleeve and pile foundation has slope, slope position In the surface of limiter;Since bridge pile foundation diameter and height are larger, when sleeve is put on pile foundation, it is inconvenient that construction can be generated Problem has much room for improvement.
Utility model content
The purpose of the utility model is to provide a kind of pile foundation reinforcement structures to facilitate worker to construct using spliced sleeve.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of pile foundation reinforcement structure, including for covering the sleeve in pile foundation periphery, the sleeve includes several section head and the tail phases The steel bushing connect and the adjusting steel bushing being connected to above steel bushing, the steel bushing include the curved plate that several are mutually clamped, phase Connector is equipped between the adjacent curved plate.
By using above-mentioned technical proposal, several curved plates are mutually clamped enclosing circlewise, it will using connector Adjacent curved plate closely connects, and pours into cement mortar into the gap between steel bushing and pile foundation, according to different pile foundation height, The steel bushing of different number is installed, several steel bushings are end to end at sleeve, and steel bushing will be finally adjusted again to be connected to above sleeve, from And strengthening construction work is completed, be conducive to improve property easy for construction.
The utility model is further arranged to: annular groove, the steel bushing bottom protrusion are equipped in the ring wall at the top of the steel bushing Equipped with can be with the annular convex platform of annular groove male-female engagement.
By using above-mentioned technical proposal, the annular convex platform of upper section steel bushing is inserted into the annular groove at the top of next section steel bushing In, the being completely embedded property between steel bushing and steel bushing can be reinforced;By setting annular convex platform and annular groove, adjacent steel bushing is increased Male-female engagement degree can leak out to avoid cement mortar between steel bushing.
The utility model is further arranged to: having poured waterproofing tack coat on the contact surface of the annular groove and annular convex platform.
By using above-mentioned technical proposal, waterproofing tack coat is poured between annular groove and annular convex platform, can further be added Being completely embedded property between strong steel bushing.
The utility model is further arranged to: the annular groove is equipped with guiding curved surface close to the two sidewalls of notch.
By using above-mentioned technical proposal, setting guiding curved surface expands the notch diameter of annular groove, is conducive to annular convex platform It is inserted into annular groove, improves property easy for construction;When avoiding installation steel bushing, rigid friction is generated between annular convex platform and annular groove, is made At damage.
The utility model is further arranged to: the steel bushing is on the outer wall of annular groove and steel bushing is close to annular convex platform It is equipped with connection ring on outer wall, is evenly distributed in several mounting holes along it in the connection ring, is successively erected by bolt assembly The excessively described mounting hole of direct puncture is fixed.
By using above-mentioned technical proposal, it is successively each passed through adjacent steel using bolt assembly and covers upper mounting hole and carries out It is fixed, the being completely embedded property between steel bushing can be further strengthened.
The utility model is further arranged to: the steel bushing is equipped with the first bulge loop close to the outer wall of annular convex platform, described First bulge loop is equipped with several vertical perforative pilot holes along its circumferencial direction, and the steel bushing is set on the outer wall of annular groove notch There is the second bulge loop, second bulge loop is equipped with several convex blocks for passing through pilot hole.
By using above-mentioned technical proposal, when adjacent steel bushing connects, in addition to annular convex platform and annular groove male-female engagement, also pass through Convex block and pilot hole male-female engagement, further realize the stable connection of adjacent steel bushing.
The utility model is further arranged to: the side of the curved plate, which extends, is equipped with several semicircular lugs, The curved plate other side is equipped with the semicircle groove for being clamped with lug along its circumferencial direction.
By using above-mentioned technical proposal, worker during installation, according to pile foundation of different shapes, lug is connected to adjacent In the semicircle groove of curved plate, steel bushing is eventually formed, improves construction efficiency;The pile foundation of different-diameter can also be applied, be applicable in Property is extensive.
The utility model is further arranged to: the connector includes that the lock tongue that is connected on the outer wall of curved plate side is convex Block and the hasp being connected on the outer wall of the curved plate other side, when the adjacent curved plate splices, the hasp and lock tongue Convex block clamping.
By using above-mentioned technical proposal, lock tongue convex block is costed using hasp, then fasten hasp, further reinforced steel sleeve Being completely embedded property can leak out between lug and groove to avoid cement mortar;Worker is also facilitated to realize using hasp structure quick Installation improves construction efficiency.
The utility model is further arranged to: the height for adjusting steel bushing height and being less than steel bushing.
The steel bushing of respective numbers is chosen according to different pile foundation height by using above-mentioned technical proposal, finally utilizes tune Section steel bushing makes up the difference in height of pile foundation and steel bushing, is conducive to the suitability for improving ruggedized construction and different pile foundations.
The utility model is further arranged to: the first section steel bushing bottom end of the sleeve is equipped with blade foot.
By using above-mentioned technical proposal, when by head section steel bushing insertion soil, blade foot can smoothly break native face, be conducive to Head section steel bushing is smoothly inserted into soil;Blade foot increases the diameter of first section steel bushing bottom end, and pile foundation can smoothly be put on by being conducive to steel bushing.
In conclusion the utility model has the following beneficial effects:
1, the utility model provides a kind of pile foundation reinforcement structure, is clamped composition steel bushing by several curved plates, will Several steel bushings composition sleeve is covered in pile foundation periphery, and worker can be assembled into different straight at the scene according to pile foundation of different shapes The steel bushing of diameter, is then assembled into sleeve, and worker is facilitated to construct;
2, it is inserted by the annular convex platform of upper section steel bushing in the annular groove of next section steel bushing, the connection between steel bushing can be reinforced Compactness;
3, it is clamped by lug on curved plate and semicircle groove, the steel for being applicable in different shape pile foundation can be assembled into Set, improves the widely applicable property of steel bushing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment 1;
Fig. 2 is the internal view of steel bushing in embodiment 1;
Fig. 3 is the enlarged drawing in the portion A in Fig. 2;
Fig. 4 is the external structure schematic diagram of 1 steel bushing of embodiment;
Fig. 5 is the structural schematic diagram of 2 steel bushing of embodiment.
In figure: 1, pile foundation;2, sleeve;3, steel bushing;4, curved plate;5, connector;6, annular groove;7, annular convex platform;8, prevent Water adhesive layer;9, it is oriented to curved surface;10, connection ring;11, mounting hole;12, bolt assembly;13, the first bulge loop;14, pilot hole;15, Second bulge loop;17, convex block;18, lug;19, semicircle groove;20, lock tongue convex block;21, hasp;22, blade foot;23, steel bushing is adjusted.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:
With reference to Fig. 1, a kind of pile foundation reinforcement structure includes for covering the sleeve 2 in 1 periphery of pile foundation, and sleeve 2 includes several The adjusting steel bushing 23 for saving end to end steel bushing 3 and being connected to above steel bushing 3, the height for adjusting steel bushing 23 are less than sleeve 2 Highly, for being adapted to the pile foundation 1 of different height;Steel bushing 3 includes the curved plate 4 that several are mutually clamped, adjacent curved plate 4 Between be equipped with connector 5;When strengthening construction, according to the different-diameter of pile foundation 1, several curved plates 4 are mutually clamped first It encloses circlewise, covers in former 1 periphery of pile foundation, then further connected curved plate 4 using connector 5, and in steel bushing 3 and stake Gap between base 1 pours into cement mortar, so that steel bushing 3 is tightly combined with former pile foundation 1;According to the different height of pile foundation 1, phase is chosen The steel bushing 3 for answering quantity is combined into sleeve 2 for steel bushing 3 is end to end, will finally adjust the installation of steel bushing 23 and is plugged on 3 top of steel bushing, complete The reinforcing of pairs of pile foundation 1.
With reference to Fig. 2, annular groove 6 is equipped in the ring wall at 3 top of steel bushing, 3 bottom of steel bushing protrusion is equipped with for matching with 6 bumps of annular groove Waterproofing tack coat 8 is poured on the contact surface of the annular convex platform 7 of conjunction, annular groove 6 and annular convex platform 7, annular groove 6 is close to the two sides of notch Wall is equipped with guiding curved surface 9, and first section 3 bottom end of steel bushing of sleeve 2 is equipped with blade foot 22;The blade foot 22 of the bottom steel bushing 3 of sleeve 2 is inserted into In soil, the annular convex platform 7 of upper section steel bushing 3 is inserted into the annular groove 6 of next section steel bushing 3, and to annular groove 6 and annular convex platform 7 Between pour waterproof binding agent, form water-proof tack coat 8, reinforce the compactness between steel bushing 3.
With reference to Fig. 3, steel bushing 3 is on the outer wall of annular groove 6 and steel bushing 3 is equipped with close to the outer wall of annular convex platform 7 and connects Ring 10, connection ring 10 are evenly distributed in several mounting holes 11 along it, successively pass vertically through mounting hole 11 by bolt assembly 12 Inside it is fixed;Mounting hole 11 is passed through by bolt assembly 12 and is fixedly connected with ring 10, thus close between further strengthening steel bushing 3 Property.
With reference to Fig. 4,4 side of curved plate, which extends, is equipped with several semicircular lugs 18, and lug 18 is preferably two, arc 4 other side of shape steel plate is equipped with the semicircle groove 19 for being clamped with lug 18 along its circumferencial direction, and connector 5 includes to be connected to Lock tongue convex block 20 on 4 side outer wall of curved plate and the hasp 21 being connected on 4 other side outer wall of curved plate, adjacent arcs When shape steel plate 4 splices, hasp 21 and lock tongue convex block 20 are clamped, and lock tongue convex block 20 and hasp 21 preferably use three;By several Lug 18 and semicircle groove 19 are clamped, and by the clamping of several curved plates 4 at steel bushing 3, form complete steel bushing 3, then use and take Button 21 clasps lock tongue convex block 20, then locks, and can further strengthen the being completely embedded property of adjacent steel bushing 3.
Working principle: in strengthening construction, according to the different-diameter of pile foundation 1, the mutually clamping of several curved plates 4 is enclosed Conjunction forms steel bushing 3, covers in 1 periphery of pile foundation, and reinforces the being completely embedded property of steel bushing 3 with connector 5, between steel bushing 3 and pile foundation 1 Joints cement mortar in gap chooses the steel bushing 3 of respective numbers according to the different height of pile foundation 1, end to end by steel bushing 3 Sleeve 2 is formed, then steel bushing 23 will be adjusted and be connected to 3 top of steel bushing, completes the reinforcing to pile foundation 1.
Embodiment 2:
With reference to Fig. 5, a kind of pile foundation reinforcement structure is that steel bushing 3 is on the outer wall of annular convex platform 7 with 1 difference of embodiment Equipped with the first bulge loop 13, the first bulge loop 13 is equipped with several vertical perforative pilot holes 14 along its circumferencial direction, and steel bushing 3 leans on near-ring The outer wall of 6 notch of slot is equipped with the second bulge loop 15, and the second bulge loop 15 is equipped with several convex blocks 17 for passing through pilot hole 14;Pass through In 17 plugging in fitting hole 14 of convex block, the being completely embedded property between steel bushing 3 can be further strengthened.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (10)

1. a kind of pile foundation reinforcement structure, including for covering the sleeve (2) in pile foundation (1) periphery, it is characterised in that: the sleeve It (2) include the end to end steel bushing of several sections (3) and the adjusting steel bushing (23) being connected to above steel bushing (3), the steel bushing (3) The curved plate (4) being mutually clamped including several is equipped with connector (5) between adjacent curved plate (4).
2. a kind of pile foundation reinforcement structure according to claim 1, it is characterised in that: in the ring wall at the top of the steel bushing (3) Equipped with annular groove (6), steel bushing (3) the bottom protrusion is equipped with can be with the annular convex platform (7) of annular groove (6) male-female engagement.
3. a kind of pile foundation reinforcement structure according to claim 2, it is characterised in that: the annular groove (6) and annular convex platform (7) Contact surface on poured waterproofing tack coat (8).
4. a kind of pile foundation reinforcement structure according to claim 2, it is characterised in that: the annular groove (6) is close to notch Two sidewalls are equipped with guiding curved surface (9).
5. a kind of pile foundation reinforcement structure according to claim 2, it is characterised in that: the steel bushing (3) is close to annular groove (6) On outer wall and steel bushing (3) is equipped with connection ring (10) on the outer wall of annular convex platform (7), along it on the connection ring (10) Several mounting holes (11) are evenly distributed in, the mounting hole (11) is successively passed vertically through by bolt assembly (12) and is consolidated It is fixed.
6. a kind of pile foundation reinforcement structure according to claim 2, it is characterised in that: the steel bushing (3) is close to annular convex platform (7) outer wall is equipped with the first bulge loop (13), and first bulge loop (13) is vertical perforative equipped with several along its circumferencial direction Pilot hole (14), the steel bushing (3) are equipped with the second bulge loop (15) close to the outer wall of annular groove (6) notch, second bulge loop (15) several convex blocks (17) for passing through pilot hole (14) are equipped with.
7. a kind of pile foundation reinforcement structure according to claim 1, it is characterised in that: prolong the side of the curved plate (4) It stretches and is equipped with several semicircular lugs (18), curved plate (4) other side is equipped with along its circumferencial direction and is used for and lug (18) semicircle groove (19) being clamped.
8. a kind of pile foundation reinforcement structure according to claim 1, it is characterised in that: the connector (5) includes being connected to Lock tongue convex block (20) on the outer wall of curved plate (4) side and the hasp being connected on the outer wall of curved plate (4) other side (21), when the adjacent curved plate (4) is spliced, the hasp (21) and lock tongue convex block (20) are clamped.
9. a kind of pile foundation reinforcement structure according to claim 1, it is characterised in that: the height for adjusting steel bushing (23) is small Height in steel bushing (3).
10. a kind of pile foundation reinforcement structure according to claim 1, it is characterised in that: the first section steel bushing of the sleeve (2) (3) bottom end is equipped with blade foot (22).
CN201820742055.3U 2018-05-17 2018-05-17 A kind of pile foundation reinforcement structure Expired - Fee Related CN208395694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820742055.3U CN208395694U (en) 2018-05-17 2018-05-17 A kind of pile foundation reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820742055.3U CN208395694U (en) 2018-05-17 2018-05-17 A kind of pile foundation reinforcement structure

Publications (1)

Publication Number Publication Date
CN208395694U true CN208395694U (en) 2019-01-18

Family

ID=65136696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820742055.3U Expired - Fee Related CN208395694U (en) 2018-05-17 2018-05-17 A kind of pile foundation reinforcement structure

Country Status (1)

Country Link
CN (1) CN208395694U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725309A (en) * 2019-09-10 2020-01-24 东南大学 Pile casing structure for treating necking problem at top of foundation pile and construction method
CN110725239A (en) * 2019-10-16 2020-01-24 张海亮 Modular bridge pile foundation reinforcing apparatus
CN111733690A (en) * 2020-05-27 2020-10-02 黑龙江建筑职业技术学院 Pier reinforcing device and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725309A (en) * 2019-09-10 2020-01-24 东南大学 Pile casing structure for treating necking problem at top of foundation pile and construction method
CN110725239A (en) * 2019-10-16 2020-01-24 张海亮 Modular bridge pile foundation reinforcing apparatus
CN111733690A (en) * 2020-05-27 2020-10-02 黑龙江建筑职业技术学院 Pier reinforcing device and construction method thereof

Similar Documents

Publication Publication Date Title
CN208395694U (en) A kind of pile foundation reinforcement structure
CN209670120U (en) A kind of precast shear wall
CN206189455U (en) Piping lane
CN109024870A (en) The connection structure and its construction method of assembled underground structure vertical member
CN208039480U (en) The connection structure of assembling type outer wall and ground base
CN110331716A (en) The construction method of the splicing construction of vertical splicing prefabricated pile and vertical splicing prefabricated pile
CN108316343A (en) Underground pipe gallery removable support template and its construction method
CN215106098U (en) Prefabricated post connection structure
CN206693265U (en) A kind of installation node of piping lane
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN110499752A (en) Assembled underground continuous wall
CN208762966U (en) The connected structure of asphalt concrete face slab and geomembrane
CN216339663U (en) A assembled reinforced earth retaining wall structure for high fill highway subgrade
CN205999942U (en) Simple light rubber fastening band
CN214329006U (en) Waterproof structure for deformation joint of pipe gallery bottom plate
CN209665721U (en) A kind of Precast T-Beam anchored end formwork for placing
CN209760610U (en) Grouting sleeve
CN209260715U (en) A kind of sliding form apparatus pouring small area and small size inclination concrete slab
CN209620049U (en) A kind of pin-connected panel anchor bolt frame girder construction
CN113982032A (en) A assembled reinforced earth retaining wall structure for high fill highway subgrade
CN113028139A (en) Combined type connector of rain and sewage pipe and construction method
CN210767503U (en) Hard crossbeam steel column convenient to installation
CN203238672U (en) Advance sealing structure of basement outer wall sedimentation post-pouring joint
CN218204580U (en) Cold joint waterproof device for underground engineering construction
CN206591552U (en) A kind of device for pile foundation repairing and reinforcing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190118

CF01 Termination of patent right due to non-payment of annual fee