CN108265872A - 一种天花吊顶转换层主龙骨一体化安装方法 - Google Patents
一种天花吊顶转换层主龙骨一体化安装方法 Download PDFInfo
- Publication number
- CN108265872A CN108265872A CN201810079157.6A CN201810079157A CN108265872A CN 108265872 A CN108265872 A CN 108265872A CN 201810079157 A CN201810079157 A CN 201810079157A CN 108265872 A CN108265872 A CN 108265872A
- Authority
- CN
- China
- Prior art keywords
- conversion layer
- ceiling
- furred ceiling
- main joist
- keel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/30—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall
Abstract
本发明提供一种天花吊顶转换层主龙骨一体化安装方法,包括:步骤一,测量放线,步骤二,在建筑物的顶板上设置膨胀螺栓,步骤三,将角钢吊杆与膨胀螺栓相连接,步骤四,安装转换层钢架:将转换层横向龙骨横向连接在角钢吊杆的底端,转换层角钢末端用角码与墙体固定,再将转换层纵向龙骨焊接在转换层横向龙骨上,转换层纵向龙骨的位置为预先需要设置吊顶主龙骨的位置,步骤五,在转换层横向龙骨和转换层纵向龙骨上安装龙骨吊杆,步骤六,安装吊顶副龙骨:将吊顶副龙骨连接在吊杆的底部,步骤七,安装吊顶:将吊顶安装在吊顶副龙骨上。本发明的天花吊顶转换层主龙骨一体化安装方法,安装过程较之前更为快速。
Description
技术领域
本发明涉及一种天花吊顶转换层主龙骨一体化安装方法,属于建筑装饰领域。
背景技术
原有施工工艺在结构转换层施工完成后,在下部有限空间内仍需进行吊顶主龙骨施工及后期调平工作,不仅大大增加了人工消耗,还造成了不必要的材料浪费。
发明内容
本发明的目的在于提供一种天花吊顶转换层主龙骨一体化安装方法,以解决上述问题。
本发明采用了如下技术方案:
一种天花吊顶转换层主龙骨一体化安装方法,其特征在于,包括:
步骤一,测量放线,
步骤二,在建筑物的顶板上设置膨胀螺栓,
步骤三,将角钢吊杆与膨胀螺栓相连接,
步骤四,安装转换层钢架:将转换层横向龙骨横向连接在角钢吊杆的底端,转换层角钢末端用角码与墙体固定,再将转换层纵向龙骨焊接在转换层横向龙骨上,转换层纵向龙骨的位置为预先需要设置吊顶主龙骨的位置,
步骤五,在转换层横向龙骨和转换层纵向龙骨上安装龙骨吊杆,
步骤六,安装吊顶副龙骨:将吊顶副龙骨连接在吊杆的底部,
步骤七,安装吊顶:将吊顶安装在吊顶副龙骨上。
进一步,本发明的天花吊顶转换层主龙骨一体化安装方法,还可以具有这样的特征:步骤四中,转换层横向龙骨的末端,与相邻的墙体固定连接。
进一步,本发明的天花吊顶转换层主龙骨一体化安装方法,其特征在于:步骤六中,吊顶副龙骨安装完毕后,还具有调平龙骨的步骤。
进一步,本发明的天花吊顶转换层主龙骨一体化安装方法,其特征在于:其中,吊顶具有扣件,吊顶副龙骨上具有卡槽,供扣件进行卡扣。
进一步,本发明的天花吊顶转换层主龙骨一体化安装方法,其特征在于:吊顶的铝板面板与钢龙骨间的接触面设置绝缘片。
进一步,本发明的天花吊顶转换层主龙骨一体化安装方法,其特征在于:步骤七中,安装吊顶后,等待预定时间后,还具有对吊顶进行调平的步骤。
进一步,本发明的天花吊顶转换层主龙骨一体化安装方法,其特征在于:其中,角钢吊杆呈T字形,包括横向的角码和纵向的角钢,角码上开有孔,与膨胀螺栓连接。
发明的有益效果
本发明的天花吊顶转换层主龙骨一体化安装方法,由于采用在转换层中之前需要设置吊顶主龙骨的位置安装转换层的纵向龙骨,以代替主龙骨,使结构更加简单。随之省去了主龙骨的调平过程。因此,安装过程较之前更为快速。
附图说明
图1是天花吊顶的整体结构示意图;
图2是吊杆的结构示意图;
图3是吊顶转换层的吊点示意图;
图4是吊顶转换层中纵向龙骨的位置示意图。
具体实施方式
以下结合附图来说明本发明的具体实施方式。
如图1所示,天花板吊顶包括:角钢吊杆、转换层钢架、龙骨吊杆以及吊顶副龙骨。
角钢吊杆,如图2所示,角钢吊杆呈T字形,包括横向的角码11和纵向的角钢16,角码上开有孔,与膨胀螺栓21连接。
转换层钢架11,设置在角钢吊杆的下面,如图3和图4所示,包括转换层纵向龙骨12,转换层横向龙骨13。二者交叉的地方作为转换层吊点14。
龙骨吊杆22,设置在转换层钢架11的下面,龙骨吊杆22用于吊装下方的吊顶副龙骨18。
吊顶(图中未显示)安装在吊顶副龙骨18上。吊顶具有扣件,所述吊顶副龙骨上具有卡槽,供扣件进行卡扣。本实施方式中,吊顶采用铝板。吊顶的铝板面板与钢龙骨间的接触面设置绝缘片,以防止产生电化学腐蚀。
铝板的安装顺序是从中间向两侧安装。
安装上述天花板吊顶的方法称为天花吊顶转换层主龙骨一体化安装方法,包括如下步骤:
步骤一,测量放线,
步骤二,在建筑物的顶板上设置膨胀螺栓,
步骤三,将角钢吊杆与膨胀螺栓相连接,
步骤四,安装转换层钢架:将转换层横向龙骨13横向连接在角钢吊杆的底端,转换层角钢末端用角码与墙体固定,再将转换层纵向龙骨12焊接在转换层横向龙骨13上,转换层纵向龙骨12的位置为预先需要设置吊顶主龙骨的位置。如图4所示,吊顶主龙骨位置17即为原来应当安装吊顶主龙骨的位置。在本发明中此位置被转换层纵向龙骨12所替代。
步骤五,在转换层横向龙骨和转换层纵向龙骨12上安装龙骨吊杆,
步骤六,安装吊顶副龙骨:将吊顶副龙骨连接在吊杆的底部,调平龙骨的步骤。
步骤七,安装吊顶:将吊顶安装在吊顶副龙骨上。安装吊顶后,等待预定时间后,还具有对吊顶进行调平的步骤。吊顶成活线19如图1中所示。
步骤四中,转换层纵向龙骨12的末端,还可以与相邻的墙体固定连接。
本发明的天花吊顶转换层主龙骨一体化安装方法,由于采用在转换层中之前需要设置吊顶主龙骨的位置安装转换层的纵向龙骨,以代替主龙骨。随之省去了主龙骨的调平过程。因此,安装过程较之前更为快速。
Claims (7)
1.一种天花吊顶转换层主龙骨一体化安装方法,其特征在于,包括:
步骤一,测量放线,
步骤二,在建筑物的顶板上设置膨胀螺栓,
步骤三,将角钢吊杆与膨胀螺栓相连接,
步骤四,安装转换层钢架:将转换层横向龙骨横向连接在角钢吊杆的底端,转换层角钢末端用角码与墙体固定,再将转换层纵向龙骨焊接在转换层横向龙骨上,转换层纵向龙骨的位置为预先需要设置吊顶主龙骨的位置,
步骤五,在所述转换层横向龙骨和转换层纵向龙骨上安装龙骨吊杆,
步骤六,安装吊顶副龙骨:将吊顶副龙骨连接在吊杆的底部,
步骤七,安装吊顶:将吊顶安装在吊顶副龙骨上。
2.如权利要求1所述的天花吊顶转换层主龙骨一体化安装方法,其特征在于:
步骤四中,转换层横向龙骨的末端,与相邻的墙体固定连接。
3.如权利要求1所述的天花吊顶转换层主龙骨一体化安装方法,其特征在于:
步骤六中,吊顶副龙骨安装完毕后,还具有调平龙骨的步骤。
4.如权利要求1所述的天花吊顶转换层主龙骨一体化安装方法,其特征在于:
其中,所述吊顶具有扣件,所述吊顶副龙骨上具有卡槽,供扣件进行卡扣。
5.如权利要求1所述的天花吊顶转换层主龙骨一体化安装方法,其特征在于:
吊顶的铝板面板与钢龙骨间的接触面设置绝缘片。
6.如权利要求1所述的天花吊顶转换层主龙骨一体化安装方法,其特征在于:
步骤七中,安装吊顶后,等待预定时间后,还具有对吊顶进行调平的步骤。
7.如权利要求1所述的天花吊顶转换层主龙骨一体化安装方法,其特征在于:
其中,所述角钢吊杆呈T字形,包括横向的角码和纵向的角钢,角码上开有孔,与膨胀螺栓连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810079157.6A CN108265872A (zh) | 2018-01-26 | 2018-01-26 | 一种天花吊顶转换层主龙骨一体化安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810079157.6A CN108265872A (zh) | 2018-01-26 | 2018-01-26 | 一种天花吊顶转换层主龙骨一体化安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108265872A true CN108265872A (zh) | 2018-07-10 |
Family
ID=62776730
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810079157.6A Pending CN108265872A (zh) | 2018-01-26 | 2018-01-26 | 一种天花吊顶转换层主龙骨一体化安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108265872A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111893881A (zh) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | 一种利用转换平台立体式快速施工方法 |
CN112982800A (zh) * | 2021-03-03 | 2021-06-18 | 上海宝冶建筑装饰有限公司 | 吊顶转换层施工方法 |
CN115977300A (zh) * | 2023-03-16 | 2023-04-18 | 北京建工集团有限责任公司 | 一种降噪装饰天花及其安装方法 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090025308A1 (en) * | 2007-07-26 | 2009-01-29 | Deans Brian W | Seismic support and reinforcement systems |
CN202809948U (zh) * | 2012-08-24 | 2013-03-20 | 叶长青 | 一种影剧院吊顶 |
CN203878845U (zh) * | 2014-06-11 | 2014-10-15 | 苏州苏明装饰股份有限公司 | 一种转换层吊顶结构 |
CN203961090U (zh) * | 2014-06-11 | 2014-11-26 | 深圳市建艺装饰集团股份有限公司 | 一种带有角钢转换层的吊顶结构 |
CN104234289A (zh) * | 2014-08-18 | 2014-12-24 | 中建七局建筑装饰工程有限公司 | 一种大高差非平面造型吊顶结构及其施工方法 |
CN105133774A (zh) * | 2015-09-24 | 2015-12-09 | 青岛建安建设集团有限公司 | 组合装配式吊顶反向支撑体系结构及设计安装一体化方法 |
CN105178495A (zh) * | 2015-07-29 | 2015-12-23 | 浙江亚厦装饰股份有限公司 | 一种吊顶龙骨系统及其施工方法 |
CN105804305A (zh) * | 2016-05-23 | 2016-07-27 | 上海中建八局装饰有限责任公司 | 波浪形金属板吊顶系统及其安装方法 |
CN205557965U (zh) * | 2016-02-01 | 2016-09-07 | 青岛海尔家居集成股份有限公司 | 一种钢结构转换层吊顶 |
CN205777020U (zh) * | 2016-07-12 | 2016-12-07 | 青岛博海建设集团有限公司 | 一种大跨度空间吊顶反向和转换支撑装置 |
CN107816161A (zh) * | 2017-10-31 | 2018-03-20 | 苏州金螳螂建筑装饰股份有限公司 | 一种吊顶装配式钢架转换层 |
-
2018
- 2018-01-26 CN CN201810079157.6A patent/CN108265872A/zh active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090025308A1 (en) * | 2007-07-26 | 2009-01-29 | Deans Brian W | Seismic support and reinforcement systems |
CN202809948U (zh) * | 2012-08-24 | 2013-03-20 | 叶长青 | 一种影剧院吊顶 |
CN203878845U (zh) * | 2014-06-11 | 2014-10-15 | 苏州苏明装饰股份有限公司 | 一种转换层吊顶结构 |
CN203961090U (zh) * | 2014-06-11 | 2014-11-26 | 深圳市建艺装饰集团股份有限公司 | 一种带有角钢转换层的吊顶结构 |
CN104234289A (zh) * | 2014-08-18 | 2014-12-24 | 中建七局建筑装饰工程有限公司 | 一种大高差非平面造型吊顶结构及其施工方法 |
CN105178495A (zh) * | 2015-07-29 | 2015-12-23 | 浙江亚厦装饰股份有限公司 | 一种吊顶龙骨系统及其施工方法 |
CN105133774A (zh) * | 2015-09-24 | 2015-12-09 | 青岛建安建设集团有限公司 | 组合装配式吊顶反向支撑体系结构及设计安装一体化方法 |
CN205557965U (zh) * | 2016-02-01 | 2016-09-07 | 青岛海尔家居集成股份有限公司 | 一种钢结构转换层吊顶 |
CN105804305A (zh) * | 2016-05-23 | 2016-07-27 | 上海中建八局装饰有限责任公司 | 波浪形金属板吊顶系统及其安装方法 |
CN205777020U (zh) * | 2016-07-12 | 2016-12-07 | 青岛博海建设集团有限公司 | 一种大跨度空间吊顶反向和转换支撑装置 |
CN107816161A (zh) * | 2017-10-31 | 2018-03-20 | 苏州金螳螂建筑装饰股份有限公司 | 一种吊顶装配式钢架转换层 |
Non-Patent Citations (2)
Title |
---|
卢春房等: "《站房工程》", 30 April 2015, 中国铁道出版社 * |
孙平雷: "全埋式大空间钢龙骨转换层和条形铝方通吊顶施工技术", 《城市建设理论研究(电子版)》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111893881A (zh) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | 一种利用转换平台立体式快速施工方法 |
CN111893881B (zh) * | 2020-06-24 | 2023-09-05 | 上海市建筑装饰工程集团有限公司 | 一种利用转换平台立体式快速施工方法 |
CN112982800A (zh) * | 2021-03-03 | 2021-06-18 | 上海宝冶建筑装饰有限公司 | 吊顶转换层施工方法 |
CN115977300A (zh) * | 2023-03-16 | 2023-04-18 | 北京建工集团有限责任公司 | 一种降噪装饰天花及其安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108265872A (zh) | 一种天花吊顶转换层主龙骨一体化安装方法 | |
CN104153485A (zh) | 一种防止窗户渗水的外墙企口及其施工方法 | |
CN104947684B (zh) | 一种基于装配式可回收工艺土钉墙支护的施工方法 | |
CN105971272A (zh) | 装配式铝模板砌块填充墙钢筋混凝土构造柱及施工方法 | |
CN111042392A (zh) | 一种sdhh型免拆模板发泡混凝土隔墙施工方法 | |
CN101906858B (zh) | 多线段艺术grc板无缝安装工艺 | |
CN205591355U (zh) | 装配式住宅楼 | |
CN103938755A (zh) | 一种井道下挂式转换梁的隔震结构及其施工方法 | |
CN105275155A (zh) | 新型金属屋面瓦安装方法 | |
CN217105790U (zh) | 保温节能墙体结构 | |
CN210396093U (zh) | 一种双剪力墙变形缝钢模板 | |
CN104989149A (zh) | 一种人民防空地下室临战转换体系及构建方法 | |
CN101886470B (zh) | 清水混凝土密肋梁施工方法 | |
CN206110683U (zh) | 一种用于仿古建筑斜坡形屋面板安装施工结构 | |
CN205876045U (zh) | 一种室内防火门固定结构 | |
CN210263539U (zh) | 一种借助桁架固定免拆外模板的装配墙体模块 | |
CN209742093U (zh) | 一种钢骨架轻型屋面板与立板的连接结构 | |
CN109610717A (zh) | 一种w字型吊顶边龙骨的安装方法 | |
CN206035226U (zh) | 一种室内赤泥板室内隔墙门框固定结构 | |
CN216973966U (zh) | 一种屋面金属瓦加固结构 | |
CN210976436U (zh) | 墙面轻钢干挂基层架 | |
CN108951887A (zh) | 一种装配式蒸压轻质混凝土女儿墙板节点的施工方法 | |
CN209145185U (zh) | 一种楼梯阳角保护装置及施工装置 | |
CN212002245U (zh) | 一种铝模板木模板结合加固装置 | |
CN211421520U (zh) | 一种石材干挂结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |
|
RJ01 | Rejection of invention patent application after publication |