- CN205776226U CN205776226U CN201620519082.5U CN201620519082U CN205776226U CN 205776226 U CN205776226 U CN 205776226U CN 201620519082 U CN201620519082 U CN 201620519082U CN 205776226 U CN205776226 U CN 205776226U
- Authority
- CN
- China
- Prior art keywords
- steel
- drilling rod
- prefabricated tubular
- rotation
- spiral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model discloses a kind of rotation and dig formula prefabricated tubular pile stake core soil sampler, cut soil blade including drilling rod, handle, wing plate, steel thimble, steel pile casting and spiral;Steel thimble is arranged in steel pile casting by wing plate, and steel thimble and steel pile casting are positioned on same axial line;Drilling rod passes steel thimble, and handle and spiral are cut soil blade and be respectively arranged on the two ends up and down of drilling rod.This soil sampler is able to ensure that spiral is cut soil blade and is always positioned at, at the stake core of prefabricated tubular pile, not havinging deviation in going down process, it is ensured that normal rotation is fetched earth, improve and remove earth, the construction effect of laitance in stake holes, while ensureing that detail design requires, save labour cost, reduce the cost.
Description
Technical field
This utility model relates to a kind of soil sampler, a kind of soil sampler for excavating prefabricated tubular pile stake in-core earth.
Background technology
Prefabricated tubular pile is widely used a kind of deep foundation type in architectural engineering pile foundation construction, foundation pile and the cushion cap being connected in stake top collectively constitute.It is the important working procedure that stake couples in bearing platform construction technical process that core is filled out on stake top.In needing before core is filled out on stake top first by stake holes, earth, laitance are cleaned out, it is ensured that the pouring quality of wadding weft variation.
The height of prefabricated tubular pile code requirement stake top wadding weft variation is not less than 3D, and not less than 1.5m.Generally in removing pile tube stake holes, the method for earth is that the method using artificial hand-held wire brush is cleared up, and pipe pile core diameter is less, stake core soil digging difficulty, labor intensity is big, inefficiency, and speed of application is slow, stake holes inner wall cleaning effect is undesirable, it is difficult to meet the requirement of detail design.
Utility model content
Utility model purpose: a kind of soil sampler that can be excavated by the earth of prefabricated tubular pile stake in-core is provided.
Technical scheme: formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation described in the utility model, cuts soil blade including drilling rod, handle, wing plate, steel thimble, steel pile casting and spiral;Steel thimble is arranged in steel pile casting by wing plate, and steel thimble and steel pile casting are positioned on same axial line;Drilling rod passes steel thimble, and handle and spiral are cut soil blade and be respectively arranged on the two ends up and down of drilling rod.
Use and steel thimble and steel pile casting are arranged on same axial line, it can be ensured that spiral is cut soil blade and is always positioned at, at the stake core of prefabricated tubular pile, not havinging deviation in going down process, it is ensured that normal rotation is fetched earth;Using spiral to cut, soil blade is both convenient rotates mining clay, and it is relatively labor-saving to use ratio, is suitable for cylindrical stake core and fetches earth use;Handle and spiral are cut soil blade and are respectively arranged on the two ends up and down of drilling rod by employing, it is possible to conveniently fetch earth manually, spacing to two ends of drill again, prevent steel pile casting from coming off from drilling rod;Use steel pile casting to have interim storage concurrently and cut the function of the soil body, it is simple to spoir.
As further restriction scheme of the present utility model, in drilling rod upper end at least provided with two handles.Use at least two handle that many people can be facilitated to operate, be also convenient for fetching earth of different depth simultaneously, effectively strengthen efficiency of construction.
As further restriction scheme of the present utility model, wing plate is three pieces altogether, and three blocks of wing plates are arranged between steel thimble and steel pile casting in 120 ° mutually.Use three blocks of wing plates mutually in 120 ° of settings, effectively strengthen the structural stability between steel thimble and steel pile casting.
As further restriction scheme of the present utility model, it is matched in clearance between drilling rod and steel thimble.Use matched in clearance to be able to ensure that drilling rod can slide axially in steel thimble up and down, but limit and radially rock.
This utility model is compared with prior art, it provides the benefit that: (1) uses and steel thimble and steel pile casting is arranged on same axial line, it is able to ensure that spiral is cut soil blade and is always positioned at, at the stake core of prefabricated tubular pile, not havinging deviation in going down process, it is ensured that normal rotation is fetched earth;(2) using spiral to cut, soil blade is both convenient rotates mining clay, and it is relatively labor-saving to use ratio, is suitable for cylindrical stake core and fetches earth use;(3) use and handle and spiral cut soil blade be respectively arranged on the two ends up and down of drilling rod, it is possible to convenient fetch earth manually, spacing to two ends of drill again, prevent steel pile casting from coming off from drilling rod;(4) use steel pile casting to have interim storage concurrently and cut the function of the soil body, it is simple to spoir.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is steel pile casting structural representation of the present utility model.
In figure: 1, drilling rod, 2, handle, 3, wing plate, 4, steel thimble, 5, steel pile casting, 6, spiral cut soil blade.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model is not limited to described embodiment.
Embodiment 1:
Formula prefabricated tubular pile stake core soil sampler is dug in rotation of the present utility model, be based on Traditional Man brushing stake holes earth, laitance on the basis of, rotation is coordinated to dig the use of formula prefabricated tubular pile stake core soil sampler, improve and remove earth, the construction effect of laitance in stake holes, while ensureing that detail design requires, save labour cost, reduce the cost.
As illustrated in fig. 1 and 2, rotation of the present utility model is dug formula prefabricated tubular pile stake core soil sampler and is included: soil blade 6 cut by drilling rod 1, handle 2, wing plate 3, steel thimble 4, steel pile casting 5 and spiral.
Wherein, steel thimble 4 is arranged in steel pile casting 5 by wing plate 3, and steel thimble 4 and steel pile casting 5 are positioned on same axial line;Drilling rod 1 is through steel thimble 4, and handle 2 and spiral are cut soil blade 6 and be respectively arranged on the two ends up and down of drilling rod 1;In drilling rod 1 upper end at least provided with two handles 2;Wing plate 3 is three pieces altogether, and three blocks of wing plates 3 are arranged between steel thimble 4 and steel pile casting 5 in 120 ° mutually;It it is matched in clearance between drilling rod 1 and steel thimble 4.
Rotation of the present utility model dig formula prefabricated tubular pile stake core soil sampler make time, specific requirement is:
1, steel pile casting 5 uses the coating steel pipe of diameter 200mm to make, wall thickness 2mm, cylinder height is 400mm, also the external diameter of used steel pile casting 5 can be determined according to practice of construction stake in-core footpath, the external diameter of steel pile casting 5 is slightly less than an in-core footpath, steel pile casting 5 combines wing plate 3 for fixing drilling rod 1, has interim storage concurrently and cuts the function of the soil body, it is simple to spoir;
2, drilling rod 1 uses a diameter 20mm, the screw-thread steel of long 2500mm to be made, and is inside through at steel pile casting 5, centrage and steel pile casting 5 dead in line, by being fixed on the handle 2 of drilling rod 1, spiral is cut soil blade 6 and carries out rotary cutting soil;
3, spiral is cut soil blade 6 and is made up of the steel plate that 2mm is thick, and spiral is cut soil blade 6 external diameter and is slightly less than steel pile casting 5 internal diameter, and blade is horizontal by 30 ° of inclination angles, and spiral cuts soil blade 5 center weld in position, drilling rod 1 termination, it is simple to rotates and cuts a core soil body;
4, handle 2 is 500mm by the screw-thread steel spacing of four diameter 20mm, long 300mm, and centrosymmetry is welded in drilling rod 1 the other end, is that a core carries out rotating screw when fetching earth and cuts the hand-held augmentor of soil blade 6, four handles 2 fetching earth for different depth;
5, fixed-wing is made up of three wing plates 3 and a steel thimble 4, wing plate 3 uses the 2mm wall thickness steel plate that size is square for 10 × 10mm to make, three wing plates 3 are mutually 120 ° of angles, two-way welding is in steel pile casting 5 and steel thimble 4, steel thimble 4 uses internal diameter 22mm, the steel pipe of wall thickness 2mm to make, and steel thimble 4 axis centre overlaps with drilling rod 1 axis centre, the motion in drilling rod 1 horizontal plane direction fixed by steel thimble 4, but is not intended to the activity of its vertical direction;
6, the material of steel pile casting 5, diameter can consider making according to on-site actual situations.
The formula prefabricated tubular pile stake core soil sampler concrete operations flow process when construction is dug in rotation of the present utility model:
1, rotation is dug and needed for formula prefabricated tubular pile stake core soil sampler is placed in, fill out the position that core fetches earth, hand-held handle 2, adjust the position of drilling rod 1 and steel pile casting 5, make pile center substantially overlap with drilling rod 1 axis, foot steps on steel pile casting 5, makes steel pile casting 5 base opening nip a core soil body;
2, both hands gripping handles 2, afterburning by handle 2, turn clockwise drilling rod 1, drives the spiral being welded on drilling rod 1 to cut soil blade 6 and cuts the stake core soil body, by the handle 2 of afterburning diverse location, the soil body carries out the cutting of different depth;
3, cutting going deep into of the stake core soil body along with soil blade 6 cut by spiral, auxiliary foot steps on steel pile casting 5, fetches earth.
Although as it has been described above, represented and described the present invention with reference to specific preferred embodiment, but it shall not be construed as the restriction to the present invention self.Under the spirit and scope of the present invention premise defined without departing from claims, can various changes can be made in the form and details to it.
Claims (4)
1. formula prefabricated tubular pile stake core soil sampler is dug in a rotation, it is characterised in that: include that soil blade (6) cut by drilling rod (1), handle (2), wing plate (3), steel thimble (4), steel pile casting (5) and spiral;Steel thimble (4) is arranged in steel pile casting (5) by wing plate (3), and steel thimble (4) and steel pile casting (5) are positioned on same axial line;Drilling rod (1) passes steel thimble (4), and handle (2) and spiral are cut soil blade (6) and be respectively arranged on the two ends up and down of drilling rod (1).
Formula prefabricated tubular pile stake core soil sampler is dug in rotation the most according to claim 1, it is characterised in that: in drilling rod (1) upper end at least provided with two handles (2).
Formula prefabricated tubular pile stake core soil sampler is dug in rotation the most according to claim 1 and 2, it is characterised in that: wing plate (3) is three pieces altogether, and three pieces of wing plates (3) are arranged between steel thimble (4) and steel pile casting (5) in 120 ° mutually.
Formula prefabricated tubular pile stake core soil sampler is dug in rotation the most according to claim 1 and 2, it is characterised in that: it is matched in clearance between drilling rod (1) and steel thimble (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620519082.5U CN205776226U (en) | 2016-05-31 | 2016-05-31 | Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620519082.5U CN205776226U (en) | 2016-05-31 | 2016-05-31 | Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205776226U true CN205776226U (en) | 2016-12-07 |
Family
ID=58135709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620519082.5U Active CN205776226U (en) | 2016-05-31 | 2016-05-31 | Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205776226U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111254932A (en) * | 2020-03-19 | 2020-06-09 | 华质建设集团有限公司 | Tubular pile core cleaning tool |
-
2016
- 2016-05-31 CN CN201620519082.5U patent/CN205776226U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111254932A (en) * | 2020-03-19 | 2020-06-09 | 华质建设集团有限公司 | Tubular pile core cleaning tool |
CN111254932B (en) * | 2020-03-19 | 2021-04-30 | 华质建设集团有限公司 | Tubular pile core cleaning tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6144542B2 (en) | Nakabori excavator | |
CN101851922B (en) | Method for eliminating underground anchor rope/rod by using all casing drill | |
CN109653682A (en) | Bore the adjustable drill bit of diameter and hole digging machine | |
CN102108706A (en) | Simple manual spiral earth fetching device for reinforcing pile core of pre-stressed pipe pile | |
CN105113488B (en) | Construction method of multi-head minor-diameter long-spiral drilling machine in cast-in-situ major-diameter tubular pile | |
CN102966094B (en) | Method for constructing concrete pile through rotary excavating and pressure irrigation | |
CN204000852U (en) | Many row's multi-shaft cement agitation pile rigs | |
CN205776226U (en) | Formula prefabricated tubular pile stake core soil sampler is dug in a kind of rotation | |
CN204199289U (en) | A kind of pipe pile core mud cleaning tool | |
CN106894460A (en) | Instrument of soil and preparation method thereof in a kind of quick cleaning Spiral digging machine drilling bucket | |
CN202946012U (en) | Sleeving spiral drilling machine for pile head processing | |
CN109610494A (en) | A kind of embedding rock construction technology of large-diameter pile foundation | |
CN108035353A (en) | A kind of prestressed concrete pipe pile stake core hole cleaning device | |
CN204080794U (en) | A kind of band is from the scalable guide rod of decontamination function | |
CN203768909U (en) | Prefabricated tubular pile inner core hole cleaning tool | |
CN203846496U (en) | Self-lock device for pulling timber piles | |
CN208563419U (en) | A kind of set digging device | |
CN104110032A (en) | Large-diameter hollow-cavity long-spiral thin-wall bored concrete pile casing | |
CN202936814U (en) | Prefabricated reinforced concrete pipe pile core cleaning shovel | |
CN206319329U (en) | A kind of water-stop curtain constructing device | |
CN206457823U (en) | A kind of device for clearing up Prefabricated hollow pile stake core | |
CN204023564U (en) | The long spiral thin wall filling pile of major diameter cavity pipe casing | |
CN218373858U (en) | Clear device of drawing of earth in precast tubular pile head | |
CN203684212U (en) | Simple foundation processing pile | |
CN220538742U (en) | Pit digging device for municipal road soft foundation construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |