CN108035353A - A kind of prestressed concrete pipe pile stake core hole cleaning device - Google Patents

A kind of prestressed concrete pipe pile stake core hole cleaning device Download PDF

Info

Publication number
CN108035353A
CN108035353A CN201810054129.9A CN201810054129A CN108035353A CN 108035353 A CN108035353 A CN 108035353A CN 201810054129 A CN201810054129 A CN 201810054129A CN 108035353 A CN108035353 A CN 108035353A
Authority
CN
China
Prior art keywords
cleaning device
main shaft
core hole
hole cleaning
prestressed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810054129.9A
Other languages
Chinese (zh)
Inventor
刘喜峰
翟桂庆
赵飞
乔艳斌
李志伟
梁晓东
乔燕丽
王东
李萍
刘光宇
尹亚伟
魏帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Engineering Co Ltd
Original Assignee
Shanxi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Engineering Co Ltd filed Critical Shanxi Construction Engineering Co Ltd
Priority to CN201810054129.9A priority Critical patent/CN108035353A/en
Publication of CN108035353A publication Critical patent/CN108035353A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Present invention relates particularly to a kind of prestressed concrete pipe pile stake core hole cleaning device, mainly solve existing PHC pipe piles in-core and pour into the technical problems such as substantial amounts of soil is not easy to dig out, labor intensity is big, work efficiency is low, construction quality is poor, pollution environment, tube wall soil are not easily cleaned.The present invention includes turning handle, transmission rod, main shaft, casing, and two sector peace shaped steel wire brush, have the advantages that easy to operate, simple in structure, easily to make.

Description

A kind of prestressed concrete pipe pile stake core hole cleaning device
Technical field
The invention belongs to construction engineering technical field, and in particular to a kind of prestressed concrete pipe pile stake core hole cleaning device.
Background technology
PHC pile piles due to bearing capacity of single pile it is high, easy for construction the advantages that, the application in engineering is more and more extensive.PHC is managed Stake can pour into substantial amounts of soil during piling construction with stake core inner in rest period and digging process, after pile crown amputation, The debris such as the soil in stake holes, mud need to be cleaned out, since stake holes aperture is smaller (aperture 20cm), draw and dig depth 3m, iron Shovel hardly enters the deeper internal debris of stake holes cleaning, and Luoyang Spade easily makes debris sink, is not easy to dig out, using high pressure when clearing up mud Water rinses and is also easy to produce mud, causes the shortcomings of labor intensity is big, work efficiency is low, construction quality is poor, pollution environment, or even sometimes Also leave hidden danger of quality.
The content of the invention
Present invention aim to address existing PHC pipe piles in-core pour into substantial amounts of soil is not easy to dig out, labor intensity is big, A kind of technical problems such as work efficiency is low, construction quality is poor, pollution environment, tube wall soil are not easily cleaned, there is provided prestressed concrete Native pipe pile core hole cleaning device.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of prestressed concrete pipe pile stake core hole cleaning device, including turning handle, transmission rod, main shaft, casing and two sectors Blade, is equipped with sawtooth at the fan-shaped edge of described two sectors, and the turning handle is located at the top of transmission rod, under transmission rod End is connected with the upper end of main shaft, and the lower end of main shaft and the upper end of casing connect, and what two sectors docked is located under casing End, and two sectors is mutually staggered, sawtooth, and two sector mistakes are equipped with the fan-shaped edge of two sectors Certain angle is opened, is conducive to the present apparatus and screws in soil layer, and the lifting of soil.
Further, the prestressed concrete pipe pile stake core hole cleaning device further includes flat pattern wire brush, and flat pattern wire brush is set On the top of main shaft, for clearing up pile pile inner wall.
Further, the angle that described two sectors mutually stagger is 30 °, using 30 ° of angle, is conducive to screw in Soil layer.
Further, length scale is equipped with the transmission rod, to observe the depth that the present apparatus gos deep into soil layer.
Further, between the turning handle and transmission rod, between transmission rod and main shaft, between flat pattern wire brush and main shaft, Using being threadedly coupled between main shaft and casing, the length of the present apparatus, and disassembly and assembly are conveniently adjusted.
The dimension data that above-mentioned pile for prestressed pipe hole cleaning device part uses can be repaiied according to actual demands of engineering Change, make.
The present invention uses above-mentioned simple scheme, draws and digs depth when be 3m, takes the special narrow spade that struggles against first by below pile crown Soil clears out in 500mm depth boundses, and turning handle, transmission rod, flat pattern wire brush, main shaft then are assembled into 1.5m devices native clearly stretches Enter stake holes internal pressure underground layer, rotate clockwise rotation turning handle, instrument, into underground layer about 100mm, transmission rod is erected with number of revolutions Straight rise to exposes pile crown, clears up on blade and carries out lower step soil digging after soil, when under soil digging to stake holes at 1.2m, spreading transmission rod To 2.2m long, with being continuously increased for clear native depth, every time during clear soil, flat pattern wire brush clears up pile pile inner wall, weight Multiple above flow, until soil is cleared up to designed elevation in stake holes, it is very convenient quick.Solves existing PHC pipe piles in-core Pour into that substantial amounts of soil is not easy to dig out, labor intensity is big, work efficiency is low, construction quality is poor, pollution environment, tube wall soil are not easy The technical problems such as cleaning.Therefore, compared with background technology, the present invention have it is easy to operate, simple in structure, easily make etc. it is excellent Point.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention.
Embodiment
Patent of the present invention is further described below in conjunction with shown in attached drawing.
A kind of prestressed concrete pipe pile stake core hole cleaning device, including turning handle 1, transmission rod 2, main shaft 3, casing 5 and two Sector 6, is equipped with length scale on the transmission rod, and sawtooth is equipped with the fan-shaped edge of described two sectors 6, The turning handle 1 is located at the top of transmission rod 2, and the lower end of transmission rod 2 is connected with the upper end of main shaft 3, lower end and the casing 5 of main shaft 3 Upper end connection, what two sectors 6 docked is located at the lower end of casing 5, and two sectors 6 is mutually staggered 30 ° Angle;The prestressed concrete pipe pile stake core hole cleaning device further includes flat pattern wire brush 4, and flat pattern wire brush 4 is located at main shaft 3 Top.Between the turning handle 1 and transmission rod 2, between transmission rod 2 and main shaft 3, between flat pattern wire brush 4 and main shaft 3, main shaft 3 Use and be threadedly coupled between casing 5.

Claims (5)

  1. A kind of 1. prestressed concrete pipe pile stake core hole cleaning device, it is characterised in that:Including turning handle (1), transmission rod (2), main shaft (3), casing (5) and two sectors (6), sawtooth, the turning handle are equipped with the fan-shaped edge of described two sectors (6) (1) top of transmission rod (2) is located at, the lower end of transmission rod (2) is connected with the upper end of main shaft (3), the lower end of main shaft (3) and casing (5) upper end connection, what two sectors (6) were docked is located at the lower end of casing (5), and makes two sectors (6) mutual Stagger.
  2. A kind of 2. prestressed concrete pipe pile stake core hole cleaning device according to claim 1, it is characterised in that:It is described it is pre- should Power concrete tubular pile stake core hole cleaning device further includes flat pattern wire brush (4), and flat pattern wire brush (4) is located at the top of main shaft (3).
  3. A kind of 3. prestressed concrete pipe pile stake core hole cleaning device according to claim 2, it is characterised in that:It is described two The angle that sector (6) mutually staggers is 30 °.
  4. A kind of 4. prestressed concrete pipe pile stake core hole cleaning device according to claim 3, it is characterised in that:In the biography Power bar (2) is equipped with length scale.
  5. 5. according to a kind of prestressed concrete pipe pile stake core hole cleaning device of claim 1-4 any one of them, it is characterised in that: Between the turning handle (1) and transmission rod (2), between transmission rod (2) and main shaft (3), between flat pattern wire brush (4) and main shaft (3), Use and be threadedly coupled between main shaft (3) and casing (5).
CN201810054129.9A 2018-01-19 2018-01-19 A kind of prestressed concrete pipe pile stake core hole cleaning device Pending CN108035353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810054129.9A CN108035353A (en) 2018-01-19 2018-01-19 A kind of prestressed concrete pipe pile stake core hole cleaning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810054129.9A CN108035353A (en) 2018-01-19 2018-01-19 A kind of prestressed concrete pipe pile stake core hole cleaning device

Publications (1)

Publication Number Publication Date
CN108035353A true CN108035353A (en) 2018-05-15

Family

ID=62096925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810054129.9A Pending CN108035353A (en) 2018-01-19 2018-01-19 A kind of prestressed concrete pipe pile stake core hole cleaning device

Country Status (1)

Country Link
CN (1) CN108035353A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114753369A (en) * 2022-04-29 2022-07-15 中冶建工集团有限公司 Cleaning equipment for hollow pipe pile
CN116220038A (en) * 2023-04-07 2023-06-06 中国十七冶集团有限公司 Assembled prestressed concrete pipe pile core cleaning device and application method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201952802U (en) * 2011-03-01 2011-08-31 中国华冶科工集团有限公司 Pile hole cleaning tool for concrete tubular pile
CN105862864A (en) * 2015-12-28 2016-08-17 上海建工七建集团有限公司 Construction method for clearing soil on pile top of pre-stressed concrete pipe pile
CN206681011U (en) * 2017-03-07 2017-11-28 中国二十冶集团有限公司 Pile tube stake holes cleaning device for inner wall
CN206706764U (en) * 2017-04-28 2017-12-05 中铁建工集团有限公司 A kind of adjustable pile tube borehole cleaning instrument

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201952802U (en) * 2011-03-01 2011-08-31 中国华冶科工集团有限公司 Pile hole cleaning tool for concrete tubular pile
CN105862864A (en) * 2015-12-28 2016-08-17 上海建工七建集团有限公司 Construction method for clearing soil on pile top of pre-stressed concrete pipe pile
CN206681011U (en) * 2017-03-07 2017-11-28 中国二十冶集团有限公司 Pile tube stake holes cleaning device for inner wall
CN206706764U (en) * 2017-04-28 2017-12-05 中铁建工集团有限公司 A kind of adjustable pile tube borehole cleaning instrument

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114753369A (en) * 2022-04-29 2022-07-15 中冶建工集团有限公司 Cleaning equipment for hollow pipe pile
CN114753369B (en) * 2022-04-29 2024-03-29 中冶建工集团有限公司 Cleaning equipment for hollow pipe pile
CN116220038A (en) * 2023-04-07 2023-06-06 中国十七冶集团有限公司 Assembled prestressed concrete pipe pile core cleaning device and application method thereof

Similar Documents

Publication Publication Date Title
CN206554077U (en) A kind of stake holes cleaning equipment
CN203546783U (en) Fish-pond dredging device
CN108035353A (en) A kind of prestressed concrete pipe pile stake core hole cleaning device
CN202969389U (en) Spiral shovel for clearing soil of pile core
CN205171521U (en) A device that is used for tubular pile stake core to clear up
CN201074340Y (en) Pile-drawing machine
CN1462827A (en) Construction for making piles and tools
CN113482140B (en) Municipal works sewer desilting device
CN204491591U (en) A kind of triaxial cement mixing pile pile-forming equipment
CN107803942B (en) Square pile linear cutting equipment and mechanical excavation method for square piles in hard rock stratum
CN208009432U (en) A kind of prestressed concrete pipe pile stake core hole cleaning device
CN113846664B (en) Continuous soil-taking and sinking machine for non-drainage open caisson
CN207567772U (en) A kind of filling stake cleaning plant of drilling
CN101906778B (en) Construction site tubular pile muddredger and manufacturing method thereof
CN203948024U (en) The latent horizontal square hole rig that revolves of formula
CN211646306U (en) Water conservancy river course floater interception cleaning device
CN211547838U (en) Pile foundation sounding pipe pull throughs
CN206457823U (en) A kind of device for clearing up Prefabricated hollow pile stake core
CN205776226U (en) Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation
CN206591521U (en) Tubular pile device of fetching earth
CN221074195U (en) Rotary drilling rig drill bit soil sampling device
CN107859483B (en) Road side horizontal drilling device
CN216225626U (en) Quick cleaning device of steel sheet pile
CN206681011U (en) Pile tube stake holes cleaning device for inner wall
CN217870478U (en) Simple detachable pipe pile core sludge removal tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 030006 9-12, C block 32, South Pingyang Road, Xiaodian District, Taiyuan, Shanxi.

Applicant after: SHANXI CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 030006 9-12, C block 32, South Pingyang Road, Xiaodian District, Taiyuan, Shanxi.

Applicant before: SHANXI CONSTRUCTION ENGINEERING Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180515