CN108005402A - A kind of operated subway station trough plate platform reinforced construction method - Google Patents

A kind of operated subway station trough plate platform reinforced construction method Download PDF

Info

Publication number
CN108005402A
CN108005402A CN201711258729.9A CN201711258729A CN108005402A CN 108005402 A CN108005402 A CN 108005402A CN 201711258729 A CN201711258729 A CN 201711258729A CN 108005402 A CN108005402 A CN 108005402A
Authority
CN
China
Prior art keywords
trough plate
grouting material
hole
strength cement
based grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711258729.9A
Other languages
Chinese (zh)
Other versions
CN108005402B (en
Inventor
程维国
曹远财
陈秀花
汪旺龙
张涛
孟志华
向徽
张志新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electromechanical Equipment Installation Co Ltd of CTCE Group
Original Assignee
Electromechanical Equipment Installation Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electromechanical Equipment Installation Co Ltd of CTCE Group filed Critical Electromechanical Equipment Installation Co Ltd of CTCE Group
Priority to CN201711258729.9A priority Critical patent/CN108005402B/en
Publication of CN108005402A publication Critical patent/CN108005402A/en
Application granted granted Critical
Publication of CN108005402B publication Critical patent/CN108005402B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of operated subway station trough plate platform reinforced construction method, belongs to operated subway station structure reinforcement construction technology field.Method comprises the following steps:s1:It please put block track circuit;s2:Preparation of construction;s3:Take hole;s4:Reinforcement installation;s5:Steel form is installed;s6:Strength cement-based grouting material stirs;s7:Strength cement-based grouting material pours and high-order funnel pressurization;s8:Platform floor recovers;s9:Disappear a little, release track blockade;The operated subway station trough plate platform reinforced construction method of patented technology of the present invention takes the hole of two diameter 90mm respectively as pouring hole and pressurization hole on trough plate, it can either ensure the integrally-built integrality of trough plate platform and operation station security, and can meet strengthening construction requirement;It is convenient and efficient by the use of assembling a part of the steel form as ruggedized construction, and there is safe, easy to operate, strong applicability, reduce manual work intensity.

Description

A kind of operated subway station trough plate platform reinforced construction method
Technical field
The present invention relates to a kind of operated subway station trough plate platform reinforced construction method, for operated subway station structure Strengthening construction, is particularly suitable for operated subway station trough plate platform strengthening construction, be well positioned to meet operated subway safety and Station structure strengthening quality, belongs to Metro Station Structure reinforcement construction technology field.
Background technology
Operated subway station trough plate platform bearing capacity needs reinforcement when inadequate, and general consolidation effect is bad, safety wind Danger is high, and operated subway station trough plate strengthening construction is within three hours after subway is stopped transport because that can only carry out construction operation, Selection operation convenience, guarantee strengthening quality and flute profile harden structure are the most important thing that operated subway station trough plate is reinforced safely, The reasonable selection of reinforcement technique is to ensure that construction quality, the key of operation security guarantee, therefore selects how reinforcement operation is grasped It is the class that our engineers and technicians need to face to make easy, guarantee strengthening quality, flute profile harden structure safety and safety of subway operation Topic.
The content of the invention
In order to overcome the above problem, the object of the present invention is to provide one kind to make operated subway station trough plate platform reinforce energy The operated subway station trough plate platform reinforced construction method that easy to operate, reliable in quality, safety of subway operation can be controlled effectively;
To achieve these goals, the present invention uses following technical scheme:
A kind of operated subway station trough plate platform reinforced construction method, it is characterised in that the construction comprises the following steps:
s1:It please put block track circuit:To running scheduling room please point, block and specify area track circuit, it is ensured that operating line is applied Work safety;
s2:Preparation of construction:Organization material, instrument are marched into the arena, and clear up and space junk and dust are reinforced under plate, complete trough plate bottom surface chisel Hair is checked and checked and accepted, and measures the hole site that takes of trough plate, and marked with carrying out;
s3:Take hole:Take hole in trough plate, for strength cement-based grouting material pour and plate in space air discharge;
s4:Reinforcement installation:Reinforced mesh has two layers up and down, middle by bearing rod that upper and lower two layers of reinforcement welding is whole into one Body, is installed reinforced mesh as an entirety, and is fixed on groove through reinforced mesh by placing concrete pad up and down Shape plate down space;
s5:Steel form is installed:Chemical anchor bolts are first planted on trough plate lower ring beam, then angle bar frame is fixed on to the change on collar tie beam Learn in crab-bolt, then bottom steel shutterings are fixed on the steel form of bottom on angle bar frame, then by side steel form, finally with expansion Cement is blocked steel form gap, trough plate bottom is formed a closed space;
S6:Strength cement-based grouting material stirs:Strength cement-based grouting material plus water are stirred, strength cement-based grouting material is in flowing viscous pasty state ;
S7:Strength cement-based grouting material pours and high-order funnel pressurization:Strength cement-based grouting material will be stirred and poured by pouring groove to groove Shape plate down space, until having strength cement-based grouting material appearance in high-order funnel base opening, stops pouring, then adds again into high-order funnel Enter strength cement-based grouting material is stirred and reversely pressurizeed, there is no obvious bubble to emerge until pouring notch, then stop pressurizeing, water When mud base grouting material pours face and do not significantly decrease, then remove and pour groove and high-order funnel, carry out next place and pour;
S8:Platform floor recovers:Platform floor recovery, hole four are carried out to pouring hole and pressurization hole with the marble that hole is taken out is taken Week is sealed with dry cement, makes hole top surface that recovery gets well and platform floor into a plane;
S9:Disappear a little, release track blockade:Track circuit is cleared up after construction, after confirmation scene cleans out safety, Carry out disappearing again a little, release track circuit block.
Further, in s3 takes hole:It is 2 to take the quantity in hole in trough plate, a diameter of 90mm in the hole.
Further, in the stirring of s6 strength cement-based grouting materials:Strength cement-based grouting material is according to 10:1 mass ratio carries out plus water It is stirred, mixing time is 2 minutes.
Further, in S7 strength cement-based grouting materials pour and high-order funnel pressurizes:It is described until pour groove(5)Mouth does not have Obvious bubble is emerged, then stops pressurizeing, its time waited pours face without under obvious for strength cement-based grouting material after five minutes During drop, then remove and pour groove(5)And high-order funnel(6), carry out next place and pour.
The present invention is operated subway station trough plate platform reinforced construction method, is had the following advantages:
1st, the hole of two 90mm is only opened in the present invention on trough plate, trough plate platform structure is destroyed and is minimized, at the same time Operations risks are minimized safely, avoids traditional platform slab of raising from being reinforced, has ensured operation security;
2nd, hole is taken on trough plate platform using measurement and positioning in the present invention, live hole is evenly distributed, and has reached neat appearance;
3rd, the part that assembled steel template is used as ruggedized construction is employed in the present invention, template can be used as and accelerated Speed of application, while quality is ensured, can greatly improve construction efficiency;
4th, employ strength cement-based grouting material new material in the present invention, material have high intensity, presetting period section, mobility it is strong, The features such as durability is good, makes convenient and quick construction, and construction quality can be effectively controlled;
5th, funnel is counter is pressurizeed using high-order in the present invention, by the air under platform trough plate between newly-increased strength cement-based grouting material Discharge, makes newly-increased structure be combined closely knit be controlled with platform trough plate;
6th, strength cement-based grouting material takes Site in the present invention, construction quality is controlled, worker's operating efficiency it is big Width is lifted.
Brief description of the drawings
Fig. 1 is the general illustration of the present invention;
1 is chemical anchor bolts in figure;2 be angle bar frame;3 be bottom steel form;4 be side steel form;5 be to pour groove;6 be high-order leakage Bucket.
Fig. 2 is the operating process schematic diagram of the present invention.
Embodiment
Below in conjunction with the accompanying drawings 1, the present invention will be described in detail for attached drawing 2:
With reference to figure 1, Fig. 2, it is chemical anchor bolts including 1;2 be angle bar frame;3 be bottom steel form;4 be side steel form;5 be to pour Groove;6 be high-order funnel;s1:It please put block track circuit;s2:Preparation of construction;s3:Take hole;s4:Reinforcement installation;s5:Steel form Installation;s6:Strength cement-based grouting material stirs;s7:Strength cement-based grouting material pours and high-order funnel pressurization;s8:Platform floor recovers;s9: Disappear a little, release track blockade;
Wherein specific implementation step is as follows:
A kind of operated subway station trough plate platform reinforced construction method, the construction comprise the following steps:
s1:It please put block track circuit:To running scheduling room please point, block and specify area track circuit, it is ensured that operating line is applied Work safety;
s2:Preparation of construction:Organization material, instrument are marched into the arena, and clear up and space junk and dust are reinforced under plate, complete trough plate bottom surface chisel Hair is checked and checked and accepted, and measures the hole site that takes of trough plate, and marked with carrying out;
s3:Take hole:Take hole in trough plate, for strength cement-based grouting material pour and plate in space air discharge;
s4:Reinforcement installation:Reinforced mesh has two layers up and down, middle by bearing rod that upper and lower two layers of reinforcement welding is whole into one Body, is installed reinforced mesh as an entirety, and is fixed on groove through reinforced mesh by placing concrete pad up and down Shape plate down space;
s5:Steel form is installed:Chemical anchor bolts 1 are first planted on trough plate lower ring beam, then angle bar frame 2 is fixed on collar tie beam On chemical anchor bolts 1, then bottom steel form 3 is installed on angle bar frame 2, then side steel form 4 is fixed on bottom steel form 3, most Steel form gap is blocked with expanding cement afterwards, trough plate bottom is formed a closed space;
S6:Strength cement-based grouting material stirs:Strength cement-based grouting material plus water are stirred, strength cement-based grouting material is in flowing viscous pasty state ;
S7:Strength cement-based grouting material pours and high-order funnel pressurization:Strength cement-based grouting material will be stirred and poured by pouring groove 5 to groove Shape plate down space, until having strength cement-based grouting material appearance in 6 base opening of high-order funnel, stops pouring, then again into high-order funnel 6 Addition is stirred strength cement-based grouting material and is reversely pressurizeed, and emerges until pouring 5 mouthfuls of groove without obvious bubble, then stop adding When pressure, strength cement-based grouting material pour face and do not significantly decrease, then remove and pour groove 5 and high-order funnel 6, carry out next place and pour Build;
S8:Platform floor recovers:Platform floor recovery, hole four are carried out to pouring hole and pressurization hole with the marble that hole is taken out is taken Week is sealed with dry cement, makes hole top surface that recovery gets well and platform floor into a plane;
S9:Disappear a little, release track blockade:Track circuit is cleared up after construction, after confirmation scene cleans out safety, Carry out disappearing again a little, release track circuit block.
In s3 takes hole:It is 2 to take the quantity in hole in trough plate, a diameter of 90mm in the hole.
In the stirring of s6 strength cement-based grouting materials:Strength cement-based grouting material is according to 10:1 mass ratio carries out plus water is stirred, Mixing time is 2 minutes.
In S7 strength cement-based grouting materials pour and high-order funnel pressurizes:It is described there is no obvious bubble up to pouring 5 mouthfuls of groove Emerge, then stop pressurizeing, when its time waited pours face for strength cement-based grouting material after five minutes and do not significantly decrease, then move Except groove 5 and high-order funnel 6 is poured, carry out next place and pour.
Track circuit is cleared up after construction, after first confirming that scene cleans out safety by class monitor and group leader, then by pipe Reason personnel, management, owner's representative jointly check again for track circuit, and confirmation of signing, and remove the warning at block both ends Lamp and protected personnel, then disappear a little, release track circuit block.
The foregoing invention can be used for operated subway station trough plate platform well and reinforce, and can make easy for construction fast Prompt, construction quality obtains effective guarantee, escorts for the normal operation of operated subway.

Claims (4)

1. a kind of operated subway station trough plate platform reinforced construction method, it is characterised in that the construction comprises the following steps:
s1:It please put block track circuit:To running scheduling room please point, block and specify area track circuit, it is ensured that operating line is applied Work safety;
s2:Preparation of construction:Organization material, instrument are marched into the arena, and clear up and space junk and dust are reinforced under plate, complete trough plate bottom surface chisel Hair is checked and checked and accepted, and measures the hole site that takes of trough plate, and marked with carrying out;
s3:Take hole:Take hole in trough plate, for strength cement-based grouting material pour and plate in space air discharge;
s4:Reinforcement installation:Reinforced mesh has two layers up and down, middle by bearing rod that upper and lower two layers of reinforcement welding is whole into one Body, is installed reinforced mesh as an entirety, and is fixed on groove through reinforced mesh by placing concrete pad up and down Shape plate down space;
s5:Steel form is installed:First chemical anchor bolts are planted on trough plate lower ring beam(1), then by angle bar frame(2)It is fixed on collar tie beam On chemical anchor bolts(1)On, then bottom steel form(3)Installed in angle bar frame(2)On, then by side steel form(4)It is fixed on bottom Steel form(3)On, finally steel form gap is blocked with expanding cement, trough plate bottom is formed a closed sky Between;
S6:Strength cement-based grouting material stirs:Strength cement-based grouting material plus water are stirred, strength cement-based grouting material is in flowing viscous pasty state ;
S7:Strength cement-based grouting material pours and high-order funnel pressurization:Strength cement-based grouting material will be stirred by pouring groove(5)Pour to Trough plate down space, until high-order funnel(6)There is strength cement-based grouting material appearance in base opening, stop pouring, then leaked again to a high position Bucket(6)Middle addition is stirred strength cement-based grouting material and is reversely pressurizeed, until pouring groove(5)Mouth is emerged without obvious bubble, Stop pressurizeing again, when strength cement-based grouting material pours face and do not significantly decrease, then remove and pour groove(5)And high-order funnel(6), into The next place of row pours;
S8:Platform floor recovers:Platform floor recovery, hole four are carried out to pouring hole and pressurization hole with the marble that hole is taken out is taken Week is sealed with dry cement, makes hole top surface that recovery gets well and platform floor into a plane;
S9:Disappear a little, release track blockade:Track circuit is cleared up after construction, after confirmation scene cleans out safety, Carry out disappearing again a little, release track circuit block.
2. trough plate platform reinforced construction method in operated subway station according to claim 1, it is characterised in that:Taken in s3 Kong Zhong:It is 2 to take the quantity in hole in trough plate, a diameter of 90mm in the hole.
3. trough plate platform reinforced construction method in operated subway station according to claim 1, it is characterised in that:In s6 water In the stirring of mud base grouting material:Strength cement-based grouting material is according to 10:1 mass ratio carries out plus water is stirred, and mixing time is 2 points Clock.
4. trough plate platform reinforced construction method in operated subway station according to claim 1, it is characterised in that:In S7 water During mud base grouting material pours and high-order funnel pressurizes:It is described until pour groove(5)Mouth is emerged without obvious bubble, then stops adding When pressure, its time waited pour face for strength cement-based grouting material after five minutes and do not significantly decrease, then remove and pour groove(5)And High-order funnel(6), carry out next place and pour.
CN201711258729.9A 2017-12-04 2017-12-04 A kind of operated subway station trough plate platform reinforced construction method Expired - Fee Related CN108005402B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711258729.9A CN108005402B (en) 2017-12-04 2017-12-04 A kind of operated subway station trough plate platform reinforced construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711258729.9A CN108005402B (en) 2017-12-04 2017-12-04 A kind of operated subway station trough plate platform reinforced construction method

Publications (2)

Publication Number Publication Date
CN108005402A true CN108005402A (en) 2018-05-08
CN108005402B CN108005402B (en) 2019-11-05

Family

ID=62056043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711258729.9A Expired - Fee Related CN108005402B (en) 2017-12-04 2017-12-04 A kind of operated subway station trough plate platform reinforced construction method

Country Status (1)

Country Link
CN (1) CN108005402B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733715A (en) * 2020-06-29 2020-10-02 中铁六局集团天津铁路建设有限公司 Construction method for slightly widening adjacent high-speed railway platform
CN114439269A (en) * 2022-03-03 2022-05-06 北京城建设计发展集团股份有限公司 Newly-built plate and platform plate reinforcing method for superposition stress of template and original structure
CN114753406A (en) * 2022-03-11 2022-07-15 中建八局轨道交通建设有限公司 Reinforced structure for mounting platform plate of half-height safety door and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733715A (en) * 2020-06-29 2020-10-02 中铁六局集团天津铁路建设有限公司 Construction method for slightly widening adjacent high-speed railway platform
CN114439269A (en) * 2022-03-03 2022-05-06 北京城建设计发展集团股份有限公司 Newly-built plate and platform plate reinforcing method for superposition stress of template and original structure
CN114753406A (en) * 2022-03-11 2022-07-15 中建八局轨道交通建设有限公司 Reinforced structure for mounting platform plate of half-height safety door and construction method thereof

Also Published As

Publication number Publication date
CN108005402B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN108005402A (en) A kind of operated subway station trough plate platform reinforced construction method
CN206189455U (en) Piping lane
CN109184737A (en) The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN110258848A (en) A kind of construction method of building energy conservation CL composite shear wall
CN103938864A (en) Infilled wall constructional column construction method
CN110872869A (en) Waterproof construction method for joints of external wall panels
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN105970803B (en) Shear-resistant energy dissipation device of assembled pier and construction method
CN208748662U (en) Foundation pit front-supporting type slip casting steel pipe support structure
CN107989049A (en) A kind of construction method of frame bank protection
CN111119928B (en) Novel tunnel primary support structure and construction method
CN109322531A (en) Large cooling column herringbone column template integral installation method
CN104153392A (en) Underwater PBM polymer concrete construction method
CN110344844A (en) A kind of track engineering section of track well construction method
CN109610842A (en) A kind of concrete jacking pump send construction method
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN107100197A (en) A kind of detachable water-stop opposite-pulling screw rod erecting device of large steel moulding plate
CN207958977U (en) A kind of device to bind for bridge hollow pier
CN207597406U (en) For the slope reinforcement system of foundation construction engineering
CN206128787U (en) Assembled dregs strorage device
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method
CN105386447A (en) Construction method for replacement support of post-cast strip in construction site
CN201686965U (en) Cast-in-situ reinforced concrete strobe for diversion tunnel
CN105755943B (en) A kind of Arch Bridge Ribs block section and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20201204