CN202688848U - Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge - Google Patents

Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge Download PDF

Info

Publication number
CN202688848U
CN202688848U CN 201220242920 CN201220242920U CN202688848U CN 202688848 U CN202688848 U CN 202688848U CN 201220242920 CN201220242920 CN 201220242920 CN 201220242920 U CN201220242920 U CN 201220242920U CN 202688848 U CN202688848 U CN 202688848U
Authority
CN
China
Prior art keywords
integral node
prestressed concrete
chord member
plate
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220242920
Other languages
Chinese (zh)
Inventor
马骉
李鹏
邓青儿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN 201220242920 priority Critical patent/CN202688848U/en
Application granted granted Critical
Publication of CN202688848U publication Critical patent/CN202688848U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an anchoring connecting structure for nodes of a composite truss girder cable-stayed bridge, which is characterized by comprising whole node plates, wherein a steel web member is welded with the whole node plates; the whole node plates are connected with a steel chord member; the steel chord member and the whole node plates are connected with a prestressed concrete chord member through shear nails; and a stay cable is anchored to the prestressed concrete chord member. According to the preferable embodiment of the utility model, a stay cable duct is arranged outside the stay cable, and stiffening plates are arranged on two sides of the stay cable duct and welded with the whole node plates; the stay cable duct penetrates through a web of the steel web member and a horizontal node plate, and is welded with the steel web member and the horizontal node plate; a bracing cable anchor block is arranged on the prestressed concrete chord member, and the stay cable is anchored onto the bracing cable anchor block through the stay cable duct; and welding stud connecting pieces are arranged on inner sides and outer sides of the whole node plates and are connected with the prestressed concrete chord member. The anchoring structure is simple, the force transmission is clear, and the construction is convenient.

Description

A kind of composite truss girder stayed-cable bridge joint anchorage syndeton
Technical field
The utility model belongs to technical field of bridge engineering, relate to the steel web member with the composite truss girder stayed-cable bridge joint anchorage syndeton of shaped steel.
Background technology
Composite truss beam bridge cable stayed bridge is in the stressed more complicated in suspension cable anchorage node place, the load that node is passed over by steel web member, string wire bar, suspension cable namely will, and the Load Transfer that also needs simultaneously to bear is to the prestressed concrete chord member, and is stressed very complicated.For this reason, research and design goes out the Types of nodes of a kind of reasonable stress, durable in use, easy construction, and tool is of great significance.
Summary of the invention
The purpose of this utility model is to provide a kind of composite truss girder stayed-cable bridge joint anchorage syndeton, the power transmission that can solve each main stressed member, and guarantee that Cable power can reasonably be delivered on string wire bar, prestressed concrete chord member and the steel web member.
To achieve these goals, the technical solution of the utility model is as follows: a kind of composite truss girder stayed-cable bridge joint anchorage syndeton, it is characterized in that described anchor connection structure comprises the integral node plate, steel web member and the welding of this integral node plate, this integral node plate is connected with the string wire bar, string wire bar, integral node plate are connected with the prestressed concrete chord member, and suspension cable is anchored in the prestressed concrete chord member.According to a preferred embodiment of the invention, suspension cable is provided with the inclined cable conduit outward, and inclined cable conduit both sides arrange stiffener and the welding of integral node plate.The anchor connection structure comprises two blocks of integral node plates that be arranged in parallel, wherein steel web member web vertically is arranged between two blocks of integral node plates and with described integral node plate and welds, horizontal node plate level is arranged between two blocks of integral node plates and with described integral node plate and welds, the inclined cable conduit passes described steel web member web and horizontal gusset plate, inclined cable conduit and steel web member web and the welding of horizontal gusset plate.The prestressed concrete chord member is provided with the drag-line anchor block, and suspension cable is anchored on the drag-line anchor block by the inclined cable conduit.The inside and outside both sides of integral node plate all arrange weldering nail connector and are connected with the prestressed concrete chord member.
This structure can solve preferably chord member, web member, crossbeam and beam rope anchoring structure and concentrate the problem that crosses, Cable power is transmitted respectively by gusset plate and concrete chord member anchor block, reduced the stress concentration phenomenon, has preferably stress performance, increase structural safety degree more than needed, also reduced the difficulty of processing and manufacturing simultaneously.
Description of drawings
Fig. 1 is the structural representation of the utility model one embodiment.
The specific embodiment
As shown in the figure, a kind of composite truss girder stayed-cable bridge joint anchorage syndeton, described composite truss beam is comprised of steel web member 1 and the prestressed concrete bridge face structure (comprising chord member, crossbeam and bridge deck) take string wire bar 2 as stiff skeleton.Described anchor connection structure comprises two blocks of integral node plates 3 that be arranged in parallel, steel web member 1 and described two blocks of integral node plates, 3 welding, wherein steel web member web 9 vertically is arranged between two blocks of integral node plates 3 and with described integral node plate 3 and welds, the frange plate of steel web member 1 welds with the lower end of corresponding integral node plate 3, the both sides of this integral node plate 3 are connected with string wire bar 2, horizontal gusset plate 10 is horizontally set between two blocks of integral node plates 3 and with described integral node plate 3 and welds, string wire bar 2 and integral node plate 3 all are connected with prestressed concrete chord member 4, and suspension cable is anchored in prestressed concrete chord member 4.According to a preferred embodiment of the invention, suspension cable is provided with inclined cable conduit 5 outward, inclined cable conduit 5 both sides arrange stiffener 6 and 3 welding of integral node plate, steel web member 1 web and horizontal gusset plate 10 offer cable guide pipe and pass hole, inclined cable conduit 5 passes described steel web member 1 and horizontal gusset plate 10 from described hole, inclined cable conduit 5 and steel web member 1 web and 10 welding of horizontal gusset plate, drag-line anchor block 8 is set on the prestressed concrete chord member 4, and suspension cable is anchored on the drag-line anchor block 8 by inclined cable conduit 5.Described two blocks of integral node plates 3 inside and outside both sides and the upper and lower both sides of horizontal gusset plate all arrange weldering nail connector 7 and are connected with prestressed concrete chord member 4.

Claims (5)

1. composite truss girder stayed-cable bridge joint anchorage syndeton, it is characterized in that described anchor connection structure comprises the integral node plate, steel web member and the welding of this integral node plate, this integral node plate and the welding of string wire bar, string wire bar, integral node plate are connected with the prestressed concrete chord member, and suspension cable is anchored in the prestressed concrete chord member.
2. anchor connection structure as claimed in claim 1, it is characterized in that: suspension cable is provided with the inclined cable conduit outward, and inclined cable conduit both sides arrange stiffener and the welding of integral node plate.
3. anchor connection structure as claimed in claim 2, it is characterized in that: the anchor connection structure comprises two blocks of integral node plates that be arranged in parallel, wherein steel web member web vertically is arranged between two blocks of integral node plates and with described integral node plate and welds, horizontal node plate level is arranged between two blocks of integral node plates and with described integral node plate and welds, the inclined cable conduit passes described steel web member web and horizontal gusset plate, and inclined cable conduit and steel web member web and the welding of horizontal gusset plate.
4. anchor connection structure as claimed in claim 2, it is characterized in that: the prestressed concrete chord member is provided with the drag-line anchor block, and suspension cable is anchored on the drag-line anchor block by the inclined cable conduit.
5. anchor connection structure as claimed in claim 1 is characterized in that: the inside and outside both sides of integral node plate all arrange weldering nail connector and are connected with prestressed concrete.
CN 201220242920 2012-05-28 2012-05-28 Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge Expired - Fee Related CN202688848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220242920 CN202688848U (en) 2012-05-28 2012-05-28 Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220242920 CN202688848U (en) 2012-05-28 2012-05-28 Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge

Publications (1)

Publication Number Publication Date
CN202688848U true CN202688848U (en) 2013-01-23

Family

ID=47544489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220242920 Expired - Fee Related CN202688848U (en) 2012-05-28 2012-05-28 Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN202688848U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061261A (en) * 2013-01-25 2013-04-24 安徽省交通投资集团有限责任公司 Anchor pulling plate component for concrete girder of cable-stayed bridge
CN105729063A (en) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 Manufacturing method of double-anchor box type external node chord member
CN113718624A (en) * 2021-09-18 2021-11-30 中交第二公路勘察设计研究院有限公司 Combined truss node structure, bridge and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061261A (en) * 2013-01-25 2013-04-24 安徽省交通投资集团有限责任公司 Anchor pulling plate component for concrete girder of cable-stayed bridge
CN103061261B (en) * 2013-01-25 2014-10-01 安徽省交通投资集团有限责任公司 Anchor pulling plate component for concrete girder of cable-stayed bridge
CN105729063A (en) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 Manufacturing method of double-anchor box type external node chord member
CN105729063B (en) * 2016-02-26 2017-11-10 江苏中铁山桥重工有限公司 A kind of box external node chord member preparation method of double anchors
CN113718624A (en) * 2021-09-18 2021-11-30 中交第二公路勘察设计研究院有限公司 Combined truss node structure, bridge and construction method

Similar Documents

Publication Publication Date Title
CN103388408B (en) A kind of building structure external prestressing muscle reinforces steering block
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN101818478B (en) Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN203729193U (en) Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN102561172A (en) Celled hybrid beam junction with composite connectors
CN103711329A (en) Method for reinforcing structure by means of method of externally attaching steel-reinforced concrete framework
CN202688848U (en) Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge
CN103061261B (en) Anchor pulling plate component for concrete girder of cable-stayed bridge
CN102979033A (en) Steel truss girder all-welded joist slice and construction method thereof
CN201695323U (en) Connecting structure for steel web member and concrete chord member
CN103806373B (en) Oblique pull assembly type steel bridge on highway suspension cable anchor system
CN203639804U (en) Continuous rigid frame bridge based on steel truss and concrete slab composite beam
CN108193607A (en) It is a kind of to reinforce with prefabricated PC truss and its construction method
CN202064276U (en) Cable-girder anchorage structure of railway steel truss cable stayed bridge
JP6997486B1 (en) New precast assembled pier
CN202913338U (en) Steel truss full-welded truss piece
CN202520007U (en) Joint construction for combination and reinforcement of frame structure
CN204940144U (en) A kind of Wavelike steel webplate temporary reinforcing device
CN103938732A (en) Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN202543784U (en) Connecting structure of side node of inverted trapezoidal sectional steel truss cable-stayed bridge
CN103938731B (en) Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN203669204U (en) Trussed steel reinforced concrete coupling beam
CN202519793U (en) Structure of connected node between concrete column and steel beam
CN203295956U (en) Large-span cable stayed bridge structure
CN202809478U (en) Edge main grider structure shaped like Chinese character 'shang' of concrete superposed beam cable-stayed bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123

Termination date: 20210528