CN110029685A - A kind of pile drawing anchor barricade fabricated construction - Google Patents

A kind of pile drawing anchor barricade fabricated construction Download PDF

Info

Publication number
CN110029685A
CN110029685A CN201910302882.XA CN201910302882A CN110029685A CN 110029685 A CN110029685 A CN 110029685A CN 201910302882 A CN201910302882 A CN 201910302882A CN 110029685 A CN110029685 A CN 110029685A
Authority
CN
China
Prior art keywords
barricade
pile
anchor
draws
coupling beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910302882.XA
Other languages
Chinese (zh)
Inventor
翟玉新
芮瑞
崔梦麟
李世仲
王子照
陈静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
China Railway Construction Group Co Ltd
Original Assignee
Wuhan University of Technology WUT
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT, China Railway Construction Group Co Ltd filed Critical Wuhan University of Technology WUT
Priority to CN201910302882.XA priority Critical patent/CN110029685A/en
Publication of CN110029685A publication Critical patent/CN110029685A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of piles to draw anchor barricade fabricated construction, including the vertical bearing pile of multiple groups, pile cover is equipped at the top of the vertical bearing pile, coupling beam is equipped between the adjacent pile cover, it is respectively equipped with pile on pile cover described in every group of outside stake and draws anchor barricade, the pile draws anchor barricade side to be equipped with counterfort, and the pile draws the anchor barricade other side to be equipped with drag-line, and the drag-line is connected with the pile cover of inboard stake, coupling beam described in every group of outside stake is equipped with prefabricated barricade.It is prefabricated in factory normalization the invention has the advantages that: using, the period of construction is effectively shortened, shape is neat, succinct, and it is more beautiful, while achieving better supporting effect.

Description

A kind of pile drawing anchor barricade fabricated construction
Technical field
The present invention relates to technical field of civil engineering, it particularly relates to which a kind of pile draws anchor barricade fabricated construction.
Background technique
Currently, various regions urbanization process is constantly accelerated, the newly-built urban construction dynamics with rebuilding old road of dilatation is continuously improved, Traditional embankment retaining wall is mostly worker's construction at the scene, and mechanization degree is low, and the construction period is long, is developed rapidly in economy Today, be already not suitable with expanding economy demand.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Summary of the invention
For above-mentioned technical problem in the related technology, the present invention proposes that a kind of pile draws anchor barricade fabricated construction, energy Enough solution mechanization degrees are low, and the construction period is long, high construction cost, the problem of construct effects of biology difference.
To realize the above-mentioned technical purpose, the technical scheme of the present invention is realized as follows:
A kind of pile drawing anchor barricade fabricated construction, including the vertical bearing pile of multiple groups, the vertical bearing pile top are equipped with pile cover, It is equipped with coupling beam between the adjacent pile cover, is respectively equipped with pile on pile cover described in every group of outside stake and draws anchor barricade, the pile Anchor barricade side is drawn to be equipped with counterfort, the pile draws the anchor barricade other side to be equipped with drag-line, and the drag-line and inboard stake is described Pile cover is connected, and coupling beam described in every group of outside stake is equipped with prefabricated barricade, and the prefabricated barricade is located at the adjacent pile and draws Between anchor barricade.
Further, the pile cover is equipped with deformed bar, and it includes drawing anchor barricade vertical plate, institute that the pile, which draws anchor barricade, It states and anchor barricade vertical plate is drawn to be equipped with through-hole corresponding with the deformed bar, the deformed bar is connected with the through-hole It connects.
Further, the counterfort is set to the outside that the barricade draws anchor barricade vertical plate, and the drag-line is set to described The inboard of barricade drawing anchor barricade vertical plate.
Further, the drawing anchor barricade vertical plate be equipped with anchor hole corresponding with the drag-line, the anchor hole with The drag-line top is connected.
Further, it is equipped with the first tongue-and-groove at left and right sides of the drawing anchor barricade vertical plate, is set at left and right sides of the prefabricated barricade There is the first tenon corresponding with first tongue-and-groove, first tongue-and-groove is connected with first tenon.
Further, the coupling beam includes tunneling boring coupling beam and half section coupling beam, wherein described in longitudinally outboard is every group adjacent It is connected between pile cover by the tunneling boring coupling beam, passes through the half section coupling beam phase between pile cover described in laterally adjacent every group Connection.
Further, the tunneling boring coupling beam is equipped with the second tongue-and-groove, and the prefabricated barricade bottom end is equipped with and described second Corresponding second tenon of tongue-and-groove, second tongue-and-groove are connected with second tenon.
Further, the prefabricated barricade is equipped with several drainage holes.
Beneficial effects of the present invention: use is prefabricated in factory normalization, effectively shortens the period of construction, shape is whole Together, succinctly, more beautiful, while achieving better supporting effect.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the overall structure diagram that the pile described according to embodiments of the present invention draws anchor barricade fabricated construction;
Fig. 2 is the overall structure diagram that the pile described according to embodiments of the present invention draws anchor barricade;
Fig. 3 is the structural schematic diagram that the pile described according to embodiments of the present invention draws anchor barricade fabricated construction;
Fig. 4 is the structural schematic diagram of the prefabricated barricade described according to embodiments of the present invention;
Fig. 5 is the structural schematic diagram of the pile cover reserved steel bar described according to embodiments of the present invention;
Fig. 6 is the structural schematic diagram of the anchor-hold described according to embodiments of the present invention;
Fig. 7 is the structural schematic diagram of the first described according to embodiments of the present invention skeleton;
Fig. 8 is the second described according to embodiments of the present invention structural schematic diagram.
In figure:
10, the vertical bearing pile of multiple groups;
20, pile cover;21, deformed bar;
30, tunneling boring coupling beam;31, the second tongue-and-groove;
40, half section coupling beam;
50, pile draws anchor barricade;51, counterfort;52, drag-line;53, through-hole;54, the first tongue-and-groove;55, anchor hole;56, it keeps off Wall draws anchor barricade vertical plate;57, the first skeleton;
60, prefabricated barricade;61, the first tenon;62, the second tenon;63, drainage hole;64, the second skeleton;
70, anchor head;71, steel plate washer;72, anchorage.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
As shown in figures 1-8, a kind of pile according to embodiments of the present invention draws anchor barricade fabricated construction, including multiple groups Vertical bearing pile 10 is equipped with pile cover 20 at the top of the vertical bearing pile 10, coupling beam, outside stake is equipped between the adjacent pile cover 20 Every group described in be respectively equipped with pile on pile cover 20 and draw anchor barricade 50, it is that assembled pile draws anchor barricade that pile, which draws anchor barricade 50, The pile draws 50 side of anchor barricade to be equipped with counterfort 51, and the pile draws 50 other side of anchor barricade to be equipped with drag-line 52, and drag-line 52 One end and the pile cover 20 of inboard stake be attached, coupling beam described in every group of outside stake is equipped with prefabricated barricade 60, and described prefabricated Barricade 60 is located at the adjacent pile and draws between anchor barricade 50, and prefabricated barricade 60 is formed according to the second skeleton 64 is prefabricated, prefabricated gear Wall 60 is inserted between longitudinally adjacent pile cover 20, and the second skeleton 64 is also framework of steel reinforcement.
In one particular embodiment of the present invention, the pile cover 20 is equipped with deformed bar 21, i.e., in the outer of longitudinal direction Vertically reserved deformed bar 21 is stretched out on side stake pile cover 20, it includes drawing anchor barricade vertical plate 56 that the pile, which draws anchor barricade 50, The drawing anchor barricade vertical plate 56 is equipped with through-hole 53 corresponding with the deformed bar 21, the deformed bar 21 and institute Through-hole 53 is stated to be connected;Through-hole 53 is reinforced hole, in use, by the assembled pile prefabricated according to the first skeleton 57 in factory Drawing to be reserved on anchor barricade 50 draws the reinforced hole in anchor barricade vertical plate 56 to be aligned in pre- answering of reserving on longitudinally outboard stake pile cover 20 Power reinforcing bar 21, the first skeleton 57 are framework of steel reinforcement.
In one particular embodiment of the present invention, the counterfort 51 is set to the barricade and draws the outer of anchor barricade vertical plate 56 Side, the drag-line 52 are set to the inboard that the barricade draws anchor barricade vertical plate 56, i.e., will be equipped with 51 side of counterfort towards outside, and be equipped with and draw Anchor barricade 50 is drawn to be installed on longitudinally outboard stake pile cover 20 towards inboard, assembled pile in 52 side of rope.
In one particular embodiment of the present invention, the drawing anchor barricade vertical plate 56 is equipped with corresponding with the drag-line 52 Anchor hole 55, the anchor hole 55 is connected with 52 top of drag-line, i.e., 52 other end of drag-line passes through reserved anchor hole 55, prestressing force grading tension is carried out to drag-line 52, after tensioning, is compensated tensioning, stretch-draw prestressing force after a period of time The soil pressure of embankment filled soil generation can be extremely resisted, and pads upper steel plate washer 71 on the outside, while being performed in steel plate washer with anchorage 72 Drag-line 52 is anchored on 71, and the anchor head 70 being made of steel plate washer 71 and anchorage 72 is protected with concreting;To anchor hole 55 Hole carries out grouting treatment, and reinforcing bar is protected not corroded.
In one particular embodiment of the present invention, the first tongue-and-groove 54 is equipped at left and right sides of the drawing anchor barricade vertical plate 56, Be equipped with first tenon 61 corresponding with first tongue-and-groove 54 at left and right sides of the prefabricated barricade 60, first tongue-and-groove 54 with First tenon 61 is connected, i.e., the first tenon 61 is directed at the first tongue-and-groove 54.
In one particular embodiment of the present invention, the coupling beam includes tunneling boring coupling beam 30 and half section coupling beam 40, In, it is connected between pile cover 20 described in longitudinally outboard is every group adjacent by the tunneling boring coupling beam 30, described in laterally adjacent every group It is connected between pile cover 20 by the half section coupling beam 40.
In one particular embodiment of the present invention, the tunneling boring coupling beam 30 is equipped with the second tongue-and-groove 31, described prefabricated 60 bottom end of barricade is equipped with second tenon 62 corresponding with second tongue-and-groove 31, second tongue-and-groove 31 and second tenon 62 are connected, i.e. the second tenon 62 is directed at the second tongue-and-groove 31, and the second tenon 62 is installed in tunneling boring coupling beam 30.
In one particular embodiment of the present invention, the prefabricated barricade 60 is equipped with several drainage holes 63.
In order to facilitate understanding above-mentioned technical proposal of the invention, below by way of in specifically used mode to of the invention above-mentioned Technical solution is described in detail.
When specifically used, pile according to the present invention draws anchor barricade fabricated construction, by vertical bearing pile 10, stake Cap 20 and assembled pile draw the connection of anchor barricade 50 to form whole, the more preferable transversely deforming that must constrain embankment, perform first vertical Bearing pile 10 and pile cover 20, pile cover 20 perform above vertical 10 center of bearing pile, by longitudinally adjacent outside stake pile cover 20 form entirety with the connection of tunneling boring coupling beam 30, and laterally adjacent pile cover 20 is connected with half section coupling beam 40, reinforce pile and draw anchor The supporting effect of barricade 50 and prefabricated barricade 60;51 side of counterfort will be equipped with towards outside, be equipped with 52 side of drag-line towards inboard, assembly Formula pile draws anchor barricade 50 to be installed on longitudinally outboard stake pile cover 20.The pile cover 20 of one end of drag-line 52 and inboard stake is connected It connects, other end drag-line passes through reserved anchor hole 55, prestressing force grading tension is carried out to drag-line, after tensioning, by one section Time compensates tensioning, stretch-draw prestressing force to the soil pressure that can resist embankment filled soil generation, and pads upper steel plate washer on the outside 71, while being performed with anchorage 72 and anchoring drag-line on steel plate washer 71, and protected with concreting and be made of steel plate washer and anchorage Anchor head 70.
In conclusion by means of above-mentioned technical proposal of the invention, using prefabricated in factory normalization, effectively shorten In the period of construction, shape is neat, succinct, more beautiful, while achieving better supporting effect, i.e., pre- using batch production standard System and in-site installation construction, shorten the completion time of project, and prefabricated construction quality is easily controllable, and wall is light and small and takes up an area less, ground Base requirement for bearing capacity is lower, and foundation condition is poor and building stones lack area can be used, especially suitable for large- and-medium size cities road And bridge lead the way construction period it is nervous, around have building limitation, traffic pressure big and the embankments earth-retainings such as foundation bearing capacity is poor Wall construction.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of pile draws anchor barricade fabricated construction, including the vertical bearing pile of multiple groups (10), vertical bearing pile (10) top Portion is equipped with pile cover (20), and coupling beam is equipped between the adjacent pile cover (20), which is characterized in that pile cover described in every group of outside stake (20) it is respectively equipped with pile on and draws anchor barricade (50), the pile draws anchor barricade (50) side to be equipped with counterfort (51), the pile Anchor barricade (50) other side is drawn to be equipped with drag-line (52), and the drag-line (52) is connected with the pile cover (20) of inboard stake, outside Coupling beam described in every group of side stake is equipped with prefabricated barricade (60).
2. pile according to claim 1 draws anchor barricade fabricated construction, which is characterized in that the pile cover (20) is equipped with Deformed bar (21), it includes drawing anchor barricade vertical plate (56) that the pile, which draws anchor barricade (50), the drawing anchor barricade vertical plate (56) It is equipped with through-hole (53) corresponding with the deformed bar (21), the deformed bar (21) and the through-hole (53) phase Connection.
3. pile according to claim 2 draws anchor barricade fabricated construction, which is characterized in that the counterfort (51) is set to The barricade draws the outside of anchor barricade vertical plate (56), and the drag-line (52) is set to the barricade and draws anchor barricade vertical plate (56) inner Side.
4. pile according to claim 2 draws anchor barricade fabricated construction, which is characterized in that the drawing anchor barricade vertical plate (56) anchor hole (55) corresponding with the drag-line (52), the anchor hole (55) and the drag-line (52) top phase are equipped with Connection.
5. pile according to claim 2 draws anchor barricade fabricated construction, which is characterized in that the drawing anchor barricade vertical plate (56) left and right sides is equipped with the first tongue-and-groove (54), is equipped with and the first tongue-and-groove (54) phase at left and right sides of the prefabricated barricade (60) Corresponding first tenon (61), first tongue-and-groove (54) are connected with first tenon (61).
6. pile according to claim 1 draws anchor barricade fabricated construction, which is characterized in that the coupling beam includes tunneling boring Coupling beam (30) and half section coupling beam (40), wherein pass through the tunneling boring between pile cover (20) described in longitudinally outboard is every group adjacent Coupling beam (30) is connected, and is connected between pile cover (20) described in laterally adjacent every group by the half section coupling beam (40).
7. pile according to claim 6 draws anchor barricade fabricated construction, which is characterized in that the tunneling boring coupling beam (30) It is equipped with the second tongue-and-groove (31), prefabricated barricade (60) bottom end is equipped with the second tenon corresponding with the second tongue-and-groove (31) (62), second tongue-and-groove (31) is connected with second tenon (62).
8. pile according to claim 1-7 draws anchor barricade fabricated construction, which is characterized in that the prefabricated gear Wall (60) is equipped with several drainage holes (63).
CN201910302882.XA 2019-04-16 2019-04-16 A kind of pile drawing anchor barricade fabricated construction Pending CN110029685A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910302882.XA CN110029685A (en) 2019-04-16 2019-04-16 A kind of pile drawing anchor barricade fabricated construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910302882.XA CN110029685A (en) 2019-04-16 2019-04-16 A kind of pile drawing anchor barricade fabricated construction

Publications (1)

Publication Number Publication Date
CN110029685A true CN110029685A (en) 2019-07-19

Family

ID=67238533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910302882.XA Pending CN110029685A (en) 2019-04-16 2019-04-16 A kind of pile drawing anchor barricade fabricated construction

Country Status (1)

Country Link
CN (1) CN110029685A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344833A (en) * 2019-08-16 2019-10-18 招商局重庆交通科研设计院有限公司 Tunnel excavation support structure and method for tunnel construction
CN111794268A (en) * 2020-06-01 2020-10-20 中铁大桥科学研究院有限公司 Composite retaining wall and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205116217U (en) * 2015-10-30 2016-03-30 正平路桥建设股份有限公司 Height is filled and is prefabricated cast -in -place combination formula stake siding wall protective structure
CN106702840A (en) * 2017-02-10 2017-05-24 湖南大学 Anchored pile reinforced earth retaining wall embankment for treating shoreside soft soil roadbed
CN107130613A (en) * 2017-05-19 2017-09-05 重庆大学 Large span tunnel is just wearing the retaining structure and its construction method of existing barricade
CN108277814A (en) * 2018-04-11 2018-07-13 王凯 Stake top counterfort wall supporting construction and construction method
CN108560348A (en) * 2018-06-05 2018-09-21 武汉理工大学 Pile formula barricade embankment
CN210597363U (en) * 2019-04-16 2020-05-22 中铁建设集团有限公司 Pile bearing anchor retaining wall assembly type structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205116217U (en) * 2015-10-30 2016-03-30 正平路桥建设股份有限公司 Height is filled and is prefabricated cast -in -place combination formula stake siding wall protective structure
CN106702840A (en) * 2017-02-10 2017-05-24 湖南大学 Anchored pile reinforced earth retaining wall embankment for treating shoreside soft soil roadbed
CN107130613A (en) * 2017-05-19 2017-09-05 重庆大学 Large span tunnel is just wearing the retaining structure and its construction method of existing barricade
CN108277814A (en) * 2018-04-11 2018-07-13 王凯 Stake top counterfort wall supporting construction and construction method
CN108560348A (en) * 2018-06-05 2018-09-21 武汉理工大学 Pile formula barricade embankment
CN210597363U (en) * 2019-04-16 2020-05-22 中铁建设集团有限公司 Pile bearing anchor retaining wall assembly type structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344833A (en) * 2019-08-16 2019-10-18 招商局重庆交通科研设计院有限公司 Tunnel excavation support structure and method for tunnel construction
CN111794268A (en) * 2020-06-01 2020-10-20 中铁大桥科学研究院有限公司 Composite retaining wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN107905251A (en) A kind of module prestressing force Retaining Wall and its assembly method
CN106012872B (en) Continuous rigid frame bridge without dorsal funciculus oblique pull reinforcement system and construction method
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN109750600B (en) Construction method of asymmetric cable crane
CN110004973B (en) Landslide prevention protection retaining wall
CN106168053A (en) Y shape pillar is used to be combined the structure at design large span deep buried metro station with uplift pile
CN111236260A (en) Variable-rigidity combined type prefabricated double-row pile supporting structure and construction method thereof
CN110029685A (en) A kind of pile drawing anchor barricade fabricated construction
CN109578011B (en) Supporting structure in municipal tunnel and construction method thereof
KR100510092B1 (en) A one-piece type arch-shaped structure with the precast concrete pannel and the steel frame under the earth, and method for manufacturing it
CN209779640U (en) foundation pit supporting pile top crown beam construction structure
CN114922200B (en) Existing-newly-built combined retaining structure of wide road embankment and construction method
CN210597363U (en) Pile bearing anchor retaining wall assembly type structure
CN109914434A (en) Foundation pit supporting pile top crown beam construction structure
US8607518B2 (en) Wall panel with extended integral post
CN112048987B (en) Single-tower space cable-surface ground anchor cable-stayed bridge under limited space condition under bridge
CN214302989U (en) Build assembled garage parking on ground additional
CN212506313U (en) Combined foundation pit supporting structure
CN212248255U (en) Plate-type connecting structure for double-row supporting of front wall rear piles
CN113404060A (en) Rigid rib wall type pile wall foundation pit supporting structure and construction method
CN208201886U (en) A kind of supporting construction of foundation pit composite pile wall
CN208717919U (en) A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction
CN217481287U (en) Shallow supporting construction for undercut that buries
CN218437076U (en) Foundation pit supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination