CN107839838A - Canoe movement and place system in a kind of big ship's space - Google Patents

Canoe movement and place system in a kind of big ship's space Download PDF

Info

Publication number
CN107839838A
CN107839838A CN201711099260.9A CN201711099260A CN107839838A CN 107839838 A CN107839838 A CN 107839838A CN 201711099260 A CN201711099260 A CN 201711099260A CN 107839838 A CN107839838 A CN 107839838A
Authority
CN
China
Prior art keywords
guide rail
rack
canoe
place system
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711099260.9A
Other languages
Chinese (zh)
Inventor
全惠文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN201711099260.9A priority Critical patent/CN107839838A/en
Publication of CN107839838A publication Critical patent/CN107839838A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for

Abstract

The present invention relates to canoe movement and place system in a kind of big ship's space, belong to technical field of ships, guide rail;Canoe apparatus for placing, it includes spaced multigroup rack, and the rack is arranged at the both sides of the guide rail;Guide rail car, it is arranged on the guide rail, can be moved along the guide rail between rack described in every group, lifting body is provided with the guide rail car, for being jacked canoe and being positioned over the canoe apparatus for placing.The present invention is by the way that canoe is positioned on guide rail car, guide rail car moves through the lifting body set thereon on guide rail and canoe is sequentially placed on multigroup rack, to complete quick mobile and placement of multiple canoes in the cabin of ship, it ensure that accuracy, the rapidity for the position for connecing ship and moving ship, and the fixed sea situation that is satisfied by of mobile and placement require.In addition, the structure of movement provided by the invention and place system is simple, quick and easy for installation.

Description

Canoe movement and place system in a kind of big ship's space
Technical field
The present invention relates to canoe movement and place system in technical field of ships, more particularly to a kind of big ship's space.
Background technology
At present, when carrying out operation on the sea, it is necessary to place a plurality of canoe on big ship, a plurality of canoe is being launched and reclaimed When, if canoe is wasted time and energy, operating efficiency is low, and the space that canoe takes is big using manual operation.If in addition, using Hanging device moves to canoe, and it is big to have an equipment occupation space, and cost is high, and due to operation on the sea, makes big ship Compare it is wavy, when using hanging device move and place canoe when, may due to hanging device with rocking for ship prestige Coerce the safety of crewman.
The content of the invention
, can be in ship's space it is an object of the invention to propose canoe movement and place system in a kind of big ship's space The quick movement and placement for realizing canoe, reduces operation difficulty, raising efficiency.
To use following technical scheme up to this purpose, the present invention:
The movement of a plurality of canoe, place system in a kind of big ship, including:
Guide rail, it is fixed on the deck plane in ship's space;
Canoe apparatus for placing, it includes spaced multigroup rack, and the rack is arranged at the two of the guide rail Side;
Guide rail car, it is arranged on the guide rail, can be moved along the guide rail between rack described in every group, described Lifting body is provided with guide rail car, for canoe to be lifted off into the rack or is positioned over the rack.
Further, it is characterised in that the rack includes the first rack and the second rack, and described first places Frame and second rack are correspondingly arranged in the both sides of the guide rail, and the guide rail car is located at first rack and described Between second rack, and it can be moved between first rack and second rack.
Further, first rack and second rack include multiple columns and are connected to multiple described Crossbeam at the top of column, the height of the column gradually increase from one end of the crossbeam to the other end.
Further, the crossbeam is provided with yielding rubber.
Further, side and second rack of first rack away from the guide rail car are led away from described The side of rail car is provided with fixed structure.
Further, the fixed structure includes the first fixation rope and second fixes rope, and the first fixation rope is connected to Bulkhead, the second fixation rope are connected to deck plane.
Further, the guide rail car includes car body, and the lifting body includes lifting platform and is connected to the car sheet The scissor component of body and the lifting platform, the both sides of the lifting platform are provided with the first drive division, the first drive division energy The lifting platform is enough driven relative to the vertical raising and lowering of car body.
Further, the scissor component includes jointed shaft and two groups of scissors at the both ends for being hingedly connected to the jointed shaft Structure, the scissor structure include the first scissor portion and the second scissor portion being hinged by jointed shaft and the first scissor portion, The one end in the one end in the first scissor portion and the second scissor portion is hingedly connected to the both sides of the guide rail car, and described first The other end in scissor portion and the other end in the second scissor portion are hingedly connected to the both sides of the lifting platform.
Further, the both sides of the guide rail car are provided with two rollers, and the roller is connected with the second drive division, institute State the second drive division to be arranged on the guide rail car, for driving the roller to rotate.
Further, the guide rail includes the first rail, the second rail and is arranged at first rail and described second More connecting rods between rail, the connecting rod are vertically connected at first rail and second rail.
Beneficial effects of the present invention:
The present invention is by the way that canoe is positioned on guide rail car, and guide rail car moves on guide rail, and the top by setting thereon Rise mechanism canoe is sequentially placed on multigroup rack, to complete quick mobile in the cabin of ship of multiple canoes and put Put, ensure that connect ship, move ship position accuracy, rapidity, it is and mobile and place and fixed be satisfied by sea situation requirement.This Outside, movement provided by the invention, the structure of place system are simple, quick and easy for installation.
Brief description of the drawings
Fig. 1 is the view that canoe provided by the invention is positioned on canoe apparatus for placing;
Fig. 2 is view when guide rail car provided by the invention jacks to canoe;
Fig. 3 is the structural representation that canoe apparatus for placing provided by the invention is installed on guide rail;
Fig. 4 is Fig. 3 top view;
Fig. 5 is Fig. 3 right view;
Fig. 6 is structural representation when guide rail car provided by the invention is in jacking;
Fig. 7 is the schematic diagram that scissor component provided by the invention is installed between lifting platform and guide rail car.
In figure:
10th, bulkhead;20th, deck plane;
1st, guide rail;11st, the first rail;12nd, the second rail;13rd, connecting rod;
2nd, canoe apparatus for placing;21st, rack;211st, the first rack;212nd, the second rack;
3rd, guide rail car;31st, lifting body;311st, lifting platform;3111st, V-groove;3112nd, shock-damping structure;312nd, scissor group Part;3121st, jointed shaft;3122nd, scissor structure;32nd, roller;
41st, column;42nd, crossbeam;
5th, fixed structure;51st, first rope is fixed;52nd, second rope is fixed;
6th, the first drive division;
71st, the first scissor portion;72nd, the second scissor portion;
8th, the second drive division.
Embodiment
In order that those skilled in the art more fully understand technical scheme, below in conjunction with the accompanying drawings and by specific Embodiment further illustrates technical scheme.
Present embodiments provide canoe movement and place system in a kind of big ship's space, as shown in Fig. 1-Fig. 7, the shifting Dynamic, place system includes guide rail 1, is fixed on the deck plane 20 in ship's space;Canoe apparatus for placing 2, it includes interval and set The multigroup rack 21 put, the rack 21 are arranged at the both sides of the guide rail 1;Guide rail car 3, it is arranged at the guide rail 1 On, it can be moved along the guide rail 1 between rack 21 described in every group, lifting body 31 is provided with the guide rail car 3, used In canoe to be lifted off to the rack 21 or is positioned on the rack 21.Wherein, 2 equal energy of guide rail 1 and canoe apparatus for placing It is enough to be releasably installed on deck plane 20 so that mobile, place system does not influence on the overall performance and structure of big ship, ensures The multifunctionality of ship, it can quickly remove the system and recover to original state of ship.
The movement and place system that the present embodiment provides also include controller, and controller is connected with guide rail car 3, for controlling The movement of guide rail car 3 and the lifting for controlling lifting body 31.
By the way that canoe is positioned on guide rail car 3, guide rail car 3 moves the present embodiment on guide rail 1, and by setting thereon Lifting body 31 canoe is sequentially placed on multigroup rack 21, it is quick in the cabin of ship to complete multiple canoes It is mobile and place, ensure that connect ship, move ship position accuracy, rapidity and movement and place the fixed sea situation that is satisfied by will Ask.In addition, the movement and the structure of place system that the present embodiment provides are simple, quick and easy for installation.
Wherein, guide rail car 3 move and place multiple canoes process it is as follows:
Guide rail car 3 is moved to along guide rail 1 to be arranged at the dispensing port (not shown) of the one end of guide rail 1, by slinging dress To put (not shown) canoe is positioned on guide rail car 3, the lifting body 31 of guide rail car 3 jacks up canoe, and higher than placement Frame 21, guide rail car 3 move backward along guide rail 1, canoe are transported at the rack 21 of dispensing port farthest, lifting body 31 fall after rise, so as to which canoe is positioned on rack 21;Guide rail car 3 is back at dispensing port, by next canoe transport to away from At adjacent rack 21 from the rack 21 of dispensing port farthest, and fallen after rise by lifting body 31, so as to which canoe be put It is placed on rack 21;The movement of remaining multiple canoe and placement process repeat no more, so as to be sequentially completed to multiple canoes Movement and placement.
As shown in Figure 3-Figure 5, the rack 21 includes the first rack 211 and the second rack 212, and described first puts Put frame 211 and second rack 212 is correspondingly arranged in the both sides of the guide rail 1, the guide rail car 3 is put positioned at described first Put between frame 211 and second rack 212, and can first rack 211 and second rack 212 it Between move.Wherein, first rack 211 and second rack 212 include multiple columns 41 and are connected to multiple The crossbeam 42 at the top of column 41, the height of the column 41 gradually increase from one end of the crossbeam 42 to the other end, with Guide rail car 3 is facilitated to pick and place canoe.In addition, the group number of rack 21 is not construed as limiting, can be according to the number of canoe in the present embodiment Amount, adjust the group number of rack 21;The material that yielding rubber or crossbeam 42 are provided with above-mentioned crossbeam 42 is yielding rubber, when When canoe is positioned on rack 21, there is the effect of damping to canoe, prevent from causing due to rocking for hull canoe from Come off on rack 21.
As depicted in figs. 1 and 2, side and second rack 212 of above-mentioned first rack 211 away from the guide rail car 3 Side away from the guide rail car 3 is provided with fixed structure 5.Specifically, fixed structure 5 includes the first fixation rope 51 and second Fixed rope 52, the first fixation rope 51 are connected to bulkhead 10, and the second fixation rope 52 is connected to deck plane 20.By Set first to fix rope 51 and second on one rack 211 and the second rack 212 and fix rope 52 by mobile and place system lock Tightly on ship, ensure that during ship running, rack 21 will not rock with the fluctuating of wave, and then add The stability of rack 21, it is therefore prevented that cause the unstable of rack 21 because ship is wavy with wave, and then cause canoe Occurred by situation about being come off on rack 21, meanwhile, it further ensure that mobile and place system stability.In addition, the Side and second rack 212 side away from the guide rail car 3 of one rack 211 away from the guide rail car 3 is all provided with Hog frame is equipped with, to strengthen the intensity of the first rack 211 and the second rack 212.
As shown in Figure 6 and Figure 7, the guide rail car 3 includes car body, and the lifting body 31 includes lifting platform 311 and connected The scissor component 312 of the car body and the lifting platform 311 is connected to, the both sides of the lifting platform 311 are provided with the first drive Dynamic portion 6, first drive division 6 can drive the lifting platform 311 relative to the vertical raising and lowering of car body.Its In, lifting platform 311 is used to place canoe, the vertical rising of lifting platform 311 is driven by the first drive division 6, so as to realize to small The jacking of ship, being vertically lowered for lifting platform 311, so as to realize that lifting platform 311 falls after rise, Jin Ershi are driven by the first drive division 6 Now canoe is positioned on rack 21.Wherein, the first drive division 6 is hydraulic cylinder, and is connected with controller, the cylinder body of hydraulic cylinder It is fixed on car body, the drive end of hydraulic cylinder is connected to lifting platform 311.
Specifically, the scissor component 312 includes jointed shaft 3121 and is hingedly connected to the both ends of the jointed shaft 3121 Two groups of scissor structures 3122, the scissor structure 3122 includes the first scissor portion 71 and passes through jointed shaft 3121 and described first The one end in the second be hinged scissor portion 72 of scissor portion 71, the one end in the first scissor portion 71 and the second scissor portion 72 is respectively articulated with In the both sides of the guide rail car 3, the other end in the other end in the first scissor portion 71 and the second scissor portion 72 is cut with scissors respectively It is connected to the both sides of the lifting platform 311.
When the first drive division 6 driving lifting platform 311 for the both sides for being arranged at the lifting platform 311 rises or falls, two The the first scissor portion 71 and the second scissor portion 72 of group scissor structure 3122 rotate around jointed shaft 3121, so as to realize with lifting platform 311 are stretched simultaneously, two groups of scissor structures 3122 to during the raising and lowering of lifting platform 311, there is supporting role, Ensure that guide rail car 3 by lifting body 31 drive lifting platform 311 jack and fall after rise during stationarity, it is small so as to ensure that Ship jack, fall after rise with lifting platform 311 during stationarity.
Above-mentioned lifting platform 311 is provided with V-groove 3111 close to the side of canoe, and V-groove 3111 includes two inclined-planes, the liter Two shock-damping structures 3112 are provided with drop platform 311, the shock-damping structure 3112 is located at the both sides of V-groove 3111 respectively, and subtracts Shake structure 3112 is provided with inclined plane close to the side of canoe, positioned at the inclined plane and V of the shock-damping structure 3112 of the side of V-groove 3111 One of inclined-plane of type groove 3111 is parallel and coplanar, positioned at the inclined plane and V of the shock-damping structure 3112 of the opposite side of V-groove 3111 Another inclined-plane of type groove 3111 is parallel and coplanar, in addition, being provided with snubber block, the material of snubber block in two inclined-planes and inclined plane Matter is rubber, for damping, to ensure the stability of the canoe on lifting platform 311.
The both sides of above-mentioned guide rail car 3 are provided with two rollers 32, and the roller 32 is connected with the second drive division 8, described Second drive division 8 is arranged on the guide rail car 3, for driving the roller 32 to be moved on guide rail 1.Wherein, the second driving Portion 8 is motor, and is connected with controller.
Above-mentioned guide rail 1 includes the first rail 11, the second rail 12 and is arranged at first rail 11 and second steel More connecting rods 13 between rail 12, the connecting rod 13 are vertically connected at first rail 11 and second rail 12. Wherein, the length of more connecting rods 13 is definite value, when installing the first rail 11 and the second rail 12, has position-limiting action, So as to ensure that the depth of parallelism of the first rail 11 and the second rail 12, and then improve the traveling comfort of guide rail car 3.
Pay attention to, the general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The industry Technical staff it should be appreciated that the present invention is not limited to the embodiments described above, described in above-mentioned embodiment and specification Merely illustrate the principles of the invention, without departing from the spirit and scope of the present invention, the present invention also have various change and Improve, these changes and improvements all fall within the protetion scope of the claimed invention, and claimed scope of the invention is by appended Claims and its equivalent thereof.

Claims (10)

1. canoe movement and place system in a kind of big ship's space, it is characterised in that including:
Guide rail (1), it is fixed on the deck plane in ship's space (20);
Canoe apparatus for placing (2), it includes spaced multigroup rack (21), and the rack (21) is arranged at described lead The both sides of rail (1);
Guide rail car (3), it is arranged on the guide rail (1), can be along the guide rail (1) between rack (21) described in every group It is mobile, lifting body (31) is provided with the guide rail car (3), for canoe to be lifted off into the rack (21) or is positioned over institute State on rack (21).
2. canoe movement and place system in big ship's space according to claim 1, it is characterised in that the rack (21) the first rack (211) and the second rack (212), first rack (211) and second rack are included (212) both sides of the guide rail (1) are correspondingly arranged in, the guide rail car (3) is located at first rack (211) and described Between two racks (212), and it can be moved between first rack (211) and second rack (212).
3. canoe movement and place system in big ship's space according to claim 2, it is characterised in that described first puts Putting frame (211) and second rack (212) includes multiple columns (4) and is connected at the top of multiple columns (41) Crossbeam (42), the height of the column (41) gradually increase from one end of the crossbeam (42) to the other end.
4. canoe movement and place system in big ship's space according to claim 3, it is characterised in that the crossbeam (42) it is provided with yielding rubber.
5. canoe movement and place system in big ship's space according to claim 2, it is characterised in that described first puts Put side and second rack (212) side away from the guide rail car (3) of the frame (211) away from the guide rail car (3) It is provided with fixed structure (5).
6. canoe movement and place system in big ship's space according to claim 5, it is characterised in that the fixed knot Structure (5) includes first and fixes rope (51) and the second fixation rope (52), and the first fixation rope (51) is connected to bulkhead (10), described Second fixation rope (52) is connected to deck plane (20).
7. canoe movement and place system in big ship's space according to claim 1, it is characterised in that the guide rail car (3) car body is included, the lifting body (31) includes lifting platform (311) and is connected to the car body and the lifting platform (311) scissor component (312), the both sides of the lifting platform (311) are provided with the first drive division (6), first driving Portion (6) can drive the lifting platform (311) relative to the vertical raising and lowering of car body.
8. canoe movement and place system in big ship's space according to claim 7, it is characterised in that the scissor group Part (312) includes jointed shaft (3121) and is hingedly connected to two groups of scissor structures at the both ends of the jointed shaft (3121) (3122), the scissor structure (3122) includes the first scissor portion (71) and cut by the jointed shaft (3121) and described first The second be hinged scissor portion (72) of fork (71), one end of the first scissor portion (71) and the one of the second scissor portion (72) End is hingedly connected to the both sides of the guide rail car (3), the other end of the first scissor portion (71) and the second scissor portion (72) the other end is hingedly connected to the both sides of the lifting platform (311).
9. canoe movement and place system in big ship's space according to claim 7, it is characterised in that the guide rail car (3) both sides are provided with two rollers (32), and the roller (32) is connected with the second drive division (8), second drive division (8) it is arranged on the guide rail car (3), for driving the roller (32) to rotate.
10. canoe movement and place system in big ship's space according to claim 1, it is characterised in that the guide rail (1) include the first rail (11), the second rail (12) and be arranged at first rail (11) and second rail (12) it Between more connecting rods (13), the connecting rod (13) is vertically connected at first rail (11) and second rail (12)。
CN201711099260.9A 2017-11-09 2017-11-09 Canoe movement and place system in a kind of big ship's space Pending CN107839838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711099260.9A CN107839838A (en) 2017-11-09 2017-11-09 Canoe movement and place system in a kind of big ship's space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711099260.9A CN107839838A (en) 2017-11-09 2017-11-09 Canoe movement and place system in a kind of big ship's space

Publications (1)

Publication Number Publication Date
CN107839838A true CN107839838A (en) 2018-03-27

Family

ID=61681539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711099260.9A Pending CN107839838A (en) 2017-11-09 2017-11-09 Canoe movement and place system in a kind of big ship's space

Country Status (1)

Country Link
CN (1) CN107839838A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109131778A (en) * 2018-08-29 2019-01-04 广船国际有限公司 One kind is partly latent to refute track tooling and installation method

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191211450A (en) * 1912-05-14 1913-04-24 James Frederick Vickery Improvements in the Means of Saving Life from Vessels at Sea.
GB191316932A (en) * 1913-07-23 1914-10-23 Martin Patent Davit Company Lt Improved means for Supporting and Moving Ships' Life Boats.
CA2255261A1 (en) * 1998-12-02 2000-06-02 Rick J. Hammond Boat storage device
CN101134497A (en) * 2007-09-21 2008-03-05 中国舰船研究设计中心 Lift type tram car for the navigation ship
CN201534606U (en) * 2009-08-07 2010-07-28 天津新港船舶重工有限责任公司 High-speed ship-based boat support of patrol boat
CN201566807U (en) * 2009-09-19 2010-09-01 中远船务工程集团有限公司 Special equipment for transportation and repair of life boat
CN201808655U (en) * 2010-09-30 2011-04-27 浙江正和造船有限公司 Pier column for sectional shipbuilding
CN103192952A (en) * 2013-04-23 2013-07-10 青岛北海船舶重工有限责任公司 Vehicular bulbous bow integral-replacing process
CN203246567U (en) * 2013-01-22 2013-10-23 黎明南 Device for folding and unfolding skiff on mother ship
CN203571346U (en) * 2013-09-18 2014-04-30 广州中船黄埔造船有限公司 Adjustable fixing support
WO2015069118A1 (en) * 2013-11-08 2015-05-14 Vestdavit Gruppen As Multi cradle apparatus
CN204737001U (en) * 2015-06-05 2015-11-04 江苏佼燕船舶设备有限公司 Bracket device for rescue boat
CN106628007A (en) * 2016-11-13 2017-05-10 无锡晟欧船舶设备有限公司 Lifeboat lowering device
WO2017119822A1 (en) * 2016-01-08 2017-07-13 Vestdavit Gruppen As Aparatus for handling boats from a midships hangar or mission bay of a mother vessel
CN107651611A (en) * 2017-09-29 2018-02-02 广船国际有限公司 A kind of electric running small rail car

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191211450A (en) * 1912-05-14 1913-04-24 James Frederick Vickery Improvements in the Means of Saving Life from Vessels at Sea.
GB191316932A (en) * 1913-07-23 1914-10-23 Martin Patent Davit Company Lt Improved means for Supporting and Moving Ships' Life Boats.
CA2255261A1 (en) * 1998-12-02 2000-06-02 Rick J. Hammond Boat storage device
CN101134497A (en) * 2007-09-21 2008-03-05 中国舰船研究设计中心 Lift type tram car for the navigation ship
CN201534606U (en) * 2009-08-07 2010-07-28 天津新港船舶重工有限责任公司 High-speed ship-based boat support of patrol boat
CN201566807U (en) * 2009-09-19 2010-09-01 中远船务工程集团有限公司 Special equipment for transportation and repair of life boat
CN201808655U (en) * 2010-09-30 2011-04-27 浙江正和造船有限公司 Pier column for sectional shipbuilding
CN203246567U (en) * 2013-01-22 2013-10-23 黎明南 Device for folding and unfolding skiff on mother ship
CN103192952A (en) * 2013-04-23 2013-07-10 青岛北海船舶重工有限责任公司 Vehicular bulbous bow integral-replacing process
CN203571346U (en) * 2013-09-18 2014-04-30 广州中船黄埔造船有限公司 Adjustable fixing support
WO2015069118A1 (en) * 2013-11-08 2015-05-14 Vestdavit Gruppen As Multi cradle apparatus
CN204737001U (en) * 2015-06-05 2015-11-04 江苏佼燕船舶设备有限公司 Bracket device for rescue boat
WO2017119822A1 (en) * 2016-01-08 2017-07-13 Vestdavit Gruppen As Aparatus for handling boats from a midships hangar or mission bay of a mother vessel
CN106628007A (en) * 2016-11-13 2017-05-10 无锡晟欧船舶设备有限公司 Lifeboat lowering device
CN107651611A (en) * 2017-09-29 2018-02-02 广船国际有限公司 A kind of electric running small rail car

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109131778A (en) * 2018-08-29 2019-01-04 广船国际有限公司 One kind is partly latent to refute track tooling and installation method

Similar Documents

Publication Publication Date Title
CN203331915U (en) Vehicle-mounted lifting device
CN105667737A (en) Ship launching method and ship moving trolley system used for implementing method
CN104608883B (en) Ship floating maintenance platform
CN106516686A (en) Tray lifting and conveying mechanism
CN107839838A (en) Canoe movement and place system in a kind of big ship's space
CN109112963B (en) Bridge hoisting equipment
CN201990928U (en) Pontoon pier steel approach bridge lifting device
CN205819494U (en) Fixed quay self adaptation is gone on board gangway ladder
JP2009214671A (en) Landing-launching device of water floating structure
CN203889011U (en) Material transporting device of drilling platform
CN201914891U (en) Two-way telescopic guide way type hydraulic elevator
CN102849470A (en) Shipping method for steel box girder section
CN211726354U (en) Forging piece immersion oil device
CN103410457A (en) Automated power ramp
CN203820331U (en) Material hoist with built-in steel wire rope
CN205775791U (en) A kind of lift suspension bridge
CN108529497A (en) Piler
CN204677223U (en) A kind of underground coal mine fully-mechanized mining working surface hydraulic support loading apparatus
CN209974209U (en) BOP shifting and transporting device
CN108249181A (en) A kind of ship shipping landing platform
CN109204738B (en) Lifting type ship launching slideway
CN105200922B (en) A kind of steel truss girder segment installation on ground transport device and transportation resources
CN109083013B (en) Bridge hoisting method
CN215883984U (en) Shore-based tugboat device
CN201301033Y (en) Hoisting pallet of generator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180327

RJ01 Rejection of invention patent application after publication