CN202969389U - Spiral shovel for clearing soil of pile core - Google Patents
Spiral shovel for clearing soil of pile core Download PDFInfo
- Publication number
- CN202969389U CN202969389U CN 201220705268 CN201220705268U CN202969389U CN 202969389 U CN202969389 U CN 202969389U CN 201220705268 CN201220705268 CN 201220705268 CN 201220705268 U CN201220705268 U CN 201220705268U CN 202969389 U CN202969389 U CN 202969389U
- Authority
- CN
- China
- Prior art keywords
- soil
- pile
- spiral shovel
- clearing
- core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
Provided is a spiral shovel for clearing soil of a pile core. In buildings adopting hollow tubular piles for constructions, tubular pile construction is generally performed before earth excavation, the pile core of a hollow tubular pile can be blocked by soil inevitably, and the soil of tubular pile needs be cleared to the designed height in the later pile extension process. The diameter of the pile core of the tubular pile is small, and soil clearing of the pile core is difficult, a large amount of labor and time are wasted, and even the working period can be influenced. The spiral shovel for clearing soil of the pile core comprises a handle (1) which is connected with a main dynamic rod (2), wherein an adjustable dynamic rod (3) is installed in the main dynamic rod and connected with an auger bit (5) through a drill bit fixing wedge (4), and lifting holes (6) are respectively arranged on the main dynamic rod and the adjustable dynamic rod. The spiral shovel can be used for clearing soil.
Description
Technical field:
The utility model relates to a kind of spiral shovel for the clear soil of stake core.
Background technology:
Adopt in the building of hollow shell pill construction, generally before soil excavation, construction hollow core pipe pile core inevitably will be blocked by the earthwork tube pile construction, stake core soil will be cleared up to design height in later stage pile extension process.Because the pipe pile core diameter is less, the clear soil of stake core is extremely difficult, consume a large amount of manpowers and time, even affects the duration.
Summary of the invention:
The purpose of this utility model is to provide a kind of spiral shovel for the clear soil of stake core, can accelerate clear native speed in the clear native process of hollow pile stake core, and easy construction greatly improves efficiency of construction.
Above-mentioned purpose realizes by following technical scheme:
A kind of spiral shovel for the clear soil of stake core, its composition comprises: handle, described handle is connected with the active force bar, in described active force bar, adjustable power rail is installed, described adjustable power rail is connected with augers by the drill bit fixed wedge, has respectively lift span on described active force bar, described adjustable power rail.
Described spiral shovel for the clear soil of stake core, described active force bar, described adjustable power rail are steel pipe, and the length of described active force bar is 1.6 meters, and the length of described adjustable power rail is 1.4 meters.
Described spiral shovel for the clear soil of stake core, described augers has the matrix screw blade.
Beneficial effect:
1. the utility model is made of the different-diameter steel pipe and shakes hands and power rail (adjustable power rail), utilize the adjustment hole on active force bar, adjustable power rail freely to stretch 3 meters up and down, satisfy general construction demand, drill bit adopts independent drill bit, can be according to stake core diameter transposing drill bit, peace is torn open convenient and swift.Matrix screw blade on augers integrates brill soil, fetches earth, and greatly shortens the engineering time.
2. manpower is saved in the utility model easy construction, raises the efficiency the worry that when having solved clear soil, stake core soil is difficult to draw out.
Description of drawings:
Accompanying drawing 1 is structural representation of the present utility model.
Accompanying drawing 2 is outside drawings of the present utility model.
The specific embodiment:
Embodiment 1:
A kind of spiral shovel for the clear soil of stake core, its composition comprises: handle 1, described handle is connected with active force bar 2, adjustable power rail 3 is installed in described active force bar, described adjustable power rail is connected with augers 5 by drill bit fixed wedge 4, has respectively lift span 6 on described active force bar, described adjustable power rail.
Embodiment 2:
The above-mentioned spiral shovel that is used for the clear soil of stake core, the length of described active force bar is 1.6 meters, the length of described adjustable power rail is 1.4 meters.
Embodiment 3:
The above-mentioned spiral shovel that is used for the clear soil of stake core, described augers has matrix screw blade 7.
Using method:
Before construction according to on-the-spot hollow pile require to use the adjusting rod fixed wedge with length adjustment to appropriate level.And install according to the stake core diameter drill bit that is applicable to a core diameter.
During construction, spiral shovel is extended a core soil layer, turn clockwise, creep into soil layer appropriate depth (thickness is as the criterion with execute-in-place skill amount and soil layer compactness), then upwards soil is proposed.
So circulation is until cleaning is to requiring the degree of depth.
Claims (3)
1. one kind is used for the clear native spiral shovel of stake core, its composition comprises: handle, it is characterized in that: described handle is connected with the active force bar, in described active force bar, adjustable power rail is installed, described adjustable power rail is connected with augers by the drill bit fixed wedge, has respectively lift span on described active force bar, described adjustable power rail.
2. according to claim 1 for the clear native spiral shovel of stake core, it is characterized in that: described active force bar, described adjustable power rail are steel pipe, and the length of described active force bar is 1.6 meters, and the length of described adjustable power rail is 1.4 meters.
3. according to claim 1 and 2 for the clear native spiral shovel of stake core, it is characterized in that: described augers has the matrix screw blade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220705268 CN202969389U (en) | 2012-12-19 | 2012-12-19 | Spiral shovel for clearing soil of pile core |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220705268 CN202969389U (en) | 2012-12-19 | 2012-12-19 | Spiral shovel for clearing soil of pile core |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202969389U true CN202969389U (en) | 2013-06-05 |
Family
ID=48510483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220705268 Expired - Fee Related CN202969389U (en) | 2012-12-19 | 2012-12-19 | Spiral shovel for clearing soil of pile core |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202969389U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103912033A (en) * | 2014-03-13 | 2014-07-09 | 国家电网公司 | Convenient pole base excavation device |
CN105256802A (en) * | 2014-07-18 | 2016-01-20 | 五冶集团上海有限公司 | Tool for dredging interior of prestressed hollow pile and using method of tool |
CN105696597A (en) * | 2016-01-25 | 2016-06-22 | 中国建筑局(集团)有限公司 | Soil-removing drill used for spirally removing soil in tubular pile hole and construction method thereof |
CN105850287A (en) * | 2016-05-19 | 2016-08-17 | 浙江省嘉兴市农业科学研究院(所) | Soil drilling tool |
CN107905230A (en) * | 2017-11-20 | 2018-04-13 | 李本根 | One kind building piling drawing out soil equipment |
CN107964956A (en) * | 2018-01-16 | 2018-04-27 | 中建五局华东建设有限公司 | Device and dredging method for hollow pile dredging |
CN110629758A (en) * | 2019-09-24 | 2019-12-31 | 中国建筑第八工程局有限公司 | Full-automatic construction equipment for excavating pile core soil of prestressed pipe pile |
-
2012
- 2012-12-19 CN CN 201220705268 patent/CN202969389U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103912033A (en) * | 2014-03-13 | 2014-07-09 | 国家电网公司 | Convenient pole base excavation device |
CN105256802A (en) * | 2014-07-18 | 2016-01-20 | 五冶集团上海有限公司 | Tool for dredging interior of prestressed hollow pile and using method of tool |
CN105256802B (en) * | 2014-07-18 | 2017-04-19 | 五冶集团上海有限公司 | Tool for dredging interior of prestressed hollow pile and using method of tool |
CN105696597A (en) * | 2016-01-25 | 2016-06-22 | 中国建筑局(集团)有限公司 | Soil-removing drill used for spirally removing soil in tubular pile hole and construction method thereof |
CN105850287A (en) * | 2016-05-19 | 2016-08-17 | 浙江省嘉兴市农业科学研究院(所) | Soil drilling tool |
CN107905230A (en) * | 2017-11-20 | 2018-04-13 | 李本根 | One kind building piling drawing out soil equipment |
CN107905230B (en) * | 2017-11-20 | 2019-08-27 | 江苏中禾建设有限公司 | A kind of building piling drawing out soil equipment |
CN107964956A (en) * | 2018-01-16 | 2018-04-27 | 中建五局华东建设有限公司 | Device and dredging method for hollow pile dredging |
CN110629758A (en) * | 2019-09-24 | 2019-12-31 | 中国建筑第八工程局有限公司 | Full-automatic construction equipment for excavating pile core soil of prestressed pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202969389U (en) | Spiral shovel for clearing soil of pile core | |
CN101851922A (en) | Method for eliminating underground anchor rope/rod by using all casing drill | |
CN102182180B (en) | Rotary extrusion sleeve anchor rod and construction method thereof | |
CN1727633A (en) | Drill pipe of the center emplacement type jumbolter and construction method | |
CN204716130U (en) | For the long-spiral drilling machine of shaping long spire hole-expanding pile | |
CN204676542U (en) | A kind of artificial clear earthenware of prefabricated pipe stake holes | |
CN204040041U (en) | A kind of front close rear thin Double-row Piles Support system being provided with vertical anchor pole | |
CN204827213U (en) | Double dynamical head digs rig soon | |
CN102797254A (en) | Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling | |
CN1141461C (en) | Method for anchor bolt construction by double sleeve | |
CN202369990U (en) | Large-diameter soil anchor rod construction device | |
CN201635074U (en) | Ground anchor | |
CN203701976U (en) | Excavated foundation bottom-end reaming device | |
CN206386140U (en) | One kind construction ground tension anchor rod | |
CN203924043U (en) | A kind of bamboo concrete stake | |
CN206034430U (en) | Single pile reducing inlays rock secant pile | |
CN204212319U (en) | A kind of screw-in greenhouse pillar | |
CN205116168U (en) | End grout static pressure tubular pile construction equipment is expanded in drilling | |
CN105239575B (en) | One kind drilling base expanding and base expanding grouting Static Pipe Pile Construction device and construction method | |
CN211621726U (en) | Foundation ditch side slope support steel pipe soil nail pullout force detection device | |
CN201962677U (en) | Pile pulling device | |
CN204125931U (en) | Foundation pile structure | |
CN101892663A (en) | Pile foundation manufacturing method | |
RU2425924C1 (en) | Anchor pile | |
CN206457823U (en) | A kind of device for clearing up Prefabricated hollow pile stake core |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130605 Termination date: 20131219 |