CN205574234U - Supplementary hull stitches work platform frame for construction immediately - Google Patents

Supplementary hull stitches work platform frame for construction immediately Download PDF

Info

Publication number
CN205574234U
CN205574234U CN201620338879.5U CN201620338879U CN205574234U CN 205574234 U CN205574234 U CN 205574234U CN 201620338879 U CN201620338879 U CN 201620338879U CN 205574234 U CN205574234 U CN 205574234U
Authority
CN
China
Prior art keywords
cross bar
auxiliary
vertical rod
frame
bar frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620338879.5U
Other languages
Chinese (zh)
Inventor
陈祥荣
何开平
李华鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201620338879.5U priority Critical patent/CN205574234U/en
Application granted granted Critical
Publication of CN205574234U publication Critical patent/CN205574234U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a supplementary hull stitches work platform frame for construction immediately, including structural framework, multilayer work platform, couple and ladder, the couple is located structural framework top or upper portion, work platform is located inside the structural framework, set up the ladder between the adjacent two -layer work platform. The utility model discloses supplementary hull stitches work platform frame for construction immediately simple manufacture, the installation is swift, and it is very convenient to stitch the construction immediately to complete cross section among the boats and ships stern portion, can effectively reduce scaffold. In addition, increase current steel pipe scaffold frame surrounding rod and the otter board simple through the scene can be applicable to the suitable region of other product boat fare type, and the commonality is stronger.

Description

A kind of auxiliary hull vertical seam construction operation paralell
Technical field
This utility model relates to work platforms design field, and one relates to auxiliary hull vertical seam construction job platform specifically Frame.
Background technology
In shipbuilding work progress, generally require and set up substantial amounts of scaffold, and the scaffold building amount of substantial amounts is also given Shipbuilding brings no small cost pressure.Along with the depression of market of ship, minimizing scaffold building amount, cost squeeze seem more Come the most important.And about minimizing built, it be unable to do without the application of frock, using frock to replace scaffold to be that minimizing scene is set in brickwork has One of effect measure.
Utility model content
The purpose of this utility model is to provide a kind of auxiliary hull vertical seam construction operation paralell for the deficiencies in the prior art.
This utility model is achieved through the following technical solutions this purpose:
A kind of auxiliary hull vertical seam construction operation paralell, including structural framing, multilamellar job platform, hook and ladder, institute Stating hook and be positioned at described structural framing top or top, described job platform is positioned at inside described structural framing, and adjacent two-layer is made Between industry platform, ladder is set.
Preferably, described structural framing comprises vertical rod combination and cross bar combination, and described vertical rod combination comprises four vertical rods, described horizontal stroke Bar combination comprises multiple cross bar frame being arranged above and below, and four vertical rods are arranged on outside cross bar combination, and job platform is arranged on cross bar frame; Cross bar frame comprises two the first parallel cross bars and second cross bar, and the two ends of the second cross bar connect first cross bar respectively One end makes cross bar put up Contraband font.
Preferably, described cross bar frame also comprises the 3rd cross bar, and the two ends of described 3rd cross bar connect two the first cross bars respectively The other end make cross bar put up hollow.
Preferably, four vertical rods are divided into several long transverse lever framves such as grade that two outer vertical rods and two interior vertical rods, cross bar combination comprise top With several increasing lengths cross bar framves of middle and lower part, each four angles waiting long transverse lever frame are connected with a vertical rod respectively, each length The angle, two, outside being incremented by cross bar frame is respectively connected with an outer vertical rod, and the limit, the left and right sides of each increasing lengths cross bar frame is respectively and one Interior vertical rod is connected.
It is highly preferred that described structural framing also comprises two groups of auxiliary poles, two groups of auxiliary poles are respectively arranged in increasing lengths cross bar The left and right sides of frame, often group auxiliary pole comprises auxiliary vertical rod group and auxiliary brace group;Each auxiliary vertical rod in auxiliary vertical rod group Bottom be connected with left side or the right edge of the most next cross bar frame in increasing lengths cross bar frame, the top of each auxiliary vertical rod with Auxiliary brace group is connected;Each one end of auxiliary brace group is connected with the middle and lower part of an interior vertical rod, each auxiliary brace group another One end is connected with the angle, one, inner side of the most next cross bar frame in increasing lengths cross bar frame, the middle part of each auxiliary brace group and length It is incremented by the angle, one, inner side of other cross bar framves in cross bar frame to be connected.
It is further preferred that each auxiliary vertical rod group comprises more than one auxiliary vertical rod be arrangeding in parallel, each auxiliary brace group Comprise more than one end to end auxiliary brace.
Preferably, every layer of job platform all comprises platform framework and web plate, and described web plate is arranged on platform framework.
Preferably, described operation horizontal stand is possibly together with support, and described support is installed on a cross bar frame in increasing lengths cross bar frame On inner side edge.
Preferably, described support comprises support bar, supports backing plate and rubber blanket, and one end of described support bar is arranged on cross bar frame On inner side edge, the other end of described support bar tilts to install support backing plate and rubber blanket successively.
It is highly preferred that described support is possibly together with anti-tripping bracket, described anti-tripping bracket is installed between support bar and cross bar frame.
Preferably, described structural framing is possibly together with railing, and described railing comprises horizontal bar bar and oblique railing, and described horizontal bar bar is arranged on Between vertical rod or between vertical rod and auxiliary brace, described oblique railing is arranged between two adjacent cross bar framves.
Preferably, described hook has two, is respectively arranged in the top of two interior vertical rods, and described hook is offered eyelet, permissible It is also used as hoisting eye plate.
Compared with prior art, this utility model has the advantages that
(1) construction of this utility model auxiliary hull vertical seam makes simple of operation paralell, quick for installation, for ship stern The vertical seam construction of middle complete cross section is very convenient, is effectively reduced scaffold building.The most only need to use loop wheel machine that this auxiliary hull is stood Seam construction operation paralell sling and hang be installed on stern complete cross section stand seam top deck on, simple and quick.
(2) in structural framing, the line style of vertical rod is similar to the line style that target watercraft engine room founds seam, and in the height direction, this is auxiliary Hull vertical seam construction operation paralell is helped to be provided with multilamellar job platform, in order to workman carries out hull and stands the construction of seam.
(3) other products boat fare type i.e. it is applicable to by the existing steel pipe scaffold railing of on-the-spot simple increase and web plate suitable Region, versatility is stronger.
Accompanying drawing explanation
Fig. 1 is the structural representation that auxiliary hull of the present utility model founds seam construction operation paralell.
Fig. 2 is the front view that auxiliary hull of the present utility model founds seam construction operation paralell.
Fig. 3 is the structural representation of structural framing in this utility model.
Fig. 4 is the front view of structural framing in this utility model.
Fig. 5 is the Fig. 2 cross-sectional view along line A-A.
Fig. 6 is the enlarged drawing of part B in Fig. 5.
Fig. 7 is the first use schematic diagram that auxiliary hull of the present utility model founds seam construction operation paralell.
Fig. 8 is the second use schematic diagram that auxiliary hull of the present utility model founds seam construction operation paralell.
Reference is:
1-structural framing;11-vertical rod;The outer vertical rod of 11a-;Vertical rod in 11b-;13-cross bar frame;131-the first cross bar;132-second Cross bar;133-the 3rd cross bar;The long transverse lever framves such as 13a-;13b-increasing lengths cross bar frame;2-job platform;21-platform framework; 22-web plate;3-links up with;4-railing;41-horizontal bar bar;The oblique railing of 42-;5-ladder;6-supports;61-rubber blanket;62-support bar; 63-supports backing plate;64-anti-tripping bracket;7-auxiliary pole;71-assists vertical rod group;72-assists brace group;711-assists vertical rod; 721-assists brace;8-operation horizontal stand;9-steel pipe scaffold.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in detail.
Embodiment 1
As Figure 1-3, the vertical seam construction operation paralell of the auxiliary hull in the present embodiment, is to stand for ship stern complete cross section The auxiliary mould of seam construction, including structural framing 1, multilamellar job platform 2, hook 3 and ladder 5, described hook 3 is positioned at Described structural framing 1 top or top, it is internal that described job platform 2 is positioned at described structural framing 1, and every layer of job platform 2 is all Comprising platform framework 21 and web plate 22, described web plate 22 is arranged on platform framework 21, adjacent two-layer job platform 2 it Between ladder 5 is set.The height that described job platform 2 founds seam according to hull is arranged, and is 6 layers in the present embodiment.Described operation Depending on platform 2 a length of stands the line style change being sewn on beam of hull direction according to hull.
As shown in Figure 3-4, described structural framing 1 comprises vertical rod combination and cross bar combination, and described vertical rod combination comprises four vertical rods 11, four vertical rods are divided into two outer vertical rod 11a and two interior vertical rod 11b, four vertical rods 11 to be arranged on outside cross bar combination, institute Stating cross bar combination and comprise 6 the cross bar framves 13 being arranged above and below, job platform 2 is arranged on cross bar frame 13.Top cross bar frame bag Containing two the first parallel cross bars 131 and second cross bar 132, the two ends of the second cross bar 132 connect one first horizontal stroke respectively One end of bar 131 makes cross bar put up Contraband font;5 cross bar framves of middle and lower part also comprise the 3rd cross bar 133, and the described 3rd The two ends of cross bar connect the other end of two the first cross bars respectively makes cross bar put up hollow.
Preferably, this utility model auxiliary hull vertical seam construction operation paralell can be left-right asymmetry according to ship type.Work as support vessel When body vertical seam construction operation paralell is left-right asymmetry, as it is shown in figure 5, each cross bar frame 13 comprise two parallel but Long 131, second cross bar 132 of the first cross bar and the 3rd cross bar 133, the two ends of two the first cross bars 131 are respectively It is connected with the two ends of the second cross bar 132 and the 3rd cross bar 133.
Preferably, the long transverse lever frame 13a and 3 increasing lengths cross bar frame 13b of middle and lower part such as cross bar combination 3 that comprise top, Each four angles waiting long transverse lever frame 13a are connected with a vertical rod 11 respectively, the outside two of each increasing lengths cross bar frame 13b Individual angle is respectively connected with an outer vertical rod 11a, and the limit, the left and right sides of each increasing lengths cross bar frame 13b is each with an interior vertical rod 11b It is connected.
It is highly preferred that described structural framing 1 also comprises two groups of auxiliary poles 7, two groups of auxiliary poles 7 are respectively arranged in length and pass Increasing the left and right sides of cross bar frame 13b, often group auxiliary pole 7 comprises auxiliary vertical rod group 71 and auxiliary brace group 72.Described interior vertical The line style that the line style that bar, auxiliary pole are formed and hull found seam matches.In the present embodiment, each auxiliary vertical rod group 71 contains The vertical rod 711 of 1 auxiliary, the bottom of auxiliary vertical rod 711 and the left side of the most next cross bar frame 13 in increasing lengths cross bar frame 13b Limit or right edge are connected, and the top of auxiliary vertical rod 711 is connected with auxiliary brace group 72;Each auxiliary brace group 72 comprises 2 Auxiliary brace 721, one end of first auxiliary brace is connected with the middle and lower part of an interior vertical rod 11, another of this auxiliary brace Hold the one end with second auxiliary brace to be connected, in second auxiliary other end of brace and increasing lengths cross bar frame 13b next Angle, one, the inner side of individual cross bar frame 13 is connected, the middle part of each auxiliary brace group 72 and other horizontal strokes in increasing lengths cross bar frame 13b Angle, one, the inner side of bridge 13 is connected.
Preferably, as shown in Figure 6, described operation horizontal stand 2 supports 6 possibly together with two, and described support 6 is installed on bottom the On the inner side edge of 2 cross bar framves 13.Described support 6 comprises support bar 62, supports backing plate 63 and rubber blanket 61, described One end of strut 62 is arranged on the inner side edge of cross bar frame 13, and the other end of described support bar 62 tilts to install supporting pad successively Plate 62 and rubber blanket 61, angle of inclination adapts with shipform.Described support 6 is possibly together with anti-tripping bracket 64, described support Bracket 64 is installed between support bar 62 and cross bar frame 13.When operation paralell is symmetrical, two support in inclining Rake angle is identical.Angle of inclination difference 2 when job platform is left-right asymmetry, in two supports.
Preferably, described structural framing 1 is possibly together with railing 4, and described railing 4 comprises horizontal bar bar 41 and oblique railing 42, described Horizontal bar bar 41 is arranged between vertical rod 11 or between vertical rod 11 and auxiliary brace 42, described oblique railing 42 is arranged on two phases Between adjacent cross bar frame.
Preferably, described hook 3 has two, is respectively arranged in the top of two interior vertical rod 11b, links up with described in the present embodiment 3 are arranged on the interior vertical rod 11b near topmost operation horizontal stand 2.Offer eyelet on described hook 3, can be also used as hanging Dress eye plate.
As it is shown in fig. 7, this utility model is when the vertical seam construction of ship stern complete cross section, because operation horizontal stand 8 adapts with ship type, Need not additionally set up scaffold etc., be used alone this utility model operation horizontal stand 8 and just can complete vertical seam construction, specifically pacify Process of assembling is as follows, first uses loop wheel machine that this utility model operation horizontal stand 8 is sling, and then operation horizontal stand 8 is hung in loop wheel machine operating It is transported near the vertical seam of stern complete cross section, then slowly near the vertical seam of complete cross section, treats the auxiliary hull vertical seam construction operation paralell first half After the hook 3 divided is stuck on outside plate and deck, and outside plate is withstood in the support 6 being positioned at operation horizontal stand the latter half, loop wheel machine unclamps, Finally the fillet welding of hook 3 with deck being connected, operation horizontal stand 8 i.e. hangs and is positioned on the outside plate of cabin, now installment work Complete, workman can at deck through ladder 5 down go to the enterprising body of navigating of each layer job platform 2 stand the assembling of seam, welding, The work such as application.
As shown in Figure 8, this utility model can be also used for the suitable region of line style of the most shipmate type, now, it is only necessary at operation horizontal Setting up steel pipe scaffold 9 on platform can use, concrete installation method is as follows: inside need to be according to ship hull plate and operation horizontal stand 8 Gap length set up the scaffold cross bar of corresponding length, railing and web plate.First, operation horizontal stand 8 is lifted suspension to place On the ship hull plate of respective regions, on every layer of job platform 2, use iron wire colligation scaffold cross bar the most respectively, in structure Colligation scaffold railing on framework 1, finally lays scaffold web plate between job platform 2 and ship hull plate, treats outside a hull After gap between plate and operation horizontal stand 8 uses steel pipe scaffold 9 to be paved with, i.e. complete installment work workman can at deck warp Cross ladder 5 down to go to the enterprising body of navigating of each layer job platform 2 and stand the work such as the assembling of seam, welding, application.
Embodiment described above only have expressed some embodiments of the present utility model, and it describes more concrete and detailed, but not Therefore the restriction to this utility model the scope of the claims can be interpreted as.It should be pointed out that, for those of ordinary skill in the art For, without departing from the concept of the premise utility, it is also possible to make some deformation and improvement, these broadly fall into this practicality Novel protection domain.Therefore, the protection domain of this utility model patent should be as the criterion with claims.

Claims (10)

1. an auxiliary hull vertical seam construction operation paralell, it is characterised in that: include structural framing, multilamellar job platform, Hook and ladder, described hook is positioned at described structural framing top or top, and described job platform is positioned at inside described structural framing, Between adjacent two-layer job platform, ladder is set.
Operation horizontal stand the most according to claim 1, it is characterised in that: described structural framing comprises vertical rod combination and horizontal stroke Bar combines, and described vertical rod combination comprises four vertical rods, and the combination of described cross bar comprises multiple cross bar frame being arranged above and below, four vertical rods Being arranged on outside cross bar combination, job platform is arranged on cross bar frame;Cross bar frame comprises two the first parallel cross bars and one second Cross bar, the two ends of the second cross bar connect one end of first cross bar respectively makes cross bar put up Contraband font.
Operation horizontal stand the most according to claim 2, it is characterised in that: described cross bar frame also comprises the 3rd cross bar, The two ends of described 3rd cross bar connect the other end of two the first cross bars respectively makes cross bar put up hollow.
Operation horizontal stand the most according to claim 2, it is characterised in that: four vertical rods are divided into two outer vertical rods and two Interior vertical rod, cross bar combination comprises the several of top and waits long transverse lever frame and several increasing lengths cross bar framves of middle and lower part, each isometric horizontal stroke Four angles of bridge are connected with a vertical rod respectively, and the angle, two, outside of each increasing lengths cross bar frame is respectively connected with an outer vertical rod, The limit, the left and right sides of each increasing lengths cross bar frame is respectively connected with an interior vertical rod.
Operation horizontal stand the most according to claim 4, it is characterised in that: described structural framing also comprises two groups of auxiliary Bar, two groups of auxiliary poles are respectively arranged in the left and right sides of increasing lengths cross bar frame, often group auxiliary pole comprise auxiliary vertical rod group and Auxiliary brace group;Each auxiliary vertical rod group comprises more than one auxiliary vertical rod be arrangeding in parallel, and each auxiliary brace group comprises one The most end to end auxiliary brace;In bottom and the increasing lengths cross bar frame of each auxiliary vertical rod in auxiliary vertical rod group next The left side of individual cross bar frame or right edge are connected, and the top of each auxiliary vertical rod is connected with auxiliary brace group;Each auxiliary brace group One end be connected with the middle and lower part of an interior vertical rod, the other end of each auxiliary brace group is the most next with increasing lengths cross bar frame Angle, one, the inner side of cross bar frame is connected, the middle part of each auxiliary brace group and the inner side one of other cross bar framves in increasing lengths cross bar frame Individual angle is connected.
Operation horizontal stand the most according to claim 1, it is characterised in that: every layer of job platform all comprise platform framework and Web plate, described web plate is arranged on platform framework.
Operation horizontal stand the most according to claim 4, it is characterised in that: described operation horizontal stand is possibly together with support, institute State support to be installed in increasing lengths cross bar frame on the inner side edge of a cross bar frame.
Operation horizontal stand the most according to claim 7, it is characterised in that: described support comprise support bar, support backing plate, Rubber blanket and anti-tripping bracket, one end of described support bar is arranged on the inner side edge of cross bar frame, and the other end of described support bar is successively Tilting to install and support backing plate and rubber blanket, described anti-tripping bracket is installed between support bar and cross bar frame.
Operation horizontal stand the most according to claim 4, it is characterised in that: described hook has two, is respectively arranged in two The top of individual interior vertical rod, described hook offers eyelet.
Operation horizontal stand the most according to claim 5, it is characterised in that: described structural framing is possibly together with railing, institute Stating railing and comprise horizontal bar bar and oblique railing, described horizontal bar bar is arranged between vertical rod or between vertical rod and auxiliary brace, described oblique hurdle Bar is arranged between two adjacent cross bar framves.
CN201620338879.5U 2016-04-20 2016-04-20 Supplementary hull stitches work platform frame for construction immediately Active CN205574234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620338879.5U CN205574234U (en) 2016-04-20 2016-04-20 Supplementary hull stitches work platform frame for construction immediately

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620338879.5U CN205574234U (en) 2016-04-20 2016-04-20 Supplementary hull stitches work platform frame for construction immediately

Publications (1)

Publication Number Publication Date
CN205574234U true CN205574234U (en) 2016-09-14

Family

ID=56863546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620338879.5U Active CN205574234U (en) 2016-04-20 2016-04-20 Supplementary hull stitches work platform frame for construction immediately

Country Status (1)

Country Link
CN (1) CN205574234U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106828825A (en) * 2017-04-11 2017-06-13 广船国际有限公司 A kind of stage apparatus
CN106892067A (en) * 2017-04-11 2017-06-27 广船国际有限公司 A kind of stage apparatus
CN107054582A (en) * 2017-04-11 2017-08-18 广船国际有限公司 A kind of fore construction platform device
CN107842188A (en) * 2017-07-21 2018-03-27 南通振华重型装备制造有限公司 A kind of application assistance platform
CN107985507A (en) * 2017-12-28 2018-05-04 广东新船重工有限公司 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device
CN112962946A (en) * 2021-03-09 2021-06-15 中建一局集团建设发展有限公司 Special-shaped scaffold supporting system for water course ball curtain installation

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106828825A (en) * 2017-04-11 2017-06-13 广船国际有限公司 A kind of stage apparatus
CN106892067A (en) * 2017-04-11 2017-06-27 广船国际有限公司 A kind of stage apparatus
CN107054582A (en) * 2017-04-11 2017-08-18 广船国际有限公司 A kind of fore construction platform device
CN106892067B (en) * 2017-04-11 2019-04-09 广船国际有限公司 A kind of stage apparatus
CN107842188A (en) * 2017-07-21 2018-03-27 南通振华重型装备制造有限公司 A kind of application assistance platform
CN107985507A (en) * 2017-12-28 2018-05-04 广东新船重工有限公司 A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device
CN112962946A (en) * 2021-03-09 2021-06-15 中建一局集团建设发展有限公司 Special-shaped scaffold supporting system for water course ball curtain installation

Similar Documents

Publication Publication Date Title
CN205574234U (en) Supplementary hull stitches work platform frame for construction immediately
CN105752267B (en) A kind of method for the host crankshaft for changing ship
CN102975818A (en) Aluminum alloy superstructure block hoisting method
CN204713400U (en) A kind of boat scaffold
CN204822001U (en) Goods hoists guider and has these goods hoist and mount guider's hull
CN207191310U (en) One kind is used for ship plank construction portable unit
CN107119904A (en) A kind of cantilevered structure truss combined support system
CN107985507A (en) A kind of two phase stainless steel tanker corrugated bulkhead rapid construction device
CN105952129B (en) A kind of elevator combined type entirety lifting operation platform and its construction method
CN201587521U (en) Broadside suspended type platform device for holding welding machine during ship building
CN103969063A (en) Chain hoist load test bed
CN206407070U (en) The support reinforcing device of double bottom block bar mount structure lifting
CN102785766B (en) New Marine scaffold tooling combination
CN207435902U (en) A kind of pier shaft hanging basket mounting platform
CN205579101U (en) Screw installation auxiliary fixtures
CN212149244U (en) High-altitude reverse jacking manual dress
CN201052950Y (en) Crane
CN212916237U (en) Bridge steel construction guardrail stand hangs spraying frock
CN205475706U (en) Hanging rack system
KR101254829B1 (en) Ladder
CN204297906U (en) Based on handling and the thin plate superstructure segmentation of standing up eye plate
CN107082390A (en) Semisubmersible platform production tree transfers guider
CN105890303A (en) Fabric hanging device for spinning workshop
CN211223762U (en) Double-bottom bracket-free type cargo oil hose crane base of oil tanker
CN210685329U (en) Hanging bracket structure for lifting scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant