CN106986291A - Large scale prefabricated wallboard overturns construction method for hanging in the air - Google Patents

Large scale prefabricated wallboard overturns construction method for hanging in the air Download PDF

Info

Publication number
CN106986291A
CN106986291A CN201710331906.5A CN201710331906A CN106986291A CN 106986291 A CN106986291 A CN 106986291A CN 201710331906 A CN201710331906 A CN 201710331906A CN 106986291 A CN106986291 A CN 106986291A
Authority
CN
China
Prior art keywords
plate
suspension centre
hanging
large scale
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710331906.5A
Other languages
Chinese (zh)
Inventor
黄坤坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710331906.5A priority Critical patent/CN106986291A/en
Publication of CN106986291A publication Critical patent/CN106986291A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F19/00Hoisting, lifting, hauling or pushing, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

Construction method for hanging is overturn in the air the invention discloses a kind of large scale prefabricated wallboard, including suspension centre is laid, plate is provided with three row's suspension centres, bottom is connected with middle row suspension centre with pulley using hanging beam, it is used for the inclination lifting process for realizing plate;Top suspension centre is mainly used in controlling the aerial upset and last lifting of plate.The large scale prefabricated wallboard that the present invention is provided overturns construction method for hanging in the air, the problem of large scale prefabricated wallboard is easily damaged in upset is solved, by quality and efficiency that prefabricated panel upset construction is further increased to flip angle, the laying of suspension centre, control of lifting rope lifting force in upset hoisting process etc..

Description

Large scale prefabricated wallboard overturns construction method for hanging in the air
Technical field
Lifting construction side is overturn in the air the present invention relates to assembled architecture field, more particularly to a kind of large scale prefabricated wallboard Method.
Background technology
With building energy conservation emission reduction and the development of housing industrialization and requirement, assembled architecture will turn into Building Trade in China hair The inexorable trend of exhibition.In assembled architecture building course, the liftings of prefabricated components as an important process therethrough Links.Because large scale prefabricated wall, post component are generally horizontal positioned in production and transportation, need first to be turned to conjunction before lifting Suitable orientation, at present application more generally " is grounded support to overturn " hanging method, and still, Large Precast Members are hung in upset Crack, folded plate are easily produced during dress, the destruction problem such as angle, damage is collapsed.For in the upset lifting of these Large Precast Members The quality problems easily occurred, in the urgent need to seeking a kind of effective aerial upset hanging method, it is to avoid when " ground connection support upset " Ground faces the local action of prefabricated components contact portion, the destruction of end when preventing from lifting.In summary, in the prior art The disadvantages mentioned above of presence, invention proposes a kind of large scale prefabricated wallboard and overturns construction method for hanging in the air.
The content of the invention
The present invention is to provide a kind of large scale prefabricated wallboard for the technical scheme that solution above-mentioned technical problem is used and turned in the air Turn construction method for hanging, its technical scheme is:
A kind of large scale prefabricated wallboard overturns construction method for hanging in the air, including suspension centre is laid, and plate is provided with three row's suspension centres, utilizes Bottom is connected by hanging beam with pulley with middle row suspension centre, and it is used for the inclination lifting process for realizing plate;Top suspension centre is main Aerial upset and last lifting for controlling plate;It is characterized in that:Comprise the following steps:
Step one:Wallboard is lain against on a base surface, fixed block, hanging beam is applied the first vertical force slightly to lift plate Rise, cork pad is disposed in bottom;Pulley is discharged, the first vertical force is continued to, while slightly pushing down bottom to be allowed to not take off From base surface, now middle part lifting rope can be slided with pulley, and plate is tilted therewith;When plate inclination angle reaches 45 °, bottom plate is cancelled The lower pressure of bottom, and fixed block;
Step 2:The first vertical force is continued to, plate bottom is promoted to more than base surface;Apply second to top suspension centre to erect To power and the first vertical force of cooperation, plate is overturn to vertical state;
Step 3:Lower section top and middle part suspension centre, plate is transferred to base surface simultaneously;Revocation middle part lifting rope, is hung by top Rope lifting plate.
Above-mentioned large scale prefabricated wallboard overturns construction method for hanging in the air, wherein, during the suspension centre is laid, main hook is installed on The top suspension centre of prefabricated panel, auxiliary hook is installed on the suspension centre in prefabricated panel plane.
Above-mentioned large scale prefabricated wallboard overturns construction method for hanging in the air, wherein, plate bottom is lifted in the step 2 To base surface above 1m.
The present invention has the advantages that relative to prior art:
The problem of large scale prefabricated wallboard is easily damaged in upset is solved, by flip angle in upset hoisting process Degree, the laying of suspension centre, control of lifting rope lifting force etc. further increase the quality and efficiency of prefabricated panel upset construction.
Brief description of the drawings
Fig. 1 is that hanging beam of the present invention applies the first vertical force schematic diagram;
Fig. 2 applies the second vertical force schematic diagram for present invention top suspension centre;
Fig. 3 is vertical state plate schematic diagram of the present invention;
Fig. 4 is present invention top lifting rope lifting plate pipe schematic diagram.
In figure:
Lifting rope in the middle part of lifting rope 2- at the top of 1-.
Embodiment
Below in conjunction with the accompanying drawing of the present invention, the technical scheme to the embodiment of the present invention carries out clear, complete description.
As shown in figure 1, a kind of disclosed large scale prefabricated wallboard overturns construction method for hanging, including suspension centre in the air Lay, plate is provided with three row's suspension centres, bottom is connected with middle row suspension centre with pulley using hanging beam, it is used to realize plate Inclination lifting process;Top suspension centre is mainly used in controlling the aerial upset and last lifting of plate;It is characterized in that:Including The following steps:
Step one:Wallboard is lain against on a base surface, fixed block, hanging beam is applied the first vertical force slightly to lift plate Rise, cork pad is disposed in bottom;Pulley is discharged, the first vertical force is continued to, while slightly pushing down bottom to be allowed to not take off From base surface, now middle part lifting rope 2 meeting be slided with pulley, and plate is tilted therewith;When plate inclination angle reaches 45 °, bottom is cancelled The lower pressure of plate bottom, and fixed block;
Step 2:The first vertical force is continued to, plate bottom is promoted to base surface above 1m;Second is applied to top suspension centre Vertical force simultaneously coordinates the first vertical force, and plate is overturn to vertical state;
Step 3:Lower section top and middle part suspension centre, plate is transferred to base surface simultaneously;Revocation middle part lifting rope 2, is hung by top Rope 1 lifts plate.
Above-mentioned large scale prefabricated wallboard overturns construction method for hanging in the air, wherein, during the suspension centre is laid, main hook is installed on The top suspension centre of prefabricated panel(2), auxiliary hook is installed on the suspension centre in prefabricated panel plane(4).
Suspension centre laying and demoulding lifting temporary support point are harmonious in plane, accomplish " one buries multi-purpose ", reduce cost.It is de- The principle that suspension centre is most preferably laid when mould is lifted by crane, one is to try to make member section uniform force, and dangerouse cross-section moment of flexure is equal;Two be to protect Demonstrate,prove prefabricated board stable equilibrium during hoisting transportation;Three be to derive to calculate using the equal principle of positive hogging moment.For plate class Component, should using etc. for beam model, calculated respectively by both direction, and be considered as the effect of whole load.Deng Dai Liang width Degree is taken as distance of the suspension centre both sides half across it and/or suspension centre to edges of boards edge with side partly across sum, and waits and be not preferably greater than for beam width 15 times of thickness of slab.
Using the above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property scope is not limited to the content on specification, it is necessary to its technical scope is determined according to right.

Claims (3)

1. a kind of large scale prefabricated wallboard overturns construction method for hanging in the air, including suspension centre is laid, and plate is provided with three row's suspension centres, profit Bottom is connected with middle row suspension centre with hanging beam with pulley, it is used for the inclination lifting process for realizing plate;Top suspension centre master It is used for the aerial upset and last lifting for controlling plate;It is characterized in that:Comprise the following steps:
Step one:Wallboard is lain against on a base surface, fixed block, hanging beam is applied the first vertical force slightly to lift plate Rise, cork pad is disposed in bottom;Pulley is discharged, the first vertical force is continued to, while slightly pushing down bottom to be allowed to not take off From base surface, now middle part lifting rope can be slided with pulley, and plate is tilted therewith;When plate inclination angle reaches 45 °, bottom plate is cancelled The lower pressure of bottom, and fixed block;
Step 2:The first vertical force is continued to, plate bottom is promoted to more than base surface;Apply second to top suspension centre to erect To power and the first vertical force of cooperation, plate is overturn to vertical state;
Step 3:Lower section top and middle part suspension centre, plate is transferred to base surface simultaneously;Revocation middle part lifting rope, is hung by top Rope lifting plate.
2. a kind of large scale prefabricated wallboard as claimed in claim 1 overturns construction method for hanging in the air, it is characterised in that:It is described to hang During point is laid, main hook is installed on the top suspension centre of prefabricated panel, and auxiliary hook is installed on the suspension centre in prefabricated panel plane.
3. a kind of large scale prefabricated wallboard as claimed in claim 1 overturns construction method for hanging in the air, it is characterised in that:The step Plate bottom is promoted to base surface above 1m in rapid two.
CN201710331906.5A 2017-05-12 2017-05-12 Large scale prefabricated wallboard overturns construction method for hanging in the air Pending CN106986291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710331906.5A CN106986291A (en) 2017-05-12 2017-05-12 Large scale prefabricated wallboard overturns construction method for hanging in the air

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710331906.5A CN106986291A (en) 2017-05-12 2017-05-12 Large scale prefabricated wallboard overturns construction method for hanging in the air

Publications (1)

Publication Number Publication Date
CN106986291A true CN106986291A (en) 2017-07-28

Family

ID=59418635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710331906.5A Pending CN106986291A (en) 2017-05-12 2017-05-12 Large scale prefabricated wallboard overturns construction method for hanging in the air

Country Status (1)

Country Link
CN (1) CN106986291A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107986162A (en) * 2017-11-22 2018-05-04 无锡华光锅炉股份有限公司 A kind of hoisting and overturning method of large-scale component
CN108018869A (en) * 2017-11-10 2018-05-11 天津大学 A kind of collapsible mud mat basis with skirtboard
CN108715397A (en) * 2018-07-27 2018-10-30 深圳市施罗德工业测控设备有限公司 A kind of service hoisting cable suitable for pipe crawling device
CN109534163A (en) * 2018-11-21 2019-03-29 长沙远大住宅工业集团股份有限公司 The overturning construction method of prefabricated panel
CN113788394A (en) * 2021-08-20 2021-12-14 海洋石油工程股份有限公司 Inclined hoisting method for large-size shallow foundation anti-sinking plate
CN114809662A (en) * 2022-05-19 2022-07-29 武汉林榔木建筑工程科技有限公司 Automatic wallboard mounting device and mounting method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09208200A (en) * 1996-02-08 1997-08-12 Takenaka Komuten Co Ltd Lifting truck for plate-like body
CN202671169U (en) * 2012-05-10 2013-01-16 平高集团有限公司 Flip tool for barrel-type workpiece
CN203639113U (en) * 2013-11-28 2014-06-11 中国核工业第五建设有限公司 Hoisting system for engineering construction and single-point type overturning support of hoisting system
CN104444810A (en) * 2014-12-04 2015-03-25 中国建筑第八工程局有限公司 Large plate turning construction method
CN104652830A (en) * 2015-01-27 2015-05-27 安徽同济建设集团有限责任公司 Construction method for building of prefabricated slab floor and prefabricated wall plate
CN205686492U (en) * 2016-06-07 2016-11-16 王雄 Semitrailer car body turning device
CN106223460A (en) * 2016-08-11 2016-12-14 中国建筑第八工程局有限公司 The prefabricated construction method of large scale wallboard

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09208200A (en) * 1996-02-08 1997-08-12 Takenaka Komuten Co Ltd Lifting truck for plate-like body
CN202671169U (en) * 2012-05-10 2013-01-16 平高集团有限公司 Flip tool for barrel-type workpiece
CN203639113U (en) * 2013-11-28 2014-06-11 中国核工业第五建设有限公司 Hoisting system for engineering construction and single-point type overturning support of hoisting system
CN104444810A (en) * 2014-12-04 2015-03-25 中国建筑第八工程局有限公司 Large plate turning construction method
CN104652830A (en) * 2015-01-27 2015-05-27 安徽同济建设集团有限责任公司 Construction method for building of prefabricated slab floor and prefabricated wall plate
CN205686492U (en) * 2016-06-07 2016-11-16 王雄 Semitrailer car body turning device
CN106223460A (en) * 2016-08-11 2016-12-14 中国建筑第八工程局有限公司 The prefabricated construction method of large scale wallboard

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108018869A (en) * 2017-11-10 2018-05-11 天津大学 A kind of collapsible mud mat basis with skirtboard
CN107986162A (en) * 2017-11-22 2018-05-04 无锡华光锅炉股份有限公司 A kind of hoisting and overturning method of large-scale component
CN108715397A (en) * 2018-07-27 2018-10-30 深圳市施罗德工业测控设备有限公司 A kind of service hoisting cable suitable for pipe crawling device
CN109534163A (en) * 2018-11-21 2019-03-29 长沙远大住宅工业集团股份有限公司 The overturning construction method of prefabricated panel
CN113788394A (en) * 2021-08-20 2021-12-14 海洋石油工程股份有限公司 Inclined hoisting method for large-size shallow foundation anti-sinking plate
CN114809662A (en) * 2022-05-19 2022-07-29 武汉林榔木建筑工程科技有限公司 Automatic wallboard mounting device and mounting method

Similar Documents

Publication Publication Date Title
CN106986291A (en) Large scale prefabricated wallboard overturns construction method for hanging in the air
CN206624553U (en) Lifting component system
CN103334587B (en) Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof
KR101648851B1 (en) Deck plate for ceiling mold
MX2021010866A (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith.
CN107366393A (en) A kind of food stuff refrigerated storage roofing colored steel Alley Oop formula hanging method
CN204626998U (en) A kind of attached lift scaffold discharging platform
CN106948603A (en) Wall plate member switching mechanism and its method for turning
CN107130517B (en) It is a kind of fine-tuning from promotion closure mould bases base apparatus and its operating method
CN203877109U (en) Lifting storage rack for building prefabricated composite floor slabs
CN203765779U (en) Overturning machine for prefabricated reinforced concrete plates
CN112376698A (en) Corridor construction method
CN107165421A (en) A kind of construction method of concrete assembled building
CN107724247B (en) A kind of box bridge tunnel face changes the outfit technique
CN103803394B (en) Hoisting method for erecting large box-type steel structure derrick by sleeving concrete well tower outside
CN202577926U (en) Fixed operating platform for elevator shaft
CN207499441U (en) A kind of aluminum dipping form material transfer mouth mold tool
CN108675116A (en) The construction method of PC components
CN206219113U (en) One kind lifting chassis
CN204416960U (en) A kind of bipod mast Lift-on/Lift-off System being convenient to movement
CN104444810B (en) Large-scale plate overturns construction method
CN208869210U (en) Derrick crane and its attachment mechanism
CN207792530U (en) A kind of system for transporting prefabricated components in subway station
CN206971757U (en) Wall plate member switching mechanism
CN106315386A (en) Integrated lifting appliance for laminated slabs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170728

WD01 Invention patent application deemed withdrawn after publication