CN201686965U - Cast-in-situ reinforced concrete strobe for diversion tunnel - Google Patents

Cast-in-situ reinforced concrete strobe for diversion tunnel Download PDF

Info

Publication number
CN201686965U
CN201686965U CN 201020195818 CN201020195818U CN201686965U CN 201686965 U CN201686965 U CN 201686965U CN 201020195818 CN201020195818 CN 201020195818 CN 201020195818 U CN201020195818 U CN 201020195818U CN 201686965 U CN201686965 U CN 201686965U
Authority
CN
China
Prior art keywords
gate
reinforced concrete
steel
diversion
shutoff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201020195818
Other languages
Chinese (zh)
Inventor
张小华
董宇宪
闵军
徐再厚
方建水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN 201020195818 priority Critical patent/CN201686965U/en
Application granted granted Critical
Publication of CN201686965U publication Critical patent/CN201686965U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a cast-in-situ reinforced concrete strobe for a diversion tunnel, comprising a left pier, a right pier and a bottom plate for a water inlet; the upstream place of the reinforced concrete strobe is provided with a construction water-retaining diversion steel strobe; the reinforced concrete strobe is internally provided with at least one diversion pipe that is communicated with a diversion hole on the corresponding construction water-retaining diversion steel strobe; and a diversion hole plugging steel gate is arranged outside the diversion hole. The cast-in-situ reinforced concrete strobe has the advantages that the plugging engineering quantity is less, the construction period is short, the corresponding construction charge is far less than that of the steel strobe plugging construction, and the economical and practical purposes are achieved.

Description

Diversion tunnel cast-in-situ steel reinforced concrete gate
Technical field
The utility model relates to the gate at diversion tunnel water inlet hole in a kind of Hydraulic and Hydro-Power Engineering, particularly a kind of diversion tunnel cast-in-situ steel reinforced concrete gate.
Background technology
In diversion tunnel shutoff construction, reach following construction requirement: (1) diversion tunnel water inlet hole shutoff, should can satisfy the retaining essential condition in the in kind vivid progress of Hydraulic and Hydro-Power Engineering dam comprehensively and require and could construct.One is chosen in finishes December in dry season~February, and the construction period is shorter, and the shutoff construction must guarantee safe and reliable; (2) diversion tunnel water inlet building should satisfy designed standard for flood control and the overcurrent requirement of corresponding discharge in flood season construction period, does not damage when carrying out shutoff at diversion tunnel water inlet hole; (3) diversion tunnel water inlet hole is wanted and can should carried out each procedure construction of reinforced concrete gate shutoff under the situation that river continues to flow driedly; (4) after the diversion tunnel water inlet hole shutoff, the plug section is met overproof flood in the construction period in diversion tunnel, and the cast-in-situ steel reinforced concrete gate can bear the water pressure of dam upstream institute water storage level, and percolating water phenomenon can not occur; (5) reinforced concrete gate after the diversion tunnel water inlet hole shutoff is not considered to bear water pressure when not reaching 28 days intensity.
In the shutoff construction of Hydraulic and Hydro-Power Engineering diversion tunnel water inlet hole, the method of taking at present is after the diversion tunnel excavation is finished, at first finish concreting, shutoff steel gate and the headstock gear fabrication and installation of water inlet headstock gear framed bent and water inlet building, then diversion tunnel overcurrent in the construction period.When shutoff need be carried out in diversion tunnel water inlet hole, open and close the steel gate by the headstock gear on the headstock gear framed bent, by the steel gate that the diversion tunnel whole shutoff in hole of intaking are tight.The characteristics of steel gate shutoff are to continue to flow, can finish at any time lock shutoff down at diversion tunnel, safe and reliable, but gate plugging structure concreting engineering quantity is big, steel gate volume and weight is big, it is also bigger to open and close the configuration of steel gate crane gear, and the engineering time is long, and difficulty is big, processing quality requires high, and corresponding cost is also high.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of diversion tunnel cast-in-situ steel reinforced concrete gate, can realize plugging diversion tunnel without cutoff by using, and the shutoff area is little, and the engineering time is short, and is safe and reliable.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is: a kind of diversion tunnel cast-in-situ steel reinforced concrete gate, comprise left and right sides abutment pier and water inlet base plate, the reinforced concrete gate upstream is provided with construction dash water conservancy diversion steel gate, at least be provided with a mozzle in the reinforced concrete gate, be communicated with the pod apertures on the corresponding construction dash water conservancy diversion steel gate, pod apertures is provided with pod apertures shutoff steel gate outward.
Also be provided with the keying support on the described reinforced concrete gate, open and close support and be connected with pod apertures shutoff steel gate.
The below of described mozzle tract also is provided with downstream cofferdam.
The operating principle of cast-in-situ steel reinforced concrete gate plugging diversion tunnel without cutoff by using is as follows: the shutoff diversion tunnel water inlet hole water inlet building of 1) being built after the diversion tunnel excavation is finished makes diversion tunnel upper water levelling along entering diversion tunnel during construction diversion.When shutoff was carried out at the water inlet hole, the gate slot on the abutment pier of the left and right sides was the brace foundation of cast-in-situ steel reinforced concrete gate and construction dash water conservancy diversion steel gate, bears the water pressure that gate transmits.Construction dash water conservancy diversion steel gate slot side and end bank pre-buried track embedded part still be steel gate side and bottom surface sealing seat, make that water can seepage under effect of water pressure behind the lock under the steel gate.
At first will construct when 2) shutoff is carried out at diversion tunnel water inlet hole and in gate slot, the mozzle that leads to the reinforced concrete gate downstream will be installed also under the dash water conservancy diversion steel gate, to block by the river of diversion tunnel, the rise river is by set pod apertures in the construction steel gate, the mozzle that passes in the reinforced concrete gate flows to the downstream, guarantees that each procedure of cast-in-situ steel reinforced concrete gate can be in dried construction on the ground.Set pod apertures is intake the hole section by narrowing down to the cross-section of river that has only pod apertures greatly with diversion tunnel in the steel gate, as the last shutoff section of diversion tunnel water inlet, effectively reduces the shutoff difficulty.Can also when not reaching 28 days intensity, the concreting of cast-in-situ steel reinforced concrete gate bear water pressure; 3) behind lock under the construction dash diversion gate, cast-in-place reinforced concrete gate with the whole shutoff of water inlet, form diversion tunnel water inlet shutoff gate structure; 4) after the concreting of cast-in-situ steel reinforced concrete gate reaches 28 days intensity and after the in kind vivid progress of dam can satisfy the retaining essential condition comprehensively and require, by manually-operated cast-in-situ steel reinforced concrete gate top pod apertures steel gate opening/closing is installed and is led the gipsy sheave group, make the pod apertures shutoff steel gate of drop in leaf rotate the shutoff pod apertures, the whole diversion tunnel water inlet whole shutoff in hole are finished, simultaneously dam begins retaining, by cast-in-situ steel reinforced concrete gate dash and bear the water pressure that the dam upstream inpoundment produces.
A kind of diversion tunnel cast-in-situ steel reinforced concrete gate that the utility model provides has following beneficial effect: 1) cast-in-situ steel reinforced concrete gate plugging diversion tunnel without cutoff by using water inlet hole is safe and reliable.
In China's Hydraulic and Hydro-Power Engineering, at first require safe and reliable for diversion tunnel water inlet hole shutoff, method commonly used is with the shutoff of steel gate, be characterized in continuing to flow at diversion tunnel, can finish lock shutoff down at any time, safe and reliable, gate plugging structure concreting engineering quantity is big, steel gate volume and weight is big, it is also bigger to open and close the configuration of steel gate crane gear, and the engineering time is long, and difficulty is big, processing quality requires high, and corresponding cost is also high.The method that the utility model adopted, construction dash water conservancy diversion steel gate can dash again can water conservancy diversion, effectively controlled the water level when diversion tunnel continues to flow, guaranteed that when diversion tunnel continues to flow shutoff each procedure of constructing has enough engineering times to construct doing on the ground safety.Reinforced concrete gate after cast-in-place satisfies bearing capacity and the requirement of percolating water do not occur.The set pod apertures of construction dash water conservancy diversion steel gate, the shutoff big section in hole of intaking is become shutoff pod apertures overcurrent light section, opening and closing device only need dispose a bracing frame and lead just energy open and close pod apertures shutoff steel gate of gipsy sheave group, effectively reduce the shutoff difficulty, make whole shutoff process reach safe and reliable requirement.
2) the cast-in-situ steel reinforced concrete gate plugging diversion tunnel without cutoff by using water inlet hole duration is short, economical and practical.
The water inlet building that method of the present utility model is arranged, there is not the headstock gear framed bent, corresponding engineering quantity is few, and water inlet base plate, left and right sides abutment pier, the construction of upstream diversion wall-retaining structure being finished the back after diversion tunnel excavation is finished just can mistake water, has shortened the water inlet structure engineering time.When the shutoff construction of water inlet hole, construction dash diversion gate is in light weight, and one is heavy to be about 5t, just can be very fast down in gate slot with the 8t mobile crane.Reinforced concrete gate is a slabbed construction, finishes the time spent to be no more than 10 days from lock under the construction dash diversion gate to the concreting of shutoff gate, and the used time of shutoff is short.Because cast-in-situ steel reinforced concrete gate shutoff engineering quantity is few, the construction period is short, and corresponding operating expenses is wanted much less than with the shutoff of steel gate, has reached economy practical purpose again.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples: Fig. 1 is a front view of the present utility model.
Fig. 2 is a right view of the present utility model.
Fig. 3 is a vertical view of the present utility model.
The specific embodiment
A kind of diversion tunnel cast-in-situ steel reinforced concrete gate, work progress is as follows: the water inlet building of being made up of water inlet base plate 2, left and right sides abutment pier 3 and upstream diversion barricade 4 that the shutoff water inlet hole of 1) building after diversion tunnel 1 excavation is finished is required makes diversion tunnel upper water levelling along entering diversion tunnel during construction diversion; 2) the 1 water inlet hole shutoff time of diversion tunnel is to finish December in dry season~February; 3) before the shutoff construction at the scene processing plant make according to construct dash water conservancy diversion steel gate 8, mozzle 6, pod apertures shutoff steel gate 10 of plan.Carry out design of reinforcing bar batching and processing in reinforcing bar factory according to water inlet and reinforced concrete gate 7 structure designs; 4) implement to prepare be at first to have repaiied builder's road and the concrete that a wide 6m in road surface leads to diversion tunnel water inlet shutoff construction part to change the material platform in the dam upstream in construction, and carry out the construct Construction Arrangement of projects such as required wind, water, electricity of diversion tunnel hole shutoff simultaneously.Then by tipping truck, flat car, dam cable machine or other crane gear, plant equipment such as mobile crane combination steel gate that the water inlet shutoff is used, reinforcing bar, tipping truck, flat car, mobile crane, backhoe and material delivery are to on-the-spot; 5) shutoff implementation process is: 1. cleaned out by manually will construct dash water conservancy diversion steel gate slot and Di Kan, hang in dash in the corresponding gate slot by the mobile crane dash water conservancy diversion steel gate 8 of will constructing earlier, manually sealing strip of paper used for sealing in the gate slot is carried out reinforcing thereupon, make the gate periphery not have percolating water, after being installed then, gate pod apertures 9 leads to the reinforced concrete gate 7 downstream mozzles of planning to build 6, the rise river passes the reinforced concrete gate of planning to build 7 by mozzle 6 and flows to the downstream, again with braiding packeted soil or rock ballast do dash downstream cofferdam 5 prevent mozzle 6 let out the past reinforced concrete gate groove of river down and pour in down a chimney, make each procedure of cast-in-situ steel reinforced concrete gate 7 can be in dry work; 2. by mobile crane pod apertures shutoff gate 10 is lifted on the construction dash water conservancy diversion steel gate 8, and on left and right sides abutment pier 3 end faces, puts No. 16 channel-section steels, pod apertures shutoff gate 10 is sling with the suspension hook of leading the gipsy sheave group; 3. manually in the reinforced concrete gate groove, at first carry out end bank, the processing of both sides gate slot seam face cutter hair, carry out formwork erection then successively, gate reinforcing bar binding and welding, the flushing of seam face, structure is checked and accepted; 4. the hole shutoff gate concrete of intaking is mixed system by the general arrangement batching plant, tipping truck transportation, be discharged into crouch jar in, the concrete that dam cable machine will crouch jar is discharged in the tipping truck that changes on the material platform, tipping truck is transported to water inlet with concrete, by backhoe concrete is discharged into institute and waters in the position.Manually smash device and close a position, vibrate, reach behind the design altitude by manually wiping one's face with Φ 100, the electronic vibration of Φ 50 plug-in types; 5. the artificial keying support 11 that the shutoff mozzle is installed on the concrete of building reinforced concrete gate 7, comprise and open and close bracing frame and gipsy sheave is led in keying, and the following pod apertures shutoff gate assembly pulley suspension hook of hanging of left and right sides abutment pier 3 end faces 16 channel-section steels taken off, change on the keying support 11, adjust pod apertures shutoff steel gate 10 shutoff enable possitions; 6. reach 28 days intensity when reinforced concrete gate 7, after dam vivid progress in kind satisfies the first filling essential condition comprehensively, open and close by operation and to lead the gipsy sheave group on the support 11, make the drop in leaf of pod apertures shutoff steel gate 10 rotate shutoff pod apertures 9; 7. after pod apertures 9 shutoff of construction dash water conservancy diversion steel gate 8, weld by manually entering the steel bar stress that reinforced concrete gate 7 downstreams is cut off by pod apertures 9 exits, get up with the concrete shutoff again, implement overall process thereby all finished cast-in-situ steel reinforced concrete gate plugging diversion tunnel without cutoff by using water inlet entrance construction.
Can draw from above-mentioned, a kind of diversion tunnel cast-in-situ steel reinforced concrete gate, comprise left and right sides abutment pier 3 and water inlet base plate 2, reinforced concrete gate 7 upstreams are provided with construction dash water conservancy diversion steel gate 8, construction dash water conservancy diversion steel gate 8 is except can the dash water conservancy diversion, it also is the face die plate of reinforced concrete gate 7, at least be provided with a mozzle 6 in the reinforced concrete gate 7, be communicated with the pod apertures 9 on the corresponding construction dash water conservancy diversion steel gate 8, also can be two according to field condition, three or more mozzle 6, corresponding so with it also have two, three or more pod apertures 9 is communicated with it.The pod apertures 9 outer pod apertures shutoff steel gates 10 that are provided with.Also be provided with on the described reinforced concrete gate 7 and open and close support 11, open and close support 11 and be connected with pod apertures shutoff steel gate 10.Be used to control the opening and closing of pod apertures shutoff steel gate 10, the below of described mozzle 6 tracts also is provided with downstream cofferdam 5.Downstream cofferdam 5 prevents from down to let out river and pours in down a chimney toward the reinforced concrete gate groove.

Claims (3)

1. diversion tunnel cast-in-situ steel reinforced concrete gate, comprise left and right sides abutment pier (3) and water inlet base plate (2), it is characterized in that: reinforced concrete gate (7) upstream is provided with construction dash water conservancy diversion steel gate (8), at least be provided with a mozzle (6) in the reinforced concrete gate (7), be communicated with the outer pod apertures shutoff steel gate (10) that is provided with of pod apertures (9) with the pod apertures (9) on the corresponding construction dash water conservancy diversion steel gate (8).
2. a kind of diversion tunnel cast-in-situ steel reinforced concrete gate according to claim 1 is characterized in that: also be provided with on the described reinforced concrete gate (7) and open and close support (11), open and close support (11) and be connected with pod apertures shutoff steel gate (10).
3. a kind of diversion tunnel cast-in-situ steel reinforced concrete gate according to claim 1 is characterized in that: the below of described mozzle (6) tract also is provided with downstream cofferdam (5).
CN 201020195818 2010-05-19 2010-05-19 Cast-in-situ reinforced concrete strobe for diversion tunnel Expired - Fee Related CN201686965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020195818 CN201686965U (en) 2010-05-19 2010-05-19 Cast-in-situ reinforced concrete strobe for diversion tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020195818 CN201686965U (en) 2010-05-19 2010-05-19 Cast-in-situ reinforced concrete strobe for diversion tunnel

Publications (1)

Publication Number Publication Date
CN201686965U true CN201686965U (en) 2010-12-29

Family

ID=43375250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020195818 Expired - Fee Related CN201686965U (en) 2010-05-19 2010-05-19 Cast-in-situ reinforced concrete strobe for diversion tunnel

Country Status (1)

Country Link
CN (1) CN201686965U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276705A (en) * 2013-05-07 2013-09-04 葛洲坝集团第六工程有限公司 Method for blocking diversion tunnel by cast-in-situ reinforced concrete without gate cutoff and blocking reinforcement cage
CN104018474A (en) * 2014-06-23 2014-09-03 黄河勘测规划设计有限公司 Method for reconstructing construction adit into maintenance adit by virtue of back-filling

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276705A (en) * 2013-05-07 2013-09-04 葛洲坝集团第六工程有限公司 Method for blocking diversion tunnel by cast-in-situ reinforced concrete without gate cutoff and blocking reinforcement cage
CN103276705B (en) * 2013-05-07 2015-04-29 葛洲坝集团第六工程有限公司 Method for blocking diversion tunnel by cast-in-place reinforced concrete without gate flow interruption and blocking reinforcement cage
CN104018474A (en) * 2014-06-23 2014-09-03 黄河勘测规划设计有限公司 Method for reconstructing construction adit into maintenance adit by virtue of back-filling
CN104018474B (en) * 2014-06-23 2016-01-20 黄河勘测规划设计有限公司 The method in a working tunnel backfill reconstruction maintenance hole

Similar Documents

Publication Publication Date Title
CN101824814B (en) Method for plugging diversion tunnel without cutoff by using cast-in-place reinforced concrete gate and the gate
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN103669356B (en) Large volume normal concrete thick layer casting method
CN108385627B (en) Hydropower station diversion tunnel plugging construction method based on karst landform
CN108930284A (en) A kind of assembled barrier wall structure and earth-filling method
CN201686965U (en) Cast-in-situ reinforced concrete strobe for diversion tunnel
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN109441110A (en) A kind of basement shear wall post-cast strip precast outer die construction method
CN102953359B (en) Method for constructing covered channel through efficient water-saving cast-in-place irrigation and drainage
CN105332382B (en) Adjacent river foundation ditch builds island cofferdam clay water stop construction method
CN208039192U (en) Plugging structure for diversion tunnel based on karst landform
CN106498963A (en) A kind of tube well dewatering system that is drawn water using air compressor machine and water pump concentration
CN208533570U (en) A kind of prefabricated assembled fetal membrane
CN204590062U (en) A kind of pole tower pile used for transmission line
CN110004959A (en) Concrete cofferdam rapid constructing method and template under circumstance of flowing water
CN208949951U (en) A kind of riverway sludge cleaning plant
CN108316260A (en) Plugging structure for diversion tunnel based on karst landform and method
CN214574063U (en) Closed structure of high water level large area foundation pit dewatering well
CN105369779B (en) Anti-flood valve and drainage pumping stations integrative-structure
CN208309611U (en) A kind of underwater broken line flow-guiding structure
CN205205789U (en) A flood control floodgate and drainage pumping stations body structure
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut
CN107471404A (en) A kind of water channel gool side leads to the production method of prefabricated component
CN208328982U (en) A kind of assembled barrier wall structure
CN111395268A (en) Construction method for concrete gravity dam of mountain river during flood season

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101229

Termination date: 20160519

CF01 Termination of patent right due to non-payment of annual fee