CN107796583A - 试验加载用平行式配重块固定装置及其工作方法 - Google Patents
试验加载用平行式配重块固定装置及其工作方法 Download PDFInfo
- Publication number
- CN107796583A CN107796583A CN201711411489.1A CN201711411489A CN107796583A CN 107796583 A CN107796583 A CN 107796583A CN 201711411489 A CN201711411489 A CN 201711411489A CN 107796583 A CN107796583 A CN 107796583A
- Authority
- CN
- China
- Prior art keywords
- transverse bar
- bar
- balancing weight
- longitudinal direction
- transverse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M7/00—Vibration-testing of structures; Shock-testing of structures
- G01M7/02—Vibration-testing by means of a shake table
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
本发明涉及一种试验加载用平行式配重块固定装置,包括相互连接的下交叉连接组件与上交叉连接组件;本发明还涉及一种试验加载用平行式配重块固定装置的工作方法。本发明结构设计简单、合理,灵活轻巧,施工方便,应用型好,实用性强,解决了试验中配重块安装固定困难等问题,具有广阔的应用前景。
Description
技术领域
本发明涉及一种试验加载用平行式配重块固定装置及其工作方法。
背景技术
进行结构抗震试验是比较大型的动力试验之一,由震动台参数性能的影响,国内外大多数振动台试验多为缩尺后模型,按照缩尺比例,要在缩尺模型上增加一定质量的配重块,目的和原模型的真实情况相一致。振动台试验时,若附加质量不足,通常会造成竖向构件混凝土较早开裂,结构刚度较早退化,而且结构底部构件可能出现受拉状态导致结构破坏模式的改变。
目前在试验室中进行振动台试验时,配重块基本由钢铁块和铅块组成,此类配重块具有成本高,应用范围小,加工和安装难度较高,因此制造一种安装方便,适用性广,价格低廉的固定配重块装置具有重要意义。
发明内容
鉴于现有技术的不足,本发明所要解决的技术问题是提供一种试验加载用平行式配重块固定装置及其工作方法,不仅结构设计合理,而且高效便捷。
为了解决上述技术问题,本发明的技术方案是:一种试验加载用平行式配重块固定装置,包括相互连接的下交叉连接组件与上交叉连接组件,所述下交叉组件包含设置在拟实验梁上部的第一横向杆、设置在拟实验梁下部的第二横向杆、设置在拟实验梁左部的第一纵向杆以及设置在拟实验梁右部的第二纵向杆,所述第一横向杆、第二横向杆、第一纵向杆以及第二纵向杆相互连接固定拟实验梁;所述第一横向杆的上部放置配重块,所述上交叉连接组件包含从第一横向杆左右两端伸出的第三横向杆与第四横向杆、设置在配重块上部的第五横向杆、设置在配重块左部的第三纵向杆以及设置在配块右部的第四纵向杆,所述第一横向杆、第三横向杆、第四横向杆、第五横向杆、第三纵向杆以及第四纵向杆相互连接固定配重块。
进一步的,所述第一横向杆为空心结构,所述第三横向杆与第四横向杆均穿设其中,所述第一横向杆的内侧壁设置有内螺纹,所述第三横向杆与第四横向杆的外侧壁均设置有与第一横向杆相配合的外螺纹。
进一步的,所述第一横向杆、第二横向杆、第一纵向杆、第二纵向杆、第三横向杆、第四横向杆、第五横向杆、第三纵向杆以及第四纵向杆上沿各自的长度方向均间隔开设有若干螺纹调节孔。
进一步的,所述第一横向杆与第一纵向杆之间、第一横向杆与第二纵向杆之间、第一横向杆与第三横向杆之间、第一横向杆与第四横向杆之间、第二横向杆与第一纵向杆之间、第二横向杆与第二纵向杆之间、第三横向杆与第三纵向杆之间、第四横向杆与第四纵向杆之间、第五横向杆与第三纵向杆、第五横向杆与第四纵向杆之间均经螺栓螺母组件固定连接。
一种试验加载用平行式配重块固定装置的工作方法,包含所述的试验加载用平行式配重块固定装置,包含以下步骤:先安装下交叉连接组件实现拟实验梁的固定,再安装上交叉连接组件实现配重块的固定。
进一步的,沿着拟实验梁与配重块的长度方向间隔设置有若干对下交叉连接组件与上交叉连接组件。
与现有技术相比,本发明具有以下有益效果:本发明结构设计简单、合理,灵活轻巧,施工方便,应用型好,实用性强,解决了试验中配重块安装固定困难等问题,具有广阔的应用前景。
下面结合附图和具体实施方式对本发明做进一步详细的说明。
附图说明
图1为本发明实施例的构造示意图。
图中:1-下交叉连接组件,101-第一横向杆,102-第二横向杆,103-第一纵向杆,104-第二纵向杆,2-上交叉连接组件,201-第三横向杆,202-第四横向杆,203-第五横向杆,204-第三纵向杆,205-第四纵向杆,3-拟实验梁,4-配重块,5-螺栓螺母组件。
具体实施方式
为让本发明的上述特征和优点能更明显易懂,下文特举实施例,并配合附图,作详细说明如下。
如图1所示,一种试验加载用平行式配重块固定装置,包括相互连接的下交叉连接组件1与上交叉连接组件2,所述下交叉组件包含设置在拟实验梁3上部的第一横向杆101、设置在拟实验梁3下部的第二横向杆102、设置在拟实验梁3左部的第一纵向杆103以及设置在拟实验梁3右部的第二纵向杆104,所述第一横向杆101、第二横向杆102、第一纵向杆103以及第二纵向杆104相互连接固定拟实验梁3;所述第一横向杆101的上部放置配重块4,所述上交叉连接组件2包含从第一横向杆101左右两端伸出的第三横向杆201与第四横向杆202、设置在配重块4上部的第五横向杆203、设置在配重块4左部的第三纵向杆204以及设置在配块右部的第四纵向杆205,所述第一横向杆101、第三横向杆201、第四横向杆202、第五横向杆203、第三纵向杆204以及第四纵向杆205相互连接固定配重块4。
在本发明实施例中,所述第一横向杆101为空心结构,所述第三横向杆201与第四横向杆202均穿设其中,所述第一横向杆101的内侧壁设置有内螺纹,所述第三横向杆201与第四横向杆202的外侧壁均设置有与第一横向杆101相配合的外螺纹,从而可以适用于不同大小的拟实验梁3与配重块4,灵活性好,适用性高,可以重复利用。
在本发明实施例中,所述第一横向杆101、第二横向杆102、第一纵向杆103、第二纵向杆104、第三横向杆201、第四横向杆202、第五横向杆203、第三纵向杆204以及第四纵向杆205上沿各自的长度方向均间隔开设有若干螺纹调节孔。
在本发明实施例中,所述第一横向杆101、第二横向杆102、第一纵向杆103、第二纵向杆104、第三横向杆201、第四横向杆202、第五横向杆203、第三纵向杆204以及第四纵向杆205均为矩形截面。
在本发明实施例中,所述第一横向杆101与第一纵向杆103之间、第一横向杆101与第二纵向杆104之间、第一横向杆101与第三横向杆201之间、第一横向杆101与第四横向杆202之间、第二横向杆102与第一纵向杆103之间、第二横向杆102与第二纵向杆104之间、第三横向杆201与第三纵向杆204之间、第四横向杆202与第四纵向杆205之间、第五横向杆203与第三纵向杆204、第五横向杆203与第四纵向杆205之间均经螺栓螺母组件5固定连接。
一种试验加载用平行式配重块固定装置的工作方法,包含所述的试验加载用平行式配重块固定装置,包含以下步骤:先安装下交叉连接组件1实现拟实验梁3的固定,再安装上交叉连接组件2实现配重块4的固定。
在本发明实施例中,沿着拟实验梁3与配重块4的长度方向间隔设置有若干对下交叉连接组件1与上交叉连接组件2,提高稳定性。
本发明不局限于上述最佳实施方式,任何人在本发明的启示下都可以得出其他各种形式的试验加载用平行式配重块固定装置及其工作方法。凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。
Claims (6)
1.一种试验加载用平行式配重块固定装置,其特征在于:包括相互连接的下交叉连接组件与上交叉连接组件,所述下交叉组件包含设置在拟实验梁上部的第一横向杆、设置在拟实验梁下部的第二横向杆、设置在拟实验梁左部的第一纵向杆以及设置在拟实验梁右部的第二纵向杆,所述第一横向杆、第二横向杆、第一纵向杆以及第二纵向杆相互连接固定拟实验梁;所述第一横向杆的上部放置配重块,所述上交叉连接组件包含从第一横向杆左右两端伸出的第三横向杆与第四横向杆、设置在配重块上部的第五横向杆、设置在配重块左部的第三纵向杆以及设置在配块右部的第四纵向杆,所述第一横向杆、第三横向杆、第四横向杆、第五横向杆、第三纵向杆以及第四纵向杆相互连接固定配重块。
2.根据权利要求1所述的试验加载用平行式配重块固定装置,其特征在于:所述第一横向杆为空心结构,所述第三横向杆与第四横向杆均穿设其中,所述第一横向杆的内侧壁设置有内螺纹,所述第三横向杆与第四横向杆的外侧壁均设置有与第一横向杆相配合的外螺纹。
3.根据权利要求1所述的试验加载用平行式配重块固定装置,其特征在于:所述第一横向杆、第二横向杆、第一纵向杆、第二纵向杆、第三横向杆、第四横向杆、第五横向杆、第三纵向杆以及第四纵向杆上沿各自的长度方向均间隔开设有若干螺纹调节孔。
4.根据权利要求1所述的试验加载用平行式配重块固定装置,其特征在于:所述第一横向杆与第一纵向杆之间、第一横向杆与第二纵向杆之间、第一横向杆与第三横向杆之间、第一横向杆与第四横向杆之间、第二横向杆与第一纵向杆之间、第二横向杆与第二纵向杆之间、第三横向杆与第三纵向杆之间、第四横向杆与第四纵向杆之间、第五横向杆与第三纵向杆、第五横向杆与第四纵向杆之间均经螺栓螺母组件固定连接。
5.一种试验加载用平行式配重块固定装置的工作方法,其特征在于,包含如权利要求1所述的试验加载用平行式配重块固定装置,包含以下步骤:先安装下交叉连接组件实现拟实验梁的固定,再安装上交叉连接组件实现配重块的固定。
6.根据权利要求5所述的试验加载用平行式配重块固定装置的工作方法,其特征在于:沿着拟实验梁与配重块的长度方向间隔设置有若干对下交叉连接组件与上交叉连接组件。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711411489.1A CN107796583A (zh) | 2017-12-23 | 2017-12-23 | 试验加载用平行式配重块固定装置及其工作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711411489.1A CN107796583A (zh) | 2017-12-23 | 2017-12-23 | 试验加载用平行式配重块固定装置及其工作方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107796583A true CN107796583A (zh) | 2018-03-13 |
Family
ID=61537967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711411489.1A Pending CN107796583A (zh) | 2017-12-23 | 2017-12-23 | 试验加载用平行式配重块固定装置及其工作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107796583A (zh) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003336318A (ja) * | 2002-05-17 | 2003-11-28 | Nippon Eisei Center:Kk | 建築用補強金具 |
KR20050105136A (ko) * | 2005-10-13 | 2005-11-03 | (주)명성온실컨설팅 | 골조고정구 |
US20060228175A1 (en) * | 2003-06-06 | 2006-10-12 | Gilbert Ossbahr | System for joining beams with square or rectangular cross-sections |
CN202519885U (zh) * | 2011-12-27 | 2012-11-07 | 中建七局第四建筑有限公司 | 一种gbf高强薄壁管用的固定装置 |
CN103328349A (zh) * | 2011-01-24 | 2013-09-25 | 世界重力有限公司 | 运输装置 |
CN204311747U (zh) * | 2014-12-05 | 2015-05-06 | 中核华泰建设有限公司 | 一种工具式柱体模板固定器 |
CN104792484A (zh) * | 2015-03-25 | 2015-07-22 | 福建省建筑科学研究院 | 用于抗震试验的叠加式混凝土配重块结构及其构造方法 |
CN204573342U (zh) * | 2015-03-23 | 2015-08-19 | 安徽合力股份有限公司 | 一种用于固定叉车上软管和电缆的管夹 |
CN205513627U (zh) * | 2016-03-03 | 2016-08-31 | 周昊涵 | 一种蚊帐支架 |
CN206159657U (zh) * | 2016-11-18 | 2017-05-10 | 贵阳友联精机技术有限公司 | 一种方便方管组装固定的管夹结构 |
CN207689093U (zh) * | 2017-12-23 | 2018-08-03 | 福州大学 | 试验加载用平行式配重块固定装置 |
-
2017
- 2017-12-23 CN CN201711411489.1A patent/CN107796583A/zh active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003336318A (ja) * | 2002-05-17 | 2003-11-28 | Nippon Eisei Center:Kk | 建築用補強金具 |
US20060228175A1 (en) * | 2003-06-06 | 2006-10-12 | Gilbert Ossbahr | System for joining beams with square or rectangular cross-sections |
KR20050105136A (ko) * | 2005-10-13 | 2005-11-03 | (주)명성온실컨설팅 | 골조고정구 |
CN103328349A (zh) * | 2011-01-24 | 2013-09-25 | 世界重力有限公司 | 运输装置 |
CN202519885U (zh) * | 2011-12-27 | 2012-11-07 | 中建七局第四建筑有限公司 | 一种gbf高强薄壁管用的固定装置 |
CN204311747U (zh) * | 2014-12-05 | 2015-05-06 | 中核华泰建设有限公司 | 一种工具式柱体模板固定器 |
CN204573342U (zh) * | 2015-03-23 | 2015-08-19 | 安徽合力股份有限公司 | 一种用于固定叉车上软管和电缆的管夹 |
CN104792484A (zh) * | 2015-03-25 | 2015-07-22 | 福建省建筑科学研究院 | 用于抗震试验的叠加式混凝土配重块结构及其构造方法 |
CN205513627U (zh) * | 2016-03-03 | 2016-08-31 | 周昊涵 | 一种蚊帐支架 |
CN206159657U (zh) * | 2016-11-18 | 2017-05-10 | 贵阳友联精机技术有限公司 | 一种方便方管组装固定的管夹结构 |
CN207689093U (zh) * | 2017-12-23 | 2018-08-03 | 福州大学 | 试验加载用平行式配重块固定装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100453999C (zh) | 32m/900t预应力混凝土先张箱梁静载试验方法 | |
CN204152217U (zh) | 一种钢结构施工通用的装配式拼装胎架 | |
CN204212070U (zh) | 不中断交通条件下可双向移动的检修平台 | |
CN100386237C (zh) | 基于结构强度变化特性的汽车结构轻量化设计方法 | |
CN111289382B (zh) | 基于静载试验竖向位移的单梁损伤识别方法 | |
CN203700977U (zh) | 一种用于提高桥梁抗剪能力的弹簧支顶加固结构 | |
CN206348147U (zh) | 一种发动机及动力总成的试验台架装置 | |
CN102914470B (zh) | 一种用于混凝土试件梁刚度试验装置及其试验方法 | |
CN112560177A (zh) | 一种改进反应谱激发响应合成的抗震特性仿真计算方法 | |
CN204435929U (zh) | 一种预应力碳纤维板张拉装置 | |
CN207689093U (zh) | 试验加载用平行式配重块固定装置 | |
CN107796583A (zh) | 试验加载用平行式配重块固定装置及其工作方法 | |
CN102819653B (zh) | Pcb加工机床铸铁横梁优化设计方法 | |
CN217378605U (zh) | 一种悬浇变截面连续梁零号块托架预压装置 | |
CN104863259B (zh) | 一种大跨度超高单层筒状建筑钢结构倒装施工方法 | |
CN107562995B (zh) | 一种平台升降系统的环梁的设计方法 | |
CN205620099U (zh) | 一种可调式动力特性测试装置 | |
CN205314603U (zh) | 一种小型施工支架 | |
CN207030673U (zh) | 能使施工电梯到达平台工作面的平台连接结构 | |
CN210243380U (zh) | 一种岩土承载力测试装置 | |
CN104764618B (zh) | 一种桥梁悬臂浇筑挂篮可控等效预压荷载试验方法 | |
CN207003501U (zh) | 一种改进后的静载基准梁构件 | |
CN207231930U (zh) | 一种玻璃纤维增强水泥排气管道抗柔性冲击检测装置 | |
CN205280343U (zh) | 大吨位非对称整孔预制箱梁梁上运梁模拟加载试验装置 | |
CN204346831U (zh) | 一种轻质梁的长期静力加载装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |