CN107740426A - A kind of assembled arcading wall base pit supporting construction and construction technology - Google Patents

A kind of assembled arcading wall base pit supporting construction and construction technology Download PDF

Info

Publication number
CN107740426A
CN107740426A CN201710973980.7A CN201710973980A CN107740426A CN 107740426 A CN107740426 A CN 107740426A CN 201710973980 A CN201710973980 A CN 201710973980A CN 107740426 A CN107740426 A CN 107740426A
Authority
CN
China
Prior art keywords
hole
construction
shaped
piece
arch piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710973980.7A
Other languages
Chinese (zh)
Inventor
刘加才
吕文通
王旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201710973980.7A priority Critical patent/CN107740426A/en
Publication of CN107740426A publication Critical patent/CN107740426A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Abstract

The invention discloses a kind of assembled arcading wall base pit supporting construction and construction technology, belong to Geotechnical Engineering field.The structure includes a kind of Prefabricated Concrete arch piece and a kind of special-shaped " mountain " word piling bar.Shape of cross section is that two arch pieces can dock above and below arc-shaped steel groove, and be connected with reserving hole together with being poured above and below the arc-shaped steel and Prefabricated Concrete arch piece of H-shaped.Shaped pile cross section is in " mountain " font, vertically has the spaced reserving hole of oblong at the edge of a wing, and the reserving hole being connected with arch piece on rib is communicated and can be connected with, and reserved anchor pole hole can be set at shaped pile web.When foundation ditch is shallower, shaped pile can form complete and closing cantilever pile foundation pit supporting system with armored concrete precast arch piece combination construction, without setting support or drawing anchor.When foundation ditch is deeper, it can add and draw anchor or inner support.

Description

A kind of assembled arcading wall base pit supporting construction and construction technology
Technical field
The present invention relates to construction engineering technical field, especially a kind of assembled arcading wall base pit supporting construction and use The supporting construction is used for the construction technology of pattern foundation pit supporting structure.
Background technology
In base pit engineering support system will ensure the safety of Underground Construction and foundation ditch surrounding enviroment, at present deep basal pit Supporting is typically all using the method for conventional drilling cast-in-place concrete pile or concrete underground continuous wall.Drill cast-in-place concrete pile Generally require separately to set water-stop curtain;Diaphram wall needs larger wall thickness to meet force request, and concrete amount is big, no The compressive property of concrete can be given full play to.
Domes have incomparable stress performance than other conventional piles, wall construction, and engineers and technicians constantly taste Examination domes are incorporated into foundation pit supporting project, emerged in large numbers some authorize and just in the patent of invention of publicity, but still have compared with Big room for improvement.Such as, Xia Xiong et al. discloses a kind of multi-arch type sheet pile supporting construction, but its H pile used with it is concrete prefabricated Connectionless device between arch piece, does not form complete foundation pit supporting system, it is impossible to and it is independent to be used as an overhang mill, and construct Middle stake is easy to that the changing of the relative positions occurs with arch piece, or even disconnects, and influences the stress performance and antiseepage function of support system;H pile place Not only increased expense with watertight rubber band and easily come off in piling construction and cause the decrease of supporting construction water-stagnating effect;It is prefabricated Arch is vertically connected with mode with convex falcon with groove to be connected, and causes junction shearing strength drastically to decline, turns into weak link.
The content of the invention
The present invention is in place of above-mentioned the deficiencies in the prior art, there is provided a kind of assembled arcading wall base pit supporting construction and Construction technology.The technical solution adopted for the present invention to solve the technical problems is:A kind of prefabricated reinforced concrete encircles piece, considers arch The characteristics of tunneling boring of shape structure is pressurized to play concrete material high compressive strength, and a kind of special-shaped " mountain " word piling bar are subject to Anchor bolt encircles piece to fix Prefabricated Concrete.When foundation ditch is shallower, shaped pile can shape with armored concrete precast arch piece combination construction Into complete and closing cantilever pile foundation pit supporting system, without setting inner support or drawing anchor.When foundation ditch is deeper, drawing anchor can be added Or inner support.
Shaped pile is spaced along pattern foundation pit supporting structure position line, and shaped pile cross section is in " mountain " font, is in channel-section steel web An additional edge of a wing is stretched out in portion.Its web is parallel with pattern foundation pit supporting structure position line during construction;At the edge of a wing of shaped pile left, center, right three vertically There is the spaced reserving hole of oblong, hole communicates and axis is parallel with stake web, can encircle piece with Prefabricated Concrete and be connected rib On reserving hole communicate, facilitate bolt connection to carry out fixed arch piece., need to be in shaped pile for needing to set the relatively deep basal pit for drawing anchor Reserved anchor pole hole is set at web.Anchor pole hole is vertically spaced at shaped pile web, and hole diameter is 200mm, through the middle part edge of a wing and web, 20 ° of the downward squint of its axis horizontal and web oblique.
Vertically there is spaced reserving hole can be with shaped pile on the left and right connection rib of armored concrete precast arch piece Reserving hole communicates at the edge of a wing, and can be bolted and carry out fixed arch piece.Concrete arch-bar plate top and shape of cross section are H-shaped Arc-shaped steel pour together, arch piece lower edge has along arch camber line spaced prepared screw-bolt hole hole, the penetrating arch bar of hole. The arc of H-shaped section arc-shaped steel is identical with arch piece arc, its two side wing edges inner groovy width dimensions and precast arch piece thickness It is identical, have at arc-shaped steel top flange along the spaced prepared screw-bolt hole hole of arch camber line.When two arch pieces dock up and down, arch up under piece Portion can be placed in the groove of H-shaped section arc-shaped steel on lower arch piece top, and two arch pieces seamless can then dock.After docking, two The reserving hole of person communicates, and can be connected with to fix.Watertight rubber band can be set at the top flange of arc-shaped steel in groove to increase Its strong water-stagnating effect.
By above technical scheme, usefulness of the present invention has:
1, the tunneling boring that Prefabricated Concrete earth-retaining arch piece used in the present invention considers domes is pressurized to play concrete The characteristics of material high compressive strength, encircle piece reasonable stress, force transmission effect is good.
2, assembled arcading wall base pit supporting construction of the invention, when foundation ditch is shallower, shaped pile and Prefabricated Concrete arch piece group Complete and closing cantilever pile foundation pit supporting system can be formed by closing construction, without setting inner support or drawing anchor;When foundation ditch is deeper, Reserved anchor pole hole, another plus anchor pole construction can be set at shaped pile web.Especially suitable for the small inconvenience in space in foundation ditch The supporting of the deep basal pit of inner support is set.
3, assembled arcading wall base pit supporting construction of the invention uses prefabricated shaped pile and precast arch piece, makes pattern foundation pit supporting structure Construction period greatly shortens, and construction is more convenient, and can realize the Reusability of component, reduces manufacturing cost.
4, Prefabricated Concrete of the invention arch piece connection rib is fixed on shaped pile groove, because of the close contact of the two three face, then without Watertight rubber band need to be set also to can guarantee that water-stagnating effect, greatly facilitate construction.
5, the Prefabricated Concrete arch piece connection rib that the present invention designs is in close contact with the face of shaped pile groove three, and is designed with bolt company Connect, it is ensured that Prefabricated Concrete encircles effective fixation of piece and stake, the hogging piece changing of the relative positions that prevents from constructing influence support system stress performance and Water-stagnating effect.
6, the present invention be designed with shape of cross section be H-shaped arc-shaped steel come connect up and down precast arch piece, make lower arch piece connect Connect more closely, strengthen its junction shear resistance.
Brief description of the drawings
Fig. 1 is the structural representation of assembled arcading wall base pit supporting construction cantilever support system of the present invention.
Fig. 2 is the structural representation that assembled arcading wall base pit supporting construction of the present invention adds suspension roof support system.
Fig. 3 is the plan of assembled arcading wall base pit supporting construction cantilever support system of the present invention.
Fig. 4 is the plan that assembled arcading wall base pit supporting construction of the present invention adds suspension roof support system.
Fig. 5 is the profile of assembled arcading wall base pit supporting construction cantilever support system of the present invention.
Fig. 6 is the profile that assembled arcading wall base pit supporting construction of the present invention adds suspension roof support system.
Fig. 7 is the shaped pile structural representation of cantilever support system of the present invention.
Fig. 8 is the shaped pile structural representation that the present invention adds suspension roof support system.
Fig. 9 is Prefabricated Concrete arch chip architecture schematic diagram of the present invention.
Figure 10 is H-shaped section arc steel structure schematic diagram of the present invention.
In figure:1st, special-shaped " mountain " word stake, 2, the side wing edge of shaped pile two, 3, the edge of a wing in the middle part of shaped pile, 4, shaped pile groove, 5, Reserving hole at the shaped pile edge of a wing, 6, reserving hole at shaped pile web, 7, connecting bolt, 8, prefabricated reinforced concrete arch piece, 9th, concrete arch piece connection rib, 10, prepared screw-bolt hole hole at concrete arch piece lower edges, 11, concrete arch piece connection rib prepared screw-bolt hole hole, 12nd, H-shaped section arc-shaped steel, 13, the side wing edge of arc-shaped steel two, 14, groove at arc-shaped steel web, 15, pre- at lower flange on arc-shaped steel Stay bolt hole, 16, watertight rubber band, 17, anchor pole, 18, crossbeam, 19, pedestal, 20, bearing plate, 21, prop, 22, anchor Tool, 23, foundation ditch, 24, the outer soil body in hole.
Embodiment
Referring to shown in Fig. 1-6, a kind of assembled arcading wall base pit supporting construction.Branch of special-shaped " mountain " the word stake 1 along foundation ditch 23 Shield position line is spaced, and vertically has the spaced reserving hole 5 of oblong at the edge of a wing of left, center, right three, can encircle piece with concrete Reserving hole 11 on connection rib 9 communicates, and the connection of blending bolt 7 carrys out fixed arch piece 8.H-shaped section arc-shaped steel 12 with it is precast reinforced Concrete arch piece pours together about 8, and when two arch pieces dock up and down, arch piece basis rest enters the arc-shaped steel at the top of lower arch piece In groove 14 at web, after arch piece docking, concrete arch piece lower edge prepared screw-bolt hole hole 10 with it is pre- at arc-shaped steel top flange 13 Bolt hole 15 is stayed to communicate, blending bolt 7 connects, and so encircles piece 8 in vertical alternate combinations into association type arch bar stake.
Described Fig. 1,3,5 are the figures of assembled arcading wall base pit supporting construction cantilever support system, suitable for compared with shallow foundation Supporting is cheated, anchor pole 17 need not be set for shallower foundation ditch, shaped pile 1 can be formed complete and sealed with the Prefabricated Concrete arch combination construction of piece 8 The cantilever pile foundation pit supporting system closed.Fig. 2,4,6 are the figures that assembled arcading wall base pit supporting construction adds suspension roof support system, It is the support form taken compared with deep basal pit, may also set up inner support support system in addition.
Described Fig. 7 is the shaped pile structural representation of assembled arcading wall base pit supporting construction cantilever support system, is fitted For shallower foundation ditch, without reserving the reserving hole 6 at web, described Fig. 8 is that assembled arcading wall base pit supporting construction adds If prefabricated shaped pile structure chart used by suspension roof support system, there is reserving hole 6 at its web, suitable for compared with deep basal pit.
It is all oblong that reserving hole 5 connects rib prepared screw-bolt hole hole 11 with concrete arch piece at the described shaped pile edge of a wing, The two horizontal size is with the equal sized of bolt 7 so that arch piece 8 is fixed at profile iron web groove 4 to prevent from departing from, vertically Size is greater than the size of bolt 7 communicating with shaped pile during convenient construction 1 and arch both pieces 8 reserving hole.
Described connecting bolt 7 need to use high-strength bolt and use high-strength steel washer.
Watertight rubber band 16 can be set with the junction of arc-shaped steel 12 in described arch piece 8, strengthens water-stagnating effect.
When described prefabricated reinforced concrete arch piece 8 carries out insertion construction, it can aid in applying with bearing plate for convenience of construction Work.
Following construction procedure is included based on assembled arcading wall base pit supporting construction:
A, determine that shaped pile 1 and concrete earth-retaining encircle the actual size of piece 8 according to the design parameter of the prospecting data of foundation ditch 23, in advance Shaped pile 1 processed and concrete earth-retaining arch piece 8.Pay attention to:Determine whether to add anchor pole or inner support depending on foundation ditch actual size, and then determine Hole 6 at the whether reserved web of shaped pile 1;To be determined if that need to reserve at web if hole 6 according to the actual loading situation of foundation ditch 6 vertical spacing distance of hole, and then determine the vertical spacing of anchor pole.
B, along the supporting position line of foundation ditch 23, the construction location of each shaped pile 1 is determined, shaped pile 1 is inserted after drilling.
C, along the supporting position line of foundation ditch 23, the construction of Prefabricated Concrete arch piece 8 is carried out between the shaped pile 1 inserted.Different Between shape stake 1, first with arc capstan engine grooving, it is inserted into first layer Prefabricated Concrete arch piece 8 and pays attention to making its top H-shaped section arc Shape steel 12 exposes ground surface to facilitate subsequent construction.After the completion of first layer Prefabricated Concrete arch piece 8 is constructed, arc-shaped steel web at an upper portion thereof Locate to set watertight rubber band 16 in groove 14, lay second layer Prefabricated Concrete arch piece 8 in groove 14 at arc-shaped steel web afterwards, and Concrete arch piece lower edge prepared screw-bolt hole hole 10 is communicated with prepared screw-bolt hole hole 15 at arc-shaped steel top flange, then connected with bolt 7 Connect.Then second layer Prefabricated Concrete arch piece 8 is inserted in soil, repeats the above steps to the arch construction of piece 8 and complete afterwards.Final arch piece 8 Vertically alternately construction is combined into association type arch bar stake, shaped pile 1 plays the role of fixed and support use in arch piece 8 both sides to it.
D, after the completion of encircleing the construction of piece 8, excavation pit to certain construction height, with bolt 7 by being reserved at the shaped pile edge of a wing Hole 5 connects rib prepared screw-bolt hole hole 11 with concrete arch piece, connects shaped pile 1 and prefabricated reinforced concrete arch piece 8;
E, to the deep basal pit of anchor pole need to be added, after the completion of the connection construction of bolt 7, anchor pole 17 and crossbeam 18 and pedestal 19th, bearing plate 20, prop 21, anchorage 22 opening position of reserving hole 6 at shaped pile web are constructed;
F, continue excavation pit to next construction height, repeat the construction of bolt 7, anchor pole 17 and crossbeam 18 etc., most end form Into complete assembled arcading wall base pit supporting construction.

Claims (6)

1. a kind of assembled arcading wall base pit supporting construction, including a kind of prefabricated reinforced concrete arch piece (8) and a kind of abnormity " mountain " word piling bar (1) is subject to anchor bolt (7) to fix Prefabricated Concrete arch piece (8);Shaped pile (1) cross section is in " mountain " font, is applied Supporting position line of the man-hour along foundation ditch (23) is spaced, and vertically has oblong spaced pre- at the edge of a wing of left, center, right three Box out hole (5), the reserving hole (11) that piece be connected on rib (9) can be encircleed with concrete and be communicated, blending bolt (7), which connects, carrys out fixed arch piece (8);For needing to set the relatively deep basal pit for drawing anchor, reserved anchor pole hole (6) need to be set at shaped pile web;H-shaped section arc Together with shape steel (12) pours up and down with prefabricated reinforced concrete arch piece (8), when two arch pieces dock up and down, arch up piece basis rest Enter in the groove (14) at the arc-shaped steel web at the top of lower arch piece, after arch piece docking, concrete arch piece lower edge prepared screw-bolt hole hole (10) communicated with arc-shaped steel top flange (13) place prepared screw-bolt hole hole (15), blending bolt (7) connection;It is different when foundation ditch is shallower Shape stake (1) can form complete and closing cantilever pile foundation pit supporting system, nothing with armored concrete precast arch piece (8) combination construction Inner support need to be set or draw anchor;When foundation ditch is deeper, it can add and draw anchor or inner support.
A kind of 2. assembled arcading wall base pit supporting construction as claimed in claim 1, it is characterised in that:Shaped pile (1) be An additional edge of a wing is stretched out in the middle part of the web of channel-section steel, its cross section is in " mountain " font.
A kind of 3. assembled arcading wall base pit supporting construction as claimed in claim 1, it is characterised in that:Shaped pile (1) is being set Anchor pole hole (6) can be reserved at its web by putting in the pattern foundation pit supporting structure for drawing anchor, anchor pole hole (6) at shaped pile web vertically Spaced, hole diameter 200mm, through the middle part edge of a wing and web, 20 ° of the downward squint of its axis horizontal is oblique with web Hand over.
A kind of 4. assembled arcading wall base pit supporting construction as claimed in claim 1, it is characterised in that:H-shaped section arc-shaped steel (12) watertight rubber band (16) can be set at top flange in groove (14) strengthens its water-stagnating effect.
A kind of 5. assembled arcading wall base pit supporting construction as claimed in claim 1, it is characterised in that:It is pre- at the shaped pile edge of a wing Hole (5) and concrete arch piece of boxing out connects the chi that rib prepared screw-bolt hole hole (11) is all oblong, the two horizontal size and bolt (7) It is very little equal so that Prefabricated Concrete arch piece (8) be fixed on profile iron web groove (4) place to prevent from departing from, vertical dimension is greater than bolt (7) size encircles communicating for the two reserving hole of piece (8) with shaped pile during convenient construction (1) with Prefabricated Concrete.
A kind of 6. assembled arcading wall base pit supporting construction as described in claim 1 to 7 any one, it is characterised in that:Apply Work step is suddenly as follows:
A, determine that shaped pile (1) and concrete earth-retaining encircle the actual size of piece (8) according to the design parameter of the prospecting data of foundation ditch (23), Prefabricated shaped pile (1) and concrete earth-retaining arch piece (8), pay attention to:Determine whether to add anchor pole or inner support depending on foundation ditch actual size, enter And hole (6) at the whether reserved web of shaped pile (1) is determined, will be according to the reality of foundation ditch if it need to reserve hole at web (6) Stressing conditions determine hole (6) vertical spacing distance, and then determine the vertical spacing of anchor pole;
B, along foundation ditch (23) supporting position line, the construction location of each shaped pile (1) is determined, shaped pile (1) is inserted after drilling;
C, along foundation ditch (23) supporting position line, the construction of Prefabricated Concrete arch piece (8) is carried out between the shaped pile (1) inserted, Between shaped pile (1), first with arc capstan engine grooving, it is inserted into first layer Prefabricated Concrete arch piece (8) and pays attention to making its top H-shaped Section arc-shaped steel (12) exposes ground surface to facilitate subsequent construction, after the completion of first layer Prefabricated Concrete arch piece (8) construction, at an upper portion thereof Watertight rubber band (16) is set at arc-shaped steel web in groove (14), lays second in groove (14) at arc-shaped steel web afterwards Layer Prefabricated Concrete arch piece (8), and make concrete arch piece lower edge prepared screw-bolt hole hole (10) and prepared screw-bolt hole at arc-shaped steel top flange Hole (15) communicates, then is connected with bolt (7), then encircles in piece (8) insertion soil second layer Prefabricated Concrete, repeats the above steps afterwards Completed to arch piece (8) construction, finally encircle piece (8) vertically alternately construction is combined into association type arch bar stake, shaped pile (1) is in arch piece (8) both sides play the role of fixed and support use to it;
D, after the completion of encircleing piece (8) construction, excavation pit to certain construction height, with bolt (7) by being reserved at the shaped pile edge of a wing Hole (5) connects rib prepared screw-bolt hole hole (11), connection shaped pile (1) and prefabricated reinforced concrete arch piece (8) with concrete arch piece;
E, to the deep basal pit of anchor pole need to be added, after the completion of bolt (7) connection construction, anchor pole (17) and crossbeam (18) and pedestal (19), bearing plate (20), prop (21), anchorage (22) reserving hole (6) opening position at shaped pile web are constructed;
F, continue excavation pit to next construction height, repeat the construction of bolt (7), anchor pole (17) and crossbeam (18) etc., finally Form complete assembled arcading wall base pit supporting construction.
CN201710973980.7A 2017-10-13 2017-10-13 A kind of assembled arcading wall base pit supporting construction and construction technology Pending CN107740426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710973980.7A CN107740426A (en) 2017-10-13 2017-10-13 A kind of assembled arcading wall base pit supporting construction and construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710973980.7A CN107740426A (en) 2017-10-13 2017-10-13 A kind of assembled arcading wall base pit supporting construction and construction technology

Publications (1)

Publication Number Publication Date
CN107740426A true CN107740426A (en) 2018-02-27

Family

ID=61237287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710973980.7A Pending CN107740426A (en) 2017-10-13 2017-10-13 A kind of assembled arcading wall base pit supporting construction and construction technology

Country Status (1)

Country Link
CN (1) CN107740426A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842783A (en) * 2018-06-28 2018-11-20 淮海工学院 A kind of construction method carrying out pattern foundation pit supporting structure using dilute stake-curved slab shell
CN110424411A (en) * 2019-08-27 2019-11-08 南京市测绘勘察研究院股份有限公司 A kind of irregular foundation pit assembled steel support device and its construction and application method
CN110453691A (en) * 2019-09-10 2019-11-15 山东建筑大学 A kind of steel pipe sand pile deep foundation pit supporting structure and construction method with inner support
CN110878555A (en) * 2019-11-22 2020-03-13 中国市政工程西北设计研究院有限公司 Large-span underground space deep foundation pit supporting system and construction method
CN112095632A (en) * 2020-08-21 2020-12-18 贵州大学 Pile-arch combined retaining structure and construction method thereof
CN112663620A (en) * 2020-12-11 2021-04-16 王杰 A campshed cantilever structure for excavation supporting
CN114045842A (en) * 2021-12-03 2022-02-15 广东建基基础工程有限公司 Construction method of deep foundation pit steel sheet pile and anchor cable supporting system
CN114059555A (en) * 2021-12-14 2022-02-18 深圳市基础工程有限公司 Arc-shaped foundation pit supporting system based on anchor structure and construction method
CN114164839A (en) * 2021-12-08 2022-03-11 浙大宁波理工学院 Foundation pit support device and construction method thereof
CN115162355A (en) * 2022-07-21 2022-10-11 中煤江南建设发展集团有限公司 Foundation pit enclosure method for expanding construction from deep foundation pit to shallow foundation pit
US11891770B2 (en) 2021-04-12 2024-02-06 Cmi Limited Co. Catenary panel retaining wall

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239584A (en) * 2015-09-30 2016-01-13 常州大学怀德学院 Multi-arch sheet pile supporting structure and construction process

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239584A (en) * 2015-09-30 2016-01-13 常州大学怀德学院 Multi-arch sheet pile supporting structure and construction process

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842783A (en) * 2018-06-28 2018-11-20 淮海工学院 A kind of construction method carrying out pattern foundation pit supporting structure using dilute stake-curved slab shell
CN110424411A (en) * 2019-08-27 2019-11-08 南京市测绘勘察研究院股份有限公司 A kind of irregular foundation pit assembled steel support device and its construction and application method
CN110453691A (en) * 2019-09-10 2019-11-15 山东建筑大学 A kind of steel pipe sand pile deep foundation pit supporting structure and construction method with inner support
CN110878555A (en) * 2019-11-22 2020-03-13 中国市政工程西北设计研究院有限公司 Large-span underground space deep foundation pit supporting system and construction method
CN112095632A (en) * 2020-08-21 2020-12-18 贵州大学 Pile-arch combined retaining structure and construction method thereof
CN112663620A (en) * 2020-12-11 2021-04-16 王杰 A campshed cantilever structure for excavation supporting
US11891770B2 (en) 2021-04-12 2024-02-06 Cmi Limited Co. Catenary panel retaining wall
CN114045842A (en) * 2021-12-03 2022-02-15 广东建基基础工程有限公司 Construction method of deep foundation pit steel sheet pile and anchor cable supporting system
CN114164839A (en) * 2021-12-08 2022-03-11 浙大宁波理工学院 Foundation pit support device and construction method thereof
CN114059555A (en) * 2021-12-14 2022-02-18 深圳市基础工程有限公司 Arc-shaped foundation pit supporting system based on anchor structure and construction method
CN114059555B (en) * 2021-12-14 2022-07-01 深圳市基础工程有限公司 Construction method of arc-shaped foundation pit supporting system based on anchoring structure
CN115162355A (en) * 2022-07-21 2022-10-11 中煤江南建设发展集团有限公司 Foundation pit enclosure method for expanding construction from deep foundation pit to shallow foundation pit

Similar Documents

Publication Publication Date Title
CN107740426A (en) A kind of assembled arcading wall base pit supporting construction and construction technology
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN106869315B (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN108487252A (en) A kind of deep foundation pit open cutting is suitable to make construction method
CN105003272A (en) Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways
CN107119711A (en) A kind of connected structure and construction method for abutting existing transfer station on a large scale
CN210598987U (en) Subway station based on single-layer four-guide-hole and middle-guide-hole inner pile foundation
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN113914392A (en) Existing building transformation method
CN105113514B (en) Foundation pit enclosure system with underground continuous wall as vertical cantilever fulcrum and construction method
CN207582471U (en) A kind of Retaining Structure with Double-row Piles equipped with deep layer prestress anchorage cable
CN113026760A (en) Combined type supporting pile for double-element foundation pit of soil and rock and construction method thereof
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN111894026A (en) Tunnel type pile foundation bearing platform combined anchorage structure and installation method thereof
CN207032282U (en) A kind of connected structure for abutting existing transfer station on a large scale
CN110029685A (en) A kind of pile drawing anchor barricade fabricated construction
CN106498951B (en) A kind of shaft excavation construction method
CN212404803U (en) Tunnel inverted arch combined type cableway bridge abutment
CN105133645B (en) The shaft main body structure of built-in lattice column and inverse make formula construction method
CN107916798A (en) The building structure of skyscraper is built suitable for tier building set
CN114411762A (en) Rear-anchor type rigid foundation pit supporting structure and construction method
CN209324377U (en) Ledge method tunneling subway station arch springing ruggedized construction
CN209260748U (en) A kind of stepped tower crane
CN111827307A (en) Pile supporting structure in combined construction method and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227