CN105298205B - 一种电网电线杆加固加高装置及其施工方法 - Google Patents

一种电网电线杆加固加高装置及其施工方法 Download PDF

Info

Publication number
CN105298205B
CN105298205B CN201510850992.1A CN201510850992A CN105298205B CN 105298205 B CN105298205 B CN 105298205B CN 201510850992 A CN201510850992 A CN 201510850992A CN 105298205 B CN105298205 B CN 105298205B
Authority
CN
China
Prior art keywords
electric pole
clip slot
laid
bracing means
power network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510850992.1A
Other languages
English (en)
Other versions
CN105298205A (zh
Inventor
郭光成
黄桂鹏
刘心杨
孟祥军
李强
孙亚忠
高秀芳
宋亮
杜玮
郭启怀
龙敦顺
吕士伟
蒋洪超
孔令琪
李磊
李现龙
郭伟
马兆伦
刘红蕾
涂祥存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510850992.1A priority Critical patent/CN105298205B/zh
Publication of CN105298205A publication Critical patent/CN105298205A/zh
Application granted granted Critical
Publication of CN105298205B publication Critical patent/CN105298205B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种电网电线杆加固加高装置,包括抱箍装置和加固装置,其特征在于,所述加固装置均布布设在电线杆四周,加固装置包括支架,所述支架一面均布设有长销穿过电线杆,另一面设有夹槽,夹槽内布设有底部埋入泥土内的圆杆,夹箍通过紧固件将圆杆锁紧在夹槽上;本发明的有益效果:该装置及其施工方法在加固电线杆时,使用方便,节省人力,特别适合泥土质量差,冻土,还有台风,暴雨等气候恶劣的地区使用,实用性强,适合推广使用。

Description

一种电网电线杆加固加高装置及其施工方法
技术领域
本发明涉及一种电力电网施工装置,具体涉及一种电网电线杆加固加高装置及其施工方法,属于电力施工技术领域。
背景技术
电力工程,即与电能的生产、输送、分配有关的工程,广义上还包括把电作为动力和能源在多种领域中应用的工程。
如一申请号为CN204098593U公开了一种老旧水泥电线杆加固装置,其特征在于:由纵向加固板、横向连接杆及外护板构成,在所述纵向加固板的板体中部制有外护板安装孔,所述的外护板通过螺钉将其安装于两两纵向加固板之间,在所述纵向加固板的两端还对称制有可调连接孔,该可调连接孔由2-4个相连通的连接孔构成,两两纵向加固板间通过该可调连接孔穿装有横向连接杆,在连接杆的两端通过螺母固位。本实用新型结构设计科学合理,具有结构简单、方便操作、杜绝老旧电线杆安全隐患、所需维修成本低、易于实现的优点,是一种具有较高创新性的老旧水泥电线杆加固装置。
又如一申请号为CN203393738U公开了一种免拉线的电线杆固定结构及固定基础,它包括电线杆,电线杆的根部设置有固定基础,固定基础为上端大下端小且纵截面呈梯形状的结构,固定基础的中心设置有固定槽,电线杆的根部插接在固定槽内;本实用新型的电杆固定结构通过对现有固定结构的改进,在电线杆的根部设置固定基础,固定基础的上端小下端大,这样就增加了电线杆根部与土地的接触面积,增加了电线杆架设后的稳定性,使电线杆的受外力能力与设置拉线或者钢结构杆塔的电线杆相同,具有结构简单、便于施工、成本低廉、美观实用、占地面积小且安全系数高的优点。
近年来,随着我国农村电网改造和移动通讯建设的进行,水泥电线杆的生产和应用得到了迅速的发展。然而,现有的电线杆有部分已经不能满足与房屋间的安全使用距离,造成安全隐患,这时就需要改造,但整体更换不仅成本高,而且影响居民正常生活,所以提出了加高电线杆的要求。
同时,近几年我国南方的气候条件变的恶劣,时而台风,暴雨等。这时需重视安全用电,就需要保证电线杆的稳定,因此也有了加固电线杆的需求。
发明内容
本发明克服了现有技术存在的问题,提出了一种电网电线杆加固加高装置及其施工方法,该装置及其施工方法特别适合泥土质量差,冻土,还有台风,暴雨等气候恶劣的地区使用,同时也能用来加高电线杆,确保电网设施运转正常。
本发明的具体技术方案如下:
一种电网电线杆加固加高装置,包括抱箍装置和加固装置,其特征在于,所述加固装置均布布设在电线杆四周,加固装置包括支架,所述支架一面均布设有长销穿过电线杆,另一面设有夹槽,夹槽内布设有底部埋入泥土内的圆杆,夹箍通过紧固件将圆杆锁紧在夹槽上;
所述抱箍装置包括套在电线杆上的圈套,所述圈套上设有紧固片,构件和连接片通过锁紧螺栓固定在紧固片上,所述构件内夹有斜加强杆,所述斜加强杆一端固定在构件内,一端埋入土中。
优先地,所述夹槽设有顶盖,圆杆与顶盖之间安装有缓冲垫。
基于上述结构,本发明还提出一种电网电线杆加高施工方法,其特征在于,包括以下步骤:
1)利用吊装设备将电线杆固定,将电线杆的中下部切断,使电线杆分为电线杆一和电线杆二;2)利用吊装设备将电线杆上吊,同时将拼接杆的下部连接在电线杆二;3)利用吊装设备使电线杆一连接拼接杆的上部;4)在电线杆一和电线杆二与拼接杆接触段注射混凝土,使三者连接在一起;5)在电线杆一与拼接杆连接处安装卡箍;6)安装加固装置,施工完成。
本发明的有益效果:该装置及其施工方法在加固电线杆时,使用方便,节省人力,特别适合泥土质量差,冻土,还有台风,暴雨等气候恶劣的地区使用,实用性强,适合推广使用。
附图说明
图1为本发明电网电线杆加固加高装置的结构示意图;
图2为本发明加固装置的结构示意图;
图3为抱箍装置的结构示意图;
图4为本发明电线杆加固完成之后的俯视图;
图5为本发明施工时工作示意图。
具体实施方式
如图所示,一种电网电线杆加固加高装置,包括抱箍装置2和加固装置4,所述加固装置4均布布设在电线杆1四周,加固装置4包括支架43,所述支架43一面均布设有长销41穿过电线杆1,另一面设有夹槽42,夹槽42内布设有底部埋入泥土内的圆杆44,夹箍45通过紧固件46将圆杆44锁紧在夹槽42上。
抱箍装置2包括套在电线杆1上的圈套21,所述圈套21上设有紧固片22,构件23和连接片25通过锁紧螺栓24固定在紧固片22上,所述构件23内夹有斜加强杆6,所述斜加强杆6一端固定在构件23内,一端埋入土中。夹槽42设有顶盖47,圆杆44与顶盖47之间安装有缓冲垫。
使用时,首先将电线杆1利用吊装设备安装到预定位置,然后再将三块支架43贴着电线杆1周围放置,根据支架43的高度,均匀分布固定孔位,然后开始对电线杆1打通孔,需要注意三块支架43的定位孔要相对错开,不然在电线杆1上无法安装,然后安装好固定螺丝。
在支架43周围空地垂直打三个空洞,分别对应着三个圆杆44,稍远点的地方打一个与地面呈40°-50°的孔洞,然后用夹具夹持斜加强杆6,施加扭矩使之钻入地下并填埋,同时将夹箍45通过紧固件46将圆杆44锁紧在夹槽42上,并进行填埋,加固装置4安装完成,此外圆杆44的底部也可以为螺旋结构,这样便于下钻。
基于上述结构,本发明还提出一种电网电线杆加高施工方法,其特征在于,包括以下步骤:
1)利用吊装设备将电线杆1固定,将电线杆1的中下部切断,使电线杆分为电线杆一1A和电线杆二1B;2)利用吊装设备将电线杆1上吊,同时将拼接杆3的下部连接在电线杆二1B;3)利用吊装设备使电线杆一1A连接拼接杆3的上部;4)在电线杆一1A和电线杆二1B与拼接杆3接触段注射混凝土,使三者连接在一起;5)在电线杆一1A与拼接杆3连接处安装卡箍8;6)安装加固装置4,施工完成。
除上述实施例外,本发明还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。

Claims (2)

1.一种电网电线杆加固加高装置,包括抱箍装置(2)和加固装置(4),其特征在于,所述加固装置(4)均布布设在电线杆(1)四周,加固装置(4)包括支架(43),所述支架(43)一面均布设有长销(41)穿过电线杆(1),另一面设有夹槽(42),夹槽(42)上布设有底部埋入泥土内的圆杆(44),夹箍(45)通过紧固件(46)将圆杆(44)锁紧在夹槽(42)上;所述抱箍装置(2)包括套在电线杆(1)上的圈套(21),所述圈套(21)上设有紧固片(22),构件(23)和连接片(25)通过锁紧螺栓(24)固定在紧固片(22)上,所述构件(23)内夹有斜加强杆(6),所述斜加强杆(6)一端固定在构件(23)内,一端埋入土中。
2.如权利要求1所述的电网电线杆加固加高装置,其特征在于:所述夹槽(42)设有顶盖(47),圆杆(44)与顶盖(47)之间安装有缓冲垫。
CN201510850992.1A 2015-11-30 2015-11-30 一种电网电线杆加固加高装置及其施工方法 Active CN105298205B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510850992.1A CN105298205B (zh) 2015-11-30 2015-11-30 一种电网电线杆加固加高装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510850992.1A CN105298205B (zh) 2015-11-30 2015-11-30 一种电网电线杆加固加高装置及其施工方法

Publications (2)

Publication Number Publication Date
CN105298205A CN105298205A (zh) 2016-02-03
CN105298205B true CN105298205B (zh) 2017-09-19

Family

ID=55195951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510850992.1A Active CN105298205B (zh) 2015-11-30 2015-11-30 一种电网电线杆加固加高装置及其施工方法

Country Status (1)

Country Link
CN (1) CN105298205B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299772A (zh) * 2015-11-30 2017-10-27 陈国栋 确保电网设施运转正常的电网电线杆加固加高装置
CN106836933A (zh) * 2017-03-07 2017-06-13 浙江工业大学 一种电线杆加固装置
ES2672256B2 (es) * 2018-02-08 2018-10-15 Sociedad Española de Montajes Industriales S.A. (SEMI, S.A.) Procedimiento de construcción de torres
CN113511606B (zh) * 2021-07-14 2022-11-25 贵州电网有限责任公司 一种适用于紧急情况下维修维护的快速拉线装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010259288A (ja) * 2009-04-28 2010-11-11 Victaulic Co Of Japan Ltd 電柱補強構造
CN102425327A (zh) * 2011-12-08 2012-04-25 河南省电力公司洛阳供电公司 一种水泥电线杆加高杆
CN104533132A (zh) * 2015-01-08 2015-04-22 广东电网有限责任公司江门台山供电局 一种10kV电线杆线路防风拉线结构
CN104895387A (zh) * 2015-04-30 2015-09-09 郭良来 一种带有围栏的安全预埋杆
CN105350816A (zh) * 2015-11-30 2016-02-24 高世龙 电网电线杆加固加高装置及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010259288A (ja) * 2009-04-28 2010-11-11 Victaulic Co Of Japan Ltd 電柱補強構造
CN102425327A (zh) * 2011-12-08 2012-04-25 河南省电力公司洛阳供电公司 一种水泥电线杆加高杆
CN104533132A (zh) * 2015-01-08 2015-04-22 广东电网有限责任公司江门台山供电局 一种10kV电线杆线路防风拉线结构
CN104895387A (zh) * 2015-04-30 2015-09-09 郭良来 一种带有围栏的安全预埋杆
CN105350816A (zh) * 2015-11-30 2016-02-24 高世龙 电网电线杆加固加高装置及其施工方法

Also Published As

Publication number Publication date
CN105298205A (zh) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105298205B (zh) 一种电网电线杆加固加高装置及其施工方法
CN105350816B (zh) 电网电线杆加固加高装置
CN205123185U (zh) 免维护绝缘子导线固定夹
CN202855486U (zh) 变压器安装结构
CN206942282U (zh) 一种加固型电力杆塔
CN205979564U (zh) 一种城市用电力钢管杆
CN205165660U (zh) 新型拉线制作装置
CN204668762U (zh) 一种配电箱的安装支架
CN205502711U (zh) 一种易安装的电线杆固定底座结构
CN204343778U (zh) 一种线杆
CN203175134U (zh) 用于升高输电线路塔接腿的桁架
CN207994992U (zh) 一种平面屋顶用光伏组件的固定基础
CN206657040U (zh) 一种电表箱固定架
CN205777822U (zh) 便携式组合拉线盘
CN203626358U (zh) 直埋式无线通信装置
CN205389010U (zh) 一种电杆、表箱接地装置
CN105162031B (zh) 一种用于农配网的电杆防冰抗风结构加固方法
CN203951109U (zh) 高压电缆头的支撑结构
CN204103022U (zh) 一种屋顶可移动式天线抱杆
CN204343777U (zh) 一种便捷线杆底座
CN204456164U (zh) 一种通信塔的拼接式基座
CN201924374U (zh) 一种光伏电站阵列桩基础
CN207568294U (zh) 一种便于高山运输的高压输电电杆
CN203769410U (zh) 一种通信塔桅装置
CN203456828U (zh) 架空导线式终端拉线装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Guo Guangcheng

Inventor after: Guo Qihuai

Inventor after: Long Dunshun

Inventor after: Lv Shiwei

Inventor after: Jiang Hongchao

Inventor after: Kong Lingqi

Inventor after: Li Lei

Inventor after: Li Xianlong

Inventor after: Guo Wei

Inventor after: Ma Zhaolun

Inventor after: Liu Honglei

Inventor after: Huang Guipeng

Inventor after: Tu Xiangcun

Inventor after: Liu Xinyang

Inventor after: Meng Xiangjun

Inventor after: Li Qiang

Inventor after: Sun Yazhong

Inventor after: Gao Xiufang

Inventor after: Song Liang

Inventor after: Du Wei

Inventor before: Xiong Dayu

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170822

Address after: 277800 Zaozhuang New District, Shandong, the Yellow River Road, No. 999

Applicant after: Zaozhuang Power Supply Company of State Grid Shandong Electric Power Company

Applicant after: State Grid Corporation of China

Address before: More than and 3 Village Chongqing city Tongliang County Fuguo town 400060 5 Group No. 31

Applicant before: Xiong Dayu

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant