CN201502065U - 一种锚杆联合开挖类复合基础 - Google Patents

一种锚杆联合开挖类复合基础 Download PDF

Info

Publication number
CN201502065U
CN201502065U CN2009202225589U CN200920222558U CN201502065U CN 201502065 U CN201502065 U CN 201502065U CN 2009202225589 U CN2009202225589 U CN 2009202225589U CN 200920222558 U CN200920222558 U CN 200920222558U CN 201502065 U CN201502065 U CN 201502065U
Authority
CN
China
Prior art keywords
basis
excavation
foundation
anchor pole
anchor rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202225589U
Other languages
English (en)
Inventor
鲁先龙
程永锋
苏荣臻
丁士君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2009202225589U priority Critical patent/CN201502065U/zh
Application granted granted Critical
Publication of CN201502065U publication Critical patent/CN201502065U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本实用新型提供了一种锚杆联合开挖类复合基础,包括开挖类基础及锚杆基础,所述锚杆基础位于地表的岩层中,其包括至少一根圆柱形或多边形的岩石锚杆,所述岩石锚杆具有锚杆主筋和围绕锚杆主筋的混凝土或水泥砂浆,所述锚杆主筋伸入到开挖类基础中;所述开挖类基础位于地表的土层中、其由配筋和混凝土构成,所述开挖类基础和锚杆基础由伸入到开挖类基础中的锚杆主筋连接。该锚杆联合开挖类复合基础无需爆破岩层,便于施工,减少土方开挖量,利用原状土,利于保护环境。

Description

一种锚杆联合开挖类复合基础
技术领域
本实用新型涉及输电线路的基础施工技术领域,尤其涉及一种锚杆联合开挖类复合基础。
背景技术
在输电线路基础中经常遇到有浅层为土层,而稍深处为岩层的地质条件,在这种地质条件下之前采用的基础形式一般为开挖回填类基础(例如:大板式基础或台阶式基础)或掏挖基础,如图1所示,现有的大板式基础或台阶式基础位于土层I和岩层II中,在土层I和岩层II中以开挖线9为边界线开挖出台阶式基础的基坑8,使得基坑8在垂直方向的截面形状呈上边长于下边的梯形,然后在基坑8内通过模具构造出台阶式基础的外轮廓,在外轮廓内布置配筋,浇注混凝土,最后向台阶式基础1与基坑8之间回填土,以保证台阶式基础的稳固。当线路荷载较大时,基础底面深度需超过岩层顶面,基础的承载力才能满足线路荷载要求,这样由于掏挖基础不能对岩层进行掏挖而无法采用,而采用大板式基础或台阶式基础要对岩层进行爆破等方法以便岩层部分的开挖,这样就给施工带来很大的难度,同时有巨大的土方开挖量,破坏原状土,不利于保护环境。
实用新型内容
为了克服现有技术中的缺陷,本实用新型提供了一种无需爆破岩层,便于施工,减少土方开挖量的锚杆联合开挖类复合基础。
为此,本实用新型提出了一种锚杆联合开挖类复合基础,包括开挖类基础及锚杆基础,所述锚杆基础位于地表的岩层中,其包括至少一根圆柱形或多边形的岩石锚杆,所述岩石锚杆具有锚杆主筋和围绕锚杆主筋的混凝土或水泥砂浆,所述锚杆主筋伸入到开挖类基础中;所述开挖类基础位于地表的土层中、其由配筋和混凝土构成,所述开挖类基础和锚杆基础由伸入到开挖类基础中的锚杆主筋连接。
其中,所述锚杆主筋伸入到开挖类基础的长度大于等于锚杆主筋直径的40倍。
其中,所述围绕锚杆主筋的混凝土或水泥砂浆的顶面伸入到开挖类基础的高度大于等于10厘米。
其中,所述开挖类基础选用大板式基础或台阶式基础。
本实用新型的锚杆联合开挖类复合基础可用于浅层为土层、稍深处为岩层的地质条件,主要应用到输电线路杆塔基础中。
由于本实用新型复合基础的开挖类基础(以选用台阶式基础或大板式基础为佳)的底面置于岩层顶面,因此在受力时,由开挖类基础承担主要下压力,开挖类基础和锚杆基础共同承担上拔力和水平力,这样就能满足输电线路荷载要求。
本实用新型的有益效果在于:该锚杆联合开挖类复合基础无需爆破岩层,便于施工,减少土方开挖量,利用原状土,利于保护环境。
附图说明
图1为现有技术中大板式基础或台阶式基础的结构示意图;
图2为本实用新型的锚杆联合开挖类复合基础的结构示意图;
图3为图2的A-A剖视图;
其中,I-土层,II-岩层,1-台阶式基础,2-锚杆基础,3-岩石锚杆,4-锚杆主筋,5-围绕锚杆主筋的混凝土或水泥砂浆,6-配筋,7-混凝土,8--基坑,9-开挖线。
具体实施方式
下面结合附图对本实用新型的锚杆联合开挖类复合基础作进一步说明。
本例中的开挖类基础以台阶式基础为例进行说明。如图2-3所示,岩层II中设置有四根按正方形布置的岩石锚杆3,该岩石锚杆3具有锚杆主筋4和围绕锚杆主筋的混凝土或水泥砂浆5,锚杆主筋4伸入到台阶式基础1中。台阶式基础1位于地表的土层I中、其由配筋6和混凝土7构成,台阶式基础1的底面置于岩层II顶面;台阶式基础1和锚杆基础2由伸入到台阶式基础1中的锚杆主筋4相连接。
本实用新型的锚杆联合开挖类复合基础的结构尺寸可采用下述参数:土层I为黄土层,土层下面的岩层II为微风化岩层,上部台阶式基础1位于1.5m厚的黄土层中,台阶式基础1的上部窄端边长为0.8m、下部扩大端的边长为3mm,微风化岩层中设置有四根按正方形布置的岩石锚杆3,岩石锚杆3的间距为40cm、其直径为0.15m,锚杆主筋4采用36mm直径的HRB335II级螺纹钢、其长度为6m,浇灌在锚杆主筋4周围的混凝土或水泥砂浆5的顶面伸入到台阶式基础中的高度应大于等于10厘米,围绕锚杆主筋的混凝土或水泥砂浆5可采用C20混凝土或M20的水泥砂浆,锚杆主筋4伸入台阶式基础1中的长度为1.44m,即该例中锚杆主筋4伸入台阶式基础1中的长度等于锚杆主筋4直径的40倍(1.44m÷36mm=40)。应使围绕锚杆主筋的混凝土或该锚杆联合开挖类复合基础能够承受150吨的上拔力。
本实用新型的具体施工过程如下:
1)成孔:利用锚杆钻机在地表的土层和岩层中钻出锚杆钻孔;
2)成孔结束后,放入并固定所述锚杆主筋,使所述锚杆主筋伸入到台阶式基础的长度应大于等于锚杆主筋直径的40倍,然后灌注所述锚杆部分围绕锚杆主筋的混凝土,使所述围绕锚杆主筋的混凝土的顶面伸入到台阶式基础的高度大于等于10厘米;
3)在地表的土层以开挖线9为边界线开挖出台阶式基础的基坑8,使得所述基坑在垂直方向的截面形状呈上边长于下边的梯形;
4)在基坑8内通过模具构造出台阶式基础的外轮廓,在外轮廓内布置配筋6,然后在台阶式基础中浇注混凝土7,最后向台阶式基础1与基坑8之间回填土,以保证台阶式基础的稳固。
本实用新型的台阶式基础1也可替换成大板式基础或其它开挖类基础,所述的锚杆基础、台阶式基础和大板式基础均为本领域技术人员所公知的基础形式,常用于输电线路基础。
此处已经根据特定的示例性实施例对本实用新型进行了描述。对本领域的技术人员来说在不脱离本实用新型的范围下进行适当的替换或修改将是显而易见的。示例性的实施例仅仅是例证性的,而不是对本实用新型的范围的限制,本实用新型的范围由所附的权利要求定义。

Claims (5)

1.一种锚杆联合开挖类复合基础,包括开挖类基础及锚杆基础(2),其特征在于:所述锚杆基础(2)位于地表的岩层(II)中,其包括至少一根圆柱形或多边形的岩石锚杆(3),所述岩石锚杆(3)具有锚杆主筋(4)和围绕锚杆主筋的混凝土或水泥砂浆(5),所述锚杆主筋(4)伸入到开挖类基础中;所述开挖类基础位于地表的土层(I)中、其由配筋(6)和混凝土(7)构成,所述开挖类基础和锚杆基础(2)由伸入到开挖类基础中的锚杆主筋(4)连接。
2.如权利要求1所述的锚杆联合开挖类复合基础,其特征在于:所述锚杆主筋(4)伸入到开挖类基础(1)的长度大于等于锚杆主筋(4)直径的40倍。
3.如权利要求1或2所述的锚杆联合开挖类复合基础,其特征在于:所述围绕锚杆主筋的混凝土或水泥砂浆(5)的顶面伸入到开挖类基础(1)的高度大于等于10厘米。
4.如权利要求1或2所述的锚杆联合开挖类复合基础,其特征在于:所述开挖类基础采用大板式基础或台阶式基础(1)。
5.如权利要求3所述的锚杆联合开挖类复合基础,其特征在于:所述开挖类基础选用大板式基础或台阶式基础(1)。
CN2009202225589U 2009-09-25 2009-09-25 一种锚杆联合开挖类复合基础 Expired - Lifetime CN201502065U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202225589U CN201502065U (zh) 2009-09-25 2009-09-25 一种锚杆联合开挖类复合基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202225589U CN201502065U (zh) 2009-09-25 2009-09-25 一种锚杆联合开挖类复合基础

Publications (1)

Publication Number Publication Date
CN201502065U true CN201502065U (zh) 2010-06-09

Family

ID=42453001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202225589U Expired - Lifetime CN201502065U (zh) 2009-09-25 2009-09-25 一种锚杆联合开挖类复合基础

Country Status (1)

Country Link
CN (1) CN201502065U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147456A (zh) * 2013-03-08 2013-06-12 中节能风力发电股份有限公司 预应力组合桩结构及其施工方法
CN104032767A (zh) * 2014-06-20 2014-09-10 天津二十冶建设有限公司 一种深基坑内塔吊基础及其施工方法
CN108589759A (zh) * 2018-05-15 2018-09-28 中国电力科学研究院有限公司 一种杆塔复合基础
CN110777836A (zh) * 2019-10-31 2020-02-11 山东建筑大学 一种钢筋混凝土板式-锚杆复合基础及其使用方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147456A (zh) * 2013-03-08 2013-06-12 中节能风力发电股份有限公司 预应力组合桩结构及其施工方法
CN104032767A (zh) * 2014-06-20 2014-09-10 天津二十冶建设有限公司 一种深基坑内塔吊基础及其施工方法
CN108589759A (zh) * 2018-05-15 2018-09-28 中国电力科学研究院有限公司 一种杆塔复合基础
CN110777836A (zh) * 2019-10-31 2020-02-11 山东建筑大学 一种钢筋混凝土板式-锚杆复合基础及其使用方法

Similar Documents

Publication Publication Date Title
CN103967031B (zh) 一种加固地基的沉箱与桩组合基础及其施工方法
CN202117068U (zh) 微型桩板式复合基础
CN101691760B (zh) 一种锚杆联合掏挖复合基础及其施工方法
CN105350531A (zh) 可承受拉压双向荷载的管桩-锚杆复合基础及施工工艺
CN102561377A (zh) 带扩底的抗震柱岩石锚杆基础及其施工方法
CN101718098B (zh) 一种微型桩联合掏挖复合基础及其施工方法
CN201232194Y (zh) 一种抗变形输电杆塔
CN210395412U (zh) 一种适用于山区架空输电线路的预应力锚桩抗拔基础
CN201502065U (zh) 一种锚杆联合开挖类复合基础
CN202227368U (zh) 地下槽型结构抗浮构造
CN201485863U (zh) 掏挖加岩石锚杆复合环保型基础
CN202187340U (zh) 钢管混凝土芯柱嵌岩桩
CN201843135U (zh) 送电线路复合基础桩
CN203498860U (zh) 光伏组件支架带混凝土块的锚杆基础结构
CN206418517U (zh) 一种用于冻土地基的预制锚固基础
CN110792095B (zh) 一种多桩承台-螺旋锚复合基础
CN204780975U (zh) 用于中压配电线路的四回路终端钢管杆掏挖锚桩复合基础
CN104895078B (zh) 一种以端承受力为主的预制桩的施工方法
CN204456182U (zh) 竖向锚拉桩挡土墙
CN201334664Y (zh) 穗状锚杆
CN203361182U (zh) 输电杆塔岩石扩底不等长锚桩
CN102286971A (zh) 钢管混凝土芯柱嵌岩桩
CN201495554U (zh) 一种锚杆联合掏挖复合基础
CN207109842U (zh) 一种岩石地基杆塔基础结构
CN202989911U (zh) 一种预制混凝土后注浆桩

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140307

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140307

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100192 HAIDIAN, BEIJING TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20140307

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: China Electric Power Research Institute

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee before: China Electric Power Research Institute

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100609