CN1727633A - Drill pipe of the center emplacement type jumbolter and construction method - Google Patents
Drill pipe of the center emplacement type jumbolter and construction method Download PDFInfo
- Publication number
- CN1727633A CN1727633A CN 200510010109 CN200510010109A CN1727633A CN 1727633 A CN1727633 A CN 1727633A CN 200510010109 CN200510010109 CN 200510010109 CN 200510010109 A CN200510010109 A CN 200510010109A CN 1727633 A CN1727633 A CN 1727633A
- Authority
- CN
- China
- Prior art keywords
- drilling rod
- drill bit
- screw
- hollow
- thread steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Earth Drilling (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A drilling rod of anchor rod drilling machine whose drilling rod is arranged in its center is a hollow rod with the connecting slot at its lower end for connecting drill bit and the top end linked with power unit for driving the drilling rod. Its construction method includes such steps as drilling to designed depth, putting spiral steel bars in the hollow drilling rod, pouring cement mortar, and withdrawing the drilling rod.
Description
Technical field: the present invention relates to bolt support equipment, be specially the drilling rod and the job practices of a kind of center emplacement type jumbolter.
Background technology: at present, known anchor bolt construction is higher in groundwater table, mud, sand bed etc. is under the geological conditions of pore-forming, most adopt that to lose the bar method be that geologic drilling rod creeps into soil layer and reaches design length, inject cement paste from the bar heart then, reach intensity and expand and draw Deng cement paste, a just whole section geologic drilling rod is all stayed in the hole.The method cost is higher.At first the every linear meter cost of this anchor body of geologic drilling rod (drill bit adds nut and adds drilling rod) is more than 5 times of rib-loop reinforcing bar and steel strand, and does not have the prestressing force effect bad, very easily causes waste at slip casting ten thousand faces; Big as drift sand, loose geology porosity, very easily cause cement paste to run off in a large number, and annotate discontented slurry in the hole, not only cause significant wastage and anchored force not strong.Duration is grown (cement paste just can reach certain intensity on 7th) in addition.
Summary of the invention: the drilling rod and the job practices that the object of the present invention is to provide a kind of simple in structure, with low cost, safe and reliable, energy conservation, easy construction, the center emplacement type jumbolter of reduction of erection time.The object of the present invention is achieved like this: it comprises drill bit (1), drilling rod (2), draw-in groove (3), kelly (4), hollow (5), cement mortar, cement paste (6), screw-thread steel (7), soil layer face (8), Grouting Pipe (9), drill bit group (10), collapsible wing plate (11), connecting axle (12), screw (13), unit head (14).A, drilling rod (2) are the logical hearts, have draw-in groove (3) to be connected with kelly (4) tight fit on the drill bit (1) in the termination of drilling rod (2); After drill bit (1) and drilling rod (2) connected, head on drill bit (1) by drilling rod (2) and creep into soil layer face (8), after reaching design length, open after drilling rod (2) other end and unit head (14) junction, can adopt following two kinds of job practicess: method 1, screw-thread steel (7) is placed in the drilling rod hollow (5) by drilling rod (2) center, elder generation's cement injection mortar (6) in drilling rod hollow (5), then unit head (14) and drilling rod (2) are connected and withdraw from drilling rod (2), screw-thread steel (7) and cement mortar (6) are stayed in soil layer face (8) hole, whenever withdraw from a joint drilling rod cement mortar of after-teeming (6), stay free section to treat to draw with soil blocking pile is bloated after cement mortar reaches intensity, method 2, screw-thread steel (7) and Grouting Pipe (9) are placed in the drilling rod hollow (5) by drilling rod (2) center together, unit head (14) and drilling rod (2) connected withdraw from drilling rod (2), screw-thread steel (7) and Grouting Pipe (9) are stayed in soil layer face (8) hole, by Grouting Pipe (9) slip casting in soil layer face (8) hole, treat to draw with soil blocking pile is bloated after cement paste (6) reaches intensity then.B, drill bit (1) are one with drill bit group (10), upward be connected with collapsible wing plate (11) in drill bit group (10) by connecting axle (12), collapsible wing plate (11) is folding at 0-90 °, be connected with draw-in groove (3) on the drilling rod (2) at the kelly (4) on the drill bit group (10), screw-thread steel (7) is threaded with screw (13) on the drill bit group (10) in hollow (5) of drilling rod (2).
Description of drawings: Fig. 1 is drill bit of the present invention, jackrod structure principle schematic; Construction principle schematic when Fig. 2 works for the present invention; Construction principle schematic when Fig. 3 has Grouting Pipe work for the present invention; Fig. 4 is that drill bit of the present invention, drilling rod are the structural principle schematic diagram of one; Fig. 5 is a drill bit group A-A cross-section structure principle schematic of the present invention.
The specific embodiment: a, drilling rod (2) are the logical hearts, have draw-in groove (3) to be connected with kelly (4) tight fit on the drill bit (1) in the termination of drilling rod (2); After drill bit (1) and drilling rod (2) connected, head on drill bit (1) by drilling rod (2) and creep into soil layer face (8), open after reaching design length, drilling rod (2) other end is with after unit head (14) is connected, can adopt following two kinds of job practices: embodiment 1, screw-thread steel (7) is placed in the drilling rod hollow (5) by drilling rod (2) center, elder generation's cement injection mortar (6) in drilling rod hollow (5), then unit head (14) and drilling rod (2) are connected and withdraw from drilling rod (2), screw-thread steel (7) and cement mortar (6) are stayed in soil layer face (8) hole, whenever withdraw from a joint drilling rod cement mortar of after-teeming (6), stay free section to treat to draw with soil blocking pile is bloated after cement mortar reaches intensity, embodiment 2, screw-thread steel (7) and Grouting Pipe (9) are placed in the drilling rod hollow (5) by drilling rod (2) center together, unit head (14) and drilling rod (2) connected withdraw from drilling rod (2), screw-thread steel (7) and Grouting Pipe (9) are stayed in soil layer face (8) hole, by Grouting Pipe (9) slip casting in soil layer face (8) hole, treat to draw with soil blocking pile is bloated after cement paste (6) reaches intensity then.Embodiment 3, drill bit (1) is an one with drill bit group (10), upward be connected with collapsible wing plate (11) in drill bit group (10) by connecting axle (12), collapsible wing plate (11) is folding at 0-90 °, be connected with draw-in groove (3) on the drilling rod (2) at the kelly (4) on the drill bit group (10), screw-thread steel (7) is threaded with screw (13) on the drill bit group (10) in hollow (5) of drilling rod (2).Drilling rod heads on the drill bit group and advances the soil layer face, reach projected depth after, withdraw from drilling rod, the tractive screw-thread steel makes the collapsible wing plate of drill bit group open barb to live the soil layer face and play the tension effect.
Claims (1)
1, the drilling rod and the job practices of a kind of center emplacement type jumbolter, it comprises drill bit (1), drilling rod (2), draw-in groove (3), kelly (4), hollow (5), cement mortar, cement paste (6), screw-thread steel (7), soil layer face (8), Grouting Pipe (9), drill bit group (10), collapsible wing plate (11), connecting axle (12), screw (13), unit head (14), it is characterized in that: a, drilling rod (2) are the logical hearts, have draw-in groove (3) to be connected with kelly (4) tight fit on the drill bit (1) in the termination of drilling rod (2); After drill bit (1) and drilling rod (2) connected, head on drill bit (1) by drilling rod (2) and creep into soil layer face (8), after reaching design length, open after drilling rod (2) other end and unit head (14) junction, can adopt following two kinds of job practicess: method 1, screw-thread steel (7) is placed in the drilling rod hollow (5) by drilling rod (2) center, elder generation's cement injection mortar (6) in drilling rod hollow (5), then unit head (14) and drilling rod (2) are connected and withdraw from drilling rod (2), screw-thread steel (7) and cement mortar (6) are stayed in soil layer face (8) hole, whenever withdraw from a joint drilling rod cement mortar of after-teeming (6), stay free section to treat to draw with soil blocking pile is bloated after cement mortar reaches intensity, method 2, screw-thread steel (7) and Grouting Pipe (9) are placed in the drilling rod hollow (5) by drilling rod (2) center together, unit head (14) and drilling rod (2) connected withdraw from drilling rod (2), screw-thread steel (7) and Grouting Pipe (9) are stayed in soil layer face (8) hole, by Grouting Pipe (9) slip casting in soil layer face (8) hole, treat to draw with soil blocking pile is bloated after cement paste (6) reaches intensity then.B, drill bit (1) are one with drill bit group (10), upward be connected with collapsible wing plate (11) in drill bit group (10) by connecting axle (12), collapsible wing plate (11) is folding at 0-90 °, be connected with draw-in groove (3) on the drilling rod (2) at the kelly (4) on the drill bit group (10), screw-thread steel (7) is threaded with screw (13) on the drill bit group (10) in hollow (5) of drilling rod (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100101094A CN100494617C (en) | 2005-06-22 | 2005-06-22 | Construction method of center mounting type anchor drill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100101094A CN100494617C (en) | 2005-06-22 | 2005-06-22 | Construction method of center mounting type anchor drill |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1727633A true CN1727633A (en) | 2006-02-01 |
CN100494617C CN100494617C (en) | 2009-06-03 |
Family
ID=35927116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100101094A Expired - Fee Related CN100494617C (en) | 2005-06-22 | 2005-06-22 | Construction method of center mounting type anchor drill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100494617C (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080376A (en) * | 2010-12-09 | 2011-06-01 | 张继红 | Built-in composite anchor rod construction method and composite anchor rod drilling tool used by same |
CN101319499B (en) * | 2007-06-07 | 2012-03-28 | 刘润郊 | Pile forming method and device for screwed pedestal pile with large flow concrete filled by hole drilling pump |
CN103277122A (en) * | 2013-05-30 | 2013-09-04 | 湖南科技大学 | Method for drilling anchor rod hole and anchoring anchor rod in broken roof |
CN103306280A (en) * | 2013-05-24 | 2013-09-18 | 郭财宝 | Stirring anchor pile implanted in inner hole of drill rod and anchoring method |
CN103321221A (en) * | 2013-05-24 | 2013-09-25 | 郭财宝 | Pressure bearing plate assembly and utilization method |
CN103410542A (en) * | 2013-08-08 | 2013-11-27 | 中国矿业大学 | Device and method for improving hole forming efficiency and anchoring performance of anchor rod and anchor cable of roadway floor |
CN114810171A (en) * | 2022-03-30 | 2022-07-29 | 西南交通大学 | Anchor rod with expandable end |
CN114908741A (en) * | 2022-05-13 | 2022-08-16 | 中铁第五勘察设计院集团有限公司 | Construction device and slope soft soil foundation treatment method |
-
2005
- 2005-06-22 CN CNB2005100101094A patent/CN100494617C/en not_active Expired - Fee Related
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101319499B (en) * | 2007-06-07 | 2012-03-28 | 刘润郊 | Pile forming method and device for screwed pedestal pile with large flow concrete filled by hole drilling pump |
CN102080376B (en) * | 2010-12-09 | 2012-07-11 | 张继红 | Built-in composite anchor rod construction method and composite anchor rod drilling tool used by same |
CN102080376A (en) * | 2010-12-09 | 2011-06-01 | 张继红 | Built-in composite anchor rod construction method and composite anchor rod drilling tool used by same |
CN103321221B (en) * | 2013-05-24 | 2016-06-01 | 郭财宝 | A kind of bearing plate assembly and using method |
CN103306280A (en) * | 2013-05-24 | 2013-09-18 | 郭财宝 | Stirring anchor pile implanted in inner hole of drill rod and anchoring method |
CN103321221A (en) * | 2013-05-24 | 2013-09-25 | 郭财宝 | Pressure bearing plate assembly and utilization method |
CN103306280B (en) * | 2013-05-24 | 2016-06-01 | 郭财宝 | A kind of drill pipe bore implants stirring-type anchoring pile and anchoring process |
CN103277122A (en) * | 2013-05-30 | 2013-09-04 | 湖南科技大学 | Method for drilling anchor rod hole and anchoring anchor rod in broken roof |
CN103277122B (en) * | 2013-05-30 | 2015-04-15 | 湖南科技大学 | Method for drilling anchor rod hole and anchoring anchor rod in broken roof |
CN103410542B (en) * | 2013-08-08 | 2016-05-04 | 中国矿业大学 | Device and method for improving hole forming efficiency and anchoring performance of anchor rod and anchor cable of roadway floor |
CN103410542A (en) * | 2013-08-08 | 2013-11-27 | 中国矿业大学 | Device and method for improving hole forming efficiency and anchoring performance of anchor rod and anchor cable of roadway floor |
CN114810171A (en) * | 2022-03-30 | 2022-07-29 | 西南交通大学 | Anchor rod with expandable end |
CN114810171B (en) * | 2022-03-30 | 2023-03-10 | 西南交通大学 | Anchor rod with expandable end |
CN114908741A (en) * | 2022-05-13 | 2022-08-16 | 中铁第五勘察设计院集团有限公司 | Construction device and slope soft soil foundation treatment method |
CN114908741B (en) * | 2022-05-13 | 2023-12-15 | 中铁第五勘察设计院集团有限公司 | Construction device and slope soft soil foundation treatment method |
Also Published As
Publication number | Publication date |
---|---|
CN100494617C (en) | 2009-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100494617C (en) | Construction method of center mounting type anchor drill | |
US10253473B2 (en) | Rock anchor foundation structure suitable for mountain photovoltaic module and construction method of rock anchor foundation structure | |
CN100513745C (en) | Construction method for mechanical hole reaming of anchor rod | |
CN203248178U (en) | Downward-hole self-drilling grouting anchor rod | |
CN202991077U (en) | Automatic drilling type hollow grouting anchor rod | |
CN102704481A (en) | Construction method combining static pressure pile sinking with middle-digging hole guiding for buildings or bridges | |
CN102182180B (en) | Rotary extrusion sleeve anchor rod and construction method thereof | |
CN110042835A (en) | It is bored certainly for native, layer of sand from anchor recoverable anchor rod and its anchoring process | |
CN205558943U (en) | Country rock fault slip casting stock in pit | |
CN1963044A (en) | Construction method for withdrawal of waste pile | |
CN209212273U (en) | A kind of basalt fibre reinforcing body anchor pole | |
CN105113982A (en) | Resonance-free and full-bush long spiral drilling machine and construction method | |
CN103343537A (en) | Drilling machine of high-pressure rotary-spraying anchor rod and construction method of high-pressure rotary-spraying anchor rod | |
CN2905900Y (en) | Self-propelled grouting anchoring-bolt | |
CN103410542B (en) | Device and method for improving hole forming efficiency and anchoring performance of anchor rod and anchor cable of roadway floor | |
CN205116168U (en) | End grout static pressure tubular pile construction equipment is expanded in drilling | |
CN104372793A (en) | Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method | |
CN201635074U (en) | Ground anchor | |
CN2813873Y (en) | Drilling rod of central placing roofbolt driller | |
CN203583501U (en) | Deep-layer shear resistant device capable of preventing rock sliding | |
CN207331690U (en) | Pile pile sunk stake machine | |
CN203701112U (en) | Composite foundation grouting steel tube type reinforced slope | |
CN206681002U (en) | A kind of complicated geological soil layer Self-drilling hollow grouting anchoring-bolt | |
CN202164599U (en) | Reinforcing pile enabling reinforcing rib body to be recycled | |
CN2903182Y (en) | Self drilling type prestressing anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090603 Termination date: 20110622 |