CN102797254A - Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling - Google Patents
Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling Download PDFInfo
- Publication number
- CN102797254A CN102797254A CN2012103317457A CN201210331745A CN102797254A CN 102797254 A CN102797254 A CN 102797254A CN 2012103317457 A CN2012103317457 A CN 2012103317457A CN 201210331745 A CN201210331745 A CN 201210331745A CN 102797254 A CN102797254 A CN 102797254A
- Authority
- CN
- China
- Prior art keywords
- long
- hole
- pile
- spiral
- drill bit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210331745.7A CN102797254B (en) | 2012-09-10 | 2012-09-10 | Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210331745.7A CN102797254B (en) | 2012-09-10 | 2012-09-10 | Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102797254A true CN102797254A (en) | 2012-11-28 |
CN102797254B CN102797254B (en) | 2014-08-06 |
Family
ID=47196535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210331745.7A Active CN102797254B (en) | 2012-09-10 | 2012-09-10 | Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102797254B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103419285A (en) * | 2013-08-01 | 2013-12-04 | 鲍林富 | Processing method of hollow stone container |
CN103526746A (en) * | 2013-09-30 | 2014-01-22 | 王志耸 | Full-thread pile pouring machine extruding soil body and pile-forming construction method thereof |
CN106677166A (en) * | 2016-12-21 | 2017-05-17 | 江苏省岩土工程公司 | Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode |
CN109236191A (en) * | 2018-11-06 | 2019-01-18 | 中铁六局集团有限公司 | Long spire modified drilling pouring pile hole construction method |
CN114182721A (en) * | 2021-12-22 | 2022-03-15 | 新疆路桥建设集团有限公司 | Construction method for bearing casing bored pile and pouring pile of raft at collapsible loess section |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3823562A (en) * | 1971-10-26 | 1974-07-16 | Vyzk Ustav Inzinierskych Stavi | Process of production of piles, pile packs, and subterranean pile walls |
US5158147A (en) * | 1991-08-09 | 1992-10-27 | Mobile Drilling Company, Inc. | Auger cutter head |
CN201771429U (en) * | 2010-08-24 | 2011-03-23 | 深圳市利赛实业发展有限公司 | Spiral drill bit |
CN102011555A (en) * | 2010-09-07 | 2011-04-13 | 李新桥 | Double-cone and double-helix drill bit for rotary drilling rig |
CN102628266A (en) * | 2011-12-30 | 2012-08-08 | 中铁二局股份有限公司 | Construction method of long spiral cast-in-situ bored pile |
-
2012
- 2012-09-10 CN CN201210331745.7A patent/CN102797254B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3823562A (en) * | 1971-10-26 | 1974-07-16 | Vyzk Ustav Inzinierskych Stavi | Process of production of piles, pile packs, and subterranean pile walls |
US5158147A (en) * | 1991-08-09 | 1992-10-27 | Mobile Drilling Company, Inc. | Auger cutter head |
CN201771429U (en) * | 2010-08-24 | 2011-03-23 | 深圳市利赛实业发展有限公司 | Spiral drill bit |
CN102011555A (en) * | 2010-09-07 | 2011-04-13 | 李新桥 | Double-cone and double-helix drill bit for rotary drilling rig |
CN102628266A (en) * | 2011-12-30 | 2012-08-08 | 中铁二局股份有限公司 | Construction method of long spiral cast-in-situ bored pile |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103419285A (en) * | 2013-08-01 | 2013-12-04 | 鲍林富 | Processing method of hollow stone container |
CN103526746A (en) * | 2013-09-30 | 2014-01-22 | 王志耸 | Full-thread pile pouring machine extruding soil body and pile-forming construction method thereof |
CN106677166A (en) * | 2016-12-21 | 2017-05-17 | 江苏省岩土工程公司 | Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode |
CN109236191A (en) * | 2018-11-06 | 2019-01-18 | 中铁六局集团有限公司 | Long spire modified drilling pouring pile hole construction method |
CN109236191B (en) * | 2018-11-06 | 2019-11-12 | 中铁六局集团有限公司 | Long spire modified drilling pouring pile hole construction method |
CN114182721A (en) * | 2021-12-22 | 2022-03-15 | 新疆路桥建设集团有限公司 | Construction method for bearing casing bored pile and pouring pile of raft at collapsible loess section |
Also Published As
Publication number | Publication date |
---|---|
CN102797254B (en) | 2014-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105780763B (en) | Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile | |
CN102797254B (en) | Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling | |
CN101487252A (en) | Construction process of cast-in-situ bored pile | |
JP6144542B2 (en) | Nakabori excavator | |
CN1995685A (en) | Pile forming mechanism with high-pressure-jet gyro bit and pile forming method | |
CN109113566A (en) | The structure-improved and full-sleeve screw cast-in-place pile construction method of full-sleeve twist bit | |
CN106978807A (en) | Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area | |
CN106088064A (en) | A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof | |
CN104805831A (en) | Pore-forming method of hard rock foundation pile with large diameter | |
CN108505935A (en) | Rectangle pile foundation drilling construction equipment and construction method | |
CN107905236A (en) | The construction method of friction pile churning driven fast pore-creating and concrete placings | |
CN1265062C (en) | Construction for making piles and tools | |
CN102409978B (en) | Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction | |
CN104563104B (en) | Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method | |
CN207260151U (en) | Drill bit is pulled out in a kind of rotation of the long casing of rotary drilling rig pulling bored concrete pile | |
JP6319935B2 (en) | Tubing pile driving method | |
CN106930274A (en) | The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed | |
CN207988946U (en) | A kind of drilling follow pile pile drilling machine with reamer | |
CN103821137B (en) | The construction method of guncreting pile at the bottom of the embedding rock of a kind of long auger, expansion | |
JP4949756B2 (en) | Expanded excavation bucket | |
CN110344764A (en) | Base expanding and base expanding reperfusion pile mechanical piling device and its pile making method | |
CN206902710U (en) | Retaining wall and counter-force open caisson platform pile pulling system | |
CN205894066U (en) | Hard stratum is broken triaxial cement stirring stake drilling tool in advance | |
CN210598826U (en) | Mechanical pile forming device for bottom-expanding cast-in-place foundation pile | |
CN208563419U (en) | A kind of set digging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170120 Address after: 333000 Jiangxi Province, Jingdezhen City Changjiang district fish Li Industrial Park, No. fifteenth Patentee after: JIANGXI HUANQIU GEOTECHNICAL TECHNOLOGY Co.,Ltd. Address before: 333000 Shangri-La City, Jiangxi Province, North Plaza Road, building, 25 Patentee before: Ma Chungen |
|
TR01 | Transfer of patent right |
Effective date of registration: 20200701 Address after: 333000 Jingdezhen high tech Zone Industrial Park (within Jingdezhen Jingxia cement components Co., Ltd.) Patentee after: Jiangxi Xinfeng Foundation Engineering Co.,Ltd. Address before: 333000 Jiangxi Province, Jingdezhen City Changjiang district fish Li Industrial Park, No. fifteenth Patentee before: JIANGXI HUANQIU GEOTECHNICAL TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Construction Method of Long Spiral Drilling Compaction Semi Borrowing Enlarged Bottom Grouting Pile Effective date of registration: 20221109 Granted publication date: 20140806 Pledgee: Jingdezhen SME Financing Guarantee Co.,Ltd. Pledgor: Jiangxi Xinfeng Foundation Engineering Co.,Ltd. Registration number: Y2022980021480 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |