CN202855486U - 变压器安装结构 - Google Patents

变压器安装结构 Download PDF

Info

Publication number
CN202855486U
CN202855486U CN 201220562901 CN201220562901U CN202855486U CN 202855486 U CN202855486 U CN 202855486U CN 201220562901 CN201220562901 CN 201220562901 CN 201220562901 U CN201220562901 U CN 201220562901U CN 202855486 U CN202855486 U CN 202855486U
Authority
CN
China
Prior art keywords
transformer
reinforced concrete
support
holder load
lightning arrester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220562901
Other languages
English (en)
Inventor
武春霞
刘大海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Baoding Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Power Supply Co Ltd filed Critical Baoding Power Supply Co Ltd
Priority to CN 201220562901 priority Critical patent/CN202855486U/zh
Application granted granted Critical
Publication of CN202855486U publication Critical patent/CN202855486U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开了一种变压器安装结构,包括至少两根钢筋水泥电杆、避雷器托担、变压器托担、配电变压器综合配电柜托担以及接地体;所述水泥电杆上设有与其轴线垂直、且与其内部钢筋连接的预埋螺栓,所述避雷器托担、变压器托担以及配电变压器综合配电柜托担均通过预埋螺栓与钢筋水泥电杆固定连接,所述接地体上焊接的角钢顶端露出地面1.8米,角钢上端与钢筋水泥电杆上设置的预埋螺栓连接;其优点在于:将避雷器托担、变压器托担、配电变压器综合配电柜托担与预埋螺栓连通,减少节点,节约物料,提高施工效率,改善接地性能。

Description

变压器安装结构
技术领域
本实用新型涉及一种变电安装结构,特别涉及一种变压器安装结构。
背景技术
无论是农网升级又或用户增容,在按照标准变台方式组装时,均采用TT接地方式。避雷器接地线单独在变台左侧电杆接地,变压器中性点、外壳,JP柜外壳引线在变台右侧电杆接地,总接地线长度将近40米,且接地扁钢分别由电杆内侧引出,露出地面约1.8米。为便于接地电阻测试,要求接地引线使用接线端子与接地扁钢连接,单单避雷器要使用5个。组装完成后要求引线顺直美观,在适当的位置采用钢包带固定,材料使用量大,施工效率低,而且由于节点较多,接地效果较差。
实用新型内容
本实用新型所要解决的技术问题是提供一种变压器安装结构,通过减少节点数量,节约材料,提高施工效率,改善接地效果。
为解决上述技术问题,本实用新型所采取的技术方案是:一种变压器安装结构,包括至少两根钢筋水泥电杆、避雷器托担、变压器托担、配电变压器综合配电柜托担以及接地体;所述水泥电杆上设有与其轴线垂直、且与其内部钢筋连接的预埋螺栓,所述避雷器托担、变压器托担以及配电变压器综合配电柜托担均通过预埋螺栓与钢筋水泥电杆固定连接,所述接地体上焊接的角钢顶端露出地面1.8米,角钢上端与钢筋水泥电杆上设置的预埋螺栓连接。
变压器托担上部固定安装变压器,变压器中性点通过绝缘线与钢筋水泥电杆上的预埋螺栓连接。
采用上述技术方案所产生的有益效果在于:在钢筋水泥电杆上设置与其内部钢筋连通的预埋螺栓,将避雷器托担、变压器托担、配电变压器综合配电柜托担与预埋螺栓连通,一方面,由于钢筋水泥电杆下端埋入地下,可以在一定程度上起到接地的作用,另外一方面,在接地体上焊接扁钢或者角钢,伸出地面部分与钢筋水泥电杆上的预埋螺栓连通,实现接地,改善接地效果,同时,避雷器托担、变压器托担、配电变压器综合配电柜托担通过预埋螺栓与钢筋水泥电杆的钢筋连接,减少节点,节约物料,提高施工效率。
附图说明
图1是本实用新型安装结构示意图;
在附图中:1、钢筋水泥电杆;2、避雷器托担;3、变压器;4、变压器横担;5、配电变压器综合配电柜托担;6、角钢。
具体实施方式
下面结合附图和具体实施方式对本实用新型作进一步详细的说明。
本实用新型涉及一种变压器安装结构,包括至少两根钢筋水泥电杆1、避雷器托担2、变压器托担4、配电变压器综合配电柜托担5以及接地体;所述钢筋水泥电杆1上设有与其轴线垂直、且与其内部钢筋连接的预埋螺栓,所述避雷器托担2、变压器托担4以及配电变压器综合配电柜托担5均通过预埋螺栓与钢筋水泥电杆1固定连接,所述接地体上焊接的角钢6顶端露出地面1.8米,角钢6上端与钢筋水泥电杆1上设置的预埋螺栓连接。
变压器托担4上部固定安装变压器3,变压器3中性点通过绝缘线与钢筋水泥电杆1上的预埋螺栓连接。
配电变压器安装规范要求避雷器引下线、变压器外壳以及变压器中性点必须与接地体连接,现有的变压器安装过程中,避雷器接地线单独在变台左侧电杆接地,变压器中性点、外壳,配电变压器综合配电柜外壳引线在变台右侧电杆接地,总接地线长度将近40米,且接地扁钢分别由电杆内侧引出,露出地面约1.8米,虽然能够满足安装规范的要求,但是,在安装过程中施工效率低,接地性能较差,还造成大量材料的浪费,本实用新型通过在钢筋水泥电杆上设置与其内筋连接的预埋螺栓,避雷器托担2、变压器托担4、配电变压器综合配电柜托担5在借助于预埋螺栓安装过程中就已经形成电连接,而变压器中性点直接通过绝缘线与预埋螺栓连接,方便安装,同时能够节约大量资源,提高施工效率,改善接地性能。 

Claims (2)

1.一种变压器安装结构,其特征在于:包括至少两根钢筋水泥电杆(1)、避雷器托担(2)、变压器托担(4)、配电变压器综合配电柜托担(5)以及接地体;所述钢筋水泥电杆(1)上设有与其轴线垂直、且与其内部钢筋连接的预埋螺栓,所述避雷器托担(2)、变压器托担(4)以及配电变压器综合配电柜托担(5)均通过预埋螺栓与钢筋水泥电杆(1)固定连接,所述接地体上焊接的角钢(6)顶端露出地面1.8米,角钢(6)上端与钢筋水泥电杆(1)上设置的预埋螺栓连接。
2.根据权利要求1所述的变压器安装结构,其特征在于:变压器托担(4)上部固定安装变压器(3),变压器(3)中性点通过绝缘线与钢筋水泥电杆(1)上的预埋螺栓连接。
CN 201220562901 2012-10-30 2012-10-30 变压器安装结构 Expired - Fee Related CN202855486U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220562901 CN202855486U (zh) 2012-10-30 2012-10-30 变压器安装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220562901 CN202855486U (zh) 2012-10-30 2012-10-30 变压器安装结构

Publications (1)

Publication Number Publication Date
CN202855486U true CN202855486U (zh) 2013-04-03

Family

ID=47986657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220562901 Expired - Fee Related CN202855486U (zh) 2012-10-30 2012-10-30 变压器安装结构

Country Status (1)

Country Link
CN (1) CN202855486U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103872595A (zh) * 2014-03-28 2014-06-18 国家电网公司 变压器的模块化接线和排线装置
CN105863358A (zh) * 2016-06-21 2016-08-17 国网江苏省电力公司扬州供电公司 一种电气柜辅助开启装置
CN105914489A (zh) * 2016-06-02 2016-08-31 国网天津市电力公司 一种土建配电室变压器中性点接地系统及其接地方法
CN107025999A (zh) * 2017-04-30 2017-08-08 陶云霞 一种特高压变压器接地线安装方法
CN107275811A (zh) * 2017-04-30 2017-10-20 陶云霞 一种特高压变压器接地铜棒防氧化方法
CN108551107A (zh) * 2018-06-12 2018-09-18 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103872595A (zh) * 2014-03-28 2014-06-18 国家电网公司 变压器的模块化接线和排线装置
CN103872595B (zh) * 2014-03-28 2016-02-17 国家电网公司 变压器的模块化接线和排线装置
CN105914489A (zh) * 2016-06-02 2016-08-31 国网天津市电力公司 一种土建配电室变压器中性点接地系统及其接地方法
CN105863358A (zh) * 2016-06-21 2016-08-17 国网江苏省电力公司扬州供电公司 一种电气柜辅助开启装置
CN105863358B (zh) * 2016-06-21 2018-11-02 国网江苏省电力公司扬州供电公司 一种电气柜辅助开启装置
CN107025999A (zh) * 2017-04-30 2017-08-08 陶云霞 一种特高压变压器接地线安装方法
CN107275811A (zh) * 2017-04-30 2017-10-20 陶云霞 一种特高压变压器接地铜棒防氧化方法
CN108551107A (zh) * 2018-06-12 2018-09-18 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法
CN108551107B (zh) * 2018-06-12 2023-05-30 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法

Similar Documents

Publication Publication Date Title
CN202855486U (zh) 变压器安装结构
CN102312602B (zh) 输电线路角钢塔
CN202299573U (zh) 一种用于架设配电线路的混凝土电杆
CN105350816B (zh) 电网电线杆加固加高装置
CN201812946U (zh) 检修电力线路用的便携式接地线
CN203406589U (zh) 砼杆接地引线保护装置
CN202131820U (zh) Y形钢管铁塔
CN201252381Y (zh) 电力线路单回t接钢管杆
CN103015786B (zh) 一种具有接地一体化功能的混凝土电杆
CN201193410Y (zh) 紧凑型窄基塔
CN203594260U (zh) 组合钢管杆
CN203674671U (zh) 基于避雷线及避雷线支架的10kV架空绝缘线路
CN206657040U (zh) 一种电表箱固定架
CN202249077U (zh) 外设橡胶保护层的风电电杆
CN202249082U (zh) 设有底端钢板圈的电杆
CN102312603B (zh) 输电线路四管塔
CN202363780U (zh) 农田机井高架式台区
CN201383639Y (zh) 具有导线l型串布置在钢管杆上的架线装置
CN202181548U (zh) 一种电渗井点
CN202227756U (zh) 设有顶端钢板圈的电杆
CN202850565U (zh) 一种电杆连接装置
CN201671392U (zh) 一种单回直线y型塔
CN202084887U (zh) 节能型电力金具阻尼间隔棒
CN203160802U (zh) 一种采用全内置式接地电极的接地一体化混凝土电杆
CN212201520U (zh) 一种紧凑型220kV同塔四回四柱圆型线路布置钢杆塔

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: BAODING POWER SUPPLY COMPANY

Effective date: 20131018

Owner name: STATE GRID HEBEI ELECTRIC POWER COMPANY BAODING PO

Effective date: 20131018

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 071000 BAODING, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131018

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: State Grid Hebei Electric Power Company

Patentee after: Baoding Power Supply Branch Company, State Grid Hebei Electric Power Company

Address before: 071000 No. 138 sunny north street, Hebei, Baoding

Patentee before: Baoding Power Supply Company

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20181030