CN107816161A - 一种吊顶装配式钢架转换层 - Google Patents
一种吊顶装配式钢架转换层 Download PDFInfo
- Publication number
- CN107816161A CN107816161A CN201711043219.XA CN201711043219A CN107816161A CN 107816161 A CN107816161 A CN 107816161A CN 201711043219 A CN201711043219 A CN 201711043219A CN 107816161 A CN107816161 A CN 107816161A
- Authority
- CN
- China
- Prior art keywords
- conversion layer
- suspension member
- furred ceiling
- fastener
- steel frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000006243 chemical reaction Methods 0.000 title claims abstract description 56
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 32
- 239000010959 steel Substances 0.000 title claims abstract description 32
- 239000000725 suspension Substances 0.000 claims abstract description 49
- 238000005452 bending Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 230000001680 brushing effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
- E04B9/20—Means for suspending the supporting construction adjustable
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明涉及一种吊顶装配式钢架转换层,包括转换层竖杆,转换层横杆,丝杆,多个第一挂件,第二挂件,卡件,主龙骨,副龙骨和紧固件,所述转换层竖杆和转换层横杆连接,所述第一挂件与转换层横杆连接,多个第一挂件间隔设置,所述丝杆通过紧固件与第一挂件连接,第二挂件与丝杆连接,所述主龙骨安装在第二挂件上,副龙骨通过卡件与主龙骨连接,副龙骨位于主龙骨下方。本发明的一种吊顶装配式钢架转换层,利用物理结构形式将龙骨系统安装固定在角钢转换层上,由于第一、第二挂件采用穿插挂钩方式,使得挂件能够在角钢上随意调节间距,施工时灵活便捷,同时挂件内部有一定空间,可利用紧固螺母实现吊顶平整度的有效调节。
Description
技术领域
本发明涉及建筑装饰技术领域,特别涉及一种吊顶装配式钢架转换层。
背景技术
传统钢架转换层工艺步骤主要分为:测量放线、打孔埋胀栓、安装角钢吊杆、焊接转换层钢架、涂刷防锈漆。然而转换层角钢需要预先进行打孔处理,影响施工效率,同时开孔处理后对角钢造成一定损伤,一定程度上影响转换层强度。有些项目甚至为了图便捷,直接将吊筋焊接在角钢侧面,存在质量隐患。同时在施工时需要开具动火证,较为不便。
发明内容
本发明为了解决现有技术的问题,提供了一种无需其他加工工具便可快速安装,施工效率较高的吊顶装配式钢架转换层。
具体技术方案如下:一种吊顶装配式钢架转换层,包括转换层竖杆,转换层横杆,丝杆,多个第一挂件,第二挂件,卡件,主龙骨,副龙骨和紧固件,所述转换层竖杆和转换层横杆连接,所述第一挂件与转换层横杆连接,多个第一挂件间隔设置,所述丝杆通过紧固件与第一挂件连接,第二挂件与丝杆连接,所述主龙骨安装在第二挂件上,副龙骨通过卡件与主龙骨连接,副龙骨位于主龙骨下方。
以下为本发明的附属技术方案。
作为优选方案,同一根主龙骨上第二挂件正反交替安装。
作为优选方案,所述第一挂件包括第一挡板,第二挡板和开口部,第一、第二挡板位于开口部两侧,第一挂件通过开口部卡住转换层横杆。
作为优选方案,所述第一挡板的端部具有弯曲部。
作为优选方案,所述第二挡板设有通孔,丝杆穿设在通孔中,紧固件设置在通孔两侧。
作为优选方案,所述紧固件为螺母。
作为优选方案,所述转换层竖杆和转换层横杆均为角钢。
本发明的技术效果:本发明的一种吊顶装配式钢架转换层,利用物理结构形式将龙骨系统安装固定在角钢转换层上,由于第一、第二挂件采用穿插挂钩方式,使得挂件能够在角钢上随意调节间距,施工时灵活便捷,同时挂件内部有一定空间,可利用紧固螺母实现吊顶平整度的有效调节。
附图说明
图1是本发明实施例的一种吊顶装配式钢架转换层的示意图。
图2是本发明实施例的第一挂件的示意图。
图3是本发明实施例的第一挂件的另一示意图。
具体实施方式
下面,结合实例对本发明的实质性特点和优势作进一步的说明,但本发明并不局限于所列的实施例。
如图1至图3所示,本实施例的一种吊顶装配式钢架转换层包括转换层竖杆1,转换层横杆2,丝杆3,多个第一挂件4,第二挂件5,卡件6,主龙骨7,副龙骨8和紧固件9,所述转换层竖杆1和转换层横杆2连接。所述第一挂件4 与转换层横杆2连接,多个第一挂件4间隔设置,所述丝杆3通过紧固件9与第一挂件4连接,第二挂件5与丝杆3连接,所述主龙骨7安装在第二挂件5 上,副龙骨8通过卡件6与主龙骨连接,副龙骨位于主龙骨下方。通过上述技术方案,无需采用焊接即可完成吊顶装配式钢架转换层的安装,只需按照合理间距进行布点便可提前安装,大大压缩施工周期,施工效率大大提高。
本实施例中,同一根主龙骨上第二挂件5正反交替安装,即第二挂件5的连接杆52交替设置在主龙骨两侧,从而使主龙骨更稳固。
本实施例中,所述第一挂件4包括第一挡板41,第二挡板42和开口部43,第一、第二挡板位于开口部两侧,第一挂件4通过开口部卡住转换层横杆2。
本实施例中,所述第一挡板41的端部具有弯曲部411,从而通过弯曲部钩住转换层横杆的边缘,防止其晃动。
本实施例中,所述第二挡板42设有通孔421,丝杆3穿设在通孔中,紧固件9设置在通孔两侧。通过两个紧固件能够对主龙骨进行调平,确保吊顶的水平标高。本实施例中,所述紧固件为螺母,所述转换层竖杆和转换层横杆均为角钢。
本实施例的一种吊顶装配式钢架转换层,利用物理结构形式将龙骨系统安装固定在角钢转换层上,由于第一、第二挂件采用穿插挂钩方式,使得挂件能够在角钢上随意调节间距,施工时灵活便捷,同时挂件内部有一定空间,可利用紧固螺母实现吊顶平整度的有效调节。
需要指出的是,上述较佳实施例仅为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围之内。
Claims (7)
1.一种吊顶装配式钢架转换层,其特征在于,包括转换层竖杆,转换层横杆,丝杆,多个第一挂件,第二挂件,卡件,主龙骨,副龙骨和紧固件,所述转换层竖杆和转换层横杆连接,所述第一挂件与转换层横杆连接,多个第一挂件间隔设置,所述丝杆通过紧固件与第一挂件连接,第二挂件与丝杆连接,所述主龙骨安装在第二挂件上,副龙骨通过卡件与主龙骨连接,副龙骨位于主龙骨下方。
2.如权利要求1所述的吊顶装配式钢架转换层,其特征在于,同一根主龙骨上第二挂件正反交替安装。
3.如权利要求2所述的吊顶装配式钢架转换层,其特征在于,所述第一挂件包括第一挡板,第二挡板和开口部,第一、第二挡板位于开口部两侧,第一挂件通过开口部卡住转换层横杆。
4.如权利要求3所述的吊顶装配式钢架转换层,其特征在于,所述第一挡板的端部具有弯曲部。
5.如权利要求4所述的吊顶装配式钢架转换层,其特征在于,所述第二挡板设有通孔,丝杆穿设在通孔中,紧固件设置在通孔两侧。
6.如权利要求5所述的吊顶装配式钢架转换层,其特征在于,所述紧固件为螺母。
7.如权利要求6所述的吊顶装配式钢架转换层,其特征在于,所述转换层竖杆和转换层横杆均为角钢。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711043219.XA CN107816161A (zh) | 2017-10-31 | 2017-10-31 | 一种吊顶装配式钢架转换层 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711043219.XA CN107816161A (zh) | 2017-10-31 | 2017-10-31 | 一种吊顶装配式钢架转换层 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107816161A true CN107816161A (zh) | 2018-03-20 |
Family
ID=61604436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711043219.XA Pending CN107816161A (zh) | 2017-10-31 | 2017-10-31 | 一种吊顶装配式钢架转换层 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107816161A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265872A (zh) * | 2018-01-26 | 2018-07-10 | 中建八局装饰工程有限公司 | 一种天花吊顶转换层主龙骨一体化安装方法 |
CN109392613A (zh) * | 2018-12-24 | 2019-03-01 | 天津市泰福钢塑管有限公司 | 一种联结稳定可防止扭转的香菇栽培支架用联结件 |
CN109680958A (zh) * | 2018-09-27 | 2019-04-26 | 上海市建筑装饰工程集团有限公司 | 大面积屋面桁架吊顶模块、转换层、组装支架安装方法 |
CN110306768A (zh) * | 2019-06-29 | 2019-10-08 | 中国二十二冶集团有限公司 | 安装吊顶面板的辅助支架及其施工方法 |
CN110670786A (zh) * | 2019-10-29 | 2020-01-10 | 广州金霸建材股份有限公司 | 一种曲率吊顶大跨度吊装结构系统及其吊装方法 |
CN111893881A (zh) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | 一种利用转换平台立体式快速施工方法 |
CN112267612A (zh) * | 2020-10-27 | 2021-01-26 | 北京华邑建设集团有限公司 | 一种大跨度金属天棚龙骨安装结构 |
CN112982800A (zh) * | 2021-03-03 | 2021-06-18 | 上海宝冶建筑装饰有限公司 | 吊顶转换层施工方法 |
CN113898110A (zh) * | 2021-10-22 | 2022-01-07 | 北京市建筑工程装饰集团有限公司 | 双曲面弧状grg吊挂装置及施工方法 |
CN115680186A (zh) * | 2022-11-19 | 2023-02-03 | 武汉妙物建筑装饰设计工程有限公司 | 一种室内吊顶结构 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202187457U (zh) * | 2011-07-26 | 2012-04-11 | 中建七局建筑装饰工程有限公司 | 一种钢格板下吊顶悬吊装置 |
CN203795691U (zh) * | 2014-01-24 | 2014-08-27 | 浙江宝兰电气有限公司 | 吊顶装饰板的紧固安装结构 |
CN204715597U (zh) * | 2015-04-16 | 2015-10-21 | 北新集团建材股份有限公司 | 矿棉板吊顶体系 |
CN105839830A (zh) * | 2016-05-18 | 2016-08-10 | 中建二局装饰工程有限公司 | 转换层双曲面吊顶龙骨可移动定位器、吊顶系统及其工法 |
CN205688642U (zh) * | 2016-06-18 | 2016-11-16 | 青岛海川建设集团有限公司 | 一种大空间吊顶装饰用支撑结构 |
CN205935362U (zh) * | 2016-08-15 | 2017-02-08 | 华北水利水电大学 | 一种轻钢龙骨吊顶建筑结构 |
CN207582777U (zh) * | 2017-10-31 | 2018-07-06 | 苏州金螳螂建筑装饰股份有限公司 | 一种吊顶装配式钢架转换层 |
-
2017
- 2017-10-31 CN CN201711043219.XA patent/CN107816161A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202187457U (zh) * | 2011-07-26 | 2012-04-11 | 中建七局建筑装饰工程有限公司 | 一种钢格板下吊顶悬吊装置 |
CN203795691U (zh) * | 2014-01-24 | 2014-08-27 | 浙江宝兰电气有限公司 | 吊顶装饰板的紧固安装结构 |
CN204715597U (zh) * | 2015-04-16 | 2015-10-21 | 北新集团建材股份有限公司 | 矿棉板吊顶体系 |
CN105839830A (zh) * | 2016-05-18 | 2016-08-10 | 中建二局装饰工程有限公司 | 转换层双曲面吊顶龙骨可移动定位器、吊顶系统及其工法 |
CN205688642U (zh) * | 2016-06-18 | 2016-11-16 | 青岛海川建设集团有限公司 | 一种大空间吊顶装饰用支撑结构 |
CN205935362U (zh) * | 2016-08-15 | 2017-02-08 | 华北水利水电大学 | 一种轻钢龙骨吊顶建筑结构 |
CN207582777U (zh) * | 2017-10-31 | 2018-07-06 | 苏州金螳螂建筑装饰股份有限公司 | 一种吊顶装配式钢架转换层 |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265872A (zh) * | 2018-01-26 | 2018-07-10 | 中建八局装饰工程有限公司 | 一种天花吊顶转换层主龙骨一体化安装方法 |
CN109680958A (zh) * | 2018-09-27 | 2019-04-26 | 上海市建筑装饰工程集团有限公司 | 大面积屋面桁架吊顶模块、转换层、组装支架安装方法 |
CN109392613A (zh) * | 2018-12-24 | 2019-03-01 | 天津市泰福钢塑管有限公司 | 一种联结稳定可防止扭转的香菇栽培支架用联结件 |
CN110306768A (zh) * | 2019-06-29 | 2019-10-08 | 中国二十二冶集团有限公司 | 安装吊顶面板的辅助支架及其施工方法 |
CN110306768B (zh) * | 2019-06-29 | 2024-01-23 | 中国二十二冶集团有限公司 | 安装吊顶面板的辅助支架及其施工方法 |
CN110670786A (zh) * | 2019-10-29 | 2020-01-10 | 广州金霸建材股份有限公司 | 一种曲率吊顶大跨度吊装结构系统及其吊装方法 |
CN111893881B (zh) * | 2020-06-24 | 2023-09-05 | 上海市建筑装饰工程集团有限公司 | 一种利用转换平台立体式快速施工方法 |
CN111893881A (zh) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | 一种利用转换平台立体式快速施工方法 |
CN112267612A (zh) * | 2020-10-27 | 2021-01-26 | 北京华邑建设集团有限公司 | 一种大跨度金属天棚龙骨安装结构 |
CN112267612B (zh) * | 2020-10-27 | 2021-11-16 | 北京华邑建设集团有限公司 | 一种大跨度金属天棚龙骨安装结构 |
CN112982800A (zh) * | 2021-03-03 | 2021-06-18 | 上海宝冶建筑装饰有限公司 | 吊顶转换层施工方法 |
CN113898110A (zh) * | 2021-10-22 | 2022-01-07 | 北京市建筑工程装饰集团有限公司 | 双曲面弧状grg吊挂装置及施工方法 |
CN115680186A (zh) * | 2022-11-19 | 2023-02-03 | 武汉妙物建筑装饰设计工程有限公司 | 一种室内吊顶结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107816161A (zh) | 一种吊顶装配式钢架转换层 | |
CN204781548U (zh) | 一种铝板吊顶吊挂结构 | |
CN207582777U (zh) | 一种吊顶装配式钢架转换层 | |
CN203820287U (zh) | 钢结构厂房屋面瓦吊装组合钢扁担 | |
CN203977672U (zh) | 一种屋面吊顶整体构件 | |
CN104088390A (zh) | 一种屋面吊顶整体构件 | |
CN204920191U (zh) | 一种铝合金模板房 | |
CN203096946U (zh) | 一种可调角度的连续索交叉节点 | |
CN203856117U (zh) | 反支撑安装结构 | |
CN106545089B (zh) | 一种穿斗式木构架抽柱空间拓展结构及其实施方法 | |
CN212358610U (zh) | 一种顶面球形网架的安装结构 | |
CN204960073U (zh) | 无横龙骨幕墙 | |
CN204960324U (zh) | 一种悬挂式楼板模板支撑装置 | |
CN210032212U (zh) | 一种新型高效节能建筑物外墙保温结构 | |
CN204959995U (zh) | 一种屋梁的模块化结构 | |
CN211714197U (zh) | 一种便于拆卸的多高层框架钢结构 | |
CN211313051U (zh) | 一种水管、电线架设的人字形吊顶骨架 | |
CN102777703A (zh) | 组装式轻型管道吊架 | |
CN204715675U (zh) | 饰面板免基层安装结构 | |
CN203023637U (zh) | 一种网格桥架吊顶安装用的倒装旗式支撑架 | |
CN206428936U (zh) | 一种木饰面挂板固定结构 | |
CN204983335U (zh) | 一种吊顶转换层用抱箍装置 | |
CN206110594U (zh) | 一种用于装饰板墙面的点式调平结构 | |
CN204919944U (zh) | 吊顶支撑装置 | |
CN214220188U (zh) | 一种用于吊顶的抱箍结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180320 |