CN107842038A - 一种综合管廊节点位置道路减沉装置 - Google Patents
一种综合管廊节点位置道路减沉装置 Download PDFInfo
- Publication number
- CN107842038A CN107842038A CN201711050209.9A CN201711050209A CN107842038A CN 107842038 A CN107842038 A CN 107842038A CN 201711050209 A CN201711050209 A CN 201711050209A CN 107842038 A CN107842038 A CN 107842038A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- precast slab
- road
- bracket
- sink device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Abstract
本发明公开了一种综合管廊节点位置道路减沉装置,其特征在于,该装置包括设置在综合管廊节点主体结构侧部的牛腿,以及搁置于牛腿上的预制混凝土板,所述预制混凝土板一端搁置于牛腿上,另一端搁置于路基上,所述预制混凝土板下部路基采用级配砂石。本发明能减少综合管廊节点位置道路路面的不均匀沉降,防止综合管廊节点边缘道路出现纵向裂缝,延长敷设有综合管廊的道路设计使用年限。
Description
技术领域
本发明涉及综合管廊领域,具体地说是一种综合管廊节点位置道路减沉装置。
背景技术
目前新建综合管廊施工完毕后,进行综合管廊两侧及顶部土体回填,再施工道路路基、路面。综合管廊标准断面顶部覆土相对较深,而综合管廊节点(接出口、投料口、通风口)由于局部设置夹层,节点顶部覆土相对较浅,由于管廊节点为刚性结构,与道路路基刚度不同,道路通行后在综合管廊节点边缘位置道路不可避免出现不均匀沉降导致的纵向裂缝。
发明内容
本发明的目的在于提供一种综合管廊节点位置道路减沉装置,减少综合管廊节点位置道路不均匀沉降,既能满足敷设综合管廊的道路设计施工需求,更能从道路路基下刚度不同角度出发,设置预制混凝土板过渡区间,根据路面功能不同确定预制混凝土板板宽,同时预制混凝土板下采用级配砂石路基,加强路基排水,减少节点边缘位置道路不均匀沉降,确保道路使用年限。
为了实现上述目的,本发明的措施是:一种综合管廊节点位置道路减沉装置,其特征在于,该装置包括设置在综合管廊节点主体结构侧部的牛腿,以及搁置于牛腿上的预制混凝土板,所述预制混凝土板一端搁置于牛腿上,所述预制混凝土板宽度根据路面功能确定,所述预制混凝土板下部路基采用级配砂石。
进一步地,牛腿采用现浇方式与综合管廊节点主体结构形式一体,牛腿内配置钢筋,保证牛腿具备足够的抗剪承载力。
进一步地,预制混凝土板内配置钢筋,保证在道路传递下来的压力下预制混凝土板具备足够的承载力。
进一步地,预制混凝土板的宽度根据路面特性确定,当综合管廊节点上部路面为非机动车道时,预制混凝土板的板宽为400~600mm,当综合管廊节点上部路面为机动车道时,预制混凝土板的板宽为800~1200mm,保证综合管廊节点边缘路面沉降满足不同路面功能要求。
进一步地,预制混凝土板下部级配砂石路基的厚度不小于25~35cm,,砂石质量比3:7~4:6,压实系数0.97,保证预制混凝土板下路基具备一定透水性,减轻膨胀沉降差。
进一步地,在上述的综合管廊节点位置道路减沉装置中,所述牛腿的宽度不小于预制混凝土板的厚度,保证预制混凝土板搁置的稳定性。
所述牛腿尺寸根据综合管廊节点与道路布置相对位置确定,所述预制混凝土板长度尺寸根据综合管廊节点平面长度尺寸确定,满足节点边缘道路减沉范围要求。
本发明能减少综合管廊节点边缘道路不均匀沉降,通过预制混凝土板刚度过渡,板下采用级配砂石路基,加强路基排水,避免出现道路纵向裂缝,延长敷设有综合管廊的道路设计使用年限。根据路面特性确定预制混凝土板的宽度,在市政综合管廊及道路施工中具有良好的适用性和经济性。
附图说明
图1为本发明的结构示意俯视图。
图2为图1的侧视图。
图中:1-牛腿、2-综合管廊节点、3-预制混凝土板、4-级配砂石路基。
具体实施方式
以下结合附图和具体实施例对本发明提出的“综合管廊节点位置道路减沉装置”作进一步详细说明。根据下面说明和权利要求书,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。
请结合参阅图1,本实施例公开了一种综合管廊节点位置道路减沉装置,包括牛腿1和预制混凝土板2,牛腿1与综合管廊节点主体结构2连接,预制混凝土板3一端搁置于牛腿1上,预制混凝土板3下部采用级配砂石路基4,牛腿1的宽度不小于预制混凝土板3的厚度。
可选的,在上述的综合管廊节点位置道路减沉装置中,所述牛腿1与综合管廊节点2连接,牛腿1采用现浇方式与综合管廊节点2形式一体,牛腿1内配置钢筋,保证牛腿1具备足够的抗剪承载力。
可选的,在上述的综合管廊节点位置道路减沉装置中,所述预制混凝土板3一端搁置于牛腿1上,预制混凝土板3内配置钢筋,保证在道路传递下来的压力下预制混凝土板3具备足够的承载力。
可选的,在上述的综合管廊节点位置道路减沉装置中,所述预制混凝土板3下部采用级配砂石路基4,保证预制混凝土板下路基具备一定透水性,减轻膨胀沉降差。
可选的,在上述的综合管廊节点位置道路减沉装置中,所述牛腿1的宽度不小于预制混凝土板3的厚度,保证预制混凝土板3搁置的稳定性。
综上所述,本发明提供的一种综合管廊节点位置道路减沉装置,本发明减少综合管廊节点边缘道路不均匀沉降,通过预制混凝土板刚度过渡,板下采用级配砂石路基,加强路基排水,避免出现道路纵向裂缝,延长敷设有综合管廊的道路设计使用年限。根据路面特性确定预制混凝土板的宽度,在市政综合管廊及道路施工中具有良好的适用性和经济性。
上述描述仅是对本发明较佳实施例的描述,并非对本发明范围的任何限定,本发明领域的普通技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求书的保护范围。
Claims (6)
1.一种综合管廊节点位置道路减沉装置,其特征在于,该装置包括设置在综合管廊节点主体结构侧部的牛腿,以及搁置于牛腿上的预制混凝土板,所述预制混凝土板一端搁置于牛腿上,另一端搁置于路基上,所述预制混凝土板下部路基采用级配砂石。
2.如权利要求1所述的综合管廊节点位置道路减沉装置,其特征在于,牛腿采用现浇方式与综合管廊节点主体结构形式一体,牛腿内配置钢筋,保证牛腿具备足够的抗剪承载力。
3.如权利要求1所述的综合管廊节点位置道路减沉装置,其特征在于,预制混凝土板内配置钢筋,保证在道路传递下来的压力下预制混凝土板具备足够的承载力。
4.如权利要求1所述的综合管廊节点位置道路减沉装置,其特征在于,预制混凝土板的宽度根据路面特性确定,当综合管廊节点上部路面为非机动车道时,预制混凝土板的板宽为400~600mm,当综合管廊节点上部路面为机动车道时,预制混凝土板的板宽为800~1200mm,保证综合管廊节点边缘路面沉降满足不同路面功能要求。
5.如权利要求1所述的综合管廊节点位置道路减沉装置,其特征在于,预制混凝土板下部级配砂石路基的厚度不小于25~35cm,砂石质量比3:7~4:6,压实系数0.97,保证预制混凝土板下路基具备一定透水性,减轻膨胀沉降差。
6.如权利要求1所述的综合管廊节点位置道路减沉装置,其特征在于,在上述的综合管廊节点位置道路减沉装置中,所述牛腿的宽度不小于预制混凝土板的厚度,保证预制混凝土板搁置的稳定性。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711050209.9A CN107842038A (zh) | 2017-10-31 | 2017-10-31 | 一种综合管廊节点位置道路减沉装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711050209.9A CN107842038A (zh) | 2017-10-31 | 2017-10-31 | 一种综合管廊节点位置道路减沉装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107842038A true CN107842038A (zh) | 2018-03-27 |
Family
ID=61681963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711050209.9A Pending CN107842038A (zh) | 2017-10-31 | 2017-10-31 | 一种综合管廊节点位置道路减沉装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107842038A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258367A (zh) * | 2019-06-24 | 2019-09-20 | 中铁第四勘察设计院集团有限公司 | 一种涵洞和路涵过渡结构 |
CN111809657A (zh) * | 2020-04-17 | 2020-10-23 | 中建五局第三建设有限公司 | 一种管廊双翼板控台背压实施工方法 |
CN114908625A (zh) * | 2021-11-25 | 2022-08-16 | 上海建工集团股份有限公司 | 一种综合管廊穿越道路的地基处理及防沉降装置及方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101187168B1 (ko) * | 2012-03-05 | 2012-09-28 | 임인혁 | 소하천용 피씨 교량 및 그 시공 방법 |
CN203716051U (zh) * | 2014-01-21 | 2014-07-16 | 浙江省交通规划设计研究院 | 一种基于软土地基上的桥头结构 |
CN203960701U (zh) * | 2014-06-03 | 2014-11-26 | 北京建工建筑设计研究院 | 软土路基新老路基路面衔接处的差异沉降协调结构 |
CN104294733A (zh) * | 2014-10-17 | 2015-01-21 | 华东建筑设计研究院有限公司 | 一种用于减小车道道面沉降突变的搭板构造 |
CN206090610U (zh) * | 2016-10-17 | 2017-04-12 | 天津滨港电镀企业管理有限公司 | 一种地下综合管廊系统 |
CN106638670A (zh) * | 2017-01-20 | 2017-05-10 | 福建省建筑设计研究院 | 半预制管廊及施工方法 |
CN106759473A (zh) * | 2016-11-11 | 2017-05-31 | 中国建筑第八工程局有限公司 | 地下综合管廊和道路的施工结构及其施工方法 |
-
2017
- 2017-10-31 CN CN201711050209.9A patent/CN107842038A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101187168B1 (ko) * | 2012-03-05 | 2012-09-28 | 임인혁 | 소하천용 피씨 교량 및 그 시공 방법 |
CN203716051U (zh) * | 2014-01-21 | 2014-07-16 | 浙江省交通规划设计研究院 | 一种基于软土地基上的桥头结构 |
CN203960701U (zh) * | 2014-06-03 | 2014-11-26 | 北京建工建筑设计研究院 | 软土路基新老路基路面衔接处的差异沉降协调结构 |
CN104294733A (zh) * | 2014-10-17 | 2015-01-21 | 华东建筑设计研究院有限公司 | 一种用于减小车道道面沉降突变的搭板构造 |
CN206090610U (zh) * | 2016-10-17 | 2017-04-12 | 天津滨港电镀企业管理有限公司 | 一种地下综合管廊系统 |
CN106759473A (zh) * | 2016-11-11 | 2017-05-31 | 中国建筑第八工程局有限公司 | 地下综合管廊和道路的施工结构及其施工方法 |
CN106638670A (zh) * | 2017-01-20 | 2017-05-10 | 福建省建筑设计研究院 | 半预制管廊及施工方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258367A (zh) * | 2019-06-24 | 2019-09-20 | 中铁第四勘察设计院集团有限公司 | 一种涵洞和路涵过渡结构 |
CN111809657A (zh) * | 2020-04-17 | 2020-10-23 | 中建五局第三建设有限公司 | 一种管廊双翼板控台背压实施工方法 |
CN114908625A (zh) * | 2021-11-25 | 2022-08-16 | 上海建工集团股份有限公司 | 一种综合管廊穿越道路的地基处理及防沉降装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106192646B (zh) | 公路隧道行车减振降噪结构及其施工方法 | |
CN106120501B (zh) | 既有挡墙段路基拼宽加高结构及施工方法 | |
CN108797249A (zh) | 软土路基高填方陡坡路段泡沫轻质土的施工方法 | |
WO2014015739A1 (zh) | 抗差异沉降的窨井装置及其施工方法 | |
CN107805987A (zh) | 深厚软基路段的厚垫层泡沫轻质土路基结构及施工方法 | |
CN107842038A (zh) | 一种综合管廊节点位置道路减沉装置 | |
CN205399090U (zh) | 一种上跨高速公路的桩基钢筋混凝土铁路路基结构 | |
CN201502019U (zh) | 一种透水地面结构 | |
CN207017093U (zh) | 新旧路基加宽拼接路基结构 | |
CN109958016A (zh) | 一种高寒地区沼泽地带路基防沉降结构 | |
CN110130177B (zh) | 公路减振降噪结构及其施工方法 | |
CN207452609U (zh) | 一种深厚软基路段的厚垫层泡沫轻质土路基结构 | |
CN210341528U (zh) | 一种园林透水砖路面结构 | |
CN215405364U (zh) | 一种路桥工程的路基结构 | |
CN208346846U (zh) | 一种综合管廊节点位置道路减沉装置 | |
CN203144861U (zh) | 市政道路局部加固结构 | |
CN208395598U (zh) | 一种用于改善易积水区域的混凝土预制块 | |
CN206616555U (zh) | 一种承受力度强的市政路基 | |
CN208379368U (zh) | 一种用于道路中央隔离带的加强型填石渗沟结构 | |
CN207073045U (zh) | 一种适用于工业化建造的预制板墙式无土路基 | |
CN207347874U (zh) | 一种路面及广场的积水导流系统 | |
CN217678430U (zh) | 城市洼地的海绵型道路 | |
CN212561951U (zh) | 地铁上盖区变形缝防排水结构 | |
CN218521536U (zh) | 一种道路路基施工结构 | |
CN204849582U (zh) | 一种人行天桥防治积水系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |