CN108018780B - A kind of steel tower column design and construction method of bolting and welding - Google Patents

A kind of steel tower column design and construction method of bolting and welding Download PDF

Info

Publication number
CN108018780B
CN108018780B CN201711346711.4A CN201711346711A CN108018780B CN 108018780 B CN108018780 B CN 108018780B CN 201711346711 A CN201711346711 A CN 201711346711A CN 108018780 B CN108018780 B CN 108018780B
Authority
CN
China
Prior art keywords
segment
connecting structure
strength bolt
bolt connecting
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711346711.4A
Other languages
Chinese (zh)
Other versions
CN108018780A (en
Inventor
李有为
张鸿
唐启
尤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201711346711.4A priority Critical patent/CN108018780B/en
Publication of CN108018780A publication Critical patent/CN108018780A/en
Application granted granted Critical
Publication of CN108018780B publication Critical patent/CN108018780B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of steel tower column of bolting and welding design and construction methods, belong to science of bridge building or other structural steelwork fields, between steel tower column segment and segment, first pass through a small amount of high-strength bolt connecting structure connection, to undertake the self weight of two to three segment head tower segments thereon, in this way, after certain segment is installed, without waiting for the segment and the indirect seam welding in next segment, segment installation can be carried out.After certain segment is installed, it first passes through high-strength bolt connecting structure to connect with next segment, thereafter, while continuing to lift a upper segment, and then the Partial seams welding in addition to high-strength bolt connecting structure between the segment and next segment is carried out, until its welding finishes.After seam welds other than high-strength bolt connecting structure, high-strength bolt connecting structure is removed, and the area joints are welded, so completes the welding of tunneling boring weld seam.The present invention had not only had extremely low project cost and maintenance difficulties, but also had high construction efficiency.

Description

A kind of steel tower column design and construction method of bolting and welding
Technical field
The invention belongs to science of bridge building or other structural steelwork fields, in particular to a kind of steel tower column design and construction side Method.
Background technique
Steel tower column is widely used in science of bridge building, and because steel tower column height is high, construction weight is big, generally use at present " point Segment factory manufacture, segmented assembly at the scene connect height " design and construction method.When segmented scene connects high, generally there is two Kind connection method, a kind of method that method is welded to connect between segment, another method are connected between segment using high-strength bolt Method.
For being welded to connect, because the girth welding period is long, and steel construction segment lifting assembled speed is relatively fast, to steel King-post installation period, which is formed, to be restricted, as after certain steel tower column segment is installed under normal circumstances, generally required to wait 4-5 days or very To longer time, after the completion of the segment and next segment (note: next segment refers in following segment) seam welds, Fang Nengjin The installation of the upper segment (note: a upper segment refers in segment above) of row, tower crane is in idle state during head tower welds, by welding Control critical circuits are connect, to restrict installation speed.
For high-strength bolt connection, installation progress is very fast for opposite welded connecting, restricts to the duration small.But because complete Section all uses high-strength bolt to connect, and high-strength bolt connecting structure input amount is huge, increases cost, and it is difficult to increase later maintenance Degree, and adverse effect is caused to steel tower column appearance.And if waiting tunneling boring high-strength bolt is all applied after twisting, then installs one Segment will also restrict the duration to a certain extent.
Summary of the invention
It is an object of the invention to: it proposes a kind of head tower column construction method of bolting and welding, both there is extremely low engineering to make Valence and maintenance difficulties, and there is high construction efficiency.
The object of the invention is realized by following technical proposals:
A kind of steel tower column design and construction method of bolting and welding, it is characterised in that successively include the following steps, wherein n is positive Integer:
Step 1: the (n+1)th segment of lifting, and connect by part high-strength bolt connecting structure with the n-th segment, high-strength bolt The dosage of connecting structure need to only meet the self weight for undertaking two to three segment head tower segments thereon;
Step 2: the n-th+2 segment of lifting, and connect by part high-strength bolt connecting structure with the (n+1)th segment, high-strength spiral shell The dosage of bolt connecting structure need to only meet the self weight for undertaking two to three segment head tower segments thereon;Meanwhile carry out the n-th segment with Except high-strength bolt connecting structure is with the girth welding of exterior domain between (n+1)th segment;
The gravity load in this stage, the (n+1)th segment and the n-th+2 segment is undertaken by high-strength bolt connecting structure, is being welded The n-th segment and the (n+1)th intersegmental weld seam do not undertake upper load;
Step 3: continue the n-th+3 segment of lifting, and is connect by part high-strength bolt connecting structure with the n-th+2 segment, it is high The dosage of strength bolt connecting structure need to only meet the self weight for undertaking two to three segment head tower segments thereon;Meanwhile carrying out (n+1)th Except high-strength bolt connecting structure is with the girth welding of exterior domain between segment and the n-th+2 segment, this n-th segment and the (n+1)th section in stage Weld seam between section in addition to high-strength bolt connecting structure finishes welding, alternatively, removing high-strength spiral shell between the n-th segment and the (n+1)th segment Weld seam other than bolt connecting structure can be completed before the n-th+3 segment lifting;
This stage, the (n+1)th segment, the n-th+2 segment, the n-th+3 segment gravity load undertaken by high-strength bolt connecting structure, The n-th segment welded and the (n+1)th intersegmental weld seam, the (n+1)th segment and the n-th+2 intersegmental weld seam do not undertake top lotus It carries;
Step 4: continue the n-th+4 segment of lifting, and is connect by part high-strength bolt connecting structure with the n-th+3 segment, it is high The dosage of strength bolt connecting structure need to only meet the self weight for undertaking two to three segment head tower segments thereon;Meanwhile carrying out n-th+2 Except high-strength bolt connecting structure is with the girth welding of exterior domain between segment and the n-th+3 segment, the (n+1)th segment of this with n-th+2 in stage Weld seam between segment in addition to high-strength bolt connecting structure finishes welding, alternatively, except height between the (n+1)th segment and the n-th+2 segment Weld seam other than strength bolt connecting structure can be completed before the n-th+4 segment lifting;
This stage removes the n-th segment and the intersegmental high-strength bolt connecting structure of n+1, the above segment weight of the seam crossing Amount is transferred to soldered weld seam and undertakes;After high-strength bolt connecting structure is removed, the area joints welding is carried out, until should All welding finishes seam at the merogenesis of segment;
Step 5: according to abovementioned steps, similarly promoting, carry out the connection construction of other head tower segments.
Alternatively, when high-strength bolt connecting structure releases between certain segment, solder joint length reaches entirely between the segment Section length is 80% or even 90% or more.
In the method for the present invention, between steel tower column segment and segment, a small amount of high-strength bolt connecting structure connection is first passed through, to undertake The self weight of two to three segment head tower segments thereon, without whole high-strength bolt connecting structure of constructing, in this way, certain segment is pacified After the completion of dress, without waiting for the segment and the indirect seam welding in next segment, segment installation can be carried out.It is installed in certain segment After the completion, it first passes through high-strength bolt connecting structure to connect with next segment, thereafter, while continuing to lift a upper segment, tightly Then the Partial seams welding in addition to high-strength bolt connecting structure between the segment and next segment is carried out, until its welding finishes. After seam welds other than high-strength bolt connecting structure, high-strength bolt connecting structure is removed, and the area joints are welded, So complete the welding of tunneling boring weld seam.It is new above to pacify when the welding of certain segment tunneling boring weld seam finishes in the case of general progress It fills segment and saves left and right in 2-3, therefore, when actual design is constructed, consider that high-strength bolt connecting structure undertakes the self weight of the segment 2-3 head tower ?.Moreover, solder joint length is up to tunneling boring length 80% or even 90% when high-strength bolt connecting structure releases More than, and seam crossing stress level is very low at this time, there is no at high-strength bolt connecting structure with other first welding regions because Weld it is asynchronous and caused by stress state difference condition, do not influence structural stress state.
The foregoing main solution of the present invention and further alternatives thereof can be freely combined to form multiple schemes, be this Invention can be used and claimed scheme;And it is of the invention, between (each non conflicting selection) selection and between other selections It can also be freely combined.Those skilled in the art, which can be illustrated after understanding the present invention program according to the prior art and common knowledge, to be had Multiple combinations are the claimed technical solution of the present invention, do not do exhaustion herein.
Beneficial effects of the present invention: not only there is extremely low project cost and maintenance difficulties, but also there is high construction efficiency.
Detailed description of the invention
Fig. 1 is the head tower segment plan view of the embodiment of the present invention;
Fig. 2 is the head tower segment facade arrangement schematic diagram of the embodiment of the present invention;
Fig. 3 is the Construction State schematic diagram of the step 1 of the embodiment of the present invention;
Fig. 4 is the Construction State schematic diagram of the step 2 of the embodiment of the present invention;
Fig. 5 is the Construction State schematic diagram of the step 3 of the embodiment of the present invention;
Fig. 6 is the Construction State schematic diagram of the step 4 of the embodiment of the present invention;
Fig. 7 is the Construction State schematic diagram of the step 5 of the embodiment of the present invention;
1 it is wherein head tower segment, 2 be high-strength bolt connecting structure, 3 be segment merogenesis line, 4 be girth welding, 5 is former high Seam welds at strength bolt connecting structure.
Specific embodiment
Following non-limiting examples are for illustrating the present invention.
Shown in 6, a kind of steel tower column design and construction method of bolting and welding successively includes the following steps (this hair Bright middle n is positive integer, when using the method for the present invention from the connection of the 1st head tower segment and the 2nd head tower segment, n 1, according to this Analogize.The high-strength bolt refers to and is manufactured with high strength steel, or needs to impose the bolt of larger pretightning force, belongs to one kind Standard component.Under normal circumstances, the plain bolt for the load ratio same specification that high-strength bolt can be born is big.Usually by regulation bolt Performance rate in 8.8 grades or more persons, referred to as high-strength bolt):
Step 1, with reference to shown in Fig. 3: the (n+1)th segment of lifting, and pass through part high-strength bolt connecting structure 2 and the n-th segment Connection, the dosage of high-strength bolt connecting structure 2 need to only meet the self weight for undertaking two to three segment head tower segments 1 thereon, and nothing The high-strength bolt connecting structure 2 that need to construct whole;
Step 2, with reference to shown in Fig. 4: the n-th+2 segment of lifting, and pass through part high-strength bolt connecting structure 2 and the (n+1)th section Section connection, the dosage of high-strength bolt connecting structure 2 need to only meet the self weight for undertaking two to three segment head tower segments 1 thereon, and Without whole high-strength bolt connecting structure 2 of constructing;Meanwhile it carrying out between the n-th segment and the (n+1)th segment except high-strength bolt connects structure 2 are made with the girth welding 4 of exterior domain;
The gravity load in this stage, the (n+1)th segment and the n-th+2 segment is undertaken by high-strength bolt connecting structure 2, is being welded The n-th segment and the (n+1)th intersegmental weld seam do not undertake upper load;
Step 3, with reference to shown in Fig. 5: continue the n-th+3 segment of lifting, and by part high-strength bolt connecting structure 2 and n-th+ The connection of 2 segments, the dosage of high-strength bolt connecting structure 2 need to only meet the self weight for undertaking two to three segment head tower segments 1 thereon, Without whole high-strength bolt connecting structure 2 of constructing;Meanwhile it carrying out between the (n+1)th segment and the n-th+2 segment except high-strength bolt connects Construction 2 is connect with the girth welding 4 of exterior domain, this in stage the n-th segment and the (n+1)th segment between in addition to high-strength bolt connecting structure Weld seam finishes welding, alternatively, the weld seam between the n-th segment and the (n+1)th segment in addition to high-strength bolt connecting structure is in the n-th+3 section It can be completed before section lifting;
This stage, the (n+1)th segment, the n-th+2 segment, the n-th+3 segment gravity load held by high-strength bolt connecting structure 2 Load, the n-th segment welded and the (n+1)th intersegmental weld seam, the (n+1)th segment and the n-th+2 intersegmental weld seam do not undertake Portion's load;
Step 4, with reference to shown in Fig. 6: continue the n-th+4 segment of lifting, and by part high-strength bolt connecting structure 2 and n-th+ The connection of 3 segments, the dosage of high-strength bolt connecting structure 2 need to only meet the self weight for undertaking two to three segment head tower segments 1 thereon, Without whole high-strength bolt connecting structure 2 of constructing;Meanwhile it carrying out between the n-th+2 segment and the n-th+3 segment except high-strength bolt connects Construction 2 is connect with the girth welding 4 of exterior domain, this in stage the (n+1)th segment and the n-th+2 segment between in addition to high-strength bolt connecting structure Weld seam welding is finished, alternatively, the weld seam between the (n+1)th segment and the n-th+2 segment in addition to high-strength bolt connecting structure is n-th It can be completed before+4 segment liftings;
This stage removes the n-th segment and the intersegmental high-strength bolt connecting structure 2 of n+1, the above segment weight of the seam crossing Amount is transferred to soldered weld seam and undertakes;When high-strength bolt connecting structure 2 releases between the segment, welds and connect between the segment Length is stitched up to tunneling boring length 90% or more.After high-strength bolt connecting structure 2 is removed, the area joints welding is carried out, until All welding finishes seam at the segment merogenesis;
Step 5, with reference to shown in Fig. 7: according to abovementioned steps, similarly promoting, carry out the connection construction of other head tower segments.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (3)

  1. The method 1. a kind of steel tower column of bolting and welding is designed and constructed, it is characterised in that successively include the following steps, wherein n is positive whole Number:
    Step 1: the (n+1)th segment of lifting, and connect by part high-strength bolt connecting structure with the n-th segment, high-strength bolt connection The dosage of construction need to only meet the self weight for undertaking two to three segment head tower segments thereon;
    Step 2: the n-th+2 segment of lifting, and connect by part high-strength bolt connecting structure with the (n+1)th segment, high-strength bolt connects The dosage for connecing construction need to only meet the self weight for undertaking two to three segment head tower segments thereon;Meanwhile carry out the n-th segment with n-th+ Except high-strength bolt connecting structure is with the girth welding of exterior domain between 1 segment;
    The gravity load in this stage, the (n+1)th segment and the n-th+2 segment is undertaken by high-strength bolt connecting structure, n-th welded Segment and the (n+1)th intersegmental weld seam do not undertake upper load;
    Step 3: continuing the n-th+3 segment of lifting, and connect by part high-strength bolt connecting structure with the n-th+2 segment, high-strength spiral shell The dosage of bolt connecting structure need to only meet the self weight for undertaking two to three segment head tower segments thereon;Meanwhile carrying out the (n+1)th segment Except high-strength bolt connecting structure is with the girth welding of exterior domain between the n-th+2 segment, this in stage the n-th segment and the (n+1)th segment between Weld seam in addition to high-strength bolt connecting structure finishes welding, alternatively, except high-strength bolt connects between the n-th segment and the (n+1)th segment Connect the weld seam other than construction can be completed before the n-th+3 segment lifting;
    This stage, the (n+1)th segment, the n-th+2 segment, the n-th+3 segment gravity load undertaken by high-strength bolt connecting structure, The n-th segment and the (n+1)th intersegmental weld seam, the (n+1)th segment and the n-th+2 intersegmental weld seam of welding do not undertake upper load;
    Step 4: continuing the n-th+4 segment of lifting, and connect by part high-strength bolt connecting structure with the n-th+3 segment, high-strength spiral shell The dosage of bolt connecting structure need to only meet the self weight for undertaking two to three segment head tower segments thereon;Meanwhile carrying out the n-th+2 segment Except high-strength bolt connecting structure is with the girth welding of exterior domain between the n-th+3 segment, this (n+1)th segment and the n-th+2 segment in stage Between weld seam in addition to high-strength bolt connecting structure welding is finished, alternatively, removing high-strength spiral shell between the (n+1)th segment and the n-th+2 segment Weld seam other than bolt connecting structure can be completed before the n-th+4 segment lifting;
    This stage removes the n-th segment and the intersegmental high-strength bolt connecting structure of n+1, and the above segment weight of the seam crossing turns Soldered weld seam is moved to undertake;After high-strength bolt connecting structure is removed, the area joints welding is carried out, until the segment All welding finishes seam at merogenesis;
    Step 5: according to abovementioned steps 1-4, similarly promoting, carry out the connection construction of other head tower segments.
  2. The method 2. steel tower column of bolting and welding as described in claim 1 is designed and constructed, it is characterised in that: high-strength between certain segment When bolt connection structure releases, solder joint length reaches tunneling boring length 80% or more between the segment.
  3. The method 3. steel tower column of bolting and welding as claimed in claim 2 is designed and constructed, it is characterised in that: high-strength between certain segment When bolt connection structure releases, solder joint length reaches tunneling boring length 90% or more between the segment.
CN201711346711.4A 2017-12-15 2017-12-15 A kind of steel tower column design and construction method of bolting and welding Active CN108018780B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711346711.4A CN108018780B (en) 2017-12-15 2017-12-15 A kind of steel tower column design and construction method of bolting and welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711346711.4A CN108018780B (en) 2017-12-15 2017-12-15 A kind of steel tower column design and construction method of bolting and welding

Publications (2)

Publication Number Publication Date
CN108018780A CN108018780A (en) 2018-05-11
CN108018780B true CN108018780B (en) 2019-04-16

Family

ID=62073733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711346711.4A Active CN108018780B (en) 2017-12-15 2017-12-15 A kind of steel tower column design and construction method of bolting and welding

Country Status (1)

Country Link
CN (1) CN108018780B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904857B (en) * 2019-12-30 2021-06-22 中国铁建投资集团有限公司 Temporary buckling tower installation method for self-anchored suspension bridge construction
CN112692521A (en) * 2020-12-23 2021-04-23 吉林建筑大学 Fine processing method for connecting node based on assembly type steel structure
CN114033234B (en) * 2021-12-14 2023-02-28 安徽省路港工程有限责任公司 Novel main tower crown structure and sectional installation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100662811B1 (en) * 2006-09-18 2006-12-29 우경건설 주식회사 Non-synthetic complex steel pipe columm having tie ends for filling a steel soncrete and construction method thereof
CN102261043A (en) * 2011-07-08 2011-11-30 中铁大桥局股份有限公司 Assembled steel pipe upright post system
CN105735112A (en) * 2016-04-14 2016-07-06 北京工业大学 Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100662811B1 (en) * 2006-09-18 2006-12-29 우경건설 주식회사 Non-synthetic complex steel pipe columm having tie ends for filling a steel soncrete and construction method thereof
CN102261043A (en) * 2011-07-08 2011-11-30 中铁大桥局股份有限公司 Assembled steel pipe upright post system
CN105735112A (en) * 2016-04-14 2016-07-06 北京工业大学 Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier

Also Published As

Publication number Publication date
CN108018780A (en) 2018-05-11

Similar Documents

Publication Publication Date Title
CN108018780B (en) A kind of steel tower column design and construction method of bolting and welding
CN103132506B (en) Bored pile double-deck Reinforced Hoop reinforcing cage processing and fabricating method
JP2019500525A (en) Assembled steel pipe casing reinforced concrete composite node and mounting method
CN105569271B (en) The compound shear connector and its fabrication and installation method of a kind of steel-concrete structure
CN103334378B (en) The few circulation classification stretch-draw construction method of Self-Anchored Concrete Suspension hoist cable
CN103883054B (en) A kind of rope bar girt strip composite floor system and construction method thereof
CN102674136A (en) Lifting method for large-scale tower equipment
CN108222289A (en) A kind of assembled bamboo wood beam-column joint connecting structure
CN102535648A (en) Steel pipe column ring beam column node structure and construction method thereof
CN205617567U (en) No welded assembled steel pipe concrete beam -column joint
CN105804400A (en) Hoisting construction method of curved truss
CN110528848A (en) External wall is laid with stone material construction builder's jack and its installation method
CN105633544B (en) FAST telescope collar tie beam lattice column structure systems
CN108252223A (en) The installation method and connection structure of the horizontal-associate structure of steel truss girder
CN107529575A (en) Universal steel concrete supporting component
CN208594732U (en) Easy-to-dismount steelwork tower truss outrigger platform
CN106544959A (en) The construction method of the lifting sections of the king-tower containing saddle and bridge main tower saddle
CN203947596U (en) A kind of assembly type cast steel outer sleeve-T-shaped beam and post linkage
CN202688848U (en) Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge
CN104652430A (en) Composite reinforcement partially prestressed concrete solid square pile and manufacturing method thereof
CN110344332A (en) Bracket is used in a kind of construction of bridge main tower upper beam
CN107654057A (en) Fix self-locking type steel pipe scaffold
CN206957067U (en) Universal steel concrete supporting component
CN204326490U (en) A kind of construction of lift well operating platform
CN208363422U (en) Damage controllable steel tube concrete superposed column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210902

Address after: 241060 R & D Center (buildings 4 and 5), No. 17-8 Fumin Road, Jiujiang Economic Development Zone, Jiujiang District, Wuhu City, Anhui Province

Patentee after: CCCC SHEC FOURTH ENGINEERING Co.,Ltd.

Patentee after: The Second Harbor Engineering Co.

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 241009 Building 1, West Side of Innovation Road, Jiujiang Economic Development Zone, Wuhu City, Anhui Province

Patentee before: CCCC SHEC FOURTH ENGINEERING Co.,Ltd.

Patentee before: The Second Harbor Engineering Co.