CN107985507A - A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device - Google Patents

A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device Download PDF

Info

Publication number
CN107985507A
CN107985507A CN201711457138.4A CN201711457138A CN107985507A CN 107985507 A CN107985507 A CN 107985507A CN 201711457138 A CN201711457138 A CN 201711457138A CN 107985507 A CN107985507 A CN 107985507A
Authority
CN
China
Prior art keywords
corrugated bulkhead
stainless steel
main frame
construction device
phase stainless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711457138.4A
Other languages
Chinese (zh)
Inventor
廖喜华
黄昌妙
孙德
孙德一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG XINCHUAN HEAVY INDUSTRY Co Ltd
Original Assignee
GUANGDONG XINCHUAN HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG XINCHUAN HEAVY INDUSTRY Co Ltd filed Critical GUANGDONG XINCHUAN HEAVY INDUSTRY Co Ltd
Priority to CN201711457138.4A priority Critical patent/CN107985507A/en
Publication of CN107985507A publication Critical patent/CN107985507A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of two phase stainless steel tanker corrugated bulkhead rapid construction device, including main frame;Main frame includes five carrier units, and five carrier units stack gradually from top to bottom;The carrier unit of the top is equipped with two hooks in main frame;Two hooks it is opening down, and two hooks are used to catch on corrugated bulkhead at the same time.After the corrugated bulkhead segment carrying positioning of building berth cargo area, with truck crane by vertical lifting of the present invention, corrugated bulkhead is hooked using two of the present invention, completion is set up, i.e. the present invention takes the time of loop wheel machine during being effectively shortened corrugated bulkhead segment carrying, and eliminate scaffold and take, tear work open, save building berth resource.

Description

A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device
Technical field
The present invention relates to tanker constructing device technical field, and in particular to a kind of two phase stainless steel tanker corrugated bulkhead Rapid construction device.
Background technology
The corrugated bulkhead of building berth cargo area needs segment carrying, and usual segmental hoisting in place, treats the foot hand of segment folding seam Frame has been set up, and after construction personnel completes corrugated bulkhead tack welding by the landing stage of scaffold, can just come loose suspension hook, but the prior art Under, the scaffold building time is longer, and split fix is slow so that the suspension hook that cannot come loose in time, cause to take shipway crane hook compared with For a long time, building berth resource cannot be efficiently utilized.
It can be seen from the above that also there are certain defect for the prior art.
The content of the invention
In view of this, in order to solve the problems of the prior art, the present invention proposes a kind of two phase stainless steel tanker groove profile Bulkhead rapid construction device.
The present invention is solved the above problems by following technological means:
A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device, including main frame;
The main frame includes five carrier units, and five carrier units stack gradually from top to bottom;
The carrier unit of the top is equipped with two hooks in the main frame;
Two hooks it is opening down, and two hooks are used to catch on corrugated bulkhead at the same time.
Further, the carrier unit includes four crossbeams;
Four crossbeams are sequentially connected composition rectangular frame;
A upright upright bar is respectively provided with four vertex of the rectangular frame;
The rectangular frame is equipped with a landing slab,
The landing slab is equipped with a rectangular through-hole, and the lower section of the rectangular through-hole is equipped with an inclined ladder.
Further, the carrier unit of the top is equipped with four hanging rings in the main frame.
Further, the carrier unit of the top is equipped with fence in the main frame;
The fence includes four columns;
Four columns upright four vertex for being arranged at landing slab respectively;
Chain is equipped between two adjacent columns.
Further, head rod and the second connecting rod are equipped between two adjacent upright bars, described first connects Extension bar is arranged vertically with upright bar, and second connecting rod is at an angle of arrangement with upright bar.
Further, bracket is equipped between the crossbeam and upright bar.
Compared with prior art, beneficial effects of the present invention are as follows:
After the corrugated bulkhead segment carrying positioning of building berth cargo area, with truck crane by vertical lifting of the present invention, this is utilized Two of invention hook corrugated bulkhead, complete to set up, i.e., during the present invention is effectively shortened corrugated bulkhead segment carrying The time of loop wheel machine is taken, and eliminates scaffold and takes, tears work open, has saved building berth resource.
Brief description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, without creative efforts, other can also be obtained according to these attached drawings Attached drawing.
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the structure diagram of carrier unit in the present invention;
Fig. 3 is the partial enlarged view A of Fig. 2;
Fig. 4 is the use schematic diagram of the present invention.
Description of reference numerals:
1st, carrier unit;2nd, link up with;3rd, crossbeam;4th, rectangular frame;5th, upright bar;6th, landing slab;7th, rectangular through-hole;8th, tiltedly Ladder;9th, hanging ring;10th, column;11st, chain;12nd, head rod;13rd, the second connecting rod;14th, bracket;15th, corrugated bulkhead;16、 Main frame.
Embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with attached drawing and specifically Embodiment technical scheme is described in detail.It is pointed out that described embodiment is only this hair Bright part of the embodiment, instead of all the embodiments, based on the embodiments of the present invention, those of ordinary skill in the art are not having All other embodiments obtained under the premise of creative work are made, belong to the scope of protection of the invention.
It is to be appreciated that the orientation or position relationship of the instruction such as term " top ", " bottom " are based on shown in the drawings Orientation or position relationship, are for only for ease of the description present invention and simplify description, rather than instruction or imply signified device or Element must have specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
Term " first ", " second ", " the 3rd " are only used for description purpose, and it is not intended that indicating or implying relatively important Property or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", " second ", " the 3rd " feature can To express or implicitly include one or more this feature.In the description of the present invention, unless otherwise indicated, " one group " It is meant that two or more.
Embodiment
As shown in Figs 1-4, a kind of two phase stainless steel tanker corrugated bulkhead rapid construction device, including main frame 16;
The main frame 16 includes five carrier units 1, and five carrier units 1 stack gradually from top to bottom;
The carrier unit 1 of the top is equipped with two hooks 2 in the main frame 16;
Two it is described hook 2 it is opening down, and two it is described hook 2 be used at the same time catch on corrugated bulkhead 15.
After 15 segment carrying of the corrugated bulkhead positioning of building berth cargo area, with truck crane by vertical lifting of the present invention, utilize Two hooks 2 of the present invention hook corrugated bulkhead 15, complete to set up, i.e., the present invention is effectively shortened the segmentation of corrugated bulkhead 15 and takes The time of loop wheel machine is taken during load, and eliminates scaffold and takes, tears work open, has saved building berth resource.
The present invention has wide range of applications, and is taken suitable for all kinds of large and medium-sized two-phase stainless molten steel goods series ship building berth cargo areas Carry corrugated bulkhead section fillet weld, cross joint assembling, electric welding, polishing.The frock that the present invention disposably makes, it is repeatable to be applied to Follow-up homologous series ship type.
Preferably, the carrier unit 1 includes four crossbeams 3;
Four crossbeams 3, which are sequentially connected, forms rectangular frame 4;
A upright upright bar 5 is respectively provided with four vertex of the rectangular frame 4;
The rectangular frame 4 is equipped with a landing slab 6,
The landing slab 6 is equipped with a rectangular through-hole 7, and the lower section of the rectangular through-hole 7 is equipped with an inclined ladder 8.
Preferably, the carrier unit 1 of the top is equipped with four hanging rings 9 in the main frame 16.After convenient Phase truck crane is by vertical lifting of the present invention.
Preferably, the carrier unit 1 of the top is equipped with fence in the main frame 16;
The fence includes four columns 10;
Four columns 10 upright four vertex for being arranged at landing slab 6 respectively;
Chain 11 is equipped between two adjacent columns 10.
Preferably, 12 and second connecting rod 13 of head rod is equipped between adjacent two upright bars 5, The head rod 12 is arranged vertically with upright bar 5, second connecting rod 13 and the angled arrangement of upright bar 5.
Preferably, bracket 14 is equipped between the crossbeam 3 and upright bar 5.
Embodiment described above only expresses the several embodiments of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

1. a kind of two phase stainless steel tanker corrugated bulkhead rapid construction device, it is characterised in that including main frame;
The main frame includes five carrier units, and five carrier units stack gradually from top to bottom;
The carrier unit of the top is equipped with two hooks in the main frame;
Two hooks it is opening down, and two hooks are used to catch on corrugated bulkhead at the same time.
2. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 1, it is characterised in that described Carrier unit includes four crossbeams;
Four crossbeams are sequentially connected composition rectangular frame;
A upright upright bar is respectively provided with four vertex of the rectangular frame;
The rectangular frame is equipped with a landing slab,
The landing slab is equipped with a rectangular through-hole, and the lower section of the rectangular through-hole is equipped with an inclined ladder.
3. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 1, it is characterised in that described The carrier unit of the top is equipped with four hanging rings in main frame.
4. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 1, it is characterised in that described The carrier unit of the top is equipped with fence in main frame;
The fence includes four columns;
Four columns upright four vertex for being arranged at landing slab respectively;
Chain is equipped between two adjacent columns.
5. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 2, it is characterised in that adjacent Two upright bars between be equipped with head rod and the second connecting rod, the head rod is arranged vertically with upright bar, institute State the second connecting rod and be at an angle of arrangement with upright bar.
6. the two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 2 or 5, it is characterised in that Bracket is equipped between the crossbeam and upright bar.
CN201711457138.4A 2017-12-28 2017-12-28 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device Pending CN107985507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711457138.4A CN107985507A (en) 2017-12-28 2017-12-28 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711457138.4A CN107985507A (en) 2017-12-28 2017-12-28 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device

Publications (1)

Publication Number Publication Date
CN107985507A true CN107985507A (en) 2018-05-04

Family

ID=62042028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711457138.4A Pending CN107985507A (en) 2017-12-28 2017-12-28 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device

Country Status (1)

Country Link
CN (1) CN107985507A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791702A (en) * 2018-05-31 2018-11-13 广船国际有限公司 A kind of corrugated bulkhead scaffold installation method
CN108999389A (en) * 2018-07-26 2018-12-14 广州供电局有限公司 The replacing options of Portable vertical hoistable platform and STATCOM valve group
CN112572721A (en) * 2020-12-01 2021-03-30 沪东中华造船(集团)有限公司 Method for scribing inclined plane groove type bulkhead installation line and method for installing inclined plane groove type bulkhead

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS611592A (en) * 1984-06-15 1986-01-07 Nippon Kokan Kk <Nkk> Method of assembling bulkhead of ship hold
CN2520285Y (en) * 2001-12-28 2002-11-13 广州广船国际股份有限公司 Corrugated bulkhead reinforcing structure of liquid cargo ship
JP2006021721A (en) * 2004-07-09 2006-01-26 Universal Shipbuilding Corp Inspecting device for hold side wall structural member
KR20100053197A (en) * 2008-11-12 2010-05-20 에스티엑스조선해양 주식회사 Working stand for working at the reverse slant part of hull block
KR20120050792A (en) * 2010-11-11 2012-05-21 삼성중공업 주식회사 Cargo carrier and construction method thereof
KR20120067011A (en) * 2010-12-15 2012-06-25 에스티엑스조선해양 주식회사 Variable pitch and transferable working plate for corrugated bulkhead
KR20130128607A (en) * 2012-05-17 2013-11-27 에스티엑스조선해양 주식회사 Working hanger unit for ship block
CN203780740U (en) * 2014-02-09 2014-08-20 舟山市定海区巨洋技术开发有限公司 Auxiliary welding device for annular section of ship body
CN203946238U (en) * 2014-06-06 2014-11-19 浙江海洋学院 A kind of compound new-type bulkhead
CN204822025U (en) * 2015-07-27 2015-12-02 上海江南长兴重工有限责任公司 Marine construction platform
CN205574235U (en) * 2016-04-28 2016-09-14 中船黄埔文冲船舶有限公司 Bulk freighter wing tank section construction stores pylon
CN205574234U (en) * 2016-04-20 2016-09-14 中船黄埔文冲船舶有限公司 Supplementary hull stitches work platform frame for construction immediately
CN106335603A (en) * 2016-09-28 2017-01-18 广船国际有限公司 Method for assembling corrugated bulkhead block
CN106627990A (en) * 2015-07-26 2017-05-10 中航鼎衡造船有限公司 Cargo hold segment corrugated wall and reinforcing plate centering installation and precision control method
CN107264720A (en) * 2017-06-27 2017-10-20 广船国际有限公司 A kind of ship bulkhead structure
CN207747980U (en) * 2017-12-28 2018-08-21 广东新船重工有限公司 A kind of two phase stainless steel tanker corrugated bulkhead guarantor's type device
CN207747979U (en) * 2017-12-28 2018-08-21 广东新船重工有限公司 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS611592A (en) * 1984-06-15 1986-01-07 Nippon Kokan Kk <Nkk> Method of assembling bulkhead of ship hold
CN2520285Y (en) * 2001-12-28 2002-11-13 广州广船国际股份有限公司 Corrugated bulkhead reinforcing structure of liquid cargo ship
JP2006021721A (en) * 2004-07-09 2006-01-26 Universal Shipbuilding Corp Inspecting device for hold side wall structural member
KR20100053197A (en) * 2008-11-12 2010-05-20 에스티엑스조선해양 주식회사 Working stand for working at the reverse slant part of hull block
KR20120050792A (en) * 2010-11-11 2012-05-21 삼성중공업 주식회사 Cargo carrier and construction method thereof
KR20120067011A (en) * 2010-12-15 2012-06-25 에스티엑스조선해양 주식회사 Variable pitch and transferable working plate for corrugated bulkhead
KR20130128607A (en) * 2012-05-17 2013-11-27 에스티엑스조선해양 주식회사 Working hanger unit for ship block
CN203780740U (en) * 2014-02-09 2014-08-20 舟山市定海区巨洋技术开发有限公司 Auxiliary welding device for annular section of ship body
CN203946238U (en) * 2014-06-06 2014-11-19 浙江海洋学院 A kind of compound new-type bulkhead
CN106627990A (en) * 2015-07-26 2017-05-10 中航鼎衡造船有限公司 Cargo hold segment corrugated wall and reinforcing plate centering installation and precision control method
CN204822025U (en) * 2015-07-27 2015-12-02 上海江南长兴重工有限责任公司 Marine construction platform
CN205574234U (en) * 2016-04-20 2016-09-14 中船黄埔文冲船舶有限公司 Supplementary hull stitches work platform frame for construction immediately
CN205574235U (en) * 2016-04-28 2016-09-14 中船黄埔文冲船舶有限公司 Bulk freighter wing tank section construction stores pylon
CN106335603A (en) * 2016-09-28 2017-01-18 广船国际有限公司 Method for assembling corrugated bulkhead block
CN107264720A (en) * 2017-06-27 2017-10-20 广船国际有限公司 A kind of ship bulkhead structure
CN207747980U (en) * 2017-12-28 2018-08-21 广东新船重工有限公司 A kind of two phase stainless steel tanker corrugated bulkhead guarantor's type device
CN207747979U (en) * 2017-12-28 2018-08-21 广东新船重工有限公司 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791702A (en) * 2018-05-31 2018-11-13 广船国际有限公司 A kind of corrugated bulkhead scaffold installation method
CN108999389A (en) * 2018-07-26 2018-12-14 广州供电局有限公司 The replacing options of Portable vertical hoistable platform and STATCOM valve group
CN108999389B (en) * 2018-07-26 2021-06-22 广东电网有限责任公司广州供电局 Portable vertical lifting platform and replacement method of STATCOM valve bank
CN112572721A (en) * 2020-12-01 2021-03-30 沪东中华造船(集团)有限公司 Method for scribing inclined plane groove type bulkhead installation line and method for installing inclined plane groove type bulkhead

Similar Documents

Publication Publication Date Title
CN107985507A (en) A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN102975818B (en) A kind of aluminum alloy superstructure block hanging method
CN205574234U (en) Supplementary hull stitches work platform frame for construction immediately
CN207747979U (en) A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device
CN102659017B (en) Steel column hoisting system
CN107931928A (en) A kind of Portable clamp for aiding in transverse and longitudinal beam welding equipment
CN108032960A (en) A kind of two phase stainless steel tanker corrugated bulkhead guarantor&#39;s type device
CN204713400U (en) A kind of boat scaffold
CN206872270U (en) A kind of device of across the railway cluster lifting of large-tonnage railway single freely-supported trough girder
CN201077714Y (en) Container lifting base angle lockhole special slings
CN107416685A (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN207986537U (en) Large-tonnage girder steel loads and unloads ship cantilever crane
CN206142648U (en) Supplementary support body of heavy panel hoist and mount
CN202953704U (en) Cross beam for single-hook lifting steel plate
CN105439003B (en) Crawler crane and its lifting test device, hanging method
CN209723570U (en) Steel column docking installation operation platform
CN107476559A (en) A kind of spigot-and-socket builder&#39;s jack and installation method
CN107838619A (en) A kind of gate fixture for aiding in girder and aggregate cross weld
CN210855055U (en) Convenient dismouting of standard festival platform cat ladder is put
CN208814502U (en) Stevedoring vehicle hanger
CN203740851U (en) Detachable lifting beam
CN105317031A (en) Method for hoisting main beam of bridge crane of primary machine room of ship elevator
CN104802946B (en) Ocean platform is segmented deck and its builds implementation, suspension arm support system
CN206752318U (en) A kind of bridge coping template fast dismounting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination