CN107986176A - High slope masonry building stones transporter - Google Patents
High slope masonry building stones transporter Download PDFInfo
- Publication number
- CN107986176A CN107986176A CN201711114051.7A CN201711114051A CN107986176A CN 107986176 A CN107986176 A CN 107986176A CN 201711114051 A CN201711114051 A CN 201711114051A CN 107986176 A CN107986176 A CN 107986176A
- Authority
- CN
- China
- Prior art keywords
- building stones
- high slope
- masonry building
- transporter
- hopper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/28—Other constructional details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/54—Safety gear
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
The present invention relates to a kind of high slope masonry building stones transporter, it is related to construction equipment technical field, progress existing in the prior art is more slow, cost is higher and technical problem there are security risk for solving.The high slope masonry building stones transporter of the present invention, including operation console, rail mechanism and haulage gear, by setting rail mechanism, hopper is set to be vertically moved up or down under the driving of haulage gear along rail mechanism, side slope masonry is carried out so as to easily transport building stones to appointed place, therefore the speed of building stones vertical transport can not only be improved, and its is easy for installation, it is easy to operate, make the cost of making relatively low, and due to, using mechanically connecting, improving the security of construction site between each component.
Description
Technical field
The present invention relates to construction equipment technical field, a kind of particularly high slope masonry building stones transporter.
Background technology
With the quickening of Urbanization Construction process step, because of the limitation of mountain area each county's landform, geomorphologic conditions, hillside place
Road and building split nature hillside, and since space is limited, the man's activity of hillside place construction in later period, there are whole for slope surface
The possibility on body landslide, to solve natural calamity caused by coming down, it is necessary to carry out effectively preventing, carries out side slope masonry and constructs barricade
It is a kind of structures on prevention landslide.
In general, the length of conventional construction storehouse surface is 10m or so, during high slope masonry construction is carried out, generally
The building stones of bottom are transported to higher slope surface using the mechanical equipments such as excavator or crane auxiliary, but single excavator or are hung
The progress of car is more slow, the cycle of construction is influenced, if increasing the problem of its quantity can then face cost increase and safety
Sex chromosome mosaicism.
The content of the invention
The present invention provides a kind of high slope masonry building stones transporter, more slow for solving progress existing in the prior art
Slowly, cost is higher and technical problem there are security risk.
The present invention provides a kind of high slope masonry building stones transporter, including operation console, is provided with and is used on the operation console
Hold the hopper and traveling wheel of building stones;
Rail mechanism, makes the traveling wheel walk on the rail mechanism, and
Haulage gear, for providing power for the walking of the traveling wheel.
In one embodiment, the rail mechanism includes two parallel and track body frames of slope surface, two rails
Multiple connectors are provided between road body frame.
In one embodiment, between the distance between two adjacent described connectors and two track body frames
Ratio of distances constant be 0.4~0.6.
In one embodiment, the bottom of two track body frames is both provided with multiple branch for being used to fix with slope surface
Support body.
In one embodiment, between the distance between two adjacent described supporters and two track body frames
Ratio of distances constant be 0.4~0.6.
In one embodiment, the opening size of the hopper upper end is more than the opening size of lower end, the hopper
Highly it is equal to or less than 1m.
In one embodiment, the end of the track body frame is provided with safety card, and the safety card is fixed on ground
Face.
In one embodiment, the side of the hopper offers door.
In one embodiment, the surrounding of the operation console is provided with protective fence.
In one embodiment, haulage gear includes hoist engine, directive wheel and steel wire rope, one end of the steel wire rope with
The hoist engine is connected, and the other end of the steel wire rope is connected through the directive wheel and with the operation console.
Compared with prior art, the advantage of the invention is that:By setting rail mechanism, make drive of the hopper in haulage gear
It can be vertically moved up or down under dynamic along rail mechanism, side slope block is carried out so as to easily transport building stones to appointed place
Body, therefore the speed of building stones vertical transport can not only be improved, and also its transportational process is more steady, in addition, rail mechanism
It is easy for installation, it is easy to operate, make the cost of making relatively low, and due to, using mechanically connecting, being improved between each component
The security of construction site.
Brief description of the drawings
The invention will be described in more detail below based on embodiments and refering to the accompanying drawings.
Fig. 1 is the top view of high slope masonry building stones transporter in the embodiment of the present invention;
Fig. 2 is the front view of the high slope masonry building stones transporter shown in Fig. 1.
Reference numeral:
1- operation consoles;2- rail mechanisms;3- haulage gears;
11- hoppers;12- traveling wheels;13- doors;
14- safety cards;15- protective fences;21- track body frames;
22- connectors;23- supporters;31- hoist engines;
32- directive wheels;33- steel wire ropes.
Embodiment
The present invention will be further described with reference to the accompanying drawings.
As shown in Figure 1, the present invention provides a kind of high slope masonry building stones transporter, it includes operation console 1, rail mechanism
2 and haulage gear 3.
Wherein, the hopper 11 and traveling wheel 12 for holding building stones are provided with operation console 1, traveling wheel 12 can be in track
Walk in mechanism 2, the power resources that traveling wheel 12 is walked are in haulage gear 3.Since the vertical transport of building stones is to pass through dragger
Structure 3 drives operation console 1, therefore can control the travelling speed of building stones.
As shown in Fig. 2, since rail mechanism 2 has certain gradient, it is therefore preferred to traveling wheel 12 is arranged on operation
Platform 1 makes traveling wheel 12 when walking on rail mechanism 2 close to the side of rail mechanism 2, operation console can vertically rise or
Decline.
Further, traveling wheel 12 is made of metal material, such as stainless steel;And a diameter of 100mm of traveling wheel is left
It is right.
Further, since dynamic hopper 11 walks on rail mechanism 2 and realizes the vertical transport of building stones, therefore and the prior art
In by excavator with the mechanical equipments such as crane aid in building stones transport compared with, ensure that building stones transport stationarity and security.
Further, since the transport to building stones in the prior art depends on excavator or crane, height is being built by laying bricks or stones
Be necessary at journey operating personnel it is extra build operating space, therefore the lifting of operating personnel is also required to extra equipment, and grasps
The lifting and the transports of building stones for making personnel can not be synchronous, therefore not only cause the substantial amounts of stand-by period, but also add and apply
Work cost.And operation console 1 can not only accommodate the hopper 11 for holding building stones in the present embodiment, but also operating personnel can be located at behaviour
Make to follow operation console 1 on platform 1 while rise or drop to designated position, eliminate the extras of descending operation personnel, and
And carried out since operating personnel are synchronous with the transport of building stones, the time of wait can be reduced, so that the efficiency of construction is improved,
Reduce the cost of construction.
In one embodiment, rail mechanism 2 includes two parallel and track body frames 21 of slope surface, two track body frames 21
Between be provided with multiple connectors 22.It is laid with for example with No. 14 channel steels as track body frame 21, and track should be made
The working face of body frame 21 is tried one's best parallel and slope surface, to ensure the stability of transport;The distance between two track body frames are left for 2.5
It is right.
Further, the ratio between the distance between two track body frames 21 of the distance between two adjacent connectors 22 are
0.4~0.6.Preferably, the ratio between the distance between two track body frames 21 of the distance between two adjacent connectors 22 are
0.5。
In addition, the bottom of two track body frames 21 is both provided with multiple supporters 23 for being used to fix with slope surface.
Further, the ratio between the distance between two track body frames 21 of the distance between two adjacent supporters 23 are
0.4~0.6.Preferably, the ratio between the distance between two track body frames 21 of the distance between two adjacent supporters 23 are
0.5。
Wherein, connector 22 and supporter 23 are made by No. 14 channel steels, and are carried out by welding with track body frame 21
It is fixedly connected.
In one embodiment, the aperture area of 11 upper end of hopper is more than the aperture area of lower end, and grasps for convenience
Building stones are taken as personnel, the height of hopper 11 is less than or equal to 1m.Preferably, the opening size of 11 upper end of hopper is:Length
For 3m, width 1.6m;Material all 11 lower ends opening size be:Length is 2.3m, width 1m;The height of hopper 11 is 1m.
Hopper 11 occurs to derail and directly bump against raw material area during decline in order to prevent, in the end of track body frame 21
Place is provided with safety card 14, wherein, safety card 14 is made of I22 I-steel, and is fixed on the end of track body frame 21
On ground between raw material area.
In addition, taking out the building stones of 11 bottom of hopper for convenience, the side of hopper 11 offers door 13.
In one embodiment, operation console 1 by length be 4m three No. 10 channel steels it is parallel be welded, wherein every groove
Spacing between steel is 250mm, and hopper 11 is located at the middle part of channel steel.
Further, the surrounding of operation console 1 is provided with protective fence.Wherein, protective fence uses the steel pipe welding of a diameter of 48mm
Connect and form.
In one embodiment, haulage gear 3 includes hoist engine 31, directive wheel 32 and the steel wire that rated load weight is 10t
Rope 33, one end of steel wire rope 33 is connected with hoist engine 31, the other end of steel wire rope 33 pass through directive wheel 32 and with 1 phase of operation console
Even.By hoist engine 31 drive operation console 1 realize vertical ascent or decline so that facilitate staff at corresponding position into
Row masonry operates.
In one embodiment, the front end of operation console is provided with broken strand of steel cable detector.Wherein, broken strand of steel cable detects
Device includes two groups of mutually perpendicular iron-core coils, operational amplifier, driving triode and relay.
It may detect the fracture of more than three steel wires in a rope strand pitch by the stranded detector of cord, ensure that steel wire rope is complete
Used entirely in defined use scope, avoid because of wire cable rupture there is a situation where work accident, improve and apply
The security at work scene.
Present invention also offers a kind of method that masonry construction is carried out using above-mentioned high slope masonry building stones transporter, its
Concrete operation step includes:
The first step, arranges construction slope surface as requested.
Second step, installs high slope masonry building stones transporter.It specifically includes following steps:
First, attachment rail mechanism 2.No. 14 channel steels are layed in slope surface and form track body frame 21, then pass through supporter
23 make track body frame 21 be fixed in slope surface, and body 22 is welded to connect between two track body frames 21.
Secondly, installation operation platform 1.Operation console 1, and the stationary hopper on operation console 1 are welded into by three No. 10 channel steels
11;In addition, safety card is installed in the end of track body frame 21.
Finally, steel wire rope 33 is connected with the traveling wheel 12 and hoist engine 31 of operation console 1 respectively.
3rd step, makes hopper 11 drop to its lowest position, and the building stones in raw material area are put into hopper 11, runs elevator
Machine, makes operation console 1 rise to designated position.
4th step, the building stones that operating personnel are taken on operation console 1 in hopper 11 carry out masonry.
5th step, repeat the above steps three and step 4, the completion until single storehouse slope surface is vertically constructed.
Although by reference to preferred embodiment, invention has been described, is not departing from the situation of the scope of the present invention
Under, various improvement can be carried out to it and component therein can be replaced with equivalent.Especially, to be rushed as long as there is no structure
Prominent, items technical characteristic mentioned in the various embodiments can be combined in any way.The invention is not limited in text
Disclosed in specific embodiment, but all technical solutions including falling within the scope of the appended claims.
Claims (10)
- A kind of 1. high slope masonry building stones transporter, it is characterised in that including:Operation console (1), is separately provided for holding the hopper (11) and traveling wheel (12) of building stones on the operation console (1);Rail mechanism (2), makes the traveling wheel (12) walk on the rail mechanism (2), andHaulage gear (3), for providing power for the walking of the traveling wheel (12).
- 2. high slope masonry building stones transporter according to claim 1, it is characterised in that the rail mechanism (2) includes Two parallel with the track body frames of slope surface (21), and multiple connectors (22) are provided between two track body frames (21).
- 3. high slope masonry building stones transporter according to claim 2, it is characterised in that two adjacent connectors The distance between (22) the ratio between the distance between two described track body frames (21) are 0.4~0.6.
- 4. the high slope masonry building stones transporter according to Claims 2 or 3, it is characterised in that two track body frames (21) bottom is both provided with multiple supporters (23) for being used to fix with slope surface.
- 5. high slope masonry building stones transporter according to claim 4, it is characterised in that two adjacent supporters The distance between (23) the ratio between the distance between two described track body frames (21) are 0.4~0.6.
- 6. the high slope masonry building stones transporter according to any claim in claim 1-3, it is characterised in that described The opening size of hopper (11) upper end is more than the opening size of lower end, and the height of the hopper (11) is equal to or less than 1m.
- 7. high slope masonry building stones transporter according to claim 6, it is characterised in that the end of the track body frame (21) Safety card (14) is provided with end, the safety card (14) is fixed on ground.
- 8. high slope masonry building stones transporter according to claim 6, it is characterised in that open the side of the hopper (11) Equipped with door (13).
- 9. the high slope masonry building stones transporter according to any claim in claim 1-3, it is characterised in that described The surrounding of operation console (1) is provided with protective fence (15).
- 10. the high slope masonry building stones transporter according to any claim in claim 1-3, it is characterised in that lead Drawing mechanism (3) includes hoist engine (31), directive wheel (32) and steel wire rope (33), one end and the elevator of the steel wire rope (33) Machine (31) is connected, and the other end of the steel wire rope (33) is connected through the directive wheel (32) and with the operation console (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711114051.7A CN107986176B (en) | 2017-11-13 | 2017-11-13 | High slope masonry stone conveyor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711114051.7A CN107986176B (en) | 2017-11-13 | 2017-11-13 | High slope masonry stone conveyor |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107986176A true CN107986176A (en) | 2018-05-04 |
CN107986176B CN107986176B (en) | 2020-01-17 |
Family
ID=62031314
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711114051.7A Active CN107986176B (en) | 2017-11-13 | 2017-11-13 | High slope masonry stone conveyor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107986176B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110054093A (en) * | 2019-05-24 | 2019-07-26 | 安徽水利开发有限公司 | Lining segment lifts conveying device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08199580A (en) * | 1995-01-24 | 1996-08-06 | Tetra:Kk | Side slope lifting device |
CN203269274U (en) * | 2013-05-31 | 2013-11-06 | 中国葛洲坝集团股份有限公司 | Slope section rail type conveying device |
CN104030133A (en) * | 2014-04-29 | 2014-09-10 | 苏州中远电梯有限公司 | Construction site electric lift car |
CN203855965U (en) * | 2014-05-28 | 2014-10-01 | 中国水利水电第八工程局有限公司 | Rail-mounted movable trolley device for slope corridor grouting construction |
CN203855967U (en) * | 2014-06-09 | 2014-10-01 | 中国葛洲坝集团股份有限公司 | Drilling and filling trolley on slope gallery |
CN204980738U (en) * | 2015-07-31 | 2016-01-20 | 中铁西北科学研究院有限公司 | Anticreep rail formula side slope material construction conveyer |
CN205892595U (en) * | 2016-07-26 | 2017-01-18 | 中国葛洲坝集团电力有限责任公司 | Hill slope rail transporting system |
CN107268630A (en) * | 2017-07-06 | 2017-10-20 | 中交路桥建设有限公司 | A kind of side slope protection construction material transport system and method |
-
2017
- 2017-11-13 CN CN201711114051.7A patent/CN107986176B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08199580A (en) * | 1995-01-24 | 1996-08-06 | Tetra:Kk | Side slope lifting device |
CN203269274U (en) * | 2013-05-31 | 2013-11-06 | 中国葛洲坝集团股份有限公司 | Slope section rail type conveying device |
CN104030133A (en) * | 2014-04-29 | 2014-09-10 | 苏州中远电梯有限公司 | Construction site electric lift car |
CN203855965U (en) * | 2014-05-28 | 2014-10-01 | 中国水利水电第八工程局有限公司 | Rail-mounted movable trolley device for slope corridor grouting construction |
CN203855967U (en) * | 2014-06-09 | 2014-10-01 | 中国葛洲坝集团股份有限公司 | Drilling and filling trolley on slope gallery |
CN204980738U (en) * | 2015-07-31 | 2016-01-20 | 中铁西北科学研究院有限公司 | Anticreep rail formula side slope material construction conveyer |
CN205892595U (en) * | 2016-07-26 | 2017-01-18 | 中国葛洲坝集团电力有限责任公司 | Hill slope rail transporting system |
CN107268630A (en) * | 2017-07-06 | 2017-10-20 | 中交路桥建设有限公司 | A kind of side slope protection construction material transport system and method |
Non-Patent Citations (1)
Title |
---|
魏臻等: "《矿井移动目标安全监控原理及关键技术》", 31 July 2011, 煤炭工业出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110054093A (en) * | 2019-05-24 | 2019-07-26 | 安徽水利开发有限公司 | Lining segment lifts conveying device |
Also Published As
Publication number | Publication date |
---|---|
CN107986176B (en) | 2020-01-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104088449B (en) | Safe and fast double-track construction platform of super high-rise curtain wall | |
CN203377546U (en) | High speed railway spanning construction apparatus | |
CN104195952A (en) | Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge | |
CN108265628A (en) | One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method | |
CN107990051B (en) | It is a kind of to lift auxiliary device and method in place for jacking pipe joints | |
CN104340813A (en) | Construction method of elevator mounting | |
CN105347188B (en) | Traction type arch-bridge crane of crane carriage | |
CN109488038B (en) | Method for installing beam string flexible inhaul cable spanning existing building | |
CN104060844A (en) | Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof | |
CN104895337B (en) | The installation method of large-size horizontal equipment in concrete frame | |
CN108755718A (en) | High Slope on Expressway beats anchor shaft anchor cable apparatus for work | |
CN105113803A (en) | High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device | |
CN204689430U (en) | To Construction of Silo movable hoisting device | |
CN210214612U (en) | Radiant cable crane hoisting system in tunnel anchor | |
CN205954489U (en) | Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support | |
CN102587284A (en) | Independent derrick mast and beam plate mounting method | |
CN103288002A (en) | Simple combination portal upper-air heavy-article hoisting device | |
CN107986176A (en) | High slope masonry building stones transporter | |
CN204022201U (en) | A kind of weight-lifting equipment for vertical transport | |
CN201183702Y (en) | Novel silo hoisting device using movable pulley | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN105484155B (en) | Crossing floor system for on-line high-speed railway crossing equipment | |
CN205346676U (en) | High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism | |
CN110065888A (en) | A kind of cable crane main rope Demolition Construction method | |
CN205275061U (en) | Semi -portal crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |