CN109131778A - One kind is partly latent to refute track tooling and installation method - Google Patents

One kind is partly latent to refute track tooling and installation method Download PDF

Info

Publication number
CN109131778A
CN109131778A CN201810996301.2A CN201810996301A CN109131778A CN 109131778 A CN109131778 A CN 109131778A CN 201810996301 A CN201810996301 A CN 201810996301A CN 109131778 A CN109131778 A CN 109131778A
Authority
CN
China
Prior art keywords
track
partly latent
tooling
bottom plate
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810996301.2A
Other languages
Chinese (zh)
Inventor
林仁志
张光锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN201810996301.2A priority Critical patent/CN109131778A/en
Publication of CN109131778A publication Critical patent/CN109131778A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • B63C3/08Tracks on slipways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention, which discloses, a kind of partly latent refutes track tooling and installation method, track tooling partly latent of refuting includes multiple bottom plates being sequentially connected, bottom plate is set on the deck partly latent refuted, and is detachably provided with multiple groups track on bottom plate along its length, and the two sides of track are provided with support platform.Track is set, it can be achieved that the modular of the track partly latent refuted produces by the way that bottom plate is arranged above deck, and on bottom plate, reduction is to the construction holding time partly latent refuted.And track tooling partly latent of refuting can be removed when not needing using track, reduce and the structure on the deck partly latent refuted is changed.By the way that support platform is arranged in the two sides of track, the steel bracket that can be moved on ship trolley during moving boatman and making provides supporting plane, reduces the work for being laid with steel plate above deck during moving ship, reduces the requirement of the stroke to the oil cylinder for moving ship trolley.

Description

One kind is partly latent to refute track tooling and installation method
Technical field
The present invention relates to shipbuilding technical field, more particularly to a kind of partly latent refute track tooling and installation method.
Background technique
Current level land moves the mode that launches a ship and mostly uses the hydraulic trolley with hoofing part greatly, and part small boat uses power Modular cart is lauched mode.When product launches a ship by move ship trolley jack up steel bracket whole ship move to it is partly latent refute, trolley after transferring The transfer that pier completes product ship is sat in decline.It carries out moving launched mode using ship trolley is moved, need in the deck plane partly latent refuted Upper setting moves the track of ship carriage walking, higher for the requirement for horizontality of deck plane.
The attachment rail directly on the deck plane partly latent refuted, because the prominent deck plane of track moves ship trolley after whole ship is transferred Seat pier is needed to decline and carry out, whole ship can be fallen on the steel bracket that lift ship uses, but at this point, be limited to move the row of ship trolley oil cylinder Journey and the head room for moving ship trolley, the support leg of steel bracket can not be directly using deck plane as supporting plane, need to be on deck Face increases a certain number of steel plates and is increased, and trolley just has decline space, and finally exits under hull bottom.
It is higher for the deck plane flatness requirement partly latent refuted in whole process, work on the spot is needed during sitting pier Personnel manually carry out pad and set steel plate, so that moving the larger workload of ship time, and there are more security hidden troubles.
Summary of the invention
The purpose of the embodiment of the present invention is: provide it is a kind of it is partly latent refute track tooling and installation method, can be effectively reduced The difficulty of track installation, and move ship time worker workload.
In order to achieve the above object, the invention adopts the following technical scheme:
On the one hand, provide it is a kind of it is partly latent refute track tooling, including multiple bottom plates being sequentially connected, the bottom plate is set to half On the latent deck refuted, multiple groups track is detachably provided on the bottom plate along its length, the two sides of the track are respectively provided with There is support platform.
As a preferred technical solution of the invention, the two sides that the track is corresponded on the bottom plate are respectively arranged with It is multiple for fixing the fixing pieces of the track, the fixing piece includes the fixing seat being fixedly installed on the bottom plate and described The pressing plate being arranged in fixing seat, described pressing plate one end are removably fixed in the fixing seat, and the other end extends to the track Side the track is fixed on the bottom plate.
As a preferred technical solution of the invention, resilient sleeper-bearing is provided between the track and the bottom plate.
As a preferred technical solution of the invention, the support platform includes support plate and is set to the support Pressure part between plate and the bottom plate.
As a preferred technical solution of the invention, the pressure part includes multiple length directions along the bottom plate The bearing plate of setting, the bearing plate are vertically arranged with the bottom plate, the support plate bottom plate setting in parallel.
As a preferred technical solution of the invention, multiple hanging codes are fixedly installed on the bottom plate, hanging code is located at The support platform is close to the side of the track.
On the other hand, a kind of above-mentioned installation method partly latent for refuting track tooling is provided, comprising the following steps:
Step S100, it crosses on the deck partly latent refuted according to design drawing;
Step S200, track tooling partly latent of refuting is lifted to the deck;
Step S300, the position partly latent for refuting track tooling is positioned and is calibrated;
Step S400, the track tooling partly latent of refuting is fixed on the deck.
As a preferred technical solution of the invention, in the step S100 the following steps are included:
Step S110, installation site line is marked according to design drawing on the deck;
Step S120, on the deck, interval, which is delineated, checks line;
Step S130, the corresponding inspection line erects mark post, and marks reference line on the mark post.
As a preferred technical solution of the invention, in the step S300 the following steps are included:
Step S310, by it is described it is partly latent refute track tooling control scribing line position;
Step S320, the track tooling partly latent of refuting is leveled using backing plate;
Step S330, the upper surface partly latent for refuting track tooling is smoothed, partly latent refutes track tooling so that described Upper surface height error be not more than 1mm.
As a preferred technical solution of the invention, by the track tooling partly latent of refuting in the step S400 Bottom plate is by being fixedly welded on the deck.
The invention has the benefit that track is arranged, it can be achieved that partly latent by the way that bottom plate is arranged above deck, and on bottom plate The modular for the track refuted produces, and reduces to the construction holding time partly latent refuted.And it can be incited somebody to action when not needing using track Track tooling partly latent of refuting is removed, and is reduced and is changed to the structure on the deck partly latent refuted.It is supported by being arranged in the two sides of track Platform, the steel bracket that can be moved on ship trolley during moving boatman and making provide supporting plane, reduce during moving ship in first It is laid with the work of steel plate on plate, reduces the requirement of the stroke to the oil cylinder for moving ship trolley.
Detailed description of the invention
The present invention will be further described in detail below based on the drawings and embodiments.
Fig. 1 refutes track tooling schematic diagram to be partly latent described in one embodiment of the invention.
Fig. 2 refutes track tooling schematic diagram to be partly latent described in one embodiment of the invention.
Fig. 3 refutes track tooling schematic diagram to be partly latent described in one embodiment of the invention.
Fig. 4 is the enlarged diagram in Fig. 2 at A.
In figure:
1, bottom plate;2, track;3, support platform;4, fixing piece;5, resilient sleeper-bearing;6, support plate;7, bearing plate;8, it hangs Code.
Specific embodiment
To keep the technical problems solved, the adopted technical scheme and the technical effect achieved by the invention clearer, below It will the technical scheme of the embodiment of the invention will be described in further detail in conjunction with attached drawing, it is clear that described embodiment is only It is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those skilled in the art exist Every other embodiment obtained under the premise of creative work is not made, shall fall within the protection scope of the present invention.
In the description of the present invention unless specifically defined or limited otherwise, term " connected ", " connection ", " fixation " are answered It is interpreted broadly, for example, it may be being fixedly connected, may be a detachable connection, or is integral;It can be mechanical connection, It can be electrical connection;It can be directly connected, the company inside two elements can also be can be indirectly connected through an intermediary Logical or two elements interaction relationship.For the ordinary skill in the art, can be understood with concrete condition above-mentioned The concrete meaning of term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower" It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above " Sign is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " following " include that fisrt feature is directly below and diagonally below the second feature, or is merely representative of First feature horizontal height is less than second feature.
As shown in Figs 1-4, in this present embodiment, one kind of the present invention is partly latent refutes track tooling, including it is multiple successively Connected bottom plate 1, bottom plate 1 are set on the deck partly latent refuted, and are detachably provided with multiple groups track on bottom plate 1 along its length 2, the two sides of track 2 are provided with support platform 3.
By the way that bottom plate 1 is arranged above deck, and on bottom plate 1 be arranged track 2, it can be achieved that the track 2 partly latent refuted mould The production of block formula, is reduced to the construction holding time partly latent refuted.And 2 work of track can be refuted by partly latent when not needing using track 2 It puts into row to remove, reduces and the structure on the deck partly latent refuted is changed.By the way that support platform 3 is arranged in the two sides of track 2, can move The steel bracket that boatman makees in the process to move on ship trolley provides supporting plane, and reduction is laid with steel plate during moving ship above deck Work, reduce to move ship trolley oil cylinder stroke requirement.
In a preferred embodiment of the invention, the two sides of respective carter 2 are respectively arranged with multiple be used on bottom plate 1 The fixing piece 4 of trapped orbit 2, fixing piece 4 include the pressing plate being arranged in the fixing seat and fixing seat being fixedly installed on bottom plate 1, Pressing plate one end is removably fixed in fixing seat, and track 2 is fixed on bottom plate 1 by the side that the other end extends to track 2.
By carrying out detachable fixation to track 2 using fixing piece 4, can facilitate in the maintenance process in later period to track 2 carry out maintenance update, reduce the consuming of resource.
Preferably, resilient sleeper-bearing 5 is provided between track 2 and bottom plate 1.
Resilient sleeper-bearing 5 is set between track 2 and bottom plate 1, buffer function can be played to track 2, is come what track 2 was subject to Bottom plate 1 and deck are transferred to from shifting ship cart vertical active force and horizontal applied force.
In embodiments of the present invention, support platform 3 includes support plate 6 and the pressure-bearing being set between support plate 6 and bottom plate 1 Part.
Specifically, pressure part includes the bearing plate 7 that multiple length directions along bottom plate 1 are arranged, bearing plate 7 and bottom plate 1 hang down Straight setting, the setting of 6 parallel mat 1 of support plate.
By using the support platform 3 for the strip row that support plate 6 and bearing plate 7 make, it can effectively be substituted off and move ship That uses in the process plays the role of padded steel plate, reduces and is laid with work brought by steel plate.
In other embodiments, the setting of support platform 3 can be also independent multiple.
Optionally, multiple stiffener plates are arranged at intervals on bottom plate 1 for reinforcing the structural strength of bottom plate 1.
In a preferred embodiment of the invention, multiple hanging codes 8 are fixedly installed on bottom plate 1, hanging code 8 is located at support Platform 3 is close to the side of track 2.
By the way that hanging code 8 is arranged on bottom plate 1, it can be easy to use that gate seat is hung or truck crane refutes the installation of track 2 to partly latent On deck plane.
Furthermore the present invention also provides a kind of installation method partly latent for refuting 2 tooling of track in above-described embodiment, It is characterized in that, comprising the following steps:
Step S100, it crosses on the deck partly latent refuted according to design drawing;
Step S200, track 2 tooling partly latent of refuting is lifted to deck;
Step S300, the position partly latent for refuting 2 tooling of track is positioned and is calibrated;
Step S400, track 2 tooling partly latent of refuting is fixed above deck.
Optionally, in the step s 100 the following steps are included:
Step S110, installation site line is marked according to design drawing above deck;
Step S120, interval delineates and checks line above deck;
Step S130, correspondence proving line erects mark post, and reference line is marked on mark post.
Optionally, in step S300 the following steps are included:
Step S310, by it is partly latent refute 2 tooling of track control scribing line position;
Step S320, track 2 tooling partly latent of refuting is leveled using backing plate;
Step S330, the upper surface partly latent for refuting 2 tooling of track is smoothed, so that the upper end partly latent for refuting 2 tooling of track The height error in face is not more than 1mm.
Wherein, in step S400 by the bottom plate 1 partly latent for refuting 2 tooling of track by being fixedly welded on deck.
Specifically, bottom plate 1 can be welded and fixed by the way of the welding of interval between bottom plate 1 and deck.
In other embodiments, bottom plate 1 can be also fixed on deck by bolt.
In the description of this article, it is to be understood that term " on ", "lower", " right side ", etc. orientation or positional relationships be based on Orientation or positional relationship shown in the drawings is merely for convenience of description and simplification and operates, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to limit of the invention System.In addition, term " first ", " second ", are only used to distinguish between description, have no special meaning.
In the description of this specification, the description of reference term " embodiment ", " example " etc. means to combine the embodiment Or example particular features, structures, materials, or characteristics described are included at least one embodiment or example of the invention.? In this specification, schematic expression of the above terms be may not refer to the same embodiment or example.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the embodiments can also be appropriately combined, and forming those skilled in the art can With the other embodiments of understanding.
The technical principle of the invention is described above in combination with a specific embodiment.These descriptions are intended merely to explain of the invention Principle, and shall not be construed in any way as a limitation of the scope of protection of the invention.Based on the explanation herein, the technology of this field Personnel can associate with other specific embodiments of the invention without creative labor, these modes are fallen within Within protection scope of the present invention.

Claims (10)

1. one kind is partly latent to refute track tooling, which is characterized in that including multiple bottom plates being sequentially connected, the bottom plate is set to partly latent On the deck refuted, multiple groups track is detachably provided on the bottom plate along its length, the two sides of the track are provided with Support platform.
2. partly latent track tooling is refuted according to claim 1, which is characterized in that the two of the track are corresponded on the bottom plate Side is respectively arranged with multiple fixing pieces for being used to fix the track, and the fixing piece includes being fixedly installed on the bottom plate The pressing plate being arranged in fixing seat and the fixing seat, described pressing plate one end are removably fixed in the fixing seat, and the other end prolongs The track is fixed on the bottom plate by the side for extending to the track.
3. partly latent track tooling is refuted according to claim 2, which is characterized in that is arranged between the track and the bottom plate Flexible backing plate.
4. partly latent track tooling is refuted according to claim 1, which is characterized in that the support platform includes support plate and sets The pressure part being placed between the support plate and the bottom plate.
5. partly latent track tooling is refuted according to claim 4, which is characterized in that the pressure part includes multiple along the bottom The bearing plate of the length direction setting of plate, the bearing plate is vertically arranged with the bottom plate, the support plate bottom plate in parallel Setting.
6. partly latent track tooling is refuted according to claim 1, which is characterized in that multiple hang is fixedly installed on the bottom plate Code, hanging code are located at the support platform close to the side of the track.
7. a kind of for the installation method partly latent for refuting track tooling as claimed in any one of claims 1 to 6, which is characterized in that packet Include following steps:
Step S100, it crosses on the deck partly latent refuted according to design drawing;
Step S200, track tooling partly latent of refuting is lifted to the deck;
Step S300, the position partly latent for refuting track tooling is positioned and is calibrated;
Step S400, the track tooling partly latent of refuting is fixed on the deck.
8. partly latent track tooling is refuted according to claim 7, which is characterized in that includes following step in the step S100 It is rapid:
Step S110, installation site line is marked according to design drawing on the deck;
Step S120, on the deck, interval, which is delineated, checks line;
Step S130, the corresponding inspection line erects mark post, and marks reference line on the mark post.
9. partly latent track tooling is refuted according to claim 7, which is characterized in that includes following step in the step S300 It is rapid:
Step S310, by it is described it is partly latent refute track tooling control scribing line position;
Step S320, the track tooling partly latent of refuting is leveled using backing plate;
Step S330, the upper surface partly latent for refuting track tooling is smoothed, partly latent refutes the upper of track tooling so that described The height error of end face is not more than 1mm.
10. partly latent track tooling is refuted according to claim 7, which is characterized in that by described half in the step S400 The latent bottom plate for refuting track tooling is by being fixedly welded on the deck.
CN201810996301.2A 2018-08-29 2018-08-29 One kind is partly latent to refute track tooling and installation method Pending CN109131778A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810996301.2A CN109131778A (en) 2018-08-29 2018-08-29 One kind is partly latent to refute track tooling and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810996301.2A CN109131778A (en) 2018-08-29 2018-08-29 One kind is partly latent to refute track tooling and installation method

Publications (1)

Publication Number Publication Date
CN109131778A true CN109131778A (en) 2019-01-04

Family

ID=64829055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810996301.2A Pending CN109131778A (en) 2018-08-29 2018-08-29 One kind is partly latent to refute track tooling and installation method

Country Status (1)

Country Link
CN (1) CN109131778A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110329421A (en) * 2019-06-28 2019-10-15 广州文冲船厂有限责任公司 A kind of semi-submerged ship pontoon sits the localization method and location structure of pier
CN112173042A (en) * 2020-09-29 2021-01-05 中船黄埔文冲船舶有限公司 Ship platform based on launching of ship moving trolley and transformation method
CN112758281A (en) * 2020-12-02 2021-05-07 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) Novel launching device for large-scale structure and under-deck reinforcing structure
CN113968318A (en) * 2021-10-27 2022-01-25 中国核动力研究设计院 Track type traction device for deep submersible vehicle culvert entering maintenance and maintenance culvert comprising track type traction device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202559192U (en) * 2012-04-25 2012-11-28 中船澄西船舶修造有限公司 Rail mounting structure for annular complete-section production line
CN204606154U (en) * 2014-12-19 2015-09-02 中交一航局第三工程有限公司 Novel half dives refutes platform
CN105644715A (en) * 2015-12-29 2016-06-08 大连船舶重工集团有限公司 Cross wall segment guide rail bracket installation method
CN205396487U (en) * 2016-03-10 2016-07-27 江南造船(集团)有限责任公司 Movable berth bogie track of marcing
CN206087226U (en) * 2016-06-17 2017-04-12 无锡红旗船厂有限公司 Make marine rail
CN107839838A (en) * 2017-11-09 2018-03-27 广船国际有限公司 Canoe movement and place system in a kind of big ship's space

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202559192U (en) * 2012-04-25 2012-11-28 中船澄西船舶修造有限公司 Rail mounting structure for annular complete-section production line
CN204606154U (en) * 2014-12-19 2015-09-02 中交一航局第三工程有限公司 Novel half dives refutes platform
CN105644715A (en) * 2015-12-29 2016-06-08 大连船舶重工集团有限公司 Cross wall segment guide rail bracket installation method
CN205396487U (en) * 2016-03-10 2016-07-27 江南造船(集团)有限责任公司 Movable berth bogie track of marcing
CN206087226U (en) * 2016-06-17 2017-04-12 无锡红旗船厂有限公司 Make marine rail
CN107839838A (en) * 2017-11-09 2018-03-27 广船国际有限公司 Canoe movement and place system in a kind of big ship's space

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110329421A (en) * 2019-06-28 2019-10-15 广州文冲船厂有限责任公司 A kind of semi-submerged ship pontoon sits the localization method and location structure of pier
CN112173042A (en) * 2020-09-29 2021-01-05 中船黄埔文冲船舶有限公司 Ship platform based on launching of ship moving trolley and transformation method
CN112758281A (en) * 2020-12-02 2021-05-07 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) Novel launching device for large-scale structure and under-deck reinforcing structure
CN113968318A (en) * 2021-10-27 2022-01-25 中国核动力研究设计院 Track type traction device for deep submersible vehicle culvert entering maintenance and maintenance culvert comprising track type traction device
CN113968318B (en) * 2021-10-27 2022-11-01 中国核动力研究设计院 Track type traction device for deep submersible vehicle culvert maintenance and maintenance culvert comprising track type traction device

Similar Documents

Publication Publication Date Title
CN109131778A (en) One kind is partly latent to refute track tooling and installation method
JP5051591B2 (en) Precast PC plate erection device for floor slab and its erection method
CN206796168U (en) The complete erecting device of prefabricated case beam reinforcing bar is used in construction
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN205474844U (en) Straddle type beiLei beam support
CN210707818U (en) Hull segmentation turn-over frame
CN214939324U (en) Rail device suitable for construction of laminated beam floor
CN202244429U (en) Bracket for assembly and translation of bulk carrier superstructure
CN106800245B (en) A kind of floorings lifting hanger, hanging apparatus and hanging method
CN109505411A (en) Tube truss structure roofing installation method
CN108166392A (en) A kind of floorings hanging device and method
CN107687132B (en) The method that equidistant double width bridge uses Segmental assembling bridge-erecting machine synchronous construction
CN217498449U (en) Prefabricated plate installation hydraulic lifting device
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN210636823U (en) Rail type overhead connecting device for pier body steel bar overhead connecting construction
CN212425240U (en) Winch support structure and bridge floor hoisting structure
JPH0813180A (en) Electrode plate transporting equipment
CN211711873U (en) Rail mounted is used for hoist and mount traction system of transportation
JPH033616Y2 (en)
CN206901598U (en) A kind of gap bridge crossbeam removes handling apparatus
CN217997830U (en) Rail mounted translation frame roof beam device
CN205638500U (en) Large -scale steel shotcrete of variant formula installation movable trolley
CN205975353U (en) External device of bridge bottom plate construction unilateral
CN220761453U (en) Suspension device of internal welding arm support without participating in welding

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104

RJ01 Rejection of invention patent application after publication