CN107795181A - 一种配电网电杆拉线拉盘方法 - Google Patents
一种配电网电杆拉线拉盘方法 Download PDFInfo
- Publication number
- CN107795181A CN107795181A CN201710926803.3A CN201710926803A CN107795181A CN 107795181 A CN107795181 A CN 107795181A CN 201710926803 A CN201710926803 A CN 201710926803A CN 107795181 A CN107795181 A CN 107795181A
- Authority
- CN
- China
- Prior art keywords
- rod
- bracing wire
- pulling plate
- anchor chamber
- pull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/20—Side-supporting means therefor, e.g. using guy ropes or struts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
一种配电网电杆拉线拉盘方法,该方法在电杆(6)周围选择合适的岩层,在岩层(1)中间沿着拉线反向钻孔,形成锚腔(2);将锥形拉棒(3)底端置于锚腔(2)之中,锥形拉棒(3)上端位于岩层之外;采用混凝土对锥形拉棒和锚腔之中的缝隙进行填充,待混凝土凝固后,锥形拉棒、锚腔及岩石形成一个稳固的拉盘结构;将拉线(4)一端固定于锥形拉棒之上,另一端固定于横担(5)之上,形成一方拉线,按照相同的方式在另外3个方位打拉线,最终形成四方拉线结构。通过粘附力和岩石自身重力平衡电杆拉线传递荷载,拉盘稳定性好,岩石开挖量小,工程实施方便,适用于山区电杆拉线,可提高配电网线路雨雪冰冻天气下的供电可靠性。
Description
技术领域
本发明涉及一种配电网电杆拉线拉盘方法,属电力工程技术领域。
背景技术
近几年,受冬季雨雪冰冻灾害影响,南方地区的电网线路因覆冰倒塔断线造成的损失严重,配电网系统一般分布于微地形微气象区域,受灾情况尤为严重,而配电网线路担负着直接给用户供电的重任,其供电可靠性尤为重要。倒杆是配电网冰灾最主要的受灾形式之一,配电网导线、横担等设备覆冰后不平衡张力急剧增大,对配电网电杆的荷载增大,超出了电杆拉线的受力极限,导致拉线拉盘失效,出现倒杆现象,因此研究牢固的拉盘基础是防止配电网线路倒杆的有效技术手段。目前的拉盘基础主要以水泥预制板为主,拉盘与地平面保持一定的角度安装,通过土壤的重力以及阻力达到稳固拉线的目的。这种方式土方开挖量大,在部分山地及岩层密集区域实施困难,导致电杆拉线稳固性差,不平衡张力下极易出现倒杆现象。而覆冰严重的配电网线路对位于岩层密集的山地区域。因此研制一种高效牢固的配电网电杆拉线拉盘方法,可有效增强配电网电杆稳定性,减少配电网线路在冬季覆冰期倒杆断线,对配电网应对雨雪冰冻灾害有重要的意义。
发明内容
本发明的目的是,针对电网电杆因覆冰等过荷载导致的倒杆现象,本发明提出一种配电网电杆拉线拉盘方法,增强配电网电杆稳定性和可靠性。
本发明实现的技术方案如下,一种配电网电杆拉线拉盘方法步骤如下:
(1)电杆固定于土壤或岩层之中;
(2)在电杆附近的岩层上开挖锚腔,将锥形拉棒置于锚腔之中,锥形拉棒的锥底与锚腔底部平齐,锥头一部分位于岩层之外;
(3)锥形拉棒与锚腔之间采用混凝土进行填充,混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;
(4)锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;
(5)按步骤(2)~(4)的方法,在电杆四个方位分别打四根拉线和四个拉盘结构,构成电杆的四方拉线结构。
一种配电网电杆拉线拉盘装置,包括锚腔、锥形拉棒、拉线、混凝土和横担;所述锚腔在电杆附近的岩层上开挖;锥形拉棒锥底置于锚腔底部,锥头一部分位于岩层之外;由混凝土充填锚腔空隙;锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;所述拉盘结构与拉线构成拉线拉盘装置。
所述锚腔的开挖方向与拉线的方向平行;所述拉线与水平面夹角在45°-60°之间。
本发明的工作原理如图1所示,通过在岩层1上开挖锚腔2,将拉棒3置于锚腔2之中,棒径粗的一端朝下,另一端位于岩层之上,采用混凝土对锚腔2与拉棒3之间的空隙进行填充,混凝土凝固后形成了岩层1、锚腔2与拉棒3一体的拉盘结构,拉线一端与拉盘相接,另一端接于电杆横担5之上,在电杆6的四个方位分别打四根拉线和四个拉盘。电杆6朝一个方向集中受力时,对侧的拉线4受力,带动拉棒3有向上运动的趋势,拉棒3与混凝土之间、混凝土与锚腔2之间的粘附力可抵消之中运动趋势,最终通过拉线4、横担5与电杆6的受力达到平衡,防止电杆6侧倾或倒杆。
本发明的有益效果在于,本发明方法利用岩石作为拉盘的基础,利用拉棒混凝土之间、混凝土与锚腔之间的粘附力以及岩石自身重力抵抗拉线传递的荷载,抗拉效果较土壤固定好;同时可有效增加拉盘自身重量,稳定性好,且岩石越大,拉盘越稳定。本发明方法仅在岩石上钻一个孔径较小的锚腔,开挖量较普通拉盘方式减小,可有效减小电杆打拉线时的工作量。方法适用于岩层密集的山区电杆拉线,可增强雨雪冰冻天气下电杆抵抗覆冰荷载的能力,提高配电网供电可靠性。
附图说明
图1所示为本发明的原理示意图;
图中,1是岩层;2是锚腔;3是拉棒;4是拉线;5是横担。
具体实施方式
本发明的具体实施方式如图1所示。
本实施例在电杆6周围选择大小、位置合适的岩石,岩石位置与横担5连线形成拉线4方向,拉线4与水平面夹角在45°-60°之间,在岩石中间沿着拉线4反向钻孔,形成锚腔2,锚腔2孔径较拉棒3底部直径稍大,将拉棒3底端置于锚腔2之中,拉棒3上端位于岩层之外,采用混凝土对拉棒3和锚腔2之中的缝隙进行填充,待混凝土凝固后,拉棒3、锚腔2及岩石形成一个稳固的拉盘结构,将拉线4一端固定于拉棒3之上,另一端固定于横担5之上,形成一方拉线,按照相同的方式在另外3个方位打拉线,最终形成四方拉线结构。
Claims (4)
1.一种配电网电杆拉线拉盘方法,其特征在于,所述方法步骤如下:
(1)电杆固定于土壤或岩层之中;
(2)在电杆附近的岩层上开挖锚腔,将锥形拉棒置于锚腔之中,锥形拉棒的锥底与锚腔底部平齐,锥头一部分位于岩层之外;
(3)锥形拉棒与锚腔之间采用混凝土进行填充,混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;
(4)锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;
(5)按步骤(2)~(4)的方法,在电杆四个方位分别打四根拉线和四个拉盘结构,构成电杆的四方拉线结构。
2.根据权利要求1所述的一种配电网电杆拉线拉盘方法,其特征在于,所述锚腔的开挖方向与拉线的方向平行。
3.根据权利要求1所述的一种配电网电杆拉线拉盘方法,其特征在于,所述拉线与水平面夹角在45°-60°之间。
4.一种配电网电杆拉线拉盘装置,其特征在于,所述装置包括锚腔、锥形拉棒、拉线、混凝土和横担;所述锚腔在电杆附近的岩层上开挖;锥形拉棒锥底置于锚腔底部,锥头一部分位于岩层之外;由混凝土充填锚腔空隙;锥形拉棒的锥头与拉线一端连接,拉线另一端与横担连接,横担固定于电杆端部;混凝土凝固后形成了岩层、锚腔与拉棒一体的拉盘结构;所述拉盘结构与拉线构成拉线拉盘装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710926803.3A CN107795181A (zh) | 2017-10-08 | 2017-10-08 | 一种配电网电杆拉线拉盘方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710926803.3A CN107795181A (zh) | 2017-10-08 | 2017-10-08 | 一种配电网电杆拉线拉盘方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107795181A true CN107795181A (zh) | 2018-03-13 |
Family
ID=61532906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710926803.3A Pending CN107795181A (zh) | 2017-10-08 | 2017-10-08 | 一种配电网电杆拉线拉盘方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107795181A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109785725A (zh) * | 2019-03-18 | 2019-05-21 | 国网上海市电力公司 | 一种培训用模拟拉线盘装置 |
CN112554636A (zh) * | 2020-12-09 | 2021-03-26 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种非岩石地质条件下的拉线型测风塔快速施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202266066U (zh) * | 2011-06-23 | 2012-06-06 | 中国电力工程顾问集团西北电力设计院 | 一种750kV输电线路V型拉线塔 |
CN103066523A (zh) * | 2012-07-17 | 2013-04-24 | 重庆市电力公司检修分公司 | 高压输电线路快速抢修塔 |
CN204343293U (zh) * | 2014-12-26 | 2015-05-20 | 国家电网公司 | 一种带全方位地锚盘的地锚 |
CN105350816A (zh) * | 2015-11-30 | 2016-02-24 | 高世龙 | 电网电线杆加固加高装置及其施工方法 |
CN106760883A (zh) * | 2016-11-10 | 2017-05-31 | 广东电网有限责任公司惠州供电局 | 用于10kV直线杆的抗风加固方法和防风拉线装置 |
-
2017
- 2017-10-08 CN CN201710926803.3A patent/CN107795181A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202266066U (zh) * | 2011-06-23 | 2012-06-06 | 中国电力工程顾问集团西北电力设计院 | 一种750kV输电线路V型拉线塔 |
CN103066523A (zh) * | 2012-07-17 | 2013-04-24 | 重庆市电力公司检修分公司 | 高压输电线路快速抢修塔 |
CN204343293U (zh) * | 2014-12-26 | 2015-05-20 | 国家电网公司 | 一种带全方位地锚盘的地锚 |
CN105350816A (zh) * | 2015-11-30 | 2016-02-24 | 高世龙 | 电网电线杆加固加高装置及其施工方法 |
CN106760883A (zh) * | 2016-11-10 | 2017-05-31 | 广东电网有限责任公司惠州供电局 | 用于10kV直线杆的抗风加固方法和防风拉线装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109785725A (zh) * | 2019-03-18 | 2019-05-21 | 国网上海市电力公司 | 一种培训用模拟拉线盘装置 |
CN112554636A (zh) * | 2020-12-09 | 2021-03-26 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种非岩石地质条件下的拉线型测风塔快速施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10253473B2 (en) | Rock anchor foundation structure suitable for mountain photovoltaic module and construction method of rock anchor foundation structure | |
US10443207B2 (en) | Pile foundations for supporting power transmission towers | |
CN207700821U (zh) | 一种立杆架设装置 | |
CN107795181A (zh) | 一种配电网电杆拉线拉盘方法 | |
CN103306283B (zh) | 一种提高非金属抗浮锚杆抗剪强度的方法 | |
CN110439353A (zh) | 一种水泥电线杆防倾倒的架设施工方法 | |
CN209243910U (zh) | 一种边坡建筑结构 | |
CN204676581U (zh) | 一种岩石地基架空电力线路杆塔和拉线新型基础 | |
CN201334664Y (zh) | 穗状锚杆 | |
RU2317375C2 (ru) | Опора контактной сети, возводимая на пучинистых грунтах | |
CN204139169U (zh) | 一种多层螺旋刀片自钻式土锚杆 | |
CN207660353U (zh) | 一种用于土方开挖中的立杆加固装置 | |
CN105041036A (zh) | 一种防止输电线路水泥杆上拔结构及其施工方法 | |
CN213805472U (zh) | 一种输电线塔锚索螺旋桩-承台基础结构 | |
CN207211388U (zh) | 预制剪力墙的竖向连接结构 | |
CN104594375B (zh) | 一种岩石地基架空电力线路杆塔和拉线基础及施工工艺 | |
CN202017214U (zh) | 冻土地基电力杆塔基础 | |
CN101349063B (zh) | 架空送电线路强风化岩层缠绕锚杆的铁塔基础 | |
CN107975048A (zh) | 一种矿区用防止水土流失的结构设施 | |
CN106906825A (zh) | 适于岩石地基的锚杆拉线基础及其施工方法 | |
CN207553724U (zh) | 一种防止电杆冻鼓倾斜的管状植入装置 | |
CN207878462U (zh) | 一种浆砌片石组合锚杆支护体系 | |
CN204899393U (zh) | 一种防止输电线路水泥杆上拔结构 | |
CN205134351U (zh) | 一种电杆基础护坡砌块 | |
CN105442627B (zh) | 一种装配式板索基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180313 |