CN105350816A - 电网电线杆加固加高装置及其施工方法 - Google Patents

电网电线杆加固加高装置及其施工方法 Download PDF

Info

Publication number
CN105350816A
CN105350816A CN201510850996.XA CN201510850996A CN105350816A CN 105350816 A CN105350816 A CN 105350816A CN 201510850996 A CN201510850996 A CN 201510850996A CN 105350816 A CN105350816 A CN 105350816A
Authority
CN
China
Prior art keywords
electric pole
heightening
electrical network
telegraph pole
bracing means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510850996.XA
Other languages
English (en)
Other versions
CN105350816B (zh
Inventor
高世龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhumadian Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710583117.0A priority Critical patent/CN107299772A/zh
Priority to CN201510850996.XA priority patent/CN105350816B/zh
Priority to CN201710583115.1A priority patent/CN107165468A/zh
Publication of CN105350816A publication Critical patent/CN105350816A/zh
Application granted granted Critical
Publication of CN105350816B publication Critical patent/CN105350816B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/344Arrangements for lifting tower sections for placing additional sections under them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/20Side-supporting means therefor, e.g. using guy ropes or struts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Mechanical Engineering (AREA)
  • Electrochemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Electric Cable Installation (AREA)
  • Foundations (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明公开了一种电网电线杆加固加高装置,包括抱箍装置和加固装置,其特征在于,所述加固装置均布布设在电线杆四周,加固装置包括支架,所述支架一面均布设有长销穿过电线杆,另一面设有夹槽,夹槽内布设有底部埋入泥土内的圆杆,夹箍通过紧固件将圆杆锁紧在夹槽上;本发明的有益效果:该装置及其施工方法在加固电线杆时,使用方便,节省人力,特别适合泥土质量差,冻土,还有台风,暴雨等气候恶劣的地区使用,实用性强,适合推广使用。

Description

电网电线杆加固加高装置及其施工方法
技术领域
本发明涉及一种电力电网施工装置,具体涉及一种电网电线杆加固加高装置及其施工方法,属于电力施工技术领域。
背景技术
电力工程,即与电能的生产、输送、分配有关的工程,广义上还包括把电作为动力和能源在多种领域中应用的工程。
如一申请号为CN204098593U公开了一种老旧水泥电线杆加固装置,其特征在于:由纵向加固板、横向连接杆及外护板构成,在所述纵向加固板的板体中部制有外护板安装孔,所述的外护板通过螺钉将其安装于两两纵向加固板之间,在所述纵向加固板的两端还对称制有可调连接孔,该可调连接孔由2-4个相连通的连接孔构成,两两纵向加固板间通过该可调连接孔穿装有横向连接杆,在连接杆的两端通过螺母固位。本实用新型结构设计科学合理,具有结构简单、方便操作、杜绝老旧电线杆安全隐患、所需维修成本低、易于实现的优点,是一种具有较高创新性的老旧水泥电线杆加固装置。
又如一申请号为CN203393738U公开了一种免拉线的电线杆固定结构及固定基础,它包括电线杆,电线杆的根部设置有固定基础,固定基础为上端大下端小且纵截面呈梯形状的结构,固定基础的中心设置有固定槽,电线杆的根部插接在固定槽内;本实用新型的电杆固定结构通过对现有固定结构的改进,在电线杆的根部设置固定基础,固定基础的上端小下端大,这样就增加了电线杆根部与土地的接触面积,增加了电线杆架设后的稳定性,使电线杆的受外力能力与设置拉线或者钢结构杆塔的电线杆相同,具有结构简单、便于施工、成本低廉、美观实用、占地面积小且安全系数高的优点。
近年来,随着我国农村电网改造和移动通讯建设的进行,水泥电线杆的生产和应用得到了迅速的发展。然而,现有的电线杆有部分已经不能满足与房屋间的安全使用距离,造成安全隐患,这时就需要改造,但整体更换不仅成本高,而且影响居民正常生活,所以提出了加高电线杆的要求。
同时,近几年我国南方的气候条件变的恶劣,时而台风,暴雨等。这时需重视安全用电,就需要保证电线杆的稳定,因此也有了加固电线杆的需求。
发明内容
本发明克服了现有技术存在的问题,提出了一种电网电线杆加固加高装置及其施工方法,该装置及其施工方法特别适合泥土质量差,冻土,还有台风,暴雨等气候恶劣的地区使用,同时也能用来加高电线杆,确保电网设施运转正常。
本发明的具体技术方案如下:
一种电网电线杆加固加高装置,包括抱箍装置和加固装置,其特征在于,所述加固装置均布布设在电线杆四周,加固装置包括支架,所述支架一面均布设有长销穿过电线杆,另一面设有夹槽,夹槽内布设有底部埋入泥土内的圆杆,夹箍通过紧固件将圆杆锁紧在夹槽上;所述支架与电线杆抱紧接触出贴有橡胶垫,支架内部设有橡胶填充层。
所述抱箍装置包括套在电线杆上的圈套,所述圈套上设有紧固片,构件和连接片通过锁紧螺栓固定在紧固片上,所述构件内夹有斜加强杆,所述斜加强杆一端固定在构件内,一端埋入土中。
优先地,所述夹槽设有顶盖,圆杆与顶盖之间安装有缓冲垫。所述顶盖(47)下方还设有盖板(411)盖住夹箍(45)。所述加固装置(4)整体喷涂处理。
基于上述结构,本发明还提出一种电网电线杆加高施工方法,其特征在于,包括以下步骤:
1)利用吊装设备将电线杆固定,将电线杆的中下部切断,使电线杆分为电线杆一和电线杆二;2)利用吊装设备将电线杆上吊,同时将拼接杆的下部连接在电线杆二;3)利用吊装设备使电线杆一连接拼接杆的上部;4)在电线杆一和电线杆二与拼接杆接触段注射混凝土,使三者连接在一起;5)在电线杆一与拼接杆连接处安装卡箍;6)安装加固装置,施工完成。
本发明的有益效果:该装置及其施工方法在加固电线杆时,使用方便,节省人力,特别适合泥土质量差,冻土,还有台风,暴雨等气候恶劣的地区使用,实用性强,适合推广使用。
附图说明
图1为本发明电网电线杆加固加高装置的结构示意图;
图2为本发明加固装置的结构示意图;
图3为抱箍装置的结构示意图;
图4为本发明电线杆加固完成之后的俯视图;
图5为本发明施工时工作示意图。
具体实施方式
如图所示,一种电网电线杆加固加高装置,包括抱箍装置2和加固装置4,所述加固装置4均布布设在电线杆1四周,加固装置4包括支架43,所述支架43一面均布设有长销41穿过电线杆1,另一面设有夹槽42,夹槽42内布设有底部埋入泥土内的圆杆44,夹箍45通过紧固件46将圆杆44锁紧在夹槽42上。所述支架43与电线杆1抱紧接触出贴有橡胶垫49,支架43内部设有橡胶填充层410,夹槽42上也贴有密封圈48。
抱箍装置2包括套在电线杆1上的圈套21,所述圈套21上设有紧固片22,构件23和连接片25通过锁紧螺栓25固定在紧固片22上,所述构件23内夹有斜加强杆6,所述斜加强杆6一端固定在构件23内,一端埋入土中。
夹槽42设有顶盖47,圆杆44与顶盖47之间安装有缓冲垫。所述夹槽设有顶盖,圆杆与顶盖之间安装有缓冲垫。所述顶盖47下方还设有盖板411盖住夹箍45。所述加固装置4整体喷涂处理,盖板411可以将夹箍45盖住防止其长时间暴露在恶劣条件下生锈。
使用时,首先将电线杆1利用吊装设备安装到预定位置,然后再将三块支架43贴着电线杆1周围放置,根据支架43的高度,均匀分布固定孔位,然后开始对电线杆1打通孔,需要注意三块支架43的定位孔要相对错开,不然在电线杆1上无法安装,然后安装好固定螺丝。
在支架43周围空地垂直打三个空洞,分别对应着三个圆杆44,稍远点的地方打一个与地面呈40°-50°的孔洞,然后用夹具夹持斜加强杆6,施加扭矩使之钻入地下并填埋,同时将夹箍45通过紧固件46将圆杆44锁紧在夹槽42上,并进行填埋,加固装置4安装完成,此外圆杆44的底部也可以为螺旋结构,这样便于下钻。
基于上述结构,本发明还提出一种电网电线杆加高施工方法,其特征在于,包括以下步骤:
1)利用吊装设备将电线杆1固定,将电线杆1的中下部切断,使电线杆分为电线杆一1A和电线杆二1B;2)利用吊装设备将电线杆1上吊,同时将拼接杆3的下部连接在电线杆二1B;3)利用吊装设备使电线杆一1A连接拼接杆3的上部;4)在电线杆一1A和电线杆二1B与拼接杆3接触段注射混凝土,使三者连接在一起;5)在电线杆一1A与拼接杆3连接处安装卡箍8;6)安装加固装置4,施工完成。
除上述实施例外,本发明还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。

Claims (5)

1.电网电线杆加固加高装置,包括抱箍装置(2)和加固装置(4),其特征在于,所述加固装置(4)均布布设在电线杆(1)四周,加固装置(4)包括支架(43),所述支架(43)一面均布设有长销(41)穿过电线杆(1),另一面设有夹槽(42),夹槽(42)上布设有底部埋入泥土内的圆杆(44),夹箍(45)通过紧固件(46)将圆杆(44)锁紧在夹槽(42)上,所述支架(43)与电线杆(1)抱紧接触出贴有橡胶垫(49),支架(43)内部设有橡胶填充层(410);
所述抱箍装置(2)包括套在电线杆(1)上的圈套(21),所述圈套(21)上设有紧固片(22),构件(23)和连接片(25)通过锁紧螺栓(25)固定在紧固片(22)上,所述构件(23)内夹有斜加强杆(6),所述斜加强杆(6)一端固定在构件(23)内,一端埋入土中。
2.如权利要求1所述的电网电线杆加固加高装置,其特征在于:所述夹槽(42)设有顶盖(47),圆杆(44)与顶盖(47)之间安装有缓冲垫。
3.如权利要求2所述的电网电线杆加固加高装置,其特征在于:所述顶盖(47)下方还设有盖板(411)盖住夹箍(45)。
4.如权利要求1-3中任意一项所述的电网电线杆加固加高装置,其特征在于:所述加固装置(4)整体喷涂处理。
5.一种电网电线杆加高施工方法,其特征在于,包括以下步骤:
1)利用吊装设备将电线杆(1)固定,将电线杆(1)的中下部切断,使电线杆分为电线杆一(1A)和电线杆二(1B);2)利用吊装设备将电线杆一(1A)上吊,同时将拼接杆(3)的下部连接在电线杆二(1B);3)利用吊装设备使电线杆一(1A)连接拼接杆(3)的上部;4)在电线杆一(1A)和电线杆二(1B)与拼接杆(3)接触段注射混凝土,使三者连接在一起;5)在电线杆一(1A)与拼接杆(3)连接处安装卡箍(8);6)安装加固装置(4),施工完成。
CN201510850996.XA 2015-11-30 2015-11-30 电网电线杆加固加高装置 Expired - Fee Related CN105350816B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201710583117.0A CN107299772A (zh) 2015-11-30 2015-11-30 确保电网设施运转正常的电网电线杆加固加高装置
CN201510850996.XA CN105350816B (zh) 2015-11-30 2015-11-30 电网电线杆加固加高装置
CN201710583115.1A CN107165468A (zh) 2015-11-30 2015-11-30 一种电网电线杆加固加高装置的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510850996.XA CN105350816B (zh) 2015-11-30 2015-11-30 电网电线杆加固加高装置

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201710583117.0A Division CN107299772A (zh) 2015-11-30 2015-11-30 确保电网设施运转正常的电网电线杆加固加高装置
CN201710583115.1A Division CN107165468A (zh) 2015-11-30 2015-11-30 一种电网电线杆加固加高装置的施工方法

Publications (2)

Publication Number Publication Date
CN105350816A true CN105350816A (zh) 2016-02-24
CN105350816B CN105350816B (zh) 2017-12-12

Family

ID=55326863

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201710583117.0A Withdrawn CN107299772A (zh) 2015-11-30 2015-11-30 确保电网设施运转正常的电网电线杆加固加高装置
CN201510850996.XA Expired - Fee Related CN105350816B (zh) 2015-11-30 2015-11-30 电网电线杆加固加高装置
CN201710583115.1A Withdrawn CN107165468A (zh) 2015-11-30 2015-11-30 一种电网电线杆加固加高装置的施工方法

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201710583117.0A Withdrawn CN107299772A (zh) 2015-11-30 2015-11-30 确保电网设施运转正常的电网电线杆加固加高装置

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710583115.1A Withdrawn CN107165468A (zh) 2015-11-30 2015-11-30 一种电网电线杆加固加高装置的施工方法

Country Status (1)

Country Link
CN (3) CN107299772A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298205A (zh) * 2015-11-30 2016-02-03 熊达煜 一种电网电线杆加固加高装置及其施工方法
CN106836933A (zh) * 2017-03-07 2017-06-13 浙江工业大学 一种电线杆加固装置
CN107795181A (zh) * 2017-10-08 2018-03-13 国网江西省电力公司电力科学研究院 一种配电网电杆拉线拉盘方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114508259B (zh) * 2022-03-11 2022-09-16 国网山东省电力公司沂水县供电公司 一种电力施工用辅助电线杆快速安装的运输装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012062746A (ja) * 2010-08-18 2012-03-29 Dainichi Concrete Kogyo Kk 繊維材料により補強したコンクリートポール及びコンクリートポールの繊維材料による補強方法
CN102425327A (zh) * 2011-12-08 2012-04-25 河南省电力公司洛阳供电公司 一种水泥电线杆加高杆
JP2014101725A (ja) * 2012-11-21 2014-06-05 Daika Sangyo Kk 中空柱状物の補強用の型枠及び補強材
CN204663119U (zh) * 2015-05-14 2015-09-23 国家电网公司 混凝土电杆加固装置
CN105298205A (zh) * 2015-11-30 2016-02-03 熊达煜 一种电网电线杆加固加高装置及其施工方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4032244A (en) * 1976-04-26 1977-06-28 Quayle Jackson C Pole top extension bracket
KR20090050873A (ko) * 2007-11-16 2009-05-20 선문대학교 산학협력단 전주 연장용 지지장치 및 이를 이용한 전주 연장 방법
CN202467235U (zh) * 2012-02-06 2012-10-03 宜阳县电业局 一种水泥电杆加固装置
CN203559610U (zh) * 2013-09-24 2014-04-23 国家电网公司 一种直筒型电杆升高架
CN204189939U (zh) * 2014-09-11 2015-03-04 福建省邮电规划设计院有限公司 原有通信天线支撑杆架改造的加固结构
CN104652910A (zh) * 2014-12-26 2015-05-27 国家电网公司 一种水泥电线杆高度调节装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012062746A (ja) * 2010-08-18 2012-03-29 Dainichi Concrete Kogyo Kk 繊維材料により補強したコンクリートポール及びコンクリートポールの繊維材料による補強方法
CN102425327A (zh) * 2011-12-08 2012-04-25 河南省电力公司洛阳供电公司 一种水泥电线杆加高杆
JP2014101725A (ja) * 2012-11-21 2014-06-05 Daika Sangyo Kk 中空柱状物の補強用の型枠及び補強材
CN204663119U (zh) * 2015-05-14 2015-09-23 国家电网公司 混凝土电杆加固装置
CN105298205A (zh) * 2015-11-30 2016-02-03 熊达煜 一种电网电线杆加固加高装置及其施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298205A (zh) * 2015-11-30 2016-02-03 熊达煜 一种电网电线杆加固加高装置及其施工方法
CN105298205B (zh) * 2015-11-30 2017-09-19 国网山东省电力公司枣庄供电公司 一种电网电线杆加固加高装置及其施工方法
CN106836933A (zh) * 2017-03-07 2017-06-13 浙江工业大学 一种电线杆加固装置
CN107795181A (zh) * 2017-10-08 2018-03-13 国网江西省电力公司电力科学研究院 一种配电网电杆拉线拉盘方法

Also Published As

Publication number Publication date
CN107299772A (zh) 2017-10-27
CN105350816B (zh) 2017-12-12
CN107165468A (zh) 2017-09-15

Similar Documents

Publication Publication Date Title
CN105350816A (zh) 电网电线杆加固加高装置及其施工方法
KR101238283B1 (ko) 전봇대 지주 보강을 위한 보강커버판을 사용한 보강 방법
CN105298205A (zh) 一种电网电线杆加固加高装置及其施工方法
CN103132766B (zh) 用于升高输电线路塔接腿的桁架及架设方法
CN202073109U (zh) 一种后张法预应力圆柱体基础结构
CN105507341A (zh) 固定电杆的方法
CN203625894U (zh) 一种桩孔内钢筋笼安装辅助装置
CN202767610U (zh) 安装稳固的高压电线杆
CN106013832B (zh) 一种通信管塔的加固改造方法
CN207004143U (zh) 一种防震输电杆塔
CN105064357A (zh) 一种预应力锚索内嵌式锚固装置及锚固方法
CN203175134U (zh) 用于升高输电线路塔接腿的桁架
CN214574126U (zh) 电力通讯组合管道抗浮装置
CN204571321U (zh) 一种集成式钢筋加工棚结构
CN206942282U (zh) 一种加固型电力杆塔
CN106869575A (zh) 一种电杆及其制备方法
CN205012299U (zh) 压力钢管安装型钢轨道装置
CN203947474U (zh) 一种抗压便携式地锚
CN207994992U (zh) 一种平面屋顶用光伏组件的固定基础
CN210714039U (zh) 一种电杆固定装置
CN203895873U (zh) 制作电缆终端用工作台
WO2013135292A1 (en) Mast
CN208763528U (zh) 多功能结构复合材料杆塔
CN108457294B (zh) 一种能防止杆塔倾覆的复合材料基础及其实施方法
RU153340U1 (ru) Фундамент многоразового использования под композитную опору линии электропередачи

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lin Rongnan

Inventor before: Gao Shilong

TA01 Transfer of patent application right

Effective date of registration: 20171113

Address after: This village Zhang ban Zhen Taiwanese Investment Zone in Huian County in Fujian province 362000 lotus No. 70

Applicant after: Lin Rongnan

Address before: Eight Township village of Yongchang County in Gansu province 737200 Yubao six No. 22 dam in Jinchang City

Applicant before: Gao Shilong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200720

Address after: 463000 west section of Zhumadian, Henan, Jiefang Road

Patentee after: ZHUMADIAN POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: This village Zhang ban Zhen Taiwanese Investment Zone in Huian County in Fujian province 362000 lotus No. 70

Patentee before: Lin Rongnan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171212

Termination date: 20211130