CN107795181A - 一种配电网电杆拉线拉盘方法 - Google Patents

一种配电网电杆拉线拉盘方法 Download PDF

Info

Publication number
CN107795181A
CN107795181A CN201710926803.3A CN201710926803A CN107795181A CN 107795181 A CN107795181 A CN 107795181A CN 201710926803 A CN201710926803 A CN 201710926803A CN 107795181 A CN107795181 A CN 107795181A
Authority
CN
China
Prior art keywords
rod
bracing wire
pulling plate
anchor chamber
pull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710926803.3A
Other languages
English (en)
Inventor
安义
朱远
张宇
谭艳军
朱思国
王华云
万军彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710926803.3A priority Critical patent/CN107795181A/zh
Publication of CN107795181A publication Critical patent/CN107795181A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/20Side-supporting means therefor, e.g. using guy ropes or struts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

一种配电网电杆拉线拉盘方法,该方法在电杆(6)周围选择合适的岩层,在岩层(1)中间沿着拉线反向钻孔,形成锚腔(2);将锥形拉棒(3)底端置于锚腔(2)之中,锥形拉棒(3)上端位于岩层之外;采用混凝土对锥形拉棒和锚腔之中的缝隙进行填充,待混凝土凝固后,锥形拉棒、锚腔及岩石形成一个稳固的拉盘结构;将拉线(4)一端固定于锥形拉棒之上,另一端固定于横担(5)之上,形成一方拉线,按照相同的方式在另外3个方位打拉线,最终形成四方拉线结构。通过粘附力和岩石自身重力平衡电杆拉线传递荷载,拉盘稳定性好,岩石开挖量小,工程实施方便,适用于山区电杆拉线,可提高配电网线路雨雪冰冻天气下的供电可靠性。

Description

一种配电网电杆拉线拉盘方法
技术领域
本发明涉及一种配电网电杆拉线拉盘方法,属电力工程技术领域。
背景技术
近几年,受冬季雨雪冰冻灾害影响,南方地区的电网线路因覆冰倒塔断线造成的损失严重,配电网系统一般分布于微地形微气象区域,受灾情况尤为严重,而配电网线路担负着直接给用户供电的重任,其供电可靠性尤为重要。倒杆是配电网冰灾最主要的受灾形式之一,配电网导线、横担等设备覆冰后不平衡张力急剧增大,对配电网电杆的荷载增大,超出了电杆拉线的受力极限,导致拉线拉盘失效,出现倒杆现象,因此研究牢固的拉盘基础是防止配电网线路倒杆的有效技术手段。目前的拉盘基础主要以水泥预制板为主,拉盘与地平面保持一定的角度安装,通过土壤的重力以及阻力达到稳固拉线的目的。这种方式土方开挖量大,在部分山地及岩层密集区域实施困难,导致电杆拉线稳固性差,不平衡张力下极易出现倒杆现象。而覆冰严重的配电网线路对位于岩层密集的山地区域。因此研制一种高效牢固的配电网电杆拉线拉盘方法,可有效增强配电网电杆稳定性,减少配电网线路在冬季覆冰期倒杆断线,对配电网应对雨雪冰冻灾害有重要的意义。
发明内容
本发明的目的是,针对电网电杆因覆冰等过荷载导致的倒杆现象,本发明提出一种配电网电杆拉线拉盘方法,增强配电网电杆稳定性和可靠性。
本发明实现的技术方案如下,一种配电网电杆拉线拉盘方法步骤如下:
(1)电杆固定于土壤或岩层之中;
(2)在电杆附近的岩层上开挖锚腔,将锥形拉棒置于锚腔之中,锥形拉棒的锥底与锚腔底部平齐,锥头一部分位于岩层之外;
(3)锥形拉棒与锚腔之间采用混凝土进行填充,混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;
(4)锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;
(5)按步骤(2)~(4)的方法,在电杆四个方位分别打四根拉线和四个拉盘结构,构成电杆的四方拉线结构。
一种配电网电杆拉线拉盘装置,包括锚腔、锥形拉棒、拉线、混凝土和横担;所述锚腔在电杆附近的岩层上开挖;锥形拉棒锥底置于锚腔底部,锥头一部分位于岩层之外;由混凝土充填锚腔空隙;锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;所述拉盘结构与拉线构成拉线拉盘装置。
所述锚腔的开挖方向与拉线的方向平行;所述拉线与水平面夹角在45°-60°之间。
本发明的工作原理如图1所示,通过在岩层1上开挖锚腔2,将拉棒3置于锚腔2之中,棒径粗的一端朝下,另一端位于岩层之上,采用混凝土对锚腔2与拉棒3之间的空隙进行填充,混凝土凝固后形成了岩层1、锚腔2与拉棒3一体的拉盘结构,拉线一端与拉盘相接,另一端接于电杆横担5之上,在电杆6的四个方位分别打四根拉线和四个拉盘。电杆6朝一个方向集中受力时,对侧的拉线4受力,带动拉棒3有向上运动的趋势,拉棒3与混凝土之间、混凝土与锚腔2之间的粘附力可抵消之中运动趋势,最终通过拉线4、横担5与电杆6的受力达到平衡,防止电杆6侧倾或倒杆。
本发明的有益效果在于,本发明方法利用岩石作为拉盘的基础,利用拉棒混凝土之间、混凝土与锚腔之间的粘附力以及岩石自身重力抵抗拉线传递的荷载,抗拉效果较土壤固定好;同时可有效增加拉盘自身重量,稳定性好,且岩石越大,拉盘越稳定。本发明方法仅在岩石上钻一个孔径较小的锚腔,开挖量较普通拉盘方式减小,可有效减小电杆打拉线时的工作量。方法适用于岩层密集的山区电杆拉线,可增强雨雪冰冻天气下电杆抵抗覆冰荷载的能力,提高配电网供电可靠性。
附图说明
图1所示为本发明的原理示意图;
图中,1是岩层;2是锚腔;3是拉棒;4是拉线;5是横担。
具体实施方式
本发明的具体实施方式如图1所示。
本实施例在电杆6周围选择大小、位置合适的岩石,岩石位置与横担5连线形成拉线4方向,拉线4与水平面夹角在45°-60°之间,在岩石中间沿着拉线4反向钻孔,形成锚腔2,锚腔2孔径较拉棒3底部直径稍大,将拉棒3底端置于锚腔2之中,拉棒3上端位于岩层之外,采用混凝土对拉棒3和锚腔2之中的缝隙进行填充,待混凝土凝固后,拉棒3、锚腔2及岩石形成一个稳固的拉盘结构,将拉线4一端固定于拉棒3之上,另一端固定于横担5之上,形成一方拉线,按照相同的方式在另外3个方位打拉线,最终形成四方拉线结构。

Claims (4)

1.一种配电网电杆拉线拉盘方法,其特征在于,所述方法步骤如下:
(1)电杆固定于土壤或岩层之中;
(2)在电杆附近的岩层上开挖锚腔,将锥形拉棒置于锚腔之中,锥形拉棒的锥底与锚腔底部平齐,锥头一部分位于岩层之外;
(3)锥形拉棒与锚腔之间采用混凝土进行填充,混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;
(4)锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;
(5)按步骤(2)~(4)的方法,在电杆四个方位分别打四根拉线和四个拉盘结构,构成电杆的四方拉线结构。
2.根据权利要求1所述的一种配电网电杆拉线拉盘方法,其特征在于,所述锚腔的开挖方向与拉线的方向平行。
3.根据权利要求1所述的一种配电网电杆拉线拉盘方法,其特征在于,所述拉线与水平面夹角在45°-60°之间。
4.一种配电网电杆拉线拉盘装置,其特征在于,所述装置包括锚腔、锥形拉棒、拉线、混凝土和横担;所述锚腔在电杆附近的岩层上开挖;锥形拉棒锥底置于锚腔底部,锥头一部分位于岩层之外;由混凝土充填锚腔空隙;锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;所述拉盘结构与拉线构成拉线拉盘装置。
CN201710926803.3A 2017-10-08 2017-10-08 一种配电网电杆拉线拉盘方法 Pending CN107795181A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710926803.3A CN107795181A (zh) 2017-10-08 2017-10-08 一种配电网电杆拉线拉盘方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710926803.3A CN107795181A (zh) 2017-10-08 2017-10-08 一种配电网电杆拉线拉盘方法

Publications (1)

Publication Number Publication Date
CN107795181A true CN107795181A (zh) 2018-03-13

Family

ID=61532906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710926803.3A Pending CN107795181A (zh) 2017-10-08 2017-10-08 一种配电网电杆拉线拉盘方法

Country Status (1)

Country Link
CN (1) CN107795181A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109785725A (zh) * 2019-03-18 2019-05-21 国网上海市电力公司 一种培训用模拟拉线盘装置
CN112554636A (zh) * 2020-12-09 2021-03-26 中国电建集团贵阳勘测设计研究院有限公司 一种非岩石地质条件下的拉线型测风塔快速施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202266066U (zh) * 2011-06-23 2012-06-06 中国电力工程顾问集团西北电力设计院 一种750kV输电线路V型拉线塔
CN103066523A (zh) * 2012-07-17 2013-04-24 重庆市电力公司检修分公司 高压输电线路快速抢修塔
CN204343293U (zh) * 2014-12-26 2015-05-20 国家电网公司 一种带全方位地锚盘的地锚
CN105350816A (zh) * 2015-11-30 2016-02-24 高世龙 电网电线杆加固加高装置及其施工方法
CN106760883A (zh) * 2016-11-10 2017-05-31 广东电网有限责任公司惠州供电局 用于10kV直线杆的抗风加固方法和防风拉线装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202266066U (zh) * 2011-06-23 2012-06-06 中国电力工程顾问集团西北电力设计院 一种750kV输电线路V型拉线塔
CN103066523A (zh) * 2012-07-17 2013-04-24 重庆市电力公司检修分公司 高压输电线路快速抢修塔
CN204343293U (zh) * 2014-12-26 2015-05-20 国家电网公司 一种带全方位地锚盘的地锚
CN105350816A (zh) * 2015-11-30 2016-02-24 高世龙 电网电线杆加固加高装置及其施工方法
CN106760883A (zh) * 2016-11-10 2017-05-31 广东电网有限责任公司惠州供电局 用于10kV直线杆的抗风加固方法和防风拉线装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109785725A (zh) * 2019-03-18 2019-05-21 国网上海市电力公司 一种培训用模拟拉线盘装置
CN112554636A (zh) * 2020-12-09 2021-03-26 中国电建集团贵阳勘测设计研究院有限公司 一种非岩石地质条件下的拉线型测风塔快速施工方法

Similar Documents

Publication Publication Date Title
US10253473B2 (en) Rock anchor foundation structure suitable for mountain photovoltaic module and construction method of rock anchor foundation structure
US10443207B2 (en) Pile foundations for supporting power transmission towers
CN207700821U (zh) 一种立杆架设装置
CN107795181A (zh) 一种配电网电杆拉线拉盘方法
CN103306283B (zh) 一种提高非金属抗浮锚杆抗剪强度的方法
CN110439353A (zh) 一种水泥电线杆防倾倒的架设施工方法
CN209243910U (zh) 一种边坡建筑结构
CN204676581U (zh) 一种岩石地基架空电力线路杆塔和拉线新型基础
CN201334664Y (zh) 穗状锚杆
RU2317375C2 (ru) Опора контактной сети, возводимая на пучинистых грунтах
CN204139169U (zh) 一种多层螺旋刀片自钻式土锚杆
CN207660353U (zh) 一种用于土方开挖中的立杆加固装置
CN105041036A (zh) 一种防止输电线路水泥杆上拔结构及其施工方法
CN213805472U (zh) 一种输电线塔锚索螺旋桩-承台基础结构
CN207211388U (zh) 预制剪力墙的竖向连接结构
CN104594375B (zh) 一种岩石地基架空电力线路杆塔和拉线基础及施工工艺
CN202017214U (zh) 冻土地基电力杆塔基础
CN101349063B (zh) 架空送电线路强风化岩层缠绕锚杆的铁塔基础
CN107975048A (zh) 一种矿区用防止水土流失的结构设施
CN106906825A (zh) 适于岩石地基的锚杆拉线基础及其施工方法
CN207553724U (zh) 一种防止电杆冻鼓倾斜的管状植入装置
CN207878462U (zh) 一种浆砌片石组合锚杆支护体系
CN204899393U (zh) 一种防止输电线路水泥杆上拔结构
CN205134351U (zh) 一种电杆基础护坡砌块
CN105442627B (zh) 一种装配式板索基础

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication