CN103147456A - 预应力组合桩结构及其施工方法 - Google Patents

预应力组合桩结构及其施工方法 Download PDF

Info

Publication number
CN103147456A
CN103147456A CN2013100746046A CN201310074604A CN103147456A CN 103147456 A CN103147456 A CN 103147456A CN 2013100746046 A CN2013100746046 A CN 2013100746046A CN 201310074604 A CN201310074604 A CN 201310074604A CN 103147456 A CN103147456 A CN 103147456A
Authority
CN
China
Prior art keywords
cushion cap
flexible anchor
pedestal
prestressing
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100746046A
Other languages
English (en)
Inventor
王光龙
王金亮
李书生
刘斌
贾锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CECEP WIND-POWER Corp
Original Assignee
CECEP WIND-POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CECEP WIND-POWER Corp filed Critical CECEP WIND-POWER Corp
Priority to CN2013100746046A priority Critical patent/CN103147456A/zh
Publication of CN103147456A publication Critical patent/CN103147456A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及风力发电领域,具体涉及一种预应力组合桩结构。该结构包括:重力承台基座中,还包括:混凝土固定部和多个柔性锚索;混凝土固定部设置于地下;重力承台基座设置于混凝土固定部上;混凝土固定部与重力承台基座通过多个柔性锚索固定连接。本发明还提供了一种预应力组合桩结构的施工方法,该方法能够减少了挖方量,施工速度快,同时还能有效的吸收振动的能量。

Description

预应力组合桩结构及其施工方法
技术领域
本发明涉及风力发电领域,具体而言,涉及一种预应力组合桩结构。
背景技术
风能作为一种清洁的可再生能源,越来越受到世界各国的重视。
相关技术中的风机桩结构是靠埋于地下的地基来保持塔筒的稳定,其原理是靠地基中重力承台的自身重量来抵抗塔筒传来的巨大荷载,从而保持塔筒的稳定。
但是,如果外部荷载很大比如高耸结构或者超高压输电线路等想保持塔筒稳定,上述结构的地基本身的体积和重量也很巨大,浇注生成该地基所需混凝土及钢筋的量很大,同时,为了将该地基埋于地下,所需的开挖量也非常大,不利于提高施工速度和缩短工期。
发明内容
本发明实施例的目的在于提供一种预应力组合桩结构及其施工方法,以解决上述的问题。
为达上述目的,本发明实施例的技术方案具体是这样实现的:
一种预应力组合桩结构,包括:重力承台基座,还包括:混凝土固定部和多个柔性锚索;
混凝土固定部设置于地下;
重力承台基座设置于所述混凝土固定部上;
混凝土固定部与重力承台基座通过多个柔性锚索固定连接。
由上述技术方案可见,本发明实施例的这种预应力组合桩结构及其施工方法,采用多个柔性锚索牢牢固定桩体,充分利用了土壤或者岩石本身的其他力学性能,如:变形模量、内摩擦角等,使混凝土和柔性锚索之间产生巨大的胶结力形成牢固的混凝土固定部以至增大混凝土与周围土体或岩石体之间的内摩擦角,从而增大摩擦力使地基能够增强抗拉、抗剪和抗压力。地基完成后的预紧力使得整个风机牢牢固定于基座及土壤上面,使土壤充分发挥其力学特性,提高了基础整体的稳定性及抗倾覆、抗拔能力。采用本发明的技术方案只需要挖掘混凝土固定部所在位置的土方就能够达到与采用巨大的传统地基同样的技术效果,能够同样满足工程的设计要求。同时,柔性锚索比较刚性锚杆而言,对于振动工况具有极佳的吸收能量的优点。本发明的技术方案减少了挖方量,施工速度快,同时还能有效的吸收振动的能量。
附图说明
图1示出了本发明的预应力组合桩结构的垂直剖面图;
图2出示了本发明的预应力组合桩结构的俯视图;
具体实施方式
下面通过具体的实施例子并结合附图对本发明做进一步的详细描述。
本发明实施例提供一种预应力组合桩结构,该结构如图1、图2所示,
一种预应力组合桩结构,包括:重力承台基座1,预应力组合桩结构进一步包括多个柔性锚索2,柔性锚索2沿垂直方向穿过重力承台基座1进入下方混凝土固定部3并与所述混凝土固定部3牢牢固化在一起。其功能是使混凝土和锚杆之间产生巨大的胶结力以至增大混凝土与周围土体或岩石体之间的内摩擦角,从而增大摩擦力使地基能够增强抗拉、抗剪和抗压力。本技术方案不限于应用在土壤中,同样适用于岩石地,做法是首先在岩石上钻孔,使孔的直径大于柔性锚索2的直径,然后将柔性锚索2放置于所钻的孔中,对孔进行混凝土浇筑,使柔性锚索2牢牢固定在岩石中。
该预应力组合桩结构,进一步包括多个预应力锚栓4,预应力锚栓4通过套管7贯穿整个所述重力承台基座1。套管7的作用是避免在后续浇筑工序中使预应力锚栓4与混凝土接触,造成预应力锚栓与混凝土固化在一起而无法被张拉,保证了最后预应力张拉工序的顺利进行。
此外,柔性锚索2在承台基座内1的部分具有套管7且沿所述重力承台基座1边沿呈环状分布。这道工序同样是为了后续预应力张拉的进行。
重力承台基座1由中心柱状基座10和外围盘形伸展段11组成,外围盘形伸展段11环绕在中心柱状基座10周围且高度低于中心柱状基座10。预应力锚栓4沿中心柱状基座10边沿呈环形分布。
预应力锚栓下部具有底环5,底环5螺接于所述预应力锚栓4下部且紧贴在所述重力承台1下表面。底环5的作用是固定预应力锚栓4的一端以备后续张拉工序。
一般为了后续预应力拉伸工作能够顺利进行,在重力承台基座1下表面会预留出足够的用于基础张拉的伸缩空间,采取在下表面做一层泡沫填充料6来预留空间。
另外,本发明在柔性锚索的上部进一步包括保护套8,保护套8的作用是对地基顶部进行外部防护,防止其被腐蚀。
本发明进一步公开了一种预应力组合桩结构的施工方法,其特征在于,包括以下步骤:
挖掘土方,包括:挖掘上部重力承台基座1和下部固定部3所在位置的土方;
放置柔性锚索2制作下方混凝土固定部3,包括:放置外圈柔性锚索2,浇筑地下混凝土固定部3,放置泡沫填充料6以形成泡沫垫层,将柔性锚索2在重力承台1内的部分套上套管7;
制作上方重力承台基座1,包括:绑扎上部重力承台基座1底板钢筋,固定预应力锚栓底环5,放置预应力锚栓4及套管7,最后对重力承台基座1进行整体浇筑;
安装第一节塔筒,包括:待混凝土达到100%强度后进行第一节塔筒吊装;
对柔性锚索2和预应力锚栓4进行预应力拉伸。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (10)

1.一种预应力组合桩结构,包括:重力承台基座,其特征在于,还包括:混凝土固定部和多个柔性锚索;
所述混凝土固定部设置于地下;
所述重力承台基座设置于所述混凝土固定部上;
所述混凝土固定部与所述重力承台基座通过所述多个柔性锚索固定连接。
2.权利要求1所述的预应力组合桩结构,其特征在于,进一步包括多个预应力锚栓,所述预应力锚栓外具有套管,所述预应力锚栓及套管沿竖直方向贯穿所述重力承台基座。
3.根据权利要求2所述的预应力组合桩结构,其特征在于,所述重力承台基座包括:中心柱状基座和外围盘形伸展段;
所述外围盘形伸展段环绕在中心柱状基座周围且高度低于中心柱状基座;所述多个预应力锚栓及套管在所述中心柱状基座上且沿中心柱状基座边沿呈环形分布。
4.根据权利要求1或2所述的预应力组合桩结构,其特征在于,所述柔性锚索在所述承台基座内的部分具有套管且沿所述重力承台基座的边沿呈环状分布。
5.根据权利要求4所述的预应力组合桩结构,其特征在于,所述多个预应力锚栓沿所述中心柱状基座的边沿呈环形分布。
6.根据权利要求5所述的预应力组合桩结构,其特征在于,所述预应力锚栓下部具有底环,所述底环螺接于所述预应力锚栓下部且与所述重力承台下表面相接触。
7.根据权利要求6所述的预应力组合桩结构,其特征在于,所述重力承台基座的下表面进一步设有泡沫填充料层。
8.根据权利要求7所述的预应力组合桩结构,其特征在于,所述柔性锚索的上部进一步包括保护套。
9.一种预应力组合桩结构的施工方法,其特征在于,包括以下步骤:
在地下放置柔性锚索;在所述柔性锚索周围浇注混凝土形成位于地下的混凝土固定部,使所述柔性锚索与所述混凝土固定部固定连接;
在所述混凝土固定部上方浇筑形成重力承台基座;通过所述柔性锚索将所述混凝土固定部与所述重力承台基座固定连接。
10.根据权利要求9所述的预应力组合桩结构的施工方法,其特征在于,所述在地下放置柔性锚索包括:
挖掘地下所述混凝土固定部所在位置的土方;
挖掘所述重力承台基座所在位置的土方;
放置所述柔性锚索;
所述在混凝土固定部上方浇筑重力承台基座包括:放置柔性锚索上端的套管;
放置预应力锚栓;
预埋钢板;
固定预应力锚栓底环;
放置预应力锚栓及预应力锚栓外的套管;
对重力承台基座进行整体浇筑;
所述通过所述柔性锚索将所述混凝土固定部与所述重力承台基座固定连接包括:
对柔性锚索及预应力锚栓进行预应力张拉。
CN2013100746046A 2013-03-08 2013-03-08 预应力组合桩结构及其施工方法 Pending CN103147456A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100746046A CN103147456A (zh) 2013-03-08 2013-03-08 预应力组合桩结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100746046A CN103147456A (zh) 2013-03-08 2013-03-08 预应力组合桩结构及其施工方法

Publications (1)

Publication Number Publication Date
CN103147456A true CN103147456A (zh) 2013-06-12

Family

ID=48545749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100746046A Pending CN103147456A (zh) 2013-03-08 2013-03-08 预应力组合桩结构及其施工方法

Country Status (1)

Country Link
CN (1) CN103147456A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963355A (zh) * 2015-06-24 2015-10-07 同济大学 一种分级锚固式风机岩石锚杆组件
CN105020543A (zh) * 2015-07-31 2015-11-04 大连华锐重工集团股份有限公司 一种预应力底座组
CN105604086A (zh) * 2016-03-04 2016-05-25 北京中水新能工程技术有限公司 风机基础结构
CN105756077A (zh) * 2016-02-17 2016-07-13 北京健安诚岩土工程有限公司 基础环岩石锚杆基础
CN107299644A (zh) * 2017-07-25 2017-10-27 惠宏工程技术(北京)有限公司 一种可用于软土地区的桩锚杆基础
CN108316131A (zh) * 2018-04-17 2018-07-24 苏交科集团(甘肃)交通规划设计有限公司 一种分块预制式全预应力墩结构及其建造方法
WO2021184746A1 (zh) * 2020-03-16 2021-09-23 中国华能集团清洁能源技术研究院有限公司 一种组合式圆筒结构风机基础

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101691760A (zh) * 2009-09-25 2010-04-07 中国电力科学研究院 一种锚杆联合掏挖复合基础及其施工方法
CN201502065U (zh) * 2009-09-25 2010-06-09 中国电力科学研究院 一种锚杆联合开挖类复合基础
CN101892671A (zh) * 2010-08-11 2010-11-24 霍宏斌 桩锚杆基础结构
CN202450540U (zh) * 2012-01-20 2012-09-26 南京国电南自新能源工程技术有限公司 一种混凝土承台结构
US8365485B2 (en) * 2008-01-16 2013-02-05 Willy Reyneveld Method and apparatus for setting support columns within a foundation
CN203213139U (zh) * 2013-03-08 2013-09-25 中节能风力发电股份有限公司 预应力组合桩结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8365485B2 (en) * 2008-01-16 2013-02-05 Willy Reyneveld Method and apparatus for setting support columns within a foundation
CN101691760A (zh) * 2009-09-25 2010-04-07 中国电力科学研究院 一种锚杆联合掏挖复合基础及其施工方法
CN201502065U (zh) * 2009-09-25 2010-06-09 中国电力科学研究院 一种锚杆联合开挖类复合基础
CN101892671A (zh) * 2010-08-11 2010-11-24 霍宏斌 桩锚杆基础结构
CN202450540U (zh) * 2012-01-20 2012-09-26 南京国电南自新能源工程技术有限公司 一种混凝土承台结构
CN203213139U (zh) * 2013-03-08 2013-09-25 中节能风力发电股份有限公司 预应力组合桩结构

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963355A (zh) * 2015-06-24 2015-10-07 同济大学 一种分级锚固式风机岩石锚杆组件
CN105020543A (zh) * 2015-07-31 2015-11-04 大连华锐重工集团股份有限公司 一种预应力底座组
CN105756077A (zh) * 2016-02-17 2016-07-13 北京健安诚岩土工程有限公司 基础环岩石锚杆基础
CN105604086A (zh) * 2016-03-04 2016-05-25 北京中水新能工程技术有限公司 风机基础结构
CN105604086B (zh) * 2016-03-04 2018-10-23 北京中水新能工程技术有限公司 风机基础结构
CN107299644A (zh) * 2017-07-25 2017-10-27 惠宏工程技术(北京)有限公司 一种可用于软土地区的桩锚杆基础
CN108316131A (zh) * 2018-04-17 2018-07-24 苏交科集团(甘肃)交通规划设计有限公司 一种分块预制式全预应力墩结构及其建造方法
WO2021184746A1 (zh) * 2020-03-16 2021-09-23 中国华能集团清洁能源技术研究院有限公司 一种组合式圆筒结构风机基础

Similar Documents

Publication Publication Date Title
CN103147456A (zh) 预应力组合桩结构及其施工方法
CN105672517B (zh) 一种摇摆自复位自立式高耸结构
CN205776249U (zh) 一种组合型内支撑结构
CN104110039A (zh) 具有压力分散型布置高强预应力锚杆(索)的风机基础
JP6834226B2 (ja) 杭基礎および鉄塔建替工法
CN102002957A (zh) 边坡支护结构
CN205712546U (zh) 一种摇摆自复位自立式高耸结构
CN105421477A (zh) 一种塔吊基础的施工方法
CN201991009U (zh) 深基坑灌注护坡桩加锚索支护体系
JP4906931B2 (ja) 土木用ブロック
CN106638674A (zh) 一种与主体结构相结合的带锚杆挡土墙及设计方法
CN104499501A (zh) 一种输电线路窄基塔单桩墩式自稳基础
CN206457843U (zh) 一种与主体结构相结合的带锚杆挡土墙
CN202090352U (zh) 钢管桩-自钻式预应力锚杆深基坑支护系统
CN203213139U (zh) 预应力组合桩结构
CN103306292B (zh) 输油气管道穿越表土层滑坡区的抗滑支撑应变防护方法
CN209053119U (zh) 一种组合抗震悬臂式挡土墙
CN201502065U (zh) 一种锚杆联合开挖类复合基础
CN204456182U (zh) 竖向锚拉桩挡土墙
CN202577316U (zh) 一种微型桩结合复合土钉墙结构
CN107119677B (zh) 一种管桩桩顶摩擦-剪切型耗能连接装置及其施工方法
CN201169781Y (zh) 一种盖挖基坑结构
CN204125965U (zh) 具有压力分散型布置高强预应力锚杆/锚索的风机基础
CN202266065U (zh) 一种定日镜立柱
CN202577343U (zh) 一种外增强挡土支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Guanglong

Inventor after: Wang Jinliang

Inventor after: Li Shusheng

Inventor after: Liu Bin

Inventor after: Jia Rui

Inventor before: Wang Guanglong

Inventor before: Wang Jinliang

Inventor before: Li Shusheng

Inventor before: Liu Bin

Inventor before: Jia Rui

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130612