CN107975075A - 一种用于既有受荷工程基桩检测结构措施的施工工艺 - Google Patents
一种用于既有受荷工程基桩检测结构措施的施工工艺 Download PDFInfo
- Publication number
- CN107975075A CN107975075A CN201711092647.1A CN201711092647A CN107975075A CN 107975075 A CN107975075 A CN 107975075A CN 201711092647 A CN201711092647 A CN 201711092647A CN 107975075 A CN107975075 A CN 107975075A
- Authority
- CN
- China
- Prior art keywords
- foundation pile
- pile
- steel
- construction technology
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Abstract
本发明涉及一种用于既有受荷工程基桩检测结构措施的施工工艺,包括如下步骤:(1)开挖土体并在承台下方待检测的基桩周围架设临时钢梁平台;(2)在临时钢梁平台与承台之间架设支撑,将待检测的基桩卸载并隔断基桩;(3)在基桩位置放置静载设备对基桩进行检测,检测完后对截断的基桩进行再恢复;(4)回填。通过该工艺,可以建造一个用于检测既有受荷工程基桩的结构措施,从而可对既有建筑下的工程基桩进行检测。
Description
技术领域
本发明涉及设计地基基础中桩基测试领域,尤其是一种用于既有受荷工程基桩检测结构措施的施工工艺。
背景技术
土地资源的匮乏严重制约了城市的良性发展。对既有建(构)筑物进行增层或改造,是合理开发利用城市空间资源,是实现可持续发展的重要途径之一。既有建(构)筑物进行增层或结构改造,主要针对采用传统的强度理论控制设计的桩基础。传统方法依据基桩的竖向承载力特征值作为指标进行设计,采用1至1.25倍基桩的竖向承载力特征值进行设计,甚至在地震下以1.5倍基桩的竖向承载力特征值设计。基桩的竖向承载力特征值为其极限承载力标准值的1/2。因此,依据建(构)筑物基桩承载力进行强度控制设计方法,保守地以桩数的增加,实现了较大的竖向刚度桩土支撑形式。诸多研究表明了,在一定的范围外,增加桩数对减少既有建筑物的沉降作用很小。既有建(构)筑物进行增层或改造的可行性,需要进一步了解基桩的承载力状态。
我国是世界上地震灾害最严重的国家之一,既有受荷基桩础的工作性状以及地震安全性,已经引起工程师的关注。地震下基桩的惯性响应和运动响应,是导致基桩损毁破坏的主要原因。惯性响应对基桩的影响主要集中在桩基础上部,运动响应对基桩的影响主要集中在土层分界面位置。与惯性响应相比,在深部土层的运动响应对既有受荷基桩础的工作性状的影响不易察觉。因此,针对震后评估基桩的工作状态,需要进一步判断桩身结构是否断裂或产生裂缝。
目前,缺乏一种检测手段可完成既有建筑下的工程基桩检测。
发明内容
本发明提供一种用于既有受荷工程基桩检测结构措施的施工工艺,通过该工艺,可以建造一个用于检测既有受荷工程基桩的结构措施,从而可对既有建筑下的工程基桩进行检测。
本发明的具体技术方案为:一种用于既有受荷工程基桩检测结构措施的施工工艺,包括如下步骤:(1)开挖土体并在承台下方待检测的基桩周围架设临时钢梁平台;
(2)在临时钢梁平台与承台之间架设支撑,将待检测的基桩卸载并隔断基桩;
(3)在基桩位置放置静载设备对基桩进行检测,检测完后对截断的基桩进行再恢复;
(4)回填。
通过架设临时钢梁平台,待检测的基桩附近设置支撑,保证了待检测基桩凿除后,充分利用承台群桩基础,继续承担上部结构荷载;在测试结束后,将基桩再恢复到原有的承载力状态,整个结构形式便于施工,安全性高,适用性强,可在不影响上部结构功能的情况下完成既有受荷工程基桩的承载力及桩身完整性检测。
作为优选,架设临时钢梁平台时,在临近开挖面和基桩周边工程桩处,人工挖置沟槽并架设钢圈梁,钢圈梁紧箍待基桩及工程桩,钢圈梁上方固定厚钢板。
作为优选,临时钢梁平台与承台之间的支撑为自锁式千斤顶,自锁式千斤顶围绕待检测基桩呈对称布置,每台自锁式千斤顶顶部设置压力传感器,初始预顶荷载可设置为5MPa。
作为优选,隔断基桩时,在承台底部与临时钢梁平台部预留20-30cm桩身,凿除基桩中部混凝土并平整处理,露出基桩内部纵筋,并截断。
作为优选,静载设备放置于临时钢梁平台部的预留桩身上,并在预留桩身上放置竖向位移计,静载设备的顶部设置压力传感器。
作为优选,静载设备为静载试验液压千斤顶,检测时,静载试验液压千斤顶第一级预顶荷载为基桩原有试验极限承载力的1/10,第一级预顶载荷后,释放并移除基桩周边的支撑,进行慢速维持静载荷试验。
作为优选,检测时边加载边绘制竖向荷载Q与基桩顶部沉降s的再加载关系曲线,结合基桩服役前的初始Q-s曲线,确定两类曲线的交汇点,即为当前既有受荷基桩在截断前的工作状态,判别上述工作状态与基桩的竖向承载力特征值的关系,当加载达到1.2倍竖向承载力特征值时终止加载,并维持静载试验液压千斤顶的当前工作状态。
作为优选,检测结束后保留静载设备,在基桩截断范围设置加密箍筋,将预留外露的纵筋焊接形成钢筋笼,搭接长度为35倍的纵筋直径,将静载设备与上述钢筋笼整体导管灌注高强度混凝土,并掺入0.01%的膨胀剂。
作为优选,基桩在承台底部和临时钢梁平台区间段外设钢管,并整体焊接,钢管上部和下部分别采用厚环板和加劲板加固。
作为优选,待后浇筑的混凝土达到强度要求后,拆除临时钢梁平台,采用砂或素土分层夯实回填至原有承台底部。
本发明的有益效果是:通过架设临时钢梁平台,待检测的基桩附近设置支撑,保证了待检测基桩凿除后,充分利用承台群桩基础,继续承担上部结构荷载;在测试结束后,将基桩再恢复到原有的承载力状态,整个结构形式便于施工,安全性高,适用性强,可在不影响上部结构功能的情况下完成既有受荷工程基桩的承载力及桩身完整性检测。
附图说明
图1是本发明基桩恢复结构示意图;
图2是本发明一种下挖土体示意图;
图3是本发明临时钢梁平台侧视俯视图;
图4是本发明架设支撑侧视俯视图;
图5是本发明一种隔断基桩的示意图;
图6是本发明一种静载设备架设示意图;
图7是本发明再恢复示意图;
图中:1、承台,2、厚环板,3、加劲板,4、钢管,5、上预留桩身,6、混凝土,7、纵筋,8、加密箍筋,9、下预留桩身,10、基桩,11、工程桩,12、开挖面,13、钢圈梁,14、厚钢板,15、临时钢梁平台,16、自锁式千斤顶,17、静载试验液压千斤顶,18、在恢复结构。
具体实施方式
下面通过具体实施例,并结合附图对本发明作进一步的描述。
实施例:一种用于既有受荷工程基桩检测结构措施的施工工艺,包括如下步骤:
(1)开挖土体并在承台下方待检测的基桩周围架设临时钢梁平台(参见图2图3);开挖承台1周边1m范围内的土体,露出支撑承台下方的支撑桩高度1m;选择承台下方中间位置的支撑桩作为待检测的基桩10,基桩周围的为工程桩11,在临近开挖面12和基桩周边工程桩处,人工挖置沟槽并架设钢圈梁13,钢圈梁紧箍待基桩及工程桩,钢圈梁上方固定厚钢板14,形成临时钢梁平台15;厚钢板与钢圈梁之间设置加劲板,并预留孔位供基桩及工程桩穿过;
(2)在临时钢梁平台与承台之间架设支撑(参见图4),支撑为自锁式千斤顶16,自锁式千斤顶为四台,四台自锁式千斤顶围绕待检测基桩呈对称布置,每台自锁式千斤顶顶部设置压力传感器,初始预顶荷载可设置为5MPa;将待检测的基桩卸载并隔断基桩;隔断基桩时,在承台底部与临时钢梁平台部分别预留30cm的上预留桩身5和下预留桩身9,凿除基桩上预留桩身和下预留桩身之间的中部混凝土并平整处理,露出基桩内部纵筋7,并截断(参见图5);
(3)采用瞬态或稳态方式在桩顶激振,对基桩进行低应变法检测,实测桩顶部的速度或力时程曲线,基于波动理论的时域或频域分析,反应基桩桩身缺陷及其位置;
(4)在基桩位置放置静载设备对基桩进行检测(参见图6),静载设备为静载试验液压千斤顶17,静载试验液压千斤顶放置于临时钢梁平台部的下预留桩身上,并在下预留桩身上放置竖向位移计,静载试验液压千斤顶的顶部设置压力传感器;检测时,静载试验液压千斤顶第一级预顶荷载为基桩原有试验极限承载力的1/10,第一级预顶载荷后,释放并移除基桩周边的支撑,进行慢速维持静载荷试验,在静载试验液压千斤顶逐级施加竖向压力,观测截断后基桩顶部随时间产生的沉降;边加载边绘制竖向荷载Q与基桩顶部沉降s的再加载关系曲线,结合施工前试桩的初始Q-s曲线,确定两类曲线的交汇点,即为当前既有受荷基桩在截断前的工作状态;判别上述工作状态与基桩的竖向承载力特征值的关系,当加载达到1.2倍基桩的竖向承载力特征值时终止加载,并维持静载试验液压千斤顶的当前工作状态;
(5)检测完后对截断的基桩进行再恢复(参见图7图1);在基桩截断范围制作钢筋笼,设置加密箍筋8,将预留外露的纵筋焊接,搭接长度为35倍的纵筋直径,搭接工艺符合相关规范要求;将静载试验液压千斤顶、压力传感器与钢筋笼整体导管灌注高强度混凝土6,并掺入0.01%的膨胀剂;基桩在承台底部和临时钢梁平台区间段设置钢管4,并整体焊接,钢管上部和下部分别采用厚环板2和加劲板3加固;
(6)回填;待后浇筑的再恢复结构18达到强度要求后,拆除临时钢梁平台,采用砂或素土分层夯实回填至原有承台底部,确保回填质量满足相关规范要求。
以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效变换,均仍属于本发明技术方案的保护范围。
Claims (10)
1.一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于包括如下步骤:(1)开挖土体并在承台下方待检测的基桩周围架设临时钢梁平台;
(2)在临时钢梁平台与承台之间架设支撑,将待检测的基桩卸载并隔断基桩;
(3)在基桩位置放置静载设备对基桩进行检测,检测完后对截断的基桩进行再恢复;
(4)回填。
2.根据权利要求1所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于架设临时钢梁平台时,在临近开挖面和基桩周边工程桩处,人工挖置沟槽并架设钢圈梁,钢圈梁紧箍待基桩及工程桩,钢圈梁上方固定厚钢板。
3.根据权利要求1或2所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于临时钢梁平台与承台之间的支撑为自锁式千斤顶,自锁式千斤顶围绕待检测基桩呈对称布置,每台自锁式千斤顶顶部设置压力传感器,初始预顶荷载可设置为5MPa。
4.根据权利要求1或2所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于隔断基桩时,在承台底部与临时钢梁平台部预留20-30cm桩身,凿除基桩中部混凝土并平整处理,露出基桩内部纵筋,并截断。
5.根据权利要求4所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于静载设备放置于临时钢梁平台部的预留桩身上,并在预留桩身上放置竖向位移计,静载设备的顶部设置压力传感器。
6.根据权利要求1或2所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于静载设备为静载试验液压千斤顶,检测时,静载试验液压千斤顶第一级预顶荷载为基桩原有试验极限承载力的1/10,第一级预顶载荷后,释放并移除基桩周边的支撑,进行慢速维持静载荷试验。
7.根据权利要求6所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于检测时边加载边绘制竖向荷载Q与基桩顶部沉降s的再加载关系曲线,结合基桩服役前的初始Q-s曲线,确定两类曲线的交汇点,即为当前既有受荷基桩在截断前的工作状态,判别上述工作状态与基桩的竖向承载力特征值的关系,当加载达到1.2倍竖向承载力特征值时终止加载,并维持静载试验液压千斤顶的当前工作状态。
8.根据权利要求1或2所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于检测结束后保留静载设备,在基桩截断范围设置加密箍筋,将预留外露的纵筋焊接形成钢筋笼,搭接长度为35倍的纵筋直径,将静载设备与上述钢筋笼整体导管灌注高强度混凝土,并掺入0.01%的膨胀剂。
9.根据权利要求8所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于基桩在承台底部和临时钢梁平台区间段外设钢管,并整体焊接,钢管上部和下部分别采用厚环板和加劲板加固。
10.根据权利要求9所述的一种用于既有受荷工程基桩检测结构措施的施工工艺,其特征在于待后浇筑的混凝土达到强度要求后,拆除临时钢梁平台,采用砂或素土分层夯实回填至原有承台底部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711092647.1A CN107975075B (zh) | 2017-11-08 | 2017-11-08 | 一种用于既有受荷工程基桩检测结构措施的施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711092647.1A CN107975075B (zh) | 2017-11-08 | 2017-11-08 | 一种用于既有受荷工程基桩检测结构措施的施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107975075A true CN107975075A (zh) | 2018-05-01 |
CN107975075B CN107975075B (zh) | 2020-05-12 |
Family
ID=62013158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711092647.1A Active CN107975075B (zh) | 2017-11-08 | 2017-11-08 | 一种用于既有受荷工程基桩检测结构措施的施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107975075B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138005A (zh) * | 2018-08-30 | 2019-01-04 | 中建七局第四建筑有限公司 | 一种用于既有受荷工程基桩检测结构措施的施工工艺 |
CN110374151A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种抗浮桩全自动竖向载荷检测方法及装置 |
CN110374150A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种设有预紧装置的抗浮桩竖向载荷实验检测方法及装置 |
CN110374148A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种抗浮工程桩竖向载荷实验检测方法及装置 |
CN110374149A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种抗浮桩竖向载荷检测方法及盘结检测装置 |
CN110424478A (zh) * | 2019-08-26 | 2019-11-08 | 关喜才 | 一种抗浮桩变直径竖向载荷检测方法及装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1015051A1 (ru) * | 1981-11-19 | 1983-04-30 | Киевский Ордена Трудового Красного Знамени Инженерно-Строительный Институт | Стенд дл испытаний свай-штампов |
CN201258494Y (zh) * | 2008-08-27 | 2009-06-17 | 湖南省第六工程有限公司 | 单桩竖向抗拔静载试验加载装置 |
JP2014088689A (ja) * | 2012-10-30 | 2014-05-15 | Ssc Pile Association | 複合補強地盤の載荷試験方法及び載荷試験装置 |
CN203701158U (zh) * | 2014-01-20 | 2014-07-09 | 青岛润佳建设集团有限公司 | 桩基础竖向承载力检测装置 |
CN204456242U (zh) * | 2015-01-30 | 2015-07-08 | 湖北省建筑工程质量监督检验测试中心 | 既有建筑物基桩静载试验装置 |
CN206607614U (zh) * | 2017-03-09 | 2017-11-03 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种用于混凝土管桩承载力检测的反力装置 |
-
2017
- 2017-11-08 CN CN201711092647.1A patent/CN107975075B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1015051A1 (ru) * | 1981-11-19 | 1983-04-30 | Киевский Ордена Трудового Красного Знамени Инженерно-Строительный Институт | Стенд дл испытаний свай-штампов |
CN201258494Y (zh) * | 2008-08-27 | 2009-06-17 | 湖南省第六工程有限公司 | 单桩竖向抗拔静载试验加载装置 |
JP2014088689A (ja) * | 2012-10-30 | 2014-05-15 | Ssc Pile Association | 複合補強地盤の載荷試験方法及び載荷試験装置 |
CN203701158U (zh) * | 2014-01-20 | 2014-07-09 | 青岛润佳建设集团有限公司 | 桩基础竖向承载力检测装置 |
CN204456242U (zh) * | 2015-01-30 | 2015-07-08 | 湖北省建筑工程质量监督检验测试中心 | 既有建筑物基桩静载试验装置 |
CN206607614U (zh) * | 2017-03-09 | 2017-11-03 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种用于混凝土管桩承载力检测的反力装置 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138005A (zh) * | 2018-08-30 | 2019-01-04 | 中建七局第四建筑有限公司 | 一种用于既有受荷工程基桩检测结构措施的施工工艺 |
CN109138005B (zh) * | 2018-08-30 | 2021-05-07 | 中建七局第四建筑有限公司 | 一种用于既有受荷工程基桩检测结构措施的施工工艺 |
CN110374151A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种抗浮桩全自动竖向载荷检测方法及装置 |
CN110374150A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种设有预紧装置的抗浮桩竖向载荷实验检测方法及装置 |
CN110374148A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种抗浮工程桩竖向载荷实验检测方法及装置 |
CN110374149A (zh) * | 2019-08-26 | 2019-10-25 | 关喜才 | 一种抗浮桩竖向载荷检测方法及盘结检测装置 |
CN110424478A (zh) * | 2019-08-26 | 2019-11-08 | 关喜才 | 一种抗浮桩变直径竖向载荷检测方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107975075B (zh) | 2020-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107975075A (zh) | 一种用于既有受荷工程基桩检测结构措施的施工工艺 | |
CN103195076B (zh) | 淤泥质深基坑塔吊基础施工方法 | |
CN103255771B (zh) | 分级开挖超深基坑工程桩兼作支护桩分级复合支护的工法 | |
CN103911983B (zh) | 轮胎-碎石排水桩复合地基处理方法 | |
CN106400820A (zh) | 一种锁扣钢管与混凝土组合桩围堰及施工方法 | |
CN104264683B (zh) | 三面环绕文保建筑凹字形超深基坑分区支护方法 | |
CN102605750A (zh) | 一种土石坝注浆加固抗震方法 | |
CN105113514B (zh) | 以地下连续墙作为竖向悬臂支点的基坑围护体系及施工方法 | |
CN103104102A (zh) | 一种地下增层改造施工方法 | |
CN104711991A (zh) | 一种临近基坑边坡的地基及其加固方法 | |
Watcharasawe et al. | Measurements and analysis of load sharing between piles and raft in a pile foundation in clay | |
CN109577322A (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
CN209211459U (zh) | 一种深埋pba地铁车站围护边桩 | |
CN109610473A (zh) | 一种市政大型池体构筑物基坑支护体系的施工方法 | |
CN207499006U (zh) | 既有受荷工程基桩检测再恢复结构 | |
CN205024712U (zh) | 一种组合式塔吊基础 | |
CN108625368A (zh) | 一种深厚软土地区刚性长短桩复合地基施工方法 | |
CN110924455A (zh) | 一种既有建筑的基桩检测施工方法 | |
CN110512667A (zh) | 一种处理因水害导致桩基沉降的新方法 | |
CN205000340U (zh) | 一种以地下连续墙作为竖向悬臂支点的基坑围护体系 | |
CN212642730U (zh) | 一种湿陷性黄土地区隧道穿越人防结构 | |
Xu et al. | Application of long-short pile retaining system in braced excavation | |
CN206706775U (zh) | 紧邻高层建筑开挖深基坑的支护结构 | |
CN216999743U (zh) | 一种能够在基坑开挖前施工斜支撑的基坑围护结构 | |
CN219011237U (zh) | 一种基坑斜支撑支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20180501 Assignee: Zhaodi Group Co.,Ltd. Assignor: Zhejiang University of Technology Contract record no.: X2021330000023 Denomination of invention: A kind of construction technology used to detect structural measures of foundation piles in existing loaded projects Granted publication date: 20200512 License type: Common License Record date: 20210310 |
|
EE01 | Entry into force of recordation of patent licensing contract |