CN107724247A - A kind of box bridge tunnel face changes the outfit technique - Google Patents
A kind of box bridge tunnel face changes the outfit technique Download PDFInfo
- Publication number
- CN107724247A CN107724247A CN201711103337.5A CN201711103337A CN107724247A CN 107724247 A CN107724247 A CN 107724247A CN 201711103337 A CN201711103337 A CN 201711103337A CN 107724247 A CN107724247 A CN 107724247A
- Authority
- CN
- China
- Prior art keywords
- box
- inverted
- box girder
- tire
- support device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种箱型梁在隧道口倒装工艺,具体是一种箱型梁在隧道口通过该工艺将轮胎运梁车上的箱型梁,倒装到运架一体机上的工艺,属于桥梁施工领域。The invention relates to a process for inverting a box-shaped beam at a tunnel entrance, specifically a process for inverting a box-shaped beam on a tire beam transport vehicle to an integrated machine for transporting a frame through the process of a box-shaped beam at the tunnel entrance, which belongs to field of bridge construction.
背景技术Background technique
运架一体机架梁项目工期短,线路上有隧道,运梁距离远,但运架一体机运梁效率低,行驶速度慢,无法保证工期;采用行驶速度快的轮胎运梁车运梁,但轮胎运梁车无法驮梁通过隧道。The construction period of the integrated rack beam project is short, there are tunnels on the line, and the beam transport distance is long, but the beam transport efficiency of the integrated frame transport machine is low, the driving speed is slow, and the construction period cannot be guaranteed; the beam transporting vehicle with fast driving speed is used to transport the beam. But the tire beam truck cannot carry the beam through the tunnel.
如果在隧道口设置一套箱型梁吊装设备,用轮胎运梁车驮箱型梁到隧道口,用吊装设备将箱型梁吊下,再用运架一体机提梁;但一般隧道口空间比较狭窄,无法满足吊装设备安装机具的站位,且运输、安装、拆解费用较高,地基基础要求比较苛刻。If a set of box girder hoisting equipment is installed at the tunnel entrance, the box girder is carried to the tunnel entrance by a tire beam transporter, the box girder is hoisted down by the hoisting equipment, and then the beam is lifted by the integrated frame transporter; It is narrow, unable to meet the station for installing equipment for hoisting equipment, and the transportation, installation, and dismantling costs are high, and the foundation requirements are relatively strict.
发明内容Contents of the invention
为了解决上述问题,本发明设计了一种箱型桥梁隧道口换装工艺,工方法简单,大大提高了有隧道桥型箱梁架设效率,节约了施工成本,具有广阔的市场前景和良好的社会效益、经济效益。In order to solve the above problems, the present invention designs a box-type bridge tunnel mouth replacement process, which has a simple construction method, greatly improves the erection efficiency of box-girder bridges with tunnels, saves construction costs, and has broad market prospects and good social benefits. benefit, economic benefit.
本发明的技术方案为:Technical scheme of the present invention is:
一种箱型桥梁隧道口换装工艺,具体施工工艺如下:A box-shaped bridge tunnel mouth replacement process, the specific construction process is as follows:
步骤一:轮胎运梁车装上倒装横梁,箱型梁放置在倒装横梁上方;Step 1: Install the inverted beam on the tire beam truck, and place the box beam on top of the inverted beam;
步骤二:在隧道口适当位置安置倒装支撑装置;Step 2: Install the inverted support device at the proper position of the tunnel entrance;
步骤三:轮胎运梁车驮梁行驶到倒装支撑装置处,由倒装支撑装置支撑倒装横梁及其上部箱型梁,轮胎运梁车驶出箱型梁腹内;Step 3: The tire beam transport vehicle drives the beam to the inverted support device, and the inverted beam and its upper box girder are supported by the inverted support device, and the tire beam transport vehicle drives out of the belly of the box beam;
步骤四:倒装支撑装置携倒装横梁及箱型梁降低;Step 4: Lower the inverted support device with the inverted beam and box girder;
步骤五:运架一体机驶来,横移到箱型梁上方,吊起箱型梁,然后将箱型梁运输到架设位置,架设箱型梁的整个过程。Step 5: The all-in-one transport and frame machine comes, moves across the box girder, lifts the box girder, and then transports the box girder to the erection position, the whole process of erecting the box girder.
优选的,所述步骤一中,轮胎运梁车上放置倒装横梁,箱型梁放置在倒装横梁上方,即倒装横梁上方支撑起箱型梁,下方支撑在轮胎运梁车上。Preferably, in the first step, the inverted beam is placed on the tire beam transport vehicle, and the box beam is placed above the inverted beam, that is, the box beam is supported above the inverted beam, and the bottom is supported on the tire beam transport vehicle.
优选的,所述步骤三中,倒装支撑装置可支撑倒装横梁,使轮胎运梁车卸载,完场受力转换,轮胎运梁车可卸载后驶出箱型梁腹内。Preferably, in the third step, the inverted support device can support the inverted beam, so that the tire beam transport vehicle can be unloaded, and after the force transfer is completed, the tire beam transport vehicle can be unloaded and then drive out of the belly of the box girder.
优选的,所述步骤四中,倒装支撑装置可携倒装横梁及箱型梁降低,以满足运架一体机吊梁高度,便于运架一体机吊梁。Preferably, in the step four, the inverted support device can lower the inverted beam and the box beam to meet the height of the hanging beam of the all-in-one machine for transporting and transporting the frame, and is convenient for the hanging beam of the all-in-one machine for transporting and transporting the frame.
本发明利用一套倒装装置将箱型梁从轮胎运梁车上卸下,降低高度,再由运架一体机吊梁、运输、架梁,大大提高了箱型梁运输效率,节约了施工成本。The present invention uses a set of inversion device to unload the box girder from the tire beam transport vehicle, lower the height, and then use the integrated machine for lifting, transporting and erecting the beam, which greatly improves the transport efficiency of the box girder and saves construction cost.
本发明的优点在于:工方法简单,大大提高了有隧道桥型箱梁架设效率,节约了施工成本,具有广阔的市场前景和良好的社会效益、经济效益。The invention has the advantages that the construction method is simple, the erection efficiency of the tunnel bridge type box girder is greatly improved, the construction cost is saved, and the invention has broad market prospects and good social and economic benefits.
下面结合附图和实施例对本发明作进一步说明。The present invention will be further described below in conjunction with drawings and embodiments.
附图说明Description of drawings
图1为本发明整体结构侧视图;Fig. 1 is a side view of the overall structure of the present invention;
图2为本发明倒装支撑装置示意图;Fig. 2 is a schematic diagram of an inverted support device of the present invention;
图3为本发明施工工艺流程示意图;Fig. 3 is a schematic diagram of the construction process of the present invention;
图中:1、箱型梁,2、倒装横梁,3、倒装支撑装置,3a、上横梁,3b、液压油缸,3c、导向柱,3d、底盘,4、轮胎运梁车,5、混凝土基础,6、运架一体机,7、路基基础。In the figure: 1. Box beam, 2. Inverted beam, 3. Inverted support device, 3a, upper beam, 3b, hydraulic cylinder, 3c, guide column, 3d, chassis, 4. tire beam transport vehicle, 5, Concrete foundation, 6. The all-in-one machine for transport and frame, 7. Subgrade foundation.
具体实施方式detailed description
以下对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。Preferred embodiments of the present invention are described below, and it should be understood that the preferred embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.
实施例1Example 1
如图1-3所示,一种箱型梁在隧道口倒装工艺,具体施工工艺如下:As shown in Figure 1-3, a box girder is inverted at the tunnel entrance, and the specific construction process is as follows:
步骤一:轮胎运梁车4装上倒装横梁2,箱型梁1放置在倒装横梁2上方;Step 1: Install the inverted beam 2 on the tire beam transport vehicle 4, and place the box beam 1 above the inverted beam 2;
步骤二:在隧道口适当位置安置倒装支撑装置3;Step 2: Place the inverted support device 3 at a proper position at the tunnel entrance;
步骤三:轮胎运梁车4驮箱型梁1行驶到倒装支撑装置3处,由倒装支撑装置3支撑倒装横梁2及其上部箱型梁1,轮胎运梁车4驶出箱型梁1腹内;Step 3: The tire beam transport vehicle 4 carries the box beam 1 and travels to the inverted support device 3, and the inverted beam 2 and its upper box beam 1 are supported by the inverted support device 3, and the tire beam transport vehicle 4 drives out of the box Beam 1 inside the abdomen;
步骤四:倒装支撑装置3携倒装横梁2及箱型梁1降低;Step 4: Lower the inverted support device 3 with the inverted beam 2 and the box beam 1;
步骤五:运架一体机6驶来,横移到箱型梁1上方,吊起箱型梁1,然后将箱型梁1运输到架设位置,架设箱型梁1的整个过程。Step 5: The all-in-one machine 6 for transporting frame comes, moves across the box girder 1, lifts the box girder 1, then transports the box girder 1 to the erection position, and completes the whole process of erecting the box girder 1.
上述倒装装置主要由前后两根倒装横梁2、四组倒装支撑装置3及电气控制系统、液压控制系统等组成,其中每套倒装支撑装置3由包括上横梁3a、液压油缸3b、导向柱3c、底盘3d等装置组成。The above-mentioned inversion device is mainly composed of two inversion beams 2 at the front and rear, four sets of inversion support devices 3, an electrical control system, a hydraulic control system, etc., wherein each set of inversion support devices 3 consists of an upper beam 3a, a hydraulic cylinder 3b, Guide post 3c, chassis 3d and other devices are composed.
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still The technical solutions recorded in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711103337.5A CN107724247B (en) | 2017-11-10 | 2017-11-10 | A kind of box bridge tunnel mouth replacement technology |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711103337.5A CN107724247B (en) | 2017-11-10 | 2017-11-10 | A kind of box bridge tunnel mouth replacement technology |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107724247A true CN107724247A (en) | 2018-02-23 |
| CN107724247B CN107724247B (en) | 2019-05-14 |
Family
ID=61215700
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711103337.5A Expired - Fee Related CN107724247B (en) | 2017-11-10 | 2017-11-10 | A kind of box bridge tunnel mouth replacement technology |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107724247B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109371853A (en) * | 2018-11-30 | 2019-02-22 | 中铁三局集团线桥工程有限公司 | Box beam tunnel face narrow and small place has bad luck relay construction system and method |
| CN114411572A (en) * | 2021-12-31 | 2022-04-29 | 中铁十四局集团青岛工程有限公司 | Novel precast box girder beam mounting operation method |
| CN116657493A (en) * | 2023-04-04 | 2023-08-29 | 中铁十四局集团第五工程有限公司 | High-speed rail box girder beam installation and replacement equipment and its operation method |
| CN119754181A (en) * | 2025-03-07 | 2025-04-04 | 中铁工程机械研究设计院有限公司 | Single main beam ultra-low position double span beam erection construction equipment and construction method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08151605A (en) * | 1994-11-30 | 1996-06-11 | Kajima Corp | Method and apparatus for manufacturing precast block for bridge |
| CN102102317A (en) * | 2009-12-22 | 2011-06-22 | 中铁科工集团有限公司 | Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam |
| CN201999628U (en) * | 2011-04-07 | 2011-10-05 | 中铁十七局集团第三工程有限公司 | Carrying pole beam for integrally hoisting and consigning bridge girder erection machine |
| CN105155417A (en) * | 2015-08-10 | 2015-12-16 | 石家庄铁道大学 | Climb type beam transportation straddle carrier and tunnel portal bridge transportation and erection method based on same |
| CN106638315A (en) * | 2016-11-10 | 2017-05-10 | 秦皇岛天业通联重工科技有限公司 | Combined beam transporting vehicle |
| CN206308621U (en) * | 2016-11-10 | 2017-07-07 | 秦皇岛天业通联重工科技有限公司 | A kind of beam car carries boom device on the back |
-
2017
- 2017-11-10 CN CN201711103337.5A patent/CN107724247B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08151605A (en) * | 1994-11-30 | 1996-06-11 | Kajima Corp | Method and apparatus for manufacturing precast block for bridge |
| CN102102317A (en) * | 2009-12-22 | 2011-06-22 | 中铁科工集团有限公司 | Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam |
| CN201999628U (en) * | 2011-04-07 | 2011-10-05 | 中铁十七局集团第三工程有限公司 | Carrying pole beam for integrally hoisting and consigning bridge girder erection machine |
| CN105155417A (en) * | 2015-08-10 | 2015-12-16 | 石家庄铁道大学 | Climb type beam transportation straddle carrier and tunnel portal bridge transportation and erection method based on same |
| CN106638315A (en) * | 2016-11-10 | 2017-05-10 | 秦皇岛天业通联重工科技有限公司 | Combined beam transporting vehicle |
| CN206308621U (en) * | 2016-11-10 | 2017-07-07 | 秦皇岛天业通联重工科技有限公司 | A kind of beam car carries boom device on the back |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109371853A (en) * | 2018-11-30 | 2019-02-22 | 中铁三局集团线桥工程有限公司 | Box beam tunnel face narrow and small place has bad luck relay construction system and method |
| CN109371853B (en) * | 2018-11-30 | 2023-11-28 | 中铁三局集团线桥工程有限公司 | Box girder tunnel portal narrow field transportation relay construction system and method |
| CN114411572A (en) * | 2021-12-31 | 2022-04-29 | 中铁十四局集团青岛工程有限公司 | Novel precast box girder beam mounting operation method |
| CN114411572B (en) * | 2021-12-31 | 2024-03-01 | 中铁十四局集团青岛工程有限公司 | Beam loading operation method for prefabricated box beam |
| CN116657493A (en) * | 2023-04-04 | 2023-08-29 | 中铁十四局集团第五工程有限公司 | High-speed rail box girder beam installation and replacement equipment and its operation method |
| CN119754181A (en) * | 2025-03-07 | 2025-04-04 | 中铁工程机械研究设计院有限公司 | Single main beam ultra-low position double span beam erection construction equipment and construction method |
| CN119754181B (en) * | 2025-03-07 | 2025-06-27 | 中铁工程机械研究设计院有限公司 | Single-girder ultralow-position double-span girder construction equipment and construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107724247B (en) | 2019-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207435916U (en) | A kind of box bridge tunnel face flipped device | |
| JP6986656B1 (en) | Construction method of lifting directly above a bridge with a large tonnage box girder and its erection method | |
| CN107724247A (en) | A kind of box bridge tunnel face changes the outfit technique | |
| CN107740350B (en) | The bridge pier column construction method and its passing method of full precast bridge Bridge Erector | |
| CN105155417B (en) | A kind of climb type fortune girder span car and the tunnel face bridge fortune frame method based on it | |
| CN101734555A (en) | CRTS Ⅰ type ballastless track slab storage and transportation turning mechanism for passenger dedicated line | |
| CN106245919B (en) | A kind of assembled architecture Automated assembly platform | |
| CN205526359U (en) | Prefab conveyer | |
| CN203213090U (en) | Transferring and hoisting device for ship reception chamber of ship lift | |
| CN104120701A (en) | Construction method and device for hoisting of heavy and large part of vertical ship lift | |
| CN111188633A (en) | Rapid construction method for secondary lining of small-section tunnel | |
| CN205171288U (en) | Magnetism floats section of track and moves gantry crane | |
| CN211496663U (en) | A gantry crane support device | |
| CN110562848B (en) | High-low level conversion device for box girder transportation | |
| CN207792530U (en) | A kind of system for transporting prefabricated components in subway station | |
| CN103410104B (en) | The bearing replacement method and apparatus of overhead road of city | |
| CN207739151U (en) | Two straddle type Bridge Erectors | |
| CN106744340A (en) | A kind of multi-functional special purpose crane in the laboratory for being applied to small space | |
| CN204569213U (en) | Mini Door Hanger | |
| CN207159836U (en) | Continuous beam side wall construction hoisting chassis | |
| CN205576656U (en) | Rail that bridge floor railway was laid welds rail production line | |
| CN205294024U (en) | AGV companion of rail mounted | |
| CN110206065A (en) | Prefabricated method piping lane installation vehicle and its install piping lane | |
| CN205873714U (en) | Aquatic gravity type gallows frame mounting structure | |
| CN207660157U (en) | A kind of movable type roof system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190514 |