CN205776226U - Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation - Google Patents

Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation Download PDF

Info

Publication number
CN205776226U
CN205776226U CN201620519082.5U CN201620519082U CN205776226U CN 205776226 U CN205776226 U CN 205776226U CN 201620519082 U CN201620519082 U CN 201620519082U CN 205776226 U CN205776226 U CN 205776226U
Authority
CN
China
Prior art keywords
steel
drilling rod
prefabricated tubular
rotation
spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620519082.5U
Other languages
Chinese (zh)
Inventor
冯敏
程建军
周广惠
全有维
黄蜂
嵇旭东
彭超
李杨
傅曼璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201620519082.5U priority Critical patent/CN205776226U/en
Application granted granted Critical
Publication of CN205776226U publication Critical patent/CN205776226U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a kind of rotation and dig formula prefabricated tubular pile stake core soil sampler, cut soil blade including drilling rod, handle, wing plate, steel thimble, steel pile casting and spiral;Steel thimble is arranged in steel pile casting by wing plate, and steel thimble and steel pile casting are positioned on same axial line;Drilling rod passes steel thimble, and handle and spiral are cut soil blade and be respectively arranged on the two ends up and down of drilling rod.This soil sampler is able to ensure that spiral is cut soil blade and is always positioned at, at the stake core of prefabricated tubular pile, not havinging deviation in going down process, it is ensured that normal rotation is fetched earth, improve and remove earth, the construction effect of laitance in stake holes, while ensureing that detail design requires, save labour cost, reduce the cost.

Description

Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation
Technical field
This utility model relates to a kind of soil sampler, a kind of soil sampler for excavating prefabricated tubular pile stake in-core earth.
Background technology
Prefabricated tubular pile is widely used a kind of deep foundation type in architectural engineering pile foundation construction, foundation pile and the cushion cap being connected in stake top collectively constitute.It is the important working procedure that stake couples in bearing platform construction technical process that core is filled out on stake top.In needing before core is filled out on stake top first by stake holes, earth, laitance are cleaned out, it is ensured that the pouring quality of wadding weft variation.
The height of prefabricated tubular pile code requirement stake top wadding weft variation is not less than 3D, and not less than 1.5m.Generally in removing pile tube stake holes, the method for earth is that the method using artificial hand-held wire brush is cleared up, and pipe pile core diameter is less, stake core soil digging difficulty, labor intensity is big, inefficiency, and speed of application is slow, stake holes inner wall cleaning effect is undesirable, it is difficult to meet the requirement of detail design.
Utility model content
Utility model purpose: a kind of soil sampler that can be excavated by the earth of prefabricated tubular pile stake in-core is provided.
Technical scheme: formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation described in the utility model, cuts soil blade including drilling rod, handle, wing plate, steel thimble, steel pile casting and spiral;Steel thimble is arranged in steel pile casting by wing plate, and steel thimble and steel pile casting are positioned on same axial line;Drilling rod passes steel thimble, and handle and spiral are cut soil blade and be respectively arranged on the two ends up and down of drilling rod.
Use and steel thimble and steel pile casting are arranged on same axial line, it can be ensured that spiral is cut soil blade and is always positioned at, at the stake core of prefabricated tubular pile, not havinging deviation in going down process, it is ensured that normal rotation is fetched earth;Using spiral to cut, soil blade is both convenient rotates mining clay, and it is relatively labor-saving to use ratio, is suitable for cylindrical stake core and fetches earth use;Handle and spiral are cut soil blade and are respectively arranged on the two ends up and down of drilling rod by employing, it is possible to conveniently fetch earth manually, spacing to two ends of drill again, prevent steel pile casting from coming off from drilling rod;Use steel pile casting to have interim storage concurrently and cut the function of the soil body, it is simple to spoir.
As further restriction scheme of the present utility model, in drilling rod upper end at least provided with two handles.Use at least two handle that many people can be facilitated to operate, be also convenient for fetching earth of different depth simultaneously, effectively strengthen efficiency of construction.
As further restriction scheme of the present utility model, wing plate is three pieces altogether, and three blocks of wing plates are arranged between steel thimble and steel pile casting in 120 ° mutually.Use three blocks of wing plates mutually in 120 ° of settings, effectively strengthen the structural stability between steel thimble and steel pile casting.
As further restriction scheme of the present utility model, it is matched in clearance between drilling rod and steel thimble.Use matched in clearance to be able to ensure that drilling rod can slide axially in steel thimble up and down, but limit and radially rock.
This utility model is compared with prior art, it provides the benefit that: (1) uses and steel thimble and steel pile casting is arranged on same axial line, it is able to ensure that spiral is cut soil blade and is always positioned at, at the stake core of prefabricated tubular pile, not havinging deviation in going down process, it is ensured that normal rotation is fetched earth;(2) using spiral to cut, soil blade is both convenient rotates mining clay, and it is relatively labor-saving to use ratio, is suitable for cylindrical stake core and fetches earth use;(3) use and handle and spiral cut soil blade be respectively arranged on the two ends up and down of drilling rod, it is possible to convenient fetch earth manually, spacing to two ends of drill again, prevent steel pile casting from coming off from drilling rod;(4) use steel pile casting to have interim storage concurrently and cut the function of the soil body, it is simple to spoir.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is steel pile casting structural representation of the present utility model.
In figure: 1, drilling rod, 2, handle, 3, wing plate, 4, steel thimble, 5, steel pile casting, 6, spiral cut soil blade.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model is not limited to described embodiment.
Embodiment 1:
Formula prefabricated tubular pile stake core soil sampler is dug in rotation of the present utility model, be based on Traditional Man brushing stake holes earth, laitance on the basis of, rotation is coordinated to dig the use of formula prefabricated tubular pile stake core soil sampler, improve and remove earth, the construction effect of laitance in stake holes, while ensureing that detail design requires, save labour cost, reduce the cost.
As illustrated in fig. 1 and 2, rotation of the present utility model is dug formula prefabricated tubular pile stake core soil sampler and is included: soil blade 6 cut by drilling rod 1, handle 2, wing plate 3, steel thimble 4, steel pile casting 5 and spiral.
Wherein, steel thimble 4 is arranged in steel pile casting 5 by wing plate 3, and steel thimble 4 and steel pile casting 5 are positioned on same axial line;Drilling rod 1 is through steel thimble 4, and handle 2 and spiral are cut soil blade 6 and be respectively arranged on the two ends up and down of drilling rod 1;In drilling rod 1 upper end at least provided with two handles 2;Wing plate 3 is three pieces altogether, and three blocks of wing plates 3 are arranged between steel thimble 4 and steel pile casting 5 in 120 ° mutually;It it is matched in clearance between drilling rod 1 and steel thimble 4.
Rotation of the present utility model dig formula prefabricated tubular pile stake core soil sampler make time, specific requirement is:
1, steel pile casting 5 uses the coating steel pipe of diameter 200mm to make, wall thickness 2mm, cylinder height is 400mm, also the external diameter of used steel pile casting 5 can be determined according to practice of construction stake in-core footpath, the external diameter of steel pile casting 5 is slightly less than an in-core footpath, steel pile casting 5 combines wing plate 3 for fixing drilling rod 1, has interim storage concurrently and cuts the function of the soil body, it is simple to spoir;
2, drilling rod 1 uses a diameter 20mm, the screw-thread steel of long 2500mm to be made, and is inside through at steel pile casting 5, centrage and steel pile casting 5 dead in line, by being fixed on the handle 2 of drilling rod 1, spiral is cut soil blade 6 and carries out rotary cutting soil;
3, spiral is cut soil blade 6 and is made up of the steel plate that 2mm is thick, and spiral is cut soil blade 6 external diameter and is slightly less than steel pile casting 5 internal diameter, and blade is horizontal by 30 ° of inclination angles, and spiral cuts soil blade 5 center weld in position, drilling rod 1 termination, it is simple to rotates and cuts a core soil body;
4, handle 2 is 500mm by the screw-thread steel spacing of four diameter 20mm, long 300mm, and centrosymmetry is welded in drilling rod 1 the other end, is that a core carries out rotating screw when fetching earth and cuts the hand-held augmentor of soil blade 6, four handles 2 fetching earth for different depth;
5, fixed-wing is made up of three wing plates 3 and a steel thimble 4, wing plate 3 uses the 2mm wall thickness steel plate that size is square for 10 × 10mm to make, three wing plates 3 are mutually 120 ° of angles, two-way welding is in steel pile casting 5 and steel thimble 4, steel thimble 4 uses internal diameter 22mm, the steel pipe of wall thickness 2mm to make, and steel thimble 4 axis centre overlaps with drilling rod 1 axis centre, the motion in drilling rod 1 horizontal plane direction fixed by steel thimble 4, but is not intended to the activity of its vertical direction;
6, the material of steel pile casting 5, diameter can consider making according to on-site actual situations.
The formula prefabricated tubular pile stake core soil sampler concrete operations flow process when construction is dug in rotation of the present utility model:
1, rotation is dug and needed for formula prefabricated tubular pile stake core soil sampler is placed in, fill out the position that core fetches earth, hand-held handle 2, adjust the position of drilling rod 1 and steel pile casting 5, make pile center substantially overlap with drilling rod 1 axis, foot steps on steel pile casting 5, makes steel pile casting 5 base opening nip a core soil body;
2, both hands gripping handles 2, afterburning by handle 2, turn clockwise drilling rod 1, drives the spiral being welded on drilling rod 1 to cut soil blade 6 and cuts the stake core soil body, by the handle 2 of afterburning diverse location, the soil body carries out the cutting of different depth;
3, cutting going deep into of the stake core soil body along with soil blade 6 cut by spiral, auxiliary foot steps on steel pile casting 5, fetches earth.
Although as it has been described above, represented and described the present invention with reference to specific preferred embodiment, but it shall not be construed as the restriction to the present invention self.Under the spirit and scope of the present invention premise defined without departing from claims, can various changes can be made in the form and details to it.

Claims (4)

1. formula prefabricated tubular pile stake core soil sampler is dug in a rotation, it is characterised in that: include that soil blade (6) cut by drilling rod (1), handle (2), wing plate (3), steel thimble (4), steel pile casting (5) and spiral;Steel thimble (4) is arranged in steel pile casting (5) by wing plate (3), and steel thimble (4) and steel pile casting (5) are positioned on same axial line;Drilling rod (1) passes steel thimble (4), and handle (2) and spiral are cut soil blade (6) and be respectively arranged on the two ends up and down of drilling rod (1).
Formula prefabricated tubular pile stake core soil sampler is dug in rotation the most according to claim 1, it is characterised in that: in drilling rod (1) upper end at least provided with two handles (2).
Formula prefabricated tubular pile stake core soil sampler is dug in rotation the most according to claim 1 and 2, it is characterised in that: wing plate (3) is three pieces altogether, and three pieces of wing plates (3) are arranged between steel thimble (4) and steel pile casting (5) in 120 ° mutually.
Formula prefabricated tubular pile stake core soil sampler is dug in rotation the most according to claim 1 and 2, it is characterised in that: it is matched in clearance between drilling rod (1) and steel thimble (4).
CN201620519082.5U 2016-05-31 2016-05-31 Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation Active CN205776226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620519082.5U CN205776226U (en) 2016-05-31 2016-05-31 Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620519082.5U CN205776226U (en) 2016-05-31 2016-05-31 Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation

Publications (1)

Publication Number Publication Date
CN205776226U true CN205776226U (en) 2016-12-07

Family

ID=58135709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620519082.5U Active CN205776226U (en) 2016-05-31 2016-05-31 Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation

Country Status (1)

Country Link
CN (1) CN205776226U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254932A (en) * 2020-03-19 2020-06-09 华质建设集团有限公司 Tubular pile core cleaning tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254932A (en) * 2020-03-19 2020-06-09 华质建设集团有限公司 Tubular pile core cleaning tool
CN111254932B (en) * 2020-03-19 2021-04-30 华质建设集团有限公司 Tubular pile core cleaning tool

Similar Documents

Publication Publication Date Title
JP6144542B2 (en) Nakabori excavator
CN101851922B (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN109653682A (en) Bore the adjustable drill bit of diameter and hole digging machine
CN102108706A (en) Simple manual spiral earth fetching device for reinforcing pile core of pre-stressed pipe pile
CN105113488B (en) Construction method of multi-head minor-diameter long-spiral drilling machine in cast-in-situ major-diameter tubular pile
CN102966094B (en) Method for constructing concrete pile through rotary excavating and pressure irrigation
CN204000852U (en) Many row's multi-shaft cement agitation pile rigs
CN205776226U (en) Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation
CN204199289U (en) A kind of pipe pile core mud cleaning tool
CN106894460A (en) Instrument of soil and preparation method thereof in a kind of quick cleaning Spiral digging machine drilling bucket
CN202946012U (en) Sleeving spiral drilling machine for pile head processing
CN109610494A (en) A kind of embedding rock construction technology of large-diameter pile foundation
CN108035353A (en) A kind of prestressed concrete pipe pile stake core hole cleaning device
CN204080794U (en) A kind of band is from the scalable guide rod of decontamination function
CN203768909U (en) Prefabricated tubular pile inner core hole cleaning tool
CN203846496U (en) Self-lock device for pulling timber piles
CN208563419U (en) A kind of set digging device
CN104110032A (en) Large-diameter hollow-cavity long-spiral thin-wall bored concrete pile casing
CN202936814U (en) Prefabricated reinforced concrete pipe pile core cleaning shovel
CN206319329U (en) A kind of water-stop curtain constructing device
CN206457823U (en) A kind of device for clearing up Prefabricated hollow pile stake core
CN204023564U (en) The long spiral thin wall filling pile of major diameter cavity pipe casing
CN218373858U (en) Clear device of drawing of earth in precast tubular pile head
CN203684212U (en) Simple foundation processing pile
CN220538742U (en) Pit digging device for municipal road soft foundation construction