CN207435902U - A kind of pier shaft hanging basket mounting platform - Google Patents
A kind of pier shaft hanging basket mounting platform Download PDFInfo
- Publication number
- CN207435902U CN207435902U CN201720140337.1U CN201720140337U CN207435902U CN 207435902 U CN207435902 U CN 207435902U CN 201720140337 U CN201720140337 U CN 201720140337U CN 207435902 U CN207435902 U CN 207435902U
- Authority
- CN
- China
- Prior art keywords
- pier shaft
- workbench
- mounting platform
- hanging basket
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000009826 distribution Methods 0.000 claims description 2
- 239000004575 stone Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 13
- 230000000694 effects Effects 0.000 abstract description 6
- 230000000670 limiting effect Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000003482 Pinner synthesis reaction Methods 0.000 description 3
- 208000035397 Ring chromosome 7 syndrome Diseases 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Abstract
The utility model is related to a kind of pier shaft hanging basket mounting platforms, including workbench and overhung construction, the workbench is set around pier shaft, the overhung construction is used to workbench being limited in the preset height position of pier shaft, the overhung construction includes the hanging stick for being supported on the top of pier shaft, and the sunpender for connecting hanging stick and workbench, the upper end of the sunpender is fixedly connected with hanging stick, the lower end of the sunpender is fixedly connected with workbench, with quick for installation rapid, it is simple in structure, the advantageous effects such as work progress is easy, and security is good.
Description
Technical field
The utility model is related to engineering construction fields, particularly a kind of pier shaft hanging basket mounting platform.
Background technology
In engineering construction, construction and installation, large scale equipment manufacture and maintenance process, it is required for carrying out substantial amounts of high-altitude work
Industry, wherein, it is relatively conventional solution by hanging basket auxiliary construction, is especially applied to overhead bridge pier, high ferro bridge pier etc.
During work, it usually needs by hanging basket, to solve the walk problem of construction personnel.
Common hanging basket is generally welded by angle steel and round steel, common mounting means, is that hanging basket integrally uses high intensity
Bolt is fixed on pier shaft periphery, such mode, same although construction personnel can be solved in travel in high sky and the demand of operation
When, how quickly, safe the installation for carrying out hanging basket also becomes a new technological difficulties urgently to be resolved hurrily.
In the prior art, also there are many improvement projects around the problem of how quickly carrying out hanging basket installation, be improved,
Such as:The Chinese utility model patent of Publication No. CN202609888U《The special high-lift operation hanging cradle of crane》, the program passes through
The mode that crane and hanging basket are combined carries out the deployment of hanging basket, still, however it remains it is bad installation security, it is dangerous compared with
The defects of height, and installation effectiveness is low, time and effort consuming.
Utility model content
The goal of the invention of the utility model is:In view of the problems of the existing technology, a kind of quick for installation, operation is provided
Simply, versatile, safe pier shaft hanging basket mounting platform is particularly suitable for high-volume pier shaft hanging basket and pacifies quickly, safely
Dress.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of pier shaft hanging basket mounting platform, including workbench and overhung construction, the workbench is set around pier shaft,
The overhung construction is used to workbench being limited in the preset height position of pier shaft, and the overhung construction includes being supported on pier shaft
Top hanging stick and sunpender for connecting hanging stick and workbench, the upper end of the sunpender be fixedly connected with hanging stick, institute
The lower end for stating sunpender is fixedly connected with workbench.
Preferably, pinner, the pinner rectangular-blocklike, the opposite sides of the pinner are provided at the top of the pier shaft
It is provided with two hanging sticks, the spacing between the hanging stick is greater than or equal to the width of pinner.Using such structure, pier shaft is utilized
The pinner structure that top carries only need to allow hanging stick to be stuck in the two of pinner structure in hoisting process by simple alignment operation
Side, you can solve the problems, such as the restriction of overhung construction horizontal level, have both easy to operate and construction safety advantageous effect.
Preferably, the quantity of the pinner is two, and two pinners are symmetrically disposed on the both sides of pier shaft, the pinner edge
The width of pier shaft is set.
Preferably, the structure in a ring of the workbench, there are one can accommodate pier to the middle part tool of the loop configuration
The hollow region of body.
Preferably, the workbench is assembled by two dismountable semicircular configurations, described two semi-circular knots
The connector being connected as a single entity is provided between structure.Using such structure, workbench is divided into two relatively solely
Vertical platform is conducive to lifting operation.
Preferably, the connector is steel wire rope.Using such structure, there is connection structure simply, easily to operate
Advantageous effect.
Preferably, it is provided with hanging ring at the top of the semicircular configuration.Using such structure, be conducive to dock crane into
Row lifting operation.
Preferably, the workbench includes the skeleton structure being welded by angle steel and horizontally spaced point
The reinforcing bar of cloth, the side of the workbench are additionally provided with guardrail.
In conclusion by adopting the above-described technical solution, the beneficial effects of the utility model are:When needing installation,
Overhung construction is sling using crane, is then from top to bottom sleeved on pier shaft, there is rapid, structure letter quick for installation
Advantageous effect single, work progress is easy, security is good.
Description of the drawings
Fig. 1 is the structure diagram of pier shaft in the utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the plan view of the utility model hanging basket mounting platform;
Fig. 4 is the schematic cross-section in A-A directions in Fig. 3;
Fig. 5 is the elevation of the utility model hanging basket mounting platform;
Fig. 6 is that the utility model hangs plan view of the blue mounting platform in installation process;
Fig. 7 is the utility model hanging basket mounting platform in installation later plan view in place.
It is marked in figure:Workbench -1;Overhung construction -2;Pier shaft -3;Hanging stick -4;Sunpender -5;Pinner -6;It hangs
Ring -7;Reinforcing bar -8.
Specific embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, is further elaborated the utility model.It should be appreciated that specific embodiment described herein is only explaining this
Utility model is not used to limit the utility model.
As shown in Figures 1 to 7, the present embodiment pier shaft hanging basket mounting platform, including workbench 1 and overhung construction 2, work
Platform 1 is mainly used for installation hanging basket, and the major function of overhung construction 2 is for workbench 1 to be limited in the pre- of pier shaft 3
If height and position, in order to facilitate hanging basket installation exercise, workbench 1 is that collar is set in entire pier shaft 3, the present embodiment
Overhung construction 2 include the hanging stick 4 for being supported on the top of pier shaft 3 and sunpender 5 for connecting hanging stick 4 and workbench 1,
Hanging stick 4 and sunpender 5 form to share the mechanical structure of the weight of workbench 1 together, when needing installation, using crane
Overhung construction 2 to be sling, is then from top to bottom sleeved on 3 top of pier shaft again, the top of pier shaft 3 is capable of providing support force,
So as to hold up entire overhung construction 2 and workbench 1, just because of this, the structure of the present embodiment is supported by the top surface of pier shaft 3
With the weight for sharing workbench 1, there are the advantageous effects such as work progress is easy, efficient, simple in structure, and security is good.
In order to which by the more steadily /V of overhung construction 2, on pier shaft 3, the present embodiment is by means of 3 top of pier shaft
Pinner 6 limits the horizontal level of hanging stick 4, specifically, be provided with the pinner 6 of rectangular-blocklike at the top of pier shaft 3, accordingly
, the overhung construction 2 of the present embodiment includes at least one set of Horizontal limiting structure, and every group of Horizontal limiting structure is mutually parallel by two
Hanging stick 4 form, two hanging sticks 4 of every group of Horizontal limiting structure are arranged on the opposite sides of pinner 6, adjacent two hanging sticks 4
Between spacing be greater than or equal to pinner 6 width, mode in this way, only need to lifting when hanging stick 4 be allowed to be stuck in 6 liang of pinner
Side, you can limitation workbench 1 has simple in structure, easy to operate, safety can compared with the degree of freedom of the horizontal direction of pier body
The advantageous effect leaned on.
Most preferably, as depicted in figs. 1 and 2, the pier shaft 3 of the present embodiment is single box single chamber nose circle shape solid pier, in pier
The top of body 3 is set there are two pinner 6, and two pinners 6 are set along the width of pier shaft 3, and two pinners 6 are along pier shaft
3 center line is symmetrically arranged.Correspondingly, the overhung construction 2 of the present embodiment includes two groups of Horizontal limiting structures, two groups of Horizontal limitings
Structure is respectively made of two hanging sticks being mutually parallel 4, and two hanging sticks 4 are separately positioned on the opposite sides of corresponding pinner 6, two
Spacing between hanging stick 4 is greater than or equal to the width of corresponding pinner 6 so that overhung construction 2 is in hoisting process, Neng Gouyou
It is sleeved on pinner 6 to realize the /V of horizontal direction under.
As shown in Fig. 3, Fig. 6 and Fig. 7, in the present embodiment, workbench 1 is mainly made using steel of the method for welding
It forms, workbench 1 includes the skeleton structure being welded by angle steel and the reinforcing bar 8 of laterally spaced distribution, workbench
1 side is additionally provided with guardrail.In order to adapt to the cross sectional shape of pier shaft 3, as shown in figure 3, workbench 1 is whole in a ring
Structure, for the middle part tool of workbench 1 there are one the hollow region that can accommodate pier shaft 3, workbench 1 here can be one
Formula structure, most preferably, as shown in fig. 6, workbench 1 can also be assembled by two dismountable semicircular configurations, phase
It answers, hanging ring 7 is provided at the top of semicircular configuration, for crane lifting operation, set between two semicircular configurations useful
In the connector being connected as a single entity, as a kind of embodiment, connector is steel wire rope, in lifting, two semi-circular knots
Structure can be lifted individually, after lifting is in place, be fixed into two relatively independent semicircular configurations by steel wire rope
One entirety, more easily constructing operation.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (8)
1. a kind of pier shaft hanging basket mounting platform, including workbench and overhung construction, the workbench is set around pier shaft, institute
Overhung construction is stated for workbench to be limited in the preset height position of pier shaft, it is characterised in that:The overhung construction includes
It is supported on the hanging stick at the top of pier shaft and the sunpender for connecting hanging stick and workbench, the upper end of the sunpender and hanging stick
It is fixedly connected, the lower end of the sunpender is fixedly connected with workbench.
2. pier shaft hanging basket mounting platform according to claim 1, it is characterised in that:Pad is provided at the top of the pier shaft
Stone, the pinner rectangular-blocklike, the opposite sides of the pinner are provided with two hanging sticks, and the spacing between the hanging stick is more than
Or the width equal to pinner.
3. pier shaft hanging basket mounting platform according to claim 2, it is characterised in that:The quantity of the pinner be two, two
A pinner is symmetrically disposed on the both sides of pier shaft, and the pinner is set along the width of pier shaft.
4. according to any pier shaft hanging basket mounting platform in claims 1 to 3, it is characterised in that:The workbench
Structure in a ring, there are one the hollow regions that can accommodate pier shaft for the middle part tool of the loop configuration.
5. pier shaft hanging basket mounting platform according to claim 4, it is characterised in that:The workbench is detachable by two
Semicircular configuration it is assembled, the connector being connected as a single entity is provided between described two semicircular configurations.
6. pier shaft hanging basket mounting platform according to claim 5, it is characterised in that:The connector is steel wire rope.
7. pier shaft hanging basket mounting platform according to claim 5, it is characterised in that:The top of the semicircular configuration is set
There is hanging ring.
8. pier shaft hanging basket mounting platform according to claim 1, it is characterised in that:The workbench includes being welded by angle steel
The skeleton structure and the reinforcing bar of several horizontally spaced distributions connect, the side of the workbench is additionally provided with
Guardrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720140337.1U CN207435902U (en) | 2017-02-16 | 2017-02-16 | A kind of pier shaft hanging basket mounting platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720140337.1U CN207435902U (en) | 2017-02-16 | 2017-02-16 | A kind of pier shaft hanging basket mounting platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207435902U true CN207435902U (en) | 2018-06-01 |
Family
ID=62394483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720140337.1U Expired - Fee Related CN207435902U (en) | 2017-02-16 | 2017-02-16 | A kind of pier shaft hanging basket mounting platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207435902U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824214A (en) * | 2018-08-14 | 2018-11-16 | 中铁十局集团第三建设有限公司 | A kind of fast-type high-speed rail Bridge Pier Construction hanging basket mounting platform and application method |
CN109610325A (en) * | 2018-12-14 | 2019-04-12 | 中铁七局集团第五工程有限公司 | The construction method of high-speed railway bridge hanging basket mounting platform |
-
2017
- 2017-02-16 CN CN201720140337.1U patent/CN207435902U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824214A (en) * | 2018-08-14 | 2018-11-16 | 中铁十局集团第三建设有限公司 | A kind of fast-type high-speed rail Bridge Pier Construction hanging basket mounting platform and application method |
CN109610325A (en) * | 2018-12-14 | 2019-04-12 | 中铁七局集团第五工程有限公司 | The construction method of high-speed railway bridge hanging basket mounting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207435902U (en) | A kind of pier shaft hanging basket mounting platform | |
CN207392772U (en) | A kind of no cable wind rope steel column straightening system | |
CN202625600U (en) | Shoulder-pole beam of double-casting bridge crane for lifting ultra-large objects | |
CN105464456A (en) | Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter | |
CN106144929A (en) | One population hoist device and construction method | |
JP6098453B2 (en) | Jib hanger | |
CN110745683A (en) | Hoisting device and method for reinforcement cage of underground continuous wall | |
CN217516571U (en) | Crane with adjustable maintenance passage | |
CN207390887U (en) | A kind of hanging apparatus | |
CN106829778B (en) | A kind of horizontal pump maintenance maintenance unit | |
CN210884909U (en) | Quick replacement vertical rolling mill rolling guide device | |
CN205579101U (en) | Screw installation auxiliary fixtures | |
CN213653209U (en) | Integrated construction movable platform for bridge flange plate | |
CN209778122U (en) | Jacking sleeve frame for mounting standard knot | |
CN108035530A (en) | A kind of inner wall of oil tank construction hanging basket | |
CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
CN204737588U (en) | Compensating beam for bridge crane | |
CN110171766B (en) | Steel bar transportation lifting appliance | |
CN209685129U (en) | A kind of stator of steam turbine generator hanging apparatus | |
CN208454407U (en) | The fixed attachment device of the wheeled supporting leg of sliding formwork | |
CN207078901U (en) | Gravity motion hanging beam | |
CN207328748U (en) | A kind of quick auxiliary device for realizing transverse bulkhead lifting positioning and construction safety | |
CN216105745U (en) | A construction equipment for isolation bearing transportation and hoist and mount | |
CN106480824B (en) | A kind of handling method of cable wire tower | |
CN206569910U (en) | The vertical hanging apparatus of slender member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180601 |
|
CF01 | Termination of patent right due to non-payment of annual fee |