CN206319329U - A kind of water-stop curtain constructing device - Google Patents

A kind of water-stop curtain constructing device Download PDF

Info

Publication number
CN206319329U
CN206319329U CN201621427248.7U CN201621427248U CN206319329U CN 206319329 U CN206319329 U CN 206319329U CN 201621427248 U CN201621427248 U CN 201621427248U CN 206319329 U CN206319329 U CN 206319329U
Authority
CN
China
Prior art keywords
drilling rod
whitewashing
jet
water
stop curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621427248.7U
Other languages
Chinese (zh)
Inventor
黄韬
张宝安
陈静
樊俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201621427248.7U priority Critical patent/CN206319329U/en
Application granted granted Critical
Publication of CN206319329U publication Critical patent/CN206319329U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a kind of water-stop curtain constructing device, including the whitewashing drilling rod and jet drilling rod vertically set, whitewashing drilling rod and jet drilling rod are hollow structure, the lower end of whitewashing drilling rod and jet drilling rod is provided with drill bit, and it is additionally provided with connection drilling rod inner chamber and outside spray orifice on whitewashing drilling rod and the side wall of jet drilling rod lower end or on drill bit, the upper end of whitewashing drilling rod and jet drilling rod is additionally provided with the drive device for driving drilling rod to rotate.To solve the problem of traditional cement mixing method technology has potential safety hazard, overcome the shortcomings of that conventional art is present well.The utility model belongs to technical field of building construction.

Description

A kind of water-stop curtain constructing device
Technical field
The utility model is related to a kind of new and effective Choice of Construction Technique of Water Stop Curtain, belongs to technical field of building construction.
Background technology
Leakage of Foundation Pit issue concerns the construction safety of base pit engineering, and water-stop curtain is control base pit engineering underground water seepage Major measure.Water-stop curtain extensive use in base pit engineering, traditional cement mixing method skill are done with cement mixing method Art Mechanization Level is low, and overlap joint quality is difficult to ensure that between every width stake stake, easily causes Leakage of Foundation Pit, there is certain potential safety hazard.
The content of the invention
The purpose of this utility model is:A kind of water-stop curtain constructing device is provided, to solve traditional Soil-cement The problem of stake technology has potential safety hazard, overcomes the shortcomings of that conventional art is present well.
To solve the above problems, intend using such a water-stop curtain constructing device, including the whitewashing vertically set to bore Bar and jet drilling rod, whitewashing drilling rod and jet drilling rod are hollow structure, and the lower end of whitewashing drilling rod and jet drilling rod is provided with Connection drilling rod inner chamber and outside spray are additionally provided with drill bit, and whitewashing drilling rod and the side wall of jet drilling rod lower end or on drill bit The upper end of hole, whitewashing drilling rod and jet drilling rod is additionally provided with the drive device for driving drilling rod to rotate.
In aforementioned means, totally three, the drilling rod of whitewashing, totally two, jet drilling rod, whitewashing drilling rod and jet drilling rod are alternately It is arranged side by side;
In aforementioned means, horizontal level of the horizontal level higher than whitewashing drilling rod lower end of jet drilling rod lower end.
The utility model additionally provides a kind of waterproof curtain construction method, including:
Step one:Installing intersection and stake position setting-out
Smooth, compacting is carried out to construction site, ground underground obstacle is removed, to facilitate equipment movement in place, verified and clear Except underground obstacle, backfill is needed for silt soil strata, back-filling in layers compacting then, water stop curtain structure is released by figure Axis, sets up interim control stake, control point is checked daily in work progress, and carry out effective protection;
Step 2:Excavate guiding storage and stay ditch
Using 0.4m3~1m3Excavator excavates working channel, when meeting underground obstacle, and big face is carried out using large-scale digging machine Product, which is deep-cut, is removed obstacles, and is finished until removing obstacles, and then backfill is compacted, and groove is excavated again;
Step 3:Positioning
The constructing device is moved on into finger fixed pile centering, two-way adjustment stake machine perpendicularity, pile foundation vertical missing is not more than 2 ‰, it is ensured that drilling rod shaft core is in place not partially, 4 10# channel-section steels depth 1.5m are driven underground in groove both sides as fixed pivot, vertically Groove direction is placed two H profile steels and is spot welded with branch, and specification is 200 × 200, is about 2.5m;
Step 4:Prepare cement mortar,
Slurries enter the configuration of tank storehouse, stirring, injection overall process intellectualized operation from bulk cement, improve the ratio of mud, cement The degree of accuracy of incorporation, cement mortar flow key index, improves mixing pile pile quality.
Step 5:Lower to bore stirring and whitewash, lower brill reaches designing pile length
Start totally-enclosed full-automatic mixing-filling system, realize the totally-enclosed of cement mortar mixing process, eliminate dust Pollution, the people of recruitment 1 ~ 2 can be reduced per machine-team by often covering system, started and sent stock pump, slurries is sprayed from the spray orifice of whitewashing drilling rod lower end And with drilling stirring after certain pressure, is started, while sending slurry pump pressure according to test pile result adjustment, it is ensured that whitewashing amount is met will Ask, the direction of rotation between rotating shaft is each other on the contrary, to realize that the control of whitewashing amount is the 70% of total amount, in drilling process from steady balance Continuous to spray into cement grout, drilling was to designing pile length original place whitewashing stirring 30 seconds, if midway pipeline blockage occurs and stopped more than 30 During minute, grouting pump and slurries transfer pipeline should be cleaned immediately, prevent slurry consolidation.
Step 6:Above propose drilling rod stirring and whitewash, above mention up to stake top
Stirring-head is inverted at the uniform velocity lifting stirring from stake end, cement grout is continuously sprayed into, up to ground, the control of whitewashing amount is The 30% of total amount, the size of grouting amount is monitored by the speed regulator mounted in operating desk and automatic instantaneous velocity meter and flow quantity recorder, is bored Head is promoted to behind ground, and reversely drilling is stirred again immediately, during stirring again, and local not enough pile body position of whitewashing is mended Slurry, and prevent that mouth spray from blocking.
Operation principle:Configure and set respectively inside five hollow drill pipes, three drilling rod whitewashings, two drilling rod jets, drilling rod There are whitewashing passage and jet channel, drilling rod front end is provided with gunniting hole, make full use of drilling rod as shotcrete pipe, swivel joint connection Grouting Pipe, slurries pass through the agitation force and compressed gas of drill bit and drilling rod blade by being injected into by Grouting Pipe in drilling rod Body is equably stirred to the cutting force of the soil body to foundation soil, is thoroughly mixed soil cement, forms continuous soil cement Wall is used as water-stop curtain.
Compared with prior art, the utility model preferably solves the construction safety technology such as water seal for deep foundation pit curtain seepage Problem, technique is advanced, globality, impermeability, good stability, intellectuality, environmental protection, reduces input and the workman of labor and materials machine Workload, shortens the duration, reduces construction costs, and the probability that reduction security incident occurs greatly reduces security incident Generation, so as to improve level of security, reached expected research effect, be from now on water-stop curtain construction be particularly similar weak soil Regional Extra-Deep Foundation Pit construction provides important foundation.Whole formation of pile digitlization, can store, can be widely applied to underground empty Between in the Choice of Construction Technique of Water Stop Curtain developed.
Brief description of the drawings
Fig. 1 is the structural representation of the constructing device;
Fig. 2 is five axle mixing pile intensity with different soil depth change curve figure.
Embodiment
, below will be by accompanying drawing to utility model to make the purpose of this utility model, technical scheme and advantage clearer It is described in further detail.
Embodiment:
With reference to Fig. 1 and 2, the present embodiment provides a kind of water-stop curtain constructing device, including three whitewashings vertically set Drilling rod 1 and two jet drilling rods 2, whitewashing drilling rod 1 and jet drilling rod 2 are alternately arranged side by side, whitewashing drilling rod 1 and jet drilling rod 2 It is hollow structure, the lower end of whitewashing drilling rod 1 and jet drilling rod 2 is provided with drill bit 3, and whitewashing drilling rod 1 and jet drilling rod 2 Connection drilling rod inner chamber and outside spray orifice 4, the horizontal level of the lower end of jet drilling rod 2 are additionally provided with the side wall at end or on drill bit 3 Higher than the horizontal level of whitewashing drilling rod 1 lower end, the upper end of whitewashing drilling rod 1 and jet drilling rod 2 is additionally provided with for driving drilling rod to turn Dynamic drive device 5.
Exemplified by positioned at Minhang District, Shanghai engineering project, 9.29 ten thousand square metres of construction area, foundation ditch area 2.16 ten thousand Square metre, 658 meters of girth, generally 2 layers basement, excavation of foundation pit depth is 8.8 ~ 12.5 meters, and foundation pit enclosure form is using brill The axle of hole pouring pile earth-retaining+five stirring pile water stopping curtain+two road reinforced concrete support(Local one of bracing members).
One, construction parameters are designed:
Cement mortar match ratio takes 1.5:1, using 42.5 grades of Portland cements, cement density is 3t/m3, soil body density Take 1.8t/m3, cement mortar proportion is 1.36kg/L, and mixing pile reference area takes 2.42 m2.The axle mixing pile of diameter phi 800 5 is overlapped Length 300mm, subsidence velocity takes 0.8m/min, and lifting speed takes 1.2m/min, drill bit every revolution lifting or sinking amount with 10 ~ 15mm is advisable.0.5 ~ 1.0MPa of grouting pressure;Reinforcing body 28d unconfined compressive strengths are not less than 0.8MPa.
Every width stake cement consumption=mixing pile reference area × effective length × soil body density × cement amount of participating in.
Two, construction technologies:
1. installing intersection:Smooth, compacting is carried out to construction site, ground underground obstacle is removed, to facilitate equipment movement just Position, is verified and removes underground obstacle, and backfill, back-filling in layers compacting are needed for silt soil strata.
2. a position setting-out:Water stop curtain structure axis is released by figure, interim control stake is set up, it is right daily in work progress Control point is checked, and carries out effective protection.
Ditch is stayed 3. excavating and being oriented to storage:Using 0.4m3~1m3Excavator excavates working channel.When meeting underground obstacle, make Large area is carried out with large-scale digging machine deep-cutting to remove obstacles, finished until removing obstacles, then backfill is compacted, and groove is excavated again.
4. positioning:Five axle mixers move on to finger fixed pile centering, and two-way adjustment stake machine perpendicularity, pile foundation vertical missing is little In 2 ‰, it is ensured that drilling rod shaft core is not in place inclined.4 10# channel-section steels depth 1.5m are driven underground in groove both sides as fixed pivot, hang down Straight flute direction is placed two H profile steels and is spot welded with branch, and specification is 200 × 200, is about 2.5m.
5. cement mortar is prepared:Slurries enter the configuration of tank storehouse, stirring, injection overall process intellectualized operation from bulk cement, improve The ratio of mud, cement mixed weight, the degree of accuracy of cement mortar flow key index, improve mixing pile pile quality.
6. filling system:With totally-enclosed full-automatic mixing-filling system, the totally-enclosed of cement mortar mixing process is realized, is disappeared Except dust pollution, the people of recruitment 1 ~ 2 can be reduced per machine-team by often covering system.
7. lower bore stirring and whitewash:Start and send stock pump, slurries spray and had after certain pressure from nozzle, start drilling and stir Mix, while sending slurry pump pressure according to test pile result adjustment, it is ensured that whitewashing amount, which is met, to be required.Direction of rotation between rotating shaft phase each other Instead, can be from surely balancing, the control of whitewashing amount is the 70% of total amount.
8. lower brill reaches designing pile length:It is continuous in drilling process to spray into cement grout, drilling to designing pile length original place spray Slurry stirring 30 seconds.If midway pipeline blockage stopping occurred more than 30 minutes, grouting pump and slurries transfer pipeline should be entered immediately Row cleaning, prevents slurry consolidation.
9. above propose drilling rod stirring and whitewash:Stirring-head is inverted at the uniform velocity lifting stirring from stake end, cement grout is continuously sprayed into, Until ground, the control of whitewashing amount is the 30% of total amount, and the size of grouting amount is by the speed regulator mounted in operating desk and automatic instantaneous velocity Meter and flow quantity recorder monitoring.
10. on mention up to stake top:Drill bit is promoted to behind ground, should reversely be crept into and be stirred again immediately, during stirring again, reply The pile body position that local whitewashing is not enough carries out benefit slurry, and prevents that mouth spray from blocking.
Three, construction monitoring results:
1. engineering time and work efficiency
The long 18.5m of cement mixing method, stake footpath φ 800, every 20 minutes width pile driving construction used times, stirring construction 8 minutes, telephone-moving 12 minutes, its work efficiency was 42.24m3/h。
2. a core detected intensities
The mixing pile that scene randomly selects 2% carries out core boring sampling, check mixing pile into pile length and uniformity.Every Stake coring quantity should not be less than at 5 points to be taken on the different depth in the long scope of full stake continuously drilled through and different soil stake core, And sample point, every 3 test blocks should be set near Foundation Pit bottom.Slip casting is answered to fill in space after the completion of boring and coring.
3. water-stagnating effect
There is no obvious EXIT POINT through observing water-stop curtain, after testing coefficient of permeability K=3.6 of 2 layers of native position soil cement × 10-6Cm/s, coefficient of permeability K=9.2 × 10 of 3 layers of native position soil cement-6Cm/s, the coefficient of permeability K of 4 layers of native position soil cement= 1.6×10-6Cm/s, is fully achieved the performance requirement of water-stop curtain.
4. the native discharge rate of displacement
12% ~ 16%, eliminate Double shaft stirring stake, three axes agitating pile displacement soil and measure big defect.
5. labour configures
Every people of five axle mixer configuration machine hand 1, slurrying and the people of filling system 1, the people of measuring point locating personnel 1, commanding 1 People.
6. deformation monitoring result
Maximum horizontal displacement 25mm at Guan Liang, deeply mixing cement-soil pile maximum point is located at excavation face, there is 38mm.
The four, scope of applications and application prospect:
Foundation ditch peripheral water stopping curtain is constructed using Novel five-axis mixing pile technology in certain project construction, every in work progress Machine-team is operated by 4 skilled workers and Pu works, and the average width of daily pile about 15, efficiency of construction is high.This project earth excavation is finished, Upon examination it is found that fender post pile body surface is more dried, foundation ditch ne-leakage phenomenon, and construction safety is secure, in work progress Any security incident is not found, and application effect is preferable.The foundation ditch peripheral water stopping curtain that this technology is applied to high building project is applied Work, is also widely used in the artificial deep-foundation pit engineering of multilayer, Super High and complicated geology.
Five, conclude the speech
Compared with conventional art, it is difficult that this technology preferably solves the construction safety such as water seal for deep foundation pit curtain seepage technology Topic, technique is advanced, and globality, impermeability, good stability, intellectuality, environmental protection reduce the input and workman's work of labor and materials machine Measure, shorten the duration, reduce construction costs, the probability that reduction security incident occurs greatly reduces security incident Occur, so as to improve level of security, reached expected research effect, be that water-stop curtain is constructed with being particularly similar weak soil from now on Area's Extra-Deep Foundation Pit construction provides important foundation.Whole formation of pile digitlization, can store, can be widely applied to the underground space In the Choice of Construction Technique of Water Stop Curtain of exploitation.

Claims (3)

1. a kind of water-stop curtain constructing device, it is characterised in that:Including the whitewashing drilling rod vertically set(1)With jet drilling rod (2), drilling rod of whitewashing(1)With jet drilling rod(2)Hollow structure is, drilling rod of whitewashing(1)With jet drilling rod(2)Lower end be respectively provided with There is drill bit(3), and whitewashing drilling rod(1)With jet drilling rod(2)On the side wall of lower end or drill bit(3)On be additionally provided with connection drilling rod in Chamber and outside spray orifice(4), drilling rod of whitewashing(1)With jet drilling rod(2)Upper end be additionally provided with for drive drilling rod rotate drive Dynamic device(5).
2. a kind of water-stop curtain constructing device according to claim 1, it is characterised in that:The whitewashing drilling rod(1)Totally three, Jet drilling rod(2)Totally two, drilling rod of whitewashing(1)With jet drilling rod(2)Alternately it is arranged side by side.
3. a kind of water-stop curtain constructing device according to claim 1, it is characterised in that:Jet drilling rod(2)The level of lower end Position is higher than whitewashing drilling rod(1)The horizontal level of lower end.
CN201621427248.7U 2016-12-23 2016-12-23 A kind of water-stop curtain constructing device Expired - Fee Related CN206319329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621427248.7U CN206319329U (en) 2016-12-23 2016-12-23 A kind of water-stop curtain constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621427248.7U CN206319329U (en) 2016-12-23 2016-12-23 A kind of water-stop curtain constructing device

Publications (1)

Publication Number Publication Date
CN206319329U true CN206319329U (en) 2017-07-11

Family

ID=59259467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621427248.7U Expired - Fee Related CN206319329U (en) 2016-12-23 2016-12-23 A kind of water-stop curtain constructing device

Country Status (1)

Country Link
CN (1) CN206319329U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024643A (en) * 2018-08-09 2018-12-18 中国地质大学(北京) A kind of water-stop curtain constructing device, equipment and waterproof curtain construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024643A (en) * 2018-08-09 2018-12-18 中国地质大学(北京) A kind of water-stop curtain constructing device, equipment and waterproof curtain construction method
CN109024643B (en) * 2018-08-09 2023-06-09 中国地质大学(北京) Waterproof curtain construction device, equipment and waterproof curtain construction method

Similar Documents

Publication Publication Date Title
CN106638643A (en) Water-stopping-curtain construction device and method
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN111396067B (en) Comprehensive shield steel sleeve receiving construction method in complex environment
CN108643948B (en) Construction method for shield to penetrate anchor cable area
CN203452083U (en) Rotary expanding pile construction equipment and grout feeding device
CN105155550B (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN111119940B (en) Grouting construction treatment method
CN108517877B (en) Supporting construction method combining consolidation grouting of hybrid filling ultra-deep foundation pit with double-row steel pipe piles
CN109595004B (en) Tunnel two-expansion four-expansion excavation method
CN111577136A (en) High-pressure jet grouting pile hole guiding construction integrated device and construction method thereof
CN108590706A (en) One kind being used for speciality single-track railway tunnel drifter with booms Construction Techniques of Grouting in Heavy Curtain
CN107299633A (en) A kind of utilization High-pressure Spiral Spray Technology improves the construction method of the bearing capacity of stake
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN1986974A (en) Pressure reducing horizontal reinforcing process for soft soil layer
CN111501781A (en) Supporting method and structure combining consolidation grouting of hybrid filling ultra-deep foundation pit with double rows of steel pipe piles
CN107338789A (en) A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake
CN110593254A (en) Construction method of cast-in-situ bored pile in stratum with karst cave in joint zone
CN108842764B (en) Rotary stirring type anchor pipe construction method
CN114319388A (en) Construction method of foundation pit enclosure structure in existing building in karst area
CN212671560U (en) High-pressure jet grouting pile hole guiding construction integrated device
CN213233469U (en) Triaxial down-the-hole impact high-pressure jet grouting equipment
CN206319329U (en) A kind of water-stop curtain constructing device
CN112252310A (en) Method for deep foundation pit waterproof curtain construction by adopting high-pressure jet grouting pile machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant