CN207747979U - A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device - Google Patents
A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device Download PDFInfo
- Publication number
- CN207747979U CN207747979U CN201721875585.7U CN201721875585U CN207747979U CN 207747979 U CN207747979 U CN 207747979U CN 201721875585 U CN201721875585 U CN 201721875585U CN 207747979 U CN207747979 U CN 207747979U
- Authority
- CN
- China
- Prior art keywords
- corrugated bulkhead
- stainless steel
- main frame
- utility
- phase stainless
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of two phase stainless steel tanker corrugated bulkhead rapid construction devices, including main frame;Main frame includes five carrier units, and five carrier units stack gradually from top to bottom;Hook there are two being set on the carrier unit of the top in main frame;Two hooks it is opening down, and two hooks are used for while catching on corrugated bulkhead.After the corrugated bulkhead segment carrying positioning of building berth cargo area, with truck crane by the utility model vertical lifting, corrugated bulkhead is hooked using two of the utility model, completion is set up, i.e. the utility model occupies the time of loop wheel machine during being effectively shortened corrugated bulkhead segment carrying, and eliminate scaffold and take, tear work open, save building berth resource.
Description
Technical field
The utility model is related to tanker constructing device technical fields, and in particular to a kind of two phase stainless steel tanker groove profile
Bulkhead rapid construction device.
Background technology
The corrugated bulkhead of building berth cargo area needs segment carrying, usual segmental hoisting in place, to wait for the foot hand of segment folding seam
Frame has been set up, and after construction personnel completes corrugated bulkhead tack welding by the landing stage of scaffold, can just come loose suspension hook, however the prior art
Under, the scaffold building time is longer, and split fix is slow so that the suspension hook that cannot come loose in time, cause to occupy shipway crane hook compared with
For a long time, building berth resource cannot be efficiently utilized.
It can be seen that there is also certain defects for the prior art.
Utility model content
In view of this, in order to solve the problems in the prior art, the utility model proposes a kind of two phase stainless steel tankers
Corrugated bulkhead rapid construction device.
The utility model is solved the above problems by following technological means:
A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device, including main frame;
The main frame includes five carrier units, and five carrier units stack gradually from top to bottom;
Hook there are two being set on the carrier unit of the top in the main frame;
Two hooks it is opening down, and two hooks are used for while catching on corrugated bulkhead.
Further, the carrier unit includes four crossbeams;
Four crossbeams are sequentially connected composition rectangular frame;
It is respectively provided with a upright upright bar under four vertex of the rectangular frame;
The rectangular frame is equipped with a landing slab,
The landing slab is equipped with a rectangular through-hole, and the lower section of the rectangular through-hole is equipped with an inclined ladder.
Further, hanging ring there are four being set on the carrier unit of the top in the main frame.
Further, the carrier unit of the top is equipped with fence in the main frame;
The fence includes four columns;
Four columns upright four vertex for being set to landing slab respectively;
Chain is equipped between two adjacent columns.
Further, head rod and the second connecting rod are equipped between two adjacent upright bars, described first connects
Extension bar is arranged vertically with upright bar, second connecting rod and the angled arrangement of upright bar.
Further, bracket is equipped between the crossbeam and upright bar.
Compared with prior art, the beneficial effects of the utility model are as follows:
After the corrugated bulkhead segment carrying positioning of building berth cargo area, with truck crane by the utility model vertical lifting, profit
Corrugated bulkhead is hooked with two of the utility model, completes to set up, i.e., the utility model is effectively shortened corrugated bulkhead
The time of loop wheel machine is occupied during segment carrying, and eliminates scaffold and takes, tears work open, has saved building berth resource.
Description of the drawings
It is required in being described below to embodiment in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing to be used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the utility model
Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of carrier unit in the utility model;
Fig. 3 is the partial enlarged view A of Fig. 2;
Fig. 4 is the use schematic diagram of the utility model.
Reference sign:
1, carrier unit;2, it links up with;3, crossbeam;4, rectangular frame;5, upright bar;6, landing slab;7, rectangular through-hole;8, tiltedly
Ladder;9, hanging ring;10, column;11, chain;12, head rod;13, the second connecting rod;14, bracket;15, corrugated bulkhead;16、
Main frame.
Specific implementation mode
To keep the above objects, features, and advantages of the utility model more obvious and easy to understand, below in conjunction with attached drawing and
The technical solution of the utility model is described in detail in specific embodiment.It should be pointed out that described embodiment is only
Only it is the utility model a part of the embodiment, instead of all the embodiments, is based on the embodiments of the present invention, this field
The every other embodiment that those of ordinary skill is obtained without making creative work, belongs to the utility model
The range of protection.
It is to be appreciated that the orientation or positional relationship of the instructions such as term " top ", " bottom " is based on ... shown in the drawings
Orientation or positional relationship is merely for convenience of describing the present invention and simplifying the description, and does not indicate or imply the indicated dress
It sets or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as to the utility model
Limitation.
Term " first ", " second ", " third " are used for description purposes only, and are not understood to indicate or imply relatively important
Property or implicitly indicate the quantity of indicated technical characteristic.Define as a result, " first ", " second ", " third " feature can
To express or implicitly include one or more this feature.In the description of the present invention, unless otherwise indicated,
" one group " is meant that two or more.
Embodiment
As shown in Figs 1-4, a kind of two phase stainless steel tanker corrugated bulkhead rapid construction device, including main frame 16;
The main frame 16 includes five carrier units 1, and five carrier units 1 stack gradually from top to bottom;
Hook 2 there are two being set on the carrier unit 1 of the top in the main frame 16;
Two it is described hook 2 it is opening down, and two it is described hook 2 be used for and meanwhile catch on corrugated bulkhead 15.
After 15 segment carrying of the corrugated bulkhead positioning of building berth cargo area, with truck crane by the utility model vertical lifting,
Corrugated bulkhead 15 is hooked using two hooks 2 of the utility model, completes to set up, i.e., the utility model is effectively shortened groove profile
The time of loop wheel machine is occupied during 15 segment carrying of bulkhead, and eliminates scaffold and takes, tears work open, has saved building berth resource.
The utility model has wide range of applications, and is suitable for all kinds of large and medium-sized two-phase stainless molten steel goods series ship building berth cargo hold areas
Carry corrugated bulkhead section fillet weld, cross joint assembly, electric welding, polishing in domain.The tooling that the utility model disposably makes can weigh
It is applied to follow-up homologous series ship type again.
Preferably, the carrier unit 1 includes four crossbeams 3;
Four crossbeams 3, which are sequentially connected, constitutes rectangular frame 4;
A upright upright bar 5 is respectively provided under four vertex of the rectangular frame 4;
The rectangular frame 4 is equipped with a landing slab 6,
The landing slab 6 is equipped with a rectangular through-hole 7, and the lower section of the rectangular through-hole 7 is equipped with an inclined ladder 8.
Preferably, hanging ring 9 there are four being set on the carrier unit 1 of the top in the main frame 16.After convenient
Phase truck crane is by the utility model vertical lifting.
Preferably, the carrier unit 1 of the top is equipped with fence in the main frame 16;
The fence includes four columns 10;
Four columns 10 upright four vertex for being set to landing slab 6 respectively;
Chain 11 is equipped between two adjacent columns 10.
Preferably, head rod 12 and the second connecting rod 13 are equipped between two adjacent upright bars 5,
The head rod 12 is arranged vertically with upright bar 5, second connecting rod 13 and the angled arrangement of upright bar 5.
Preferably, bracket 14 is equipped between the crossbeam 3 and upright bar 5.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed,
But it should not be understood as limiting the scope of the patent of the utility model.It should be pointed out that for the common of this field
For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to
In the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (6)
1. a kind of two phase stainless steel tanker corrugated bulkhead rapid construction device, which is characterized in that including main frame;
The main frame includes five carrier units, and five carrier units stack gradually from top to bottom;
Hook there are two being set on the carrier unit of the top in the main frame;
Two hooks it is opening down, and two hooks are used for while catching on corrugated bulkhead.
2. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 1, which is characterized in that described
Carrier unit includes four crossbeams;
Four crossbeams are sequentially connected composition rectangular frame;
It is respectively provided with a upright upright bar under four vertex of the rectangular frame;
The rectangular frame is equipped with a landing slab,
The landing slab is equipped with a rectangular through-hole, and the lower section of the rectangular through-hole is equipped with an inclined ladder.
3. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 1, which is characterized in that described
Hanging ring there are four being set on the carrier unit of the top in main frame.
4. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 1, which is characterized in that described
The carrier unit of the top is equipped with fence in main frame;
The fence includes four columns;
Four columns upright four vertex for being set to landing slab respectively;
Chain is equipped between two adjacent columns.
5. two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 2, which is characterized in that adjacent
Two upright bars between be equipped with head rod and the second connecting rod, the head rod is arranged vertically with upright bar, institute
State the second connecting rod and the angled arrangement of upright bar.
6. the two phase stainless steel tanker corrugated bulkhead rapid construction device according to claim 2 or 5, which is characterized in that
Bracket is equipped between the crossbeam and upright bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721875585.7U CN207747979U (en) | 2017-12-28 | 2017-12-28 | A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721875585.7U CN207747979U (en) | 2017-12-28 | 2017-12-28 | A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207747979U true CN207747979U (en) | 2018-08-21 |
Family
ID=63151024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721875585.7U Expired - Fee Related CN207747979U (en) | 2017-12-28 | 2017-12-28 | A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207747979U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107985507A (en) * | 2017-12-28 | 2018-05-04 | 广东新船重工有限公司 | A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device |
CN110789679A (en) * | 2019-09-25 | 2020-02-14 | 沪东中华造船(集团)有限公司 | Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship |
-
2017
- 2017-12-28 CN CN201721875585.7U patent/CN207747979U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107985507A (en) * | 2017-12-28 | 2018-05-04 | 广东新船重工有限公司 | A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device |
CN110789679A (en) * | 2019-09-25 | 2020-02-14 | 沪东中华造船(集团)有限公司 | Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207747979U (en) | A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device | |
CN107985507A (en) | A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device | |
CN106939707A (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN102975818A (en) | Aluminum alloy superstructure block hoisting method | |
CN102659017A (en) | Steel column hoisting system | |
CN105645249A (en) | Balance crane used for hoisting box girders of steel bridge | |
CN106184798A (en) | FPSO helicopter platform hoisting | |
CN109263792A (en) | A kind of method of Large Container Ship lashing bridge block normal state displacement aboard ship | |
CN206142648U (en) | Supplementary support body of heavy panel hoist and mount | |
CN202953704U (en) | Cross beam for single-hook lifting steel plate | |
CN209723570U (en) | Steel column docking installation operation platform | |
CN106395619B (en) | Truss-like gantry crane girder and truss-like gantry crane | |
CN210855055U (en) | Convenient dismouting of standard festival platform cat ladder is put | |
CN103896153A (en) | Zig-zag derrick for replacing disconnecting link | |
CN203740851U (en) | Detachable lifting beam | |
CN208686048U (en) | A kind of civil engineering work construction bracket | |
CN205222430U (en) | A large -scale gallows of taking a trial run for container counter weight | |
CN205500638U (en) | Simply hoist transportation equipment | |
CN202766080U (en) | Special lifting apparatus for fan blade | |
CN204917628U (en) | Hanging flower basket | |
CN208545671U (en) | Tie up auxiliary stand and bridge construction of beam device | |
CN205676099U (en) | A kind of fork lifter boom of quick installation | |
CN205011077U (en) | Transportation climbing support | |
CN110510057A (en) | A kind of hanging method of sheet segmentation | |
CN205741935U (en) | The mounting and positioning device of Wavelike steel webplate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180821 Termination date: 20201228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |