CN202017214U - 冻土地基电力杆塔基础 - Google Patents

冻土地基电力杆塔基础 Download PDF

Info

Publication number
CN202017214U
CN202017214U CN2011201003085U CN201120100308U CN202017214U CN 202017214 U CN202017214 U CN 202017214U CN 2011201003085 U CN2011201003085 U CN 2011201003085U CN 201120100308 U CN201120100308 U CN 201120100308U CN 202017214 U CN202017214 U CN 202017214U
Authority
CN
China
Prior art keywords
frozen soil
cylinder
soil foundation
pole tower
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201003085U
Other languages
English (en)
Inventor
朱江
郭永胜
徐博
邬宗宪
满国民
薛英
王永华
董天元
陈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co., Ltd of Chinese energy construction group Xinjiang Electric Power Design Inst. Wang Dazhi
Original Assignee
Xinjiang electric power design institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang electric power design institute filed Critical Xinjiang electric power design institute
Priority to CN2011201003085U priority Critical patent/CN202017214U/zh
Application granted granted Critical
Publication of CN202017214U publication Critical patent/CN202017214U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

冻土地基电力杆塔基础,柱体(2)呈立柱型状,柱体(2)内部垂直方向固定主筋(4),相邻主筋(4)在水平方向上通过箍筋(5)连接固定,柱体(2)上部垂直内固定地脚螺栓(1),地脚螺栓(1)上端伸出柱体(2)顶面。柱体结构能够最大限度保持冻土结构稳定性,成型过程中不需要回填开挖出的冻土,避免冻融现象发生,体积小,结构紧凑,便于施工,具有可靠性、耐用性和经济性,可广泛适用于冻土地基。

Description

冻土地基电力杆塔基础
技术领域
本实用新型涉及一种国际专利分类E02D部分类中的冻土地基基础技术领域,特别是涉及冻土地带的电力杆塔基础结构。
背景技术
目前,电力线路常需要跨越冻土地带,而冻土是指在零摄氏度以下冻结并且含有冰的岩土,以现有技术,在冻土地区架空输电线路的基础往往会不同程度受到地基土冻胀和融沉的影响,杆塔会失稳而出现倒杆和倒塔工程事故,严重影响线路安全运行,并造成巨大经济损失。究其原因,主要由于在制作基础时由于对冻土层的扰动和回填导致冻土原有状态改变而发生融沉而不能保持基础稳定,但是相关改进技术方案公开较少。
发明内容
本实用新型的目的是提供一种有效保证冻土地基承载电力杆塔安全稳定的基础结构,特别是冻土地基电力杆塔基础。
实现本实用新型的发明目的措施在于:柱体呈立柱型状,柱体内部垂直方向固定主筋,相邻主筋在水平方向上通过箍筋连接固定,柱体上部垂直内固定地脚螺栓,地脚螺栓上端伸出柱体顶面。
本实用新型的优点在于,柱体结构能够最大限度保持冻土结构稳定性,成型过程中不需要回填开挖出的冻土,避免冻融现象发生,体积小,结构紧凑,便于施工,具有可靠性、耐用性和经济性,可广泛适用于冻土地基。
附图说明
图1是本实用新型的结构示意图
图2是图1的俯视结构示意图
附图标记:地脚螺栓1,柱体2,冻土地基3,主筋4,箍筋5,护板6,柱脚7。
具体实施方式
以下结合附图进行说明:
柱体2呈立柱型状,柱体2内部垂直方向固定主筋4,相邻主筋4在水平方向上通过箍筋5连接固定,柱体2上部垂直内固定地脚螺栓1,地脚螺栓1上端伸出柱体2顶面。
柱体2外形呈圆柱状,或棱柱状。柱体2底部固定柱脚7,柱脚7直径大于柱体2。
主筋4和箍筋5外侧固定护板6,护板6外侧面与柱体2外壁面重合。
柱体2由钢筋混凝土制成,柱体2主体埋于冻土地基3中,柱体2顶面露出冻土地基3上。
本实用新型制作安装时,依据基础坑洞形状置入实现固定好的主筋4和箍筋5构件,护板6在外侧起到扶正作用,在空隙中填充混凝土,混凝土凝固后由于柱脚7作用更加稳固,没有回填冻土也避免融沉现象发生。
在以上实施例中,未及叙述的涉及实施的其他必要技术等采用现有技术,不再依次列举详述。

Claims (4)

1.冻土地基电力杆塔基础,其特征是:柱体(2)呈立柱型状,柱体(2)内部垂直方向固定主筋(4),相邻主筋(4)在水平方向上通过箍筋(5)连接固定,柱体(2)上部垂直内固定地脚螺栓(1),地脚螺栓(1)上端伸出柱体(2)顶面。
2.如权利要求1所述的冻土地基电力杆塔基础,其特征在于,柱体(2)外形呈圆柱状,或棱柱状。
3.如权利要求1所述的冻土地基电力杆塔基础,其特征在于,柱体(2)底部固定柱脚(7),柱脚(7)直径大于柱体(2)。
4.如权利要求1所述的冻土地基电力杆塔基础,其特征在于,主筋(4)和箍筋(5)外侧固定护板(6),护板(6)外侧面与柱体(2)外壁面重合。
CN2011201003085U 2011-04-08 2011-04-08 冻土地基电力杆塔基础 Expired - Lifetime CN202017214U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201003085U CN202017214U (zh) 2011-04-08 2011-04-08 冻土地基电力杆塔基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201003085U CN202017214U (zh) 2011-04-08 2011-04-08 冻土地基电力杆塔基础

Publications (1)

Publication Number Publication Date
CN202017214U true CN202017214U (zh) 2011-10-26

Family

ID=44810885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201003085U Expired - Lifetime CN202017214U (zh) 2011-04-08 2011-04-08 冻土地基电力杆塔基础

Country Status (1)

Country Link
CN (1) CN202017214U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677651A (zh) * 2012-04-26 2012-09-19 北京正和恒基滨水生态环境治理股份有限公司 山体生态修复方法
CN103343548A (zh) * 2013-07-31 2013-10-09 山东电力工程咨询院有限公司 一种输电塔基础型式及其承载力计算方法
CN103469809A (zh) * 2013-09-26 2013-12-25 国家电网公司 输电塔整板式基础
CN111827767A (zh) * 2020-07-31 2020-10-27 海南信强实业有限公司 一种新型电杆

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677651A (zh) * 2012-04-26 2012-09-19 北京正和恒基滨水生态环境治理股份有限公司 山体生态修复方法
CN102677651B (zh) * 2012-04-26 2015-01-07 北京正和恒基滨水生态环境治理股份有限公司 山体生态修复方法
CN103343548A (zh) * 2013-07-31 2013-10-09 山东电力工程咨询院有限公司 一种输电塔基础型式及其承载力计算方法
CN103343548B (zh) * 2013-07-31 2015-03-11 山东电力工程咨询院有限公司 一种输电塔基础型式及其承载力计算方法
CN103469809A (zh) * 2013-09-26 2013-12-25 国家电网公司 输电塔整板式基础
CN111827767A (zh) * 2020-07-31 2020-10-27 海南信强实业有限公司 一种新型电杆

Similar Documents

Publication Publication Date Title
CN200985518Y (zh) 门式抗浮结构
CN203583498U (zh) 一种微型桩组合墙支护结构
CN104532868B (zh) 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法
CN202017214U (zh) 冻土地基电力杆塔基础
CN103352582B (zh) 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法
CN203222809U (zh) 一种输电线路杆塔预应力混凝土管桩基础
CN101691760B (zh) 一种锚杆联合掏挖复合基础及其施工方法
CN103498478B (zh) 岩石坝基帷幕灌浆施工方法
CN104878778A (zh) 地下结构的抗震加固结构及方法
CN204959787U (zh) 一种新型塔吊组合式基础
CN202090352U (zh) 钢管桩-自钻式预应力锚杆深基坑支护系统
CN201502065U (zh) 一种锚杆联合开挖类复合基础
CN102286979A (zh) 钢管桩-自钻式预应力锚杆深基坑支护施工方法
CN209779642U (zh) 一种具有抗滑结构的微型桩及其挡墙组合体
CN204370417U (zh) 一种用于基坑工程阳角或道路围护处的对拉锚索支护结构
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN102644266B (zh) 一种采用劈裂锚杆桩加固桥台区域软土层路面的方法
CN203007967U (zh) 一种高原戈壁沙土地区光伏电站组件支架基础
CN202644565U (zh) 冻土地基电力杆塔基础
CN104131535A (zh) 一种高聚物复合加筋土石坝抗震结构及其施工方法
CN203768940U (zh) 一种架空输电线路角钢塔基础
CN101892663A (zh) 桩式基础制作方法
CN205205885U (zh) 一种钢立柱垂直度偏差处理部件
CN201495554U (zh) 一种锚杆联合掏挖复合基础
CN206408631U (zh) 用于临近既有地下结构的基坑桩锚支护体系

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP XINJIANG ELECTRIC P

Free format text: FORMER NAME: XINJIANG ELECTRIC POWER DESIGN INST. WANG DAZHI

CP01 Change in the name or title of a patent holder

Address after: 830001 No. three, 100 Wan Lu, the Xinjiang Uygur Autonomous Region, Urumqi

Patentee after: Co., Ltd of Chinese energy construction group Xinjiang Electric Power Design Inst. Wang Dazhi

Address before: 830001 No. three, 100 Wan Lu, the Xinjiang Uygur Autonomous Region, Urumqi

Patentee before: Xinjiang Electric Power Design Institute

CX01 Expiry of patent term

Granted publication date: 20111026