CN107842201A - A kind of floorslab thickness control device and its application method - Google Patents
A kind of floorslab thickness control device and its application method Download PDFInfo
- Publication number
- CN107842201A CN107842201A CN201711251149.7A CN201711251149A CN107842201A CN 107842201 A CN107842201 A CN 107842201A CN 201711251149 A CN201711251149 A CN 201711251149A CN 107842201 A CN107842201 A CN 107842201A
- Authority
- CN
- China
- Prior art keywords
- concrete block
- thickness control
- standing screw
- cylinder concrete
- control device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/10—Devices for levelling, e.g. templates or boards
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The present invention discloses a kind of floorslab thickness control device and its application method, prefabricated cylindrical hollow concrete block, standing screw including same thickness of slab, anchoring steel disc, hexagonal flange nut, it is first that floor bar colligation is complete during use, 2m is spaced on slab form and bores anchor caverns, cylindrical hollow concrete block is placed on anchor caverns position;By anchorage screw by being worn inside hollow concrete block to form plate hole, in template bottom, fastened using hex nut.During concreting, top of concrete absolute altitude is smeared to hollow concrete block is suitable for reading and flushed by worker, you can completes strip thickness control work.Prefabricated cylindrical hollow concrete block is as floorslab thickness control device, with anchoring in easy for installation, concreting process firmly, the characteristics of not easily shifted, slab thickness control accuracy is high, anchor bolt can be reused, maintenance cost is reduced, while also saves material.
Description
Technical field
The present invention relates to building field, specifically a kind of floorslab thickness control device and its application method.
Background technology
At present, traditional thickness of concrete floor control has:Floor thickness is marked out on the wall column vertical reinforcement reserved
Control line is spent, is measured with ruler during casting concrete;Or inserted in concrete and carried out with reinforcing bar during casting concrete
Measure etc..
Although such a method can control thickness of concrete floor, but still larger disadvantage be present.By worker's level, ring
The influences such as border are big, it has not been convenient to operate and are also easy to produce larger error, can increase the risk of the slab thickness deviation processing in later stage.
The content of the invention
It is an object of the invention to provide a kind of floorslab thickness control device and its application method, the present invention can repeat to make
With, it is easy for installation, the difficulty of construction of thickness of concrete floor control is reduced, while also reduce slab thickness deviation processing
Risk.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of floorslab thickness control device, including fixing device and cylinder concrete block, the fixing device include reinforcing bar
Handle, anchoring steel disc, standing screw and hexagonal flange nut, standing screw upper end are provided with anchoring steel disc, and anchoring steel disc upper end is set
There is reinforcing bar handle, standing screw is provided with hexagonal flange nut.
Shaft core position on the cylinder concrete block is provided with a through hole.
The anchoring steel disc and reinforcing bar handle, standing screw and anchoring steel disc are by being welded and fixed
Through hole on the cylinder concrete block is available for standing screw to pass through, and cylinder concrete block and fixing device cooperation make
With.
A kind of application method of floorslab thickness control device, comprises the following steps:
S1:After the completion of floor bar colligation, at interval of 2m holes drilled through on slab form;
S2:Cylinder concrete block is placed on slab form, while ensures through hole and floor on cylinder concrete block
Through hole in template is concentric;
S3:Standing screw in fixing device is passed through into the through hole on cylinder concrete block and slab form;
S4:Tightened in the lower end of standing screw with hexagonal flange nut;
S5:During concreting, staff by the top surface absolute altitude of concrete smear to cylinder concrete block is suitable for reading flushes,
Strip thickness control work can be completed,
S6:After concreting, the hexagonal flange nut of screw rod bottom is unclamped, standing screw can be directly from cylinder coagulation
Extracted out in soil block, the through hole among cylinder concrete block is blocked with waterproof mortar.
Beneficial effects of the present invention:
1st, cylinder concrete block strength grade is highly thick with storey floors used with storey floors concrete strength used
Degree, interval 2m set one, play a part of controlling slab thickness;
2nd, welding bends to the reinforcing bar handle of semicircle on the anchoring steel disc of standing screw, and assembling and disassembling screw rod is convenient;It is fixed
The cylinder concrete block of elevation control is firmly fixed on slab form by screw rod, reduces coagulation in concreting process
Vibration displacement when the impact displacement of soil and vibrated concrete, can efficiently control concrete thickness;
3rd, the floorslab thickness control device in the present invention, there is the characteristics of convenient to assemble and disassemble, standing screw after concreting
Bottom hexagonal flange nut unclamps, and standing screw can directly be extracted out from cylinder concrete block, can reuse, reduce mixed
The difficulty of construction of solidifying Tulou plate thickness control, while also reduce the risk of slab thickness deviation processing.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is fixture structure schematic diagram of the present invention;
Fig. 2 is fixing device schematic diagram of the present invention;
Fig. 3 is cylinder concrete block front view;
Fig. 4 is cylinder concrete block top view;
Fig. 5 is floorslab thickness control device application schematic diagram of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained all other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
A kind of floorslab thickness control device, including fixing device and cylinder concrete block 5, as shown in Figure 1-2, fixing device
Including reinforcing bar handle 1, anchoring steel disc 2, standing screw 3 and hexagonal flange nut 4, the upper end of standing screw 3 is provided with anchoring steel disc 2,
Anchoring steel disc 2 upper end is provided with reinforcing bar handle 1, and standing screw 3 is provided with hexagonal flange nut 4.
Steel disc 2 and reinforcing bar handle 1, standing screw 3 and anchoring steel disc 2 are anchored by being welded and fixed.
Shaft core position on cylinder concrete block 5 is provided with a through hole, and the through hole on cylinder concrete block 5 is available for standing screw
3 are passed through, and cylinder concrete block 5 and fixing device are used cooperatively.
The application method of above-mentioned floorslab thickness control device comprises the following steps:
S1:After the completion of floor bar colligation, at interval of 2m holes drilled through on slab form 6;
S2:Cylinder concrete block 5 is placed on slab form 6, while ensures through hole and building on cylinder concrete block 5
Through hole on template die plate 6 is concentric;
S3:Standing screw 3 in fixing device is passed through into the through hole on cylinder concrete block 5 and slab form 6;
S4:Tightened in the lower end hexagonal flange nut 4 of standing screw 3;
S5:During concreting, staff smears the top surface absolute altitude of concrete seven to suitable for reading neat with cylinder concrete block 5
It is flat, you can strip thickness control work is completed,
S6:After concreting, the hexagonal flange nut 4 of the bottom of screw rod 3 is unclamped, standing screw 3 can be directly from cylinder
Extracted out in concrete block 5, the through hole among cylinder concrete block 5 is blocked with waterproof mortar.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
At least one implementation of the present invention is contained in reference to specific features, structure, material or the feature that the embodiment or example describe
In example or example.In this manual, identical embodiment or example are not necessarily referring to the schematic representation of above-mentioned term.
Moreover, specific features, structure, material or the feature of description can close in any one or more embodiments or example
Suitable mode combines.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally
The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes
Change and improvement all fall within the protetion scope of the claimed invention.
Claims (4)
1. a kind of floorslab thickness control device, including fixing device and cylinder concrete block (5), it is characterised in that the fixation
Device includes reinforcing bar handle (1), anchoring steel disc (2), standing screw (3) and hexagonal flange nut (4), standing screw (3) upper end
Provided with anchoring steel disc (2), anchoring steel disc (2) upper end is provided with reinforcing bar handle (1), and standing screw (3) is provided with hexagonal flange nut
(4);
Shaft core position on the cylinder concrete block (5) is provided with a through hole.
2. a kind of floorslab thickness control device according to claim 1, it is characterised in that the anchoring steel disc (2) and steel
Muscle handle (1), standing screw (3) and anchoring steel disc (2) are by being welded and fixed.
A kind of 3. floorslab thickness control device according to claim 1, it is characterised in that the cylinder concrete block (5)
On through hole be available for standing screw (3) to pass through, cylinder concrete block (5) and fixing device are used cooperatively.
4. a kind of application method of floorslab thickness control device, it is characterised in that comprise the following steps:
S1:After the completion of floor bar colligation, at interval of 2m holes drilled through on slab form (6);
S2:Cylinder concrete block (5) is placed on slab form (6), at the same ensure the through hole on cylinder concrete block (5) and
Through hole on slab form (6) is concentric;
S3:Standing screw (3) in fixing device is passed through into the through hole on cylinder concrete block (5) and slab form (6);
S4:Tightened in the lower end of standing screw (3) with hexagonal flange nut (4);
S5:During concreting, staff smears the top surface absolute altitude of concrete (7) to suitable for reading neat with cylinder concrete block (5)
It is flat, you can strip thickness control work is completed,
S6:After concreting, the hexagonal flange nut (4) of screw rod (3) bottom is unclamped, standing screw (3) can be directly from circle
Extracted out in post concrete block (5), the through hole among cylinder concrete block (5) is blocked with waterproof mortar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711251149.7A CN107842201A (en) | 2017-12-01 | 2017-12-01 | A kind of floorslab thickness control device and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711251149.7A CN107842201A (en) | 2017-12-01 | 2017-12-01 | A kind of floorslab thickness control device and its application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107842201A true CN107842201A (en) | 2018-03-27 |
Family
ID=61664317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711251149.7A Pending CN107842201A (en) | 2017-12-01 | 2017-12-01 | A kind of floorslab thickness control device and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107842201A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011001770A (en) * | 2009-06-19 | 2011-01-06 | Nikkari Co Ltd | Measuring bar |
CN103122696A (en) * | 2013-02-06 | 2013-05-29 | 上海中锦建设集团股份有限公司 | Thickness controller of cast-in-place concrete floor and method thereof |
CN105220882A (en) * | 2015-09-16 | 2016-01-06 | 中天建设集团有限公司 | A kind of cement waters smashes thickness control device and using method thereof |
CN205088965U (en) * | 2015-09-30 | 2016-03-16 | 中国建筑第八工程局有限公司 | Can dismantle floor gauge control instrument |
CN205955225U (en) * | 2016-08-29 | 2017-02-15 | 中国建筑第五工程局有限公司安徽分公司 | Thick controlling means of cast in situ concrete floor board |
CN206034925U (en) * | 2016-08-25 | 2017-03-22 | 中建四局第六建筑工程有限公司 | Control stopper of cast -in -place concrete floor thickness |
CN207582978U (en) * | 2017-12-01 | 2018-07-06 | 中建四局第六建筑工程有限公司 | A kind of floorslab thickness control device |
-
2017
- 2017-12-01 CN CN201711251149.7A patent/CN107842201A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011001770A (en) * | 2009-06-19 | 2011-01-06 | Nikkari Co Ltd | Measuring bar |
CN103122696A (en) * | 2013-02-06 | 2013-05-29 | 上海中锦建设集团股份有限公司 | Thickness controller of cast-in-place concrete floor and method thereof |
CN105220882A (en) * | 2015-09-16 | 2016-01-06 | 中天建设集团有限公司 | A kind of cement waters smashes thickness control device and using method thereof |
CN205088965U (en) * | 2015-09-30 | 2016-03-16 | 中国建筑第八工程局有限公司 | Can dismantle floor gauge control instrument |
CN206034925U (en) * | 2016-08-25 | 2017-03-22 | 中建四局第六建筑工程有限公司 | Control stopper of cast -in -place concrete floor thickness |
CN205955225U (en) * | 2016-08-29 | 2017-02-15 | 中国建筑第五工程局有限公司安徽分公司 | Thick controlling means of cast in situ concrete floor board |
CN207582978U (en) * | 2017-12-01 | 2018-07-06 | 中建四局第六建筑工程有限公司 | A kind of floorslab thickness control device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
CN107297810A (en) | A kind of making of precast wall body component and installation method | |
CN104790676A (en) | Rapid leveling and alignment device and method for installation of prefabricated wallboards | |
CN107268424A (en) | Can fast leveling precast assembly bridge pier structure and its construction method | |
CN209585294U (en) | A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction | |
CN206784951U (en) | Concrete placement floor thickness control device | |
CN104963289A (en) | Integral one-time pouring construction method of large-volume concrete for special-shaped pier stud | |
CN113202222A (en) | Construction method for assembled type superposed beam slab | |
CN208965714U (en) | A kind of prefabricated piping lane main frame structure of assembly concrete | |
CN206917087U (en) | A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould | |
CN210976588U (en) | Template reinforcing system for double shear walls at deformation joint | |
CN106759943A (en) | A kind of pre-assembled Anchor Bolts in Steel Column Bases structure | |
CN104947853B (en) | A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method | |
CN106351245A (en) | Tower crane foundation base and construction method thereof | |
CN207582978U (en) | A kind of floorslab thickness control device | |
CN113829493A (en) | Processing method of prefabricated greening retaining wall | |
CN212295166U (en) | Assembly type wall body connecting structure based on ribbed box | |
CN205712565U (en) | A kind of prefabricated two-sided wall | |
CN105735228B (en) | High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method | |
CN205171381U (en) | Prefabricated assembly bridge bent cap positioner | |
CN107587770A (en) | Disjunctor storehouse synchronization slding form operation method | |
CN105275198B (en) | A kind of shear-wall strengthening formwork structure and its construction method | |
CN107842201A (en) | A kind of floorslab thickness control device and its application method | |
CN103132494A (en) | Embedded anchor cone accurate positioning method | |
CN109779226A (en) | A kind of opposite sex chimney construction security platform structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180327 |