CN107724247B - A kind of box bridge tunnel face changes the outfit technique - Google Patents

A kind of box bridge tunnel face changes the outfit technique Download PDF

Info

Publication number
CN107724247B
CN107724247B CN201711103337.5A CN201711103337A CN107724247B CN 107724247 B CN107724247 B CN 107724247B CN 201711103337 A CN201711103337 A CN 201711103337A CN 107724247 B CN107724247 B CN 107724247B
Authority
CN
China
Prior art keywords
upside
down mounting
box
box beam
tire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711103337.5A
Other languages
Chinese (zh)
Other versions
CN107724247A (en
Inventor
张广潭
邢立成
覃艳明
张晓刚
闫亮
方子辉
和锋
张勋榜
张胜伟
李彬
刘会平
张伟
苑喜斌
曹静蕾
刘沙沙
侯子旗
尹红旭
汪睿超
王向南
王婧雯
常立辉
刘兴华
马广杰
李海霞
赵岩
郑海洋
李�杰
赵臣
张志超
闫磊
才龙
李雨中
宋鹏飞
焦润安
刘晓轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Excellent Heavy Industry Vehicle Technology Co Ltd
QINHUANGDAO UNITE HEAVY INDUSTRY TECHNOLOGY Co Ltd
Original Assignee
Beijing Excellent Heavy Industry Vehicle Technology Co Ltd
QINHUANGDAO UNITE HEAVY INDUSTRY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Excellent Heavy Industry Vehicle Technology Co Ltd, QINHUANGDAO UNITE HEAVY INDUSTRY TECHNOLOGY Co Ltd filed Critical Beijing Excellent Heavy Industry Vehicle Technology Co Ltd
Priority to CN201711103337.5A priority Critical patent/CN107724247B/en
Publication of CN107724247A publication Critical patent/CN107724247A/en
Application granted granted Critical
Publication of CN107724247B publication Critical patent/CN107724247B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

It changes the outfit technique the invention discloses a kind of box bridge tunnel face, utilize a set of box beam flipped device, the box beam that tire beam car ships is unloaded, then with can by tunnel Yun Liang, set a roof beam in place but box beam is sling, transports, set up by integration of transporting and building machine that the speed of travel is slower;The present invention has the advantages that work method is simple, tunnel bridge molding box erection efficiency is substantially increased, construction cost has been saved, has been had a vast market foreground and good social benefit, economic benefit.

Description

A kind of box bridge tunnel face changes the outfit technique
Technical field
The present invention relates to a kind of box beams in tunnel face reverse installation process, and specifically a kind of box beam passes through the work in tunnel face Skill is by the box beam on tire beam car, and technique in upside-down mounting to integration of transporting and building machine belongs to field of bridge construction.
Background technique
Integration of transporting and building rack beam project duration is short, has tunnel on route, fortune beam distance is remote, but integration of transporting and building machine transports beam efficiency Low, travel speed is slow, not can guarantee the duration;Beam is transported using the fast tire beam car of travel speed, but tire beam car can not be carried on the back Beam passes through tunnel.
If a set of box beam hanging device is arranged in tunnel face, box beam is carried on the back to tunnel face with tire beam car, with hanging Installing is standby to hang down box beam, then with integration of transporting and building machine bale handle;But general tunnel face space is narrow, is unable to satisfy lifting and sets The erect-position of standby installation equipment, and transport, install, disassembling costly, foundation requirement is harsher.
Summary of the invention
To solve the above-mentioned problems, the present invention devises a kind of box bridge tunnel face and changes the outfit technique, and work method is simple, greatly Tunnel bridge molding box erection efficiency has been improved greatly, construction cost has been saved, has had a vast market foreground and good society Benefit, economic benefit.
The technical solution of the present invention is as follows:
A kind of box bridge tunnel face changes the outfit technique, and Specific construction technique is as follows:
Step 1: tire beam car loads onto upside-down mounting crossbeam, and box beam is placed on above upside-down mounting crossbeam;
Step 2: upside-down mounting support device is disposed in tunnel face appropriate location;
Step 3: tire beam car is carried beam on the back and is driven at upside-down mounting support device, by upside-down mounting support device upside-down mounting crossbeam And its top box beam, tire beam car are driven out in the box soffit of girder;
Step 4: upside-down mounting support device is taken upside-down mounting crossbeam and box beam and is reduced;
Step 5: integration of transporting and building machine, which is sailed, to be come, and is laterally moved to above box beam, is sling box beam, then transport box beam Decorating position sets up the whole process of box beam.
Preferably, in the step 1, upside-down mounting crossbeam is placed on tire beam car, box beam is placed on upside-down mounting crossbeam Box beam plays in side, i.e. upside-down mounting crossbeam upper support, and supported underneath is on tire beam car.
Preferably, in the step 3, upside-down mounting support device can support upside-down mounting crossbeam, unload tire beam car, complete field Stress check calculation is driven out in the box soffit of girder after tire beam car is off-loadable.
Preferably, in the step 4, upside-down mounting support device can take upside-down mounting crossbeam and box beam and reduce, and transport frame one to meet Body machine hanging beam height is convenient for integration of transporting and building machine hanging beam.
The present invention is unloaded box beam using a set of flipped device from tire beam car, reduces height, then by fortune frame one Body machine hanging beam is transported, is set a roof beam in place, and is substantially increased box beam conevying efficiency, has been saved construction cost.
The present invention has the advantages that work method is simple, tunnel bridge molding box erection efficiency is substantially increased, has saved and has applied Work cost has a vast market foreground and good social benefit, economic benefit.
Present invention will be further explained below with reference to the attached drawings and examples.
Detailed description of the invention
Fig. 1 is overall structure side view of the present invention;
Fig. 2 is upside-down mounting support device schematic diagram of the present invention;
Fig. 3 is construction technology process schematic diagram of the present invention;
In figure: 1, box beam, 2, upside-down mounting crossbeam, 3, upside-down mounting support device, 3a, upper beam, 3b, hydraulic cylinder, 3c, guiding Column, 3d, chassis, 4, tire beam car, 5, concrete foundation, 6, integration of transporting and building machine, 7, foundation of road bed.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described, it should be understood that preferred embodiment described herein is only used In the description and interpretation present invention, it is not intended to limit the present invention.
Embodiment 1
As shown in Figure 1-3, a kind of box beam, in tunnel face reverse installation process, Specific construction technique is as follows:
Step 1: tire beam car 4 loads onto upside-down mounting crossbeam 2, and box beam 1 is placed on 2 top of upside-down mounting crossbeam;
Step 2: upside-down mounting support device 3 is disposed in tunnel face appropriate location;
Step 3: tire beam car 4 is carried box beam 1 on the back and is driven at upside-down mounting support device 3, is supported by upside-down mounting support device 3 Upside-down mounting crossbeam 2 and its top box beam 1, tire beam car 4 are driven out in 1 abdomen of box beam;
Step 4: upside-down mounting support device 3 is taken upside-down mounting crossbeam 2 and box beam 1 and is reduced;
Step 5: integration of transporting and building machine 6, which is sailed, to be come, and is laterally moved to 1 top of box beam, is sling box beam 1, then transport box beam 1 It is defeated to arrive decorating position, set up the whole process of box beam 1.
Above-mentioned flipped device mainly by 2, four groups of the upside-down mounting crossbeam upside-down mounting support device 3 of front and back two and electric control system, The composition such as hydraulic control system, wherein every set upside-down mounting support device 3 is by including upper beam 3a, hydraulic cylinder 3b, guide post 3c, bottom The devices such as disk 3d composition.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (1)

  1. The technique 1. a kind of box bridge tunnel face changes the outfit, which is characterized in that Specific construction technique is as follows:
    Step 1: tire beam car is loaded into upside-down mounting crossbeam, then box beam is placed on above the upside-down mounting crossbeam;The upside-down mounting Crossbeam upper support plays the box beam, and supported underneath is on the tire beam car;
    Step 2: upside-down mounting support device is disposed in tunnel face appropriate location;Upside-down mounting crossbeam described in the upside-down mounting support device, The tire beam car is unloaded, stress check calculation is completed;
    Step 3: the upside-down mounting support device of step 2 is driven to by the upside-down mounting crossbeam that tire beam car carries step 1 on the back, by described The box beam of upside-down mounting crossbeam and upper part described in upside-down mounting support device, then the tire beam car is driven out to the case In the abdomen of type beam;
    Step 4: the upside-down mounting support device is taken the upside-down mounting crossbeam and box beam and is reduced;
    Step 5: integration of transporting and building machine, which is sailed, to be come, and is laterally moved to above the box beam, the box beam is sling, then by the box Beam transports decorating position, sets up the box beam.
CN201711103337.5A 2017-11-10 2017-11-10 A kind of box bridge tunnel face changes the outfit technique Active CN107724247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711103337.5A CN107724247B (en) 2017-11-10 2017-11-10 A kind of box bridge tunnel face changes the outfit technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711103337.5A CN107724247B (en) 2017-11-10 2017-11-10 A kind of box bridge tunnel face changes the outfit technique

Publications (2)

Publication Number Publication Date
CN107724247A CN107724247A (en) 2018-02-23
CN107724247B true CN107724247B (en) 2019-05-14

Family

ID=61215700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711103337.5A Active CN107724247B (en) 2017-11-10 2017-11-10 A kind of box bridge tunnel face changes the outfit technique

Country Status (1)

Country Link
CN (1) CN107724247B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371853B (en) * 2018-11-30 2023-11-28 中铁三局集团线桥工程有限公司 Box girder tunnel portal narrow field transportation relay construction system and method
CN114411572B (en) * 2021-12-31 2024-03-01 中铁十四局集团青岛工程有限公司 Beam loading operation method for prefabricated box beam

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08151605A (en) * 1994-11-30 1996-06-11 Kajima Corp Manufacture of precast block for bridge and its device
CN102102317A (en) * 2009-12-22 2011-06-22 中铁科工集团有限公司 Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
CN201999628U (en) * 2011-04-07 2011-10-05 中铁十七局集团第三工程有限公司 Carrying pole beam for integrally hoisting and consigning bridge girder erection machine
CN105155417A (en) * 2015-08-10 2015-12-16 石家庄铁道大学 Climb type beam transportation straddle carrier and tunnel portal bridge transportation and erection method based on same
CN106638315A (en) * 2016-11-10 2017-05-10 秦皇岛天业通联重工科技有限公司 Combined beam transporting vehicle
CN206308621U (en) * 2016-11-10 2017-07-07 秦皇岛天业通联重工科技有限公司 A kind of beam car carries boom device on the back

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08151605A (en) * 1994-11-30 1996-06-11 Kajima Corp Manufacture of precast block for bridge and its device
CN102102317A (en) * 2009-12-22 2011-06-22 中铁科工集团有限公司 Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
CN201999628U (en) * 2011-04-07 2011-10-05 中铁十七局集团第三工程有限公司 Carrying pole beam for integrally hoisting and consigning bridge girder erection machine
CN105155417A (en) * 2015-08-10 2015-12-16 石家庄铁道大学 Climb type beam transportation straddle carrier and tunnel portal bridge transportation and erection method based on same
CN106638315A (en) * 2016-11-10 2017-05-10 秦皇岛天业通联重工科技有限公司 Combined beam transporting vehicle
CN206308621U (en) * 2016-11-10 2017-07-07 秦皇岛天业通联重工科技有限公司 A kind of beam car carries boom device on the back

Also Published As

Publication number Publication date
CN107724247A (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN204640475U (en) Precuring storehouse and the prefabricated components production system containing this precuring storehouse
CN106638687B (en) A kind of accurate quick-assembling technique of precast assembly pipe gallery
CN207435916U (en) A kind of box bridge tunnel face flipped device
CN101979803B (en) Method for mounting prefabricated members of roof or floor in place and mounting equipment
CN202450774U (en) Shaft template of small-step-pitch self-climbing elevator
CN104695337A (en) Self-lifting sliding and turnover construction system and construction method
CN106522362A (en) Construction device and construction method of steel structure beam of corridor system
CN107724247B (en) A kind of box bridge tunnel face changes the outfit technique
CN104140037A (en) Wallboard lifting system
CN106245919A (en) A kind of assembled architecture Automated assembly platform
CN203559597U (en) Sliding device convenient to operate
CN105625645A (en) Construction method of suspension type steel-structured lighting skylight
CN104895336A (en) Method for installing steel beam of stiff hybrid structure in place
CN103821084B (en) Operational method at the bottom of implement at the bottom of beam and beam
KR101160273B1 (en) Straddle carrier for bridge construction
CN103669882B (en) Utilize wire rope to do in industrial premises method that track carries out Components installation
JP2008248664A (en) Hoisting method of curtain wall
CN212769508U (en) Novel hoisting equipment is transported to moving die carrier dolly and bracket
CN104120701A (en) Construction method and device for hoisting of heavy and large part of vertical ship lift
CN111115461B (en) Reinforcing steel bar and mould transportation and automatic assembling equipment
JP2007239313A (en) Bridge batch removal method
CN106671262B (en) Rail mounted concrete distributing device rectangle and its distributing method
CN207159836U (en) Continuous beam side wall construction hoisting chassis
CN202899639U (en) Concrete column structure
CN201817201U (en) Trolley slippage construction device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant