CN107762197A - Application process of the door type frame in glass production line workshop building - Google Patents

Application process of the door type frame in glass production line workshop building Download PDF

Info

Publication number
CN107762197A
CN107762197A CN201610683144.0A CN201610683144A CN107762197A CN 107762197 A CN107762197 A CN 107762197A CN 201610683144 A CN201610683144 A CN 201610683144A CN 107762197 A CN107762197 A CN 107762197A
Authority
CN
China
Prior art keywords
support body
installation
support
placement
door type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610683144.0A
Other languages
Chinese (zh)
Inventor
张善鹏
周勤
李贤杰
叶方徽
徐亮
陆剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Original Assignee
Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd filed Critical Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Priority to CN201610683144.0A priority Critical patent/CN107762197A/en
Publication of CN107762197A publication Critical patent/CN107762197A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to glass production line construction.Application process of the door type frame of the present invention in glass production line workshop building, including subordinate's step:Step 1, support body calculate:According to support body material, on-site actual situations, with reference to drawing, the arrangement of support body is calculated;Step 2, Land leveling, confirm that landing load is reliable;Step 3, the selection of support body:It is reasonably combined from different support bodys according to story height and load situation;Step 4, support body are set up:Door type frame is set up according to the arrangement of design drawing, the order set up is unwrapping wire → laying springboard successively, and → placement flat mouth jacking → sets up support body → installation cross support → hung and buckled scaffold board of the hung and buckled cat ladder → installation of installation horizon bar → installation → installation pitman → and sets up upper strata support body → placement U-shaped jacking → small cross bar → installation form of placement leger → placement.The advantages that present invention is simple to operate, safe efficient is all that steel pipe support body can not compare.

Description

Application process of the door type frame in glass production line workshop building
Technical field
The present invention relates to glass production line construction, more particularly to glass production line workshop building.
Background technology
Door type frame is widely used in building construction process, is mainly used in building external scaffolding, temporary support, simply Full hall scaffold etc., it is domestic and relative in the application construction at home of full hall support frame or relatively fewer Full hall support frame also rests on steel tube frame and bowl fastening type support frame, to find out its cause, mainly the accessory of door type frame is than it The accessory of his support body is relatively more.The advantages that use of door type frame abroad is fairly common, and its is simple to operate, safe efficient All it is that steel pipe support body can not compare.But the dimensions of door type frame there is no supporting specification at home using English mark In the case of, door type frame occurs different sizes in various regions, causes door type frame to be difficult to mutual assembly, gradually causes door type frame in state Interior application is obstructed.
The content of the invention
A kind of present invention seek to address that above mentioned problem, there is provided application side of door type frame in glass production line workshop building Method.The present invention substitutes conventional steel frame and set up, and improves efficiency of construction, and safety is economical.
Application process of the door type frame of the present invention in glass production line workshop building, it is characterised in that it includes:
Step 1, support body calculate:According to support body material, on-site actual situations, with reference to drawing, the arrangement of support body is calculated;
Step 2: Land leveling:The ground that support body is set up carries out compactness inspection, detection knot when setting up if backfill Compared with fruit designs ground load value with support body, corresponding measure is taken according to comparative result, if it is coagulation that fruit support body, which sets up ground, Soil face need not then consider ground load problem;
Step 3: the selection of support body:Select different support bodys reasonably combined according to story height and load situation, the scaffold board of auxiliary With steel ladder in work progress it is essential.
Step 4: support body is set up:Door type frame is set up according to the arrangement of design drawing, the order set up is successively, unwrapping wire → Laying springboard → placement flat mouth jacking → set up support body → installation cross support → installation horizon bar → hung and buckled cat ladder of installation → Hung and buckled scaffold board → installation pitman → is installed and sets up upper strata support body → placement U-shaped jacking → placement leger → small horizontal stroke of placement Bar → installation form.
Door type frame substantially has in workshop building:Jenny scaffold, jenny scaffold mainly in building wall, plaster, apply Used in the construction links such as brush.External scaffolding is built, building external scaffolding is mainly in building wall, wall face finishing, door and window peace Used in the construction links such as dress.Full hall scaffold, full hall scaffold in the plastering of building top, fit up, the construction such as disassemblerassembler Used in link.Full hall support frame, mainly during reinforced concrete construction, supports the beam of roofing and the template of plate, reinforcing bar And caused load in concreting process, during building structure construction, this is a considerable construction operation Link.
Greatly improved the invention enables efficiency of construction, the turnover rate of material improves;Security during setting up is big It is big to improve;The pattern set up more specification, it is easy to design to calculate the examination with support body.
Embodiment
Application of the door type frame during glass production line workshop building, it is necessary to introduce which building glass factory has Structure, simply introduced with reference to process of glass, the building concentration of glass factory mainly has melt station, pressing section, moved back Firer's section, finished product storehouse, batch plant, mixing room, former mixed belt porch, former molten belt porch, silica sand equalization warehouse, sacked material storehouse, system Powder workshop, cullet belt porch, cullet yard, waste heat boiler room, change distribution houselet, pump house, cooling tower, chimney, water tower Deng these monomers constitute a main production link of glass factory.
The construction procedure that the present invention sets up door type frame is as follows:
Step 1, support body design:Full hall support frame support body is designed, needs to consider the height that support body is set up, support body in calculating process The use of model and accessory, sets up the ground compactness of support body, the load of support body support, primary-secondary beam, floor height and Position is moved towards, and the arrangement of door frame is set up generally according to the direction of girder, that is, cross support is parallel to girder;
Step 2, Land leveling:The ground that support body is set up preferably carries out compactness inspection if backfill, setting up, detection knot Compared with fruit designs ground load value with support body, corresponding measure is taken according to comparative result, if it is coagulation that fruit support body, which sets up ground, Soil face need not then consider ground load problem;
Step 3, select support body:The goods and materials that full hall support frame sets up needs typically have 50mm*200mm sheeting caps, flat mouth top Support, U-shaped jacking, fastener, steel pipe, pitman, cross support, hung and buckled scaffold board, hung and buckled cat ladder, all kinds of door frames;
Step 4, support body are set up:Door type frame is set up according to the arrangement of design drawing, the order set up is unwrapping wire → laying successively Springboard → placement flat mouth jacking → sets up support body → installation cross support → hung and buckled cat ladder → installation of installation horizon bar → installation Hung and buckled scaffold board → installation pitman → set up upper strata support body → placement U-shaped jacking → placement leger → small cross bar of placement → Installation form.
Main support body size:
Cross support size:
Jacking size:
Jacking is divided into flat mouth jacking and U-shaped jacking, and diameter is generally 40mm, and length mainly has:400mm、600mm、750mm、 900mm、1000mm。
The formwork-support set up using door frame material:
1)Door frame is arranged perpendicular to the standard boom of beam axis.Press 1.8m spacing, two sides dress cross support, on door frame crossbeam Set up along flitch to support beam bottom mother plate, side form support beam form can construct by, be transmitted to support frame by hound, to ensure Support frame is stable, and bar of sweeping the floor, sealing bar can be added if necessary in bottom and loads onto level frame on door frame top.
(1)Make beam forms support
During with gate architecture modeling plate bracing frame, its framework is determined according to construction requirement and load situation, and its structural form is used by it Way substantially has following several:
2)Door frame is put parallel to two arrangements of beam axis.Array pitch determines as needed, generally 0.8~1.2m, is filled between row It is connected with suitable cross support or with cross bar, is connected between row's door frame with leger
3)Interlaced arrangement of the door frame perpendicular to beam axis.This arrangement can make the Concentrated load point of beam avoid door frame across In, to adapt to the support requirement of large-scale beam.Arrangement form can use overlapping or stagger, i.e., with two pairs(Frame is away from 0.9m)Or 3 pairs (Frame is away from 0.6m)Door frame is by standard boom size interlaced arrangement and all installs cross support, and is set if necessary in vertical and horizontal Pull bar is connected and strengthened.
(a)Perpendicular to beam axis arrangement;(b)Parallel to beam axis arrangement
(2)Make beam, plate shuttering supporting
The support of floor can be constructed by full hall scaffold, and the support of beam can be paid attention between them by above-mentioned construction in design Entire combination and drawknot.
The design of gate-type steel pipe template support frame calculates:
I 0A 1Withh 1I 1The respectively gross cross-sectional the moment of inertia of door frame vertical rod and gross cross-sectional product is with adding The height and gross cross-sectional product of strong bar), 1.93m and 1.525cm are taken respectively when taking k=1.17, h0 and i(Vertical rod is φ 42 × 2.5) With 1.90m and 1.652(Vertical rod is φ 48 × 3.5)When, its λ, φ and Rd are respectively 148,0.316,20.08kN and 135, 0.371st, 37.19kN, the latter are roughly equivalent to the stability bearing capacity of the high straight carbon steel pipe holder vertical rods of 4m of μ ' h=1.8 listed by table 3 (Rd=37.2), and table μ ' h=1.92 Rd be 33.3, be only its 90%.For safety, by gate type steel pipe scaffold Stable bearing capacity is multiplied by the stability bearing capacity design load of 0.9 reduction coefficient as gate-type steel tube frame, is listed in table three In.
The formwork-support set up with gate type steel pipe scaffold, due to being flushed between each layer door frame so that by the single-row door of multilayer The transverse direction for the support that frame is formed(Door frame in-plane)Rigidity is poor.It is higher in support and without even wall support set when, be relatively also easy to produce Excessive lateral deformation(Big ripple rouses bent unstability), significantly reduce its bearing capacity.And the stability meter of gate type steel pipe scaffold It is 1 that calculation, which takes the computational length coefficient of door frame vertical rod, i.e.
The stable bearing capacity table three of gate-type steel tube frame
As the Rd of design load N≤table three of the door frame vertical rod load determined by preceding method, it is qualified as to check.
The setting of support frame should meet reliably to bear model hard loading, ensure to settle, deform, displacement meets regulation, definitely The requirement for the frame that caves in and collapse is avoided the occurrence of, and it should be specifically noted that ensures following three points:
(1)Hard point should be located at pillar or at pillar, avoid horizon bar span centre stress;
(2)The peak load effect being likely to occur in construction is taken into full account, and ensures that it still has 2 times of safety coefficient;
(3)The substrate of pillar is definitely reliable, and serious sedimentation and deformation must not occur.
So that the door type frame of annealing room is set up as an example, the floor height of annealing room belongs to high at home typically in 7-8 rice or so Branch modular category, the load of annealing room is mainly the equipment such as annealing kiln and airduct, therefore the section of the beam of the workshop section and plate is not It is very big, thickness of slab is typically between 150-200mm, and girder section is typically between 300*700mm-350*850mm, secondary beam section Differ in size.
The species of door frame can be selected according to calculating, and we commonly use 1219 wide support bodys here, and height can be selected as needed Different height is arranged in pairs or groups, and general we are highly used as main body support body from 1700mm height or 1524mm, can close to die head The adjustment of overhead height is carried out from the jacking that 490mm and 600mm grows, is allowed to meet floor height top elevation.
When the beam section of Support Position is larger, door type frame should arranged superposed, and the arrangement that misplaces so is more beneficial for frame The stress of body, ensure the stabilization of support system.

Claims (1)

1. application process of the door type frame in glass production line workshop building, it is characterised in that it includes:
Step 1, support body calculate:According to support body material, on-site actual situations, with reference to drawing, the arrangement of support body is calculated;
Step 2: Land leveling:The ground that support body is set up carries out compactness inspection, detection knot when setting up if backfill Compared with fruit designs ground load value with support body, corresponding measure is taken according to comparative result, if it is coagulation that fruit support body, which sets up ground, Soil face need not then consider ground load problem;
Step 3: the selection of support body:Select different support bodys reasonably combined according to story height and load situation, the scaffold board of auxiliary With steel ladder in work progress it is essential;
Step 4: support body is set up:Door type frame is set up according to the arrangement of design drawing, the order set up is unwrapping wire → laying successively Springboard → placement flat mouth jacking → sets up support body → installation cross support → hung and buckled cat ladder → installation of installation horizon bar → installation Hung and buckled scaffold board → installation pitman → set up upper strata support body → placement U-shaped jacking → placement leger → small cross bar of placement → Installation form.
CN201610683144.0A 2016-08-18 2016-08-18 Application process of the door type frame in glass production line workshop building Pending CN107762197A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610683144.0A CN107762197A (en) 2016-08-18 2016-08-18 Application process of the door type frame in glass production line workshop building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610683144.0A CN107762197A (en) 2016-08-18 2016-08-18 Application process of the door type frame in glass production line workshop building

Publications (1)

Publication Number Publication Date
CN107762197A true CN107762197A (en) 2018-03-06

Family

ID=61261350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610683144.0A Pending CN107762197A (en) 2016-08-18 2016-08-18 Application process of the door type frame in glass production line workshop building

Country Status (1)

Country Link
CN (1) CN107762197A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2313002Y (en) * 1997-02-25 1999-04-07 都兴林 Steel-tube trestle for building
CN1250129A (en) * 1998-09-14 2000-04-12 东芝株式会社 Construction working method for nuclear electric power generation installation
CN102337785A (en) * 2011-08-19 2012-02-01 徐州中煤百甲重钢结构有限公司 Construction process of ultra-large-span net-frame arch-shaped shed type storage silo
CN203129702U (en) * 2013-01-29 2013-08-14 北京中关村开发建设股份有限公司 Large space frame antique city wall structure
CN103452350A (en) * 2013-09-02 2013-12-18 中建一局集团建设发展有限公司 Fabricated electronic workshop and construction method thereof
CN103669815A (en) * 2013-12-02 2014-03-26 中国一冶集团有限公司 Method for constructing hanging rope and pipe combined all-round scaffold construction platform and protective system
CN203640246U (en) * 2013-12-18 2014-06-11 杭州萧山新欣钢构有限公司 Quickly-detached scaffold for setting up steel structure factory building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2313002Y (en) * 1997-02-25 1999-04-07 都兴林 Steel-tube trestle for building
CN1250129A (en) * 1998-09-14 2000-04-12 东芝株式会社 Construction working method for nuclear electric power generation installation
CN102337785A (en) * 2011-08-19 2012-02-01 徐州中煤百甲重钢结构有限公司 Construction process of ultra-large-span net-frame arch-shaped shed type storage silo
CN203129702U (en) * 2013-01-29 2013-08-14 北京中关村开发建设股份有限公司 Large space frame antique city wall structure
CN103452350A (en) * 2013-09-02 2013-12-18 中建一局集团建设发展有限公司 Fabricated electronic workshop and construction method thereof
CN103669815A (en) * 2013-12-02 2014-03-26 中国一冶集团有限公司 Method for constructing hanging rope and pipe combined all-round scaffold construction platform and protective system
CN203640246U (en) * 2013-12-18 2014-06-11 杭州萧山新欣钢构有限公司 Quickly-detached scaffold for setting up steel structure factory building

Similar Documents

Publication Publication Date Title
CN101575911B (en) Top-down decreasing-formwork formwork system and construction method
CN102733545A (en) Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN113550578A (en) High-altitude overhanging structure formwork support and upper protection system construction method
WO2014126544A1 (en) Horizontal and vertical reinforcement used on columns and structural walls in buildings
CN112900853A (en) High-altitude ultra-large heavy-load special-shaped overhanging cornice beam slab formwork construction method
CN212053673U (en) Tower construction operation platform of dome
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN206581577U (en) Using housing construction builder's jack
CN107401279A (en) Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method
CN206917094U (en) A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch
CN204059420U (en) Late poured band support structure
CN102277900A (en) Sectional-stacking jacking mounting method of vase-shaped space steel structure
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN107762197A (en) Application process of the door type frame in glass production line workshop building
CN102787717B (en) Self-supporting combined steel template construction method
CN206636168U (en) A kind of overhanging scaffold system
CN207194487U (en) Piping lane engineering construction ceiling
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN209163448U (en) A kind of superelevation long-span beams formwork support structure
CN208168315U (en) The job platform of Zhongting for super high-rise building
CN106760490A (en) Cement clinker library concrete over-form construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180306