CN202644565U - 冻土地基电力杆塔基础 - Google Patents
冻土地基电力杆塔基础 Download PDFInfo
- Publication number
- CN202644565U CN202644565U CN 201220283039 CN201220283039U CN202644565U CN 202644565 U CN202644565 U CN 202644565U CN 201220283039 CN201220283039 CN 201220283039 CN 201220283039 U CN201220283039 U CN 201220283039U CN 202644565 U CN202644565 U CN 202644565U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- frozen soil
- foundation
- power tower
- diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本实用新型公开一种冻土地基电力杆塔基础,包括柱体,在柱体的底端设置有扩大端,在柱体上竖向间隔设置多个扩径部,扩径部套在柱体上且外径大于柱体直径,柱体、扩大端和扩径部浇注为一体,柱体内部设置钢筋笼,伸出冻土表面的柱体端部设置有地脚螺栓。根据设计要求,在地基上钻出坑洞,坑洞的形状与本实用新型的形状相同,植入钢筋笼,再浇注混凝土,混凝土凝固后,由于扩大端和扩径部的作用更加稳固,没有回填冻土也避免融沉现象的发生。
Description
技术领域
本实用新型涉及一种国际专利分类E02D部分类中的冻土地基基础技术领域,特
别是涉及冻土地带的电力杆塔基础结构。
背景技术
目前,电力线路常需要跨越冻土地带,而冻土是指在零摄氏度以下冻结并且含有
冰的岩土,以现有技术,在冻土地区架空输电线路的基础往往会不同程度受到地基土冻胀
和融沉的影响,杆塔会失稳而出现倒杆和倒塔工程事故,严重影响线路安全运行,并造成巨
大经济损失。究其原因,主要由于在制作基础时由于对冻土层的扰动和回填导致冻土原有
状态改变而发生融沉而不能保持基础稳定,但是相关改进技术方案公开较少。
本实用新型的目的在于克服上述不足提供一种冻土地基电力杆塔基础。
本实用新型的目的通过以下技术方案来实现:
一种冻土地基电力杆塔基础,包括柱体,在柱体的底端设置有扩大端,在柱体上竖向间隔设置多个扩径部,扩径部套在柱体上且外径大于柱体直径,柱体、扩大端和扩径部浇注为一体,柱体内部设置钢筋笼,伸出冻土表面的柱体端部设置有地脚螺栓。
上述冻土地基电力杆塔基础,所述扩大端和扩径部的纵截面是等腰梯形。
上述冻土地基电力杆塔基础,所述钢筋笼包括柱体内垂直设置的固定主筋,相邻主筋在水平方向上通过箍筋连接固定,在主筋和箍筋外侧固定护板,护板外侧面与柱体外壁重合。
采用上述技术方案,本实用新型有以下优点:根据设计要求,在地基上钻出坑洞,坑洞的形状与本实用新型的形状相同,植入钢筋笼,再浇注混凝土,混凝土凝固后,由于扩大端和扩径部的作用更加稳固,没有回填冻土也避免融沉现象的发生。
附图说明
图1是本实用新型的结构示意图。
图2是图1的俯视图。
具体实施方式
如图1和图2所示的一种冻土地基电力杆塔基础,包括柱体2,在柱体2的底端设置有扩大端5,在柱体2上竖向间隔设置多个扩径部6,扩径部6套在柱体上且外径大于柱体直径,柱体2、扩大端5和扩径部6浇注为一体,柱体2内部设置钢筋笼,伸出冻土表面的柱体端部设置有地脚螺栓1,所述扩大端8和扩径部5的纵截面是等腰梯形,所述钢筋笼包括柱体内垂直设置的固定主筋3,相邻主筋3在水平方向上通过箍筋6连接固定,在主筋3和箍筋6外侧固定护板7,护板7外侧面与柱体2外壁重合。
本实用新型制作安装时,按设计要求,在地基4上钻出坑洞,坑洞的形状与本实用新型的形状相同,依据基础坑洞形状置入事先固定好的主筋3和箍筋6构件,护板7在外侧起到扶正作用,在空隙中填充混凝土,混凝土凝固后由于扩大端和扩径部作用更加稳固,没有回填冻土也避免融沉现象发生。
Claims (3)
1.一种冻土地基电力杆塔基础,其特征在于:包括柱体(2),在柱体(2)的底端设置有扩大端(5),在柱体(2)上竖向间隔设置多个扩径部(6),扩径部(6)套在柱体上且外径大于柱体直径,柱体(2)、扩大端5和扩径部(6)浇注为一体,柱体(2)内部设置钢筋笼,伸出冻土表面的柱体端部设置有地脚螺栓(1)。
2.根据权利要求1所述的冻土地基电力杆塔基础,其特征在于:所述扩大端(8)和扩径部(5)的纵截面是等腰梯形。
3.根据权利要求1或2所述的冻土地基电力杆塔基础,其特征在于:所述钢筋笼包括柱体内垂直设置的固定主筋(3),相邻主筋(3)在水平方向上通过箍筋(6)连接固定,在主筋(3)和箍筋(6)外侧固定护板(7),护板(7外侧面与柱体(2)外壁重合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220283039 CN202644565U (zh) | 2012-06-15 | 2012-06-15 | 冻土地基电力杆塔基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220283039 CN202644565U (zh) | 2012-06-15 | 2012-06-15 | 冻土地基电力杆塔基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202644565U true CN202644565U (zh) | 2013-01-02 |
Family
ID=47413693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220283039 Expired - Fee Related CN202644565U (zh) | 2012-06-15 | 2012-06-15 | 冻土地基电力杆塔基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202644565U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674836A (zh) * | 2015-01-31 | 2015-06-03 | 安徽华电工程咨询设计有限公司 | 一种采用双菱形支盘的掏挖基础 |
CN110080270A (zh) * | 2018-01-26 | 2019-08-02 | 中国电力科学研究院有限公司 | 一种基础骨架整体吊装的输电线路岩石地基施工方法 |
-
2012
- 2012-06-15 CN CN 201220283039 patent/CN202644565U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674836A (zh) * | 2015-01-31 | 2015-06-03 | 安徽华电工程咨询设计有限公司 | 一种采用双菱形支盘的掏挖基础 |
CN110080270A (zh) * | 2018-01-26 | 2019-08-02 | 中国电力科学研究院有限公司 | 一种基础骨架整体吊装的输电线路岩石地基施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206512701U (zh) | 一种内置型钢的微型钢管桩支护结构 | |
CN104074529B (zh) | 一种深部巷硐连续双壳加固方法 | |
CN104594372B (zh) | 一种风机桩墩基础及其施工方法 | |
CN102400469B (zh) | 咬合桩圆桶型基础及其建造方法 | |
CN203684230U (zh) | 一种预制双排桩结构 | |
CN102359118B (zh) | 地下连续墙环形基础及其建造方法 | |
CN100557140C (zh) | 倒t型导管墙桩基防波堤 | |
CN101691760B (zh) | 一种锚杆联合掏挖复合基础及其施工方法 | |
CN202644565U (zh) | 冻土地基电力杆塔基础 | |
CN203238642U (zh) | 基坑支护挡墙 | |
CN201874004U (zh) | 架空送电线路岩石扩底锚桩基础 | |
CN104404949A (zh) | 一种树根形灌注桩 | |
CN204491649U (zh) | 一种风机桩墩基础 | |
CN203373735U (zh) | 外置纵向腹板的混凝土预制管桩 | |
CN205934951U (zh) | 一种多年冻土区桩基础 | |
CN202730796U (zh) | 既有挡土墙肋板式卸荷加固结构 | |
CN202017214U (zh) | 冻土地基电力杆塔基础 | |
CN201502065U (zh) | 一种锚杆联合开挖类复合基础 | |
CN102433873A (zh) | 侧壁多孔空心桩 | |
CN203684267U (zh) | 一种新型海上风电基础结构 | |
CN210507458U (zh) | 一种基坑竖向拉锚支护系统 | |
CN202298627U (zh) | 一种基坑支护结构 | |
CN106759267A (zh) | 一种便于硬岩层钢板桩打入的辅助引孔方法 | |
CN206986915U (zh) | 一种风机平台安装基础 | |
CN207362864U (zh) | 一种用于输电铁塔的基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130102 Termination date: 20140615 |
|
EXPY | Termination of patent right or utility model |