CN107689887A - 一种核电厂控制系统临时控制变更在线管理系统 - Google Patents
一种核电厂控制系统临时控制变更在线管理系统 Download PDFInfo
- Publication number
- CN107689887A CN107689887A CN201710729748.9A CN201710729748A CN107689887A CN 107689887 A CN107689887 A CN 107689887A CN 201710729748 A CN201710729748 A CN 201710729748A CN 107689887 A CN107689887 A CN 107689887A
- Authority
- CN
- China
- Prior art keywords
- change
- data
- module
- configuration
- risk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000008859 change Effects 0.000 title claims abstract description 170
- 230000006870 function Effects 0.000 claims abstract description 63
- 238000007726 management method Methods 0.000 claims abstract description 55
- 238000000034 method Methods 0.000 claims abstract description 22
- 241001269238 Data Species 0.000 claims abstract description 18
- 230000008569 process Effects 0.000 claims abstract description 18
- 238000013070 change management Methods 0.000 claims abstract description 13
- 230000000977 initiatory effect Effects 0.000 claims abstract description 11
- 238000003860 storage Methods 0.000 claims abstract description 10
- 238000004458 analytical method Methods 0.000 claims description 14
- 238000001514 detection method Methods 0.000 claims description 12
- 238000013507 mapping Methods 0.000 claims description 12
- 238000005516 engineering process Methods 0.000 claims description 11
- 238000007689 inspection Methods 0.000 claims description 10
- 238000012545 processing Methods 0.000 claims description 9
- 238000010586 diagram Methods 0.000 claims description 8
- 239000000284 extract Substances 0.000 claims description 8
- 230000008676 import Effects 0.000 claims description 7
- 238000012986 modification Methods 0.000 claims description 7
- 230000004048 modification Effects 0.000 claims description 7
- 238000013475 authorization Methods 0.000 claims description 6
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 6
- 230000007257 malfunction Effects 0.000 claims description 6
- 230000007246 mechanism Effects 0.000 claims description 6
- 238000011084 recovery Methods 0.000 claims description 6
- 238000012502 risk assessment Methods 0.000 claims description 4
- 230000004075 alteration Effects 0.000 claims description 3
- 238000012508 change request Methods 0.000 claims description 3
- 238000013500 data storage Methods 0.000 claims description 3
- 238000001914 filtration Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000004044 response Effects 0.000 claims description 3
- 238000012216 screening Methods 0.000 claims description 3
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 claims description 3
- 238000011144 upstream manufacturing Methods 0.000 claims description 3
- 238000010977 unit operation Methods 0.000 abstract description 5
- 238000012800 visualization Methods 0.000 abstract 1
- 238000012360 testing method Methods 0.000 description 3
- 230000003993 interaction Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000009666 routine test Methods 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/069—Management of faults, events, alarms or notifications using logs of notifications; Post-processing of notifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710729748.9A CN107689887B (zh) | 2017-08-23 | 2017-08-23 | 一种核电厂控制系统临时控制变更在线管理系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710729748.9A CN107689887B (zh) | 2017-08-23 | 2017-08-23 | 一种核电厂控制系统临时控制变更在线管理系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107689887A true CN107689887A (zh) | 2018-02-13 |
CN107689887B CN107689887B (zh) | 2020-07-28 |
Family
ID=61152548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710729748.9A Active CN107689887B (zh) | 2017-08-23 | 2017-08-23 | 一种核电厂控制系统临时控制变更在线管理系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107689887B (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108876228A (zh) * | 2018-09-28 | 2018-11-23 | 苏州朗动网络科技有限公司 | 企业风险的监控方法、装置、计算机设备及存储介质 |
CN108985563A (zh) * | 2018-06-12 | 2018-12-11 | 西安交通大学 | 一种基于自组织特征映射的机电系统服役动态标记方法 |
CN109241113A (zh) * | 2018-08-31 | 2019-01-18 | 阿里巴巴集团控股有限公司 | 风险检查方法及系统 |
CN110362878A (zh) * | 2019-06-24 | 2019-10-22 | 上海核工程研究设计院有限公司 | 反应堆保护系统安全级显示画面仿真验证平台 |
CN110570708A (zh) * | 2019-08-30 | 2019-12-13 | 福建福清核电有限公司 | 一种基于反应堆保护系统的核电厂仪控检修技能竞赛平台 |
CN110940303A (zh) * | 2019-12-20 | 2020-03-31 | 福建福清核电有限公司 | 一种安全阀阀位传感器校准系统及方法 |
CN111340321A (zh) * | 2018-12-19 | 2020-06-26 | 国家电投集团科学技术研究院有限公司 | 核电厂设计变更在线分析管理系统 |
CN111428460A (zh) * | 2018-12-24 | 2020-07-17 | 核工业计算机应用研究所 | 一种电子任务工单的执行方法及系统 |
CN113032206A (zh) * | 2021-02-25 | 2021-06-25 | 广东核电合营有限公司 | 用于核电站的显示数据的方法、装置、终端及存储介质 |
CN113075911A (zh) * | 2021-03-24 | 2021-07-06 | 中广核工程有限公司 | 核电厂安全级数字化仪控系统软件自动验证方法和系统 |
CN113554244A (zh) * | 2020-04-23 | 2021-10-26 | 中国石油化工股份有限公司 | 基于效率变更短板的炼化企业生产变更预警方法及装置 |
CN113673945A (zh) * | 2021-07-23 | 2021-11-19 | 中核核电运行管理有限公司 | 核电厂临时变更监控方法及装置 |
CN113759850A (zh) * | 2021-09-13 | 2021-12-07 | 西安热工研究院有限公司 | 一种火力发电厂dcs查找强制状态功能块的方法 |
CN117195240A (zh) * | 2023-11-02 | 2023-12-08 | 西安热工研究院有限公司 | 可信dcs上位机数据组态验证及发布方法和系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130145452A1 (en) * | 2011-11-14 | 2013-06-06 | Florida Power & Light Company | Systems and methods for managing advanced metering infrastructure |
CN103400193A (zh) * | 2013-08-21 | 2013-11-20 | 中国科学院合肥物质科学研究院 | 一种用于核电站的三日风险滚动监测管理系统及管理方法 |
CN104751265A (zh) * | 2013-12-31 | 2015-07-01 | 苏州热工研究院有限公司 | 一种核电厂技术支持文件管控系统及其方法 |
CN105469186A (zh) * | 2014-11-28 | 2016-04-06 | 上海核工程研究设计院 | 一种能够自监测的风险监测系统及自监测方法 |
CN106447284A (zh) * | 2016-08-30 | 2017-02-22 | 中广核工程有限公司 | 一种核电站dcs组态变更信息化平台管理系统和方法 |
-
2017
- 2017-08-23 CN CN201710729748.9A patent/CN107689887B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130145452A1 (en) * | 2011-11-14 | 2013-06-06 | Florida Power & Light Company | Systems and methods for managing advanced metering infrastructure |
CN103400193A (zh) * | 2013-08-21 | 2013-11-20 | 中国科学院合肥物质科学研究院 | 一种用于核电站的三日风险滚动监测管理系统及管理方法 |
CN104751265A (zh) * | 2013-12-31 | 2015-07-01 | 苏州热工研究院有限公司 | 一种核电厂技术支持文件管控系统及其方法 |
CN105469186A (zh) * | 2014-11-28 | 2016-04-06 | 上海核工程研究设计院 | 一种能够自监测的风险监测系统及自监测方法 |
CN106447284A (zh) * | 2016-08-30 | 2017-02-22 | 中广核工程有限公司 | 一种核电站dcs组态变更信息化平台管理系统和方法 |
Non-Patent Citations (1)
Title |
---|
路进军等: "核电工程设计变更管理系统应用研究", 《信息通信》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108985563A (zh) * | 2018-06-12 | 2018-12-11 | 西安交通大学 | 一种基于自组织特征映射的机电系统服役动态标记方法 |
CN109241113A (zh) * | 2018-08-31 | 2019-01-18 | 阿里巴巴集团控股有限公司 | 风险检查方法及系统 |
CN108876228A (zh) * | 2018-09-28 | 2018-11-23 | 苏州朗动网络科技有限公司 | 企业风险的监控方法、装置、计算机设备及存储介质 |
CN111340321A (zh) * | 2018-12-19 | 2020-06-26 | 国家电投集团科学技术研究院有限公司 | 核电厂设计变更在线分析管理系统 |
CN111340321B (zh) * | 2018-12-19 | 2024-01-23 | 国家电投集团科学技术研究院有限公司 | 核电厂设计变更在线分析管理系统 |
CN111428460A (zh) * | 2018-12-24 | 2020-07-17 | 核工业计算机应用研究所 | 一种电子任务工单的执行方法及系统 |
CN110362878A (zh) * | 2019-06-24 | 2019-10-22 | 上海核工程研究设计院有限公司 | 反应堆保护系统安全级显示画面仿真验证平台 |
CN110570708A (zh) * | 2019-08-30 | 2019-12-13 | 福建福清核电有限公司 | 一种基于反应堆保护系统的核电厂仪控检修技能竞赛平台 |
CN110940303A (zh) * | 2019-12-20 | 2020-03-31 | 福建福清核电有限公司 | 一种安全阀阀位传感器校准系统及方法 |
CN113554244A (zh) * | 2020-04-23 | 2021-10-26 | 中国石油化工股份有限公司 | 基于效率变更短板的炼化企业生产变更预警方法及装置 |
CN113032206A (zh) * | 2021-02-25 | 2021-06-25 | 广东核电合营有限公司 | 用于核电站的显示数据的方法、装置、终端及存储介质 |
CN113075911A (zh) * | 2021-03-24 | 2021-07-06 | 中广核工程有限公司 | 核电厂安全级数字化仪控系统软件自动验证方法和系统 |
CN113673945A (zh) * | 2021-07-23 | 2021-11-19 | 中核核电运行管理有限公司 | 核电厂临时变更监控方法及装置 |
CN113759850A (zh) * | 2021-09-13 | 2021-12-07 | 西安热工研究院有限公司 | 一种火力发电厂dcs查找强制状态功能块的方法 |
CN113759850B (zh) * | 2021-09-13 | 2022-12-13 | 西安热工研究院有限公司 | 一种火力发电厂dcs查找强制状态功能块的方法 |
CN117195240A (zh) * | 2023-11-02 | 2023-12-08 | 西安热工研究院有限公司 | 可信dcs上位机数据组态验证及发布方法和系统 |
CN117195240B (zh) * | 2023-11-02 | 2024-05-28 | 西安热工研究院有限公司 | 可信dcs上位机数据组态验证及发布方法和系统 |
Also Published As
Publication number | Publication date |
---|---|
CN107689887B (zh) | 2020-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107689887A (zh) | 一种核电厂控制系统临时控制变更在线管理系统 | |
CN107450493B (zh) | 一种核电厂控制系统临时控制变更在线管理方法 | |
CN110674189B (zh) | 一种智能变电站二次状态监测与故障定位的方法 | |
CN107910085B (zh) | 一种dcs组态数据智能化分析调试方法 | |
CN104483842B (zh) | 一种调控一体自动化主站比对方法 | |
CN106157167A (zh) | 一种二次设备遥控操作票系统和二次设备遥控操作票的实现方法 | |
CN106815709A (zh) | 一种服务快速响应中心支撑系统及方法 | |
CN105914892A (zh) | 一种二次检修安措票系统及其实现方法 | |
CN109343395A (zh) | 一种核电厂dcs操作日志的异常检测系统和方法 | |
CN110942155A (zh) | 一种机器学习引擎的研究方法 | |
CN108470218A (zh) | 公用设施运维管理系统 | |
EP2775361A2 (de) | System und Verfahren zur Ereignisprotokollierung in einer technischen Anlage oder einem technischen Prozess | |
CN110175324A (zh) | 一种基于数据挖掘的电网运行操作指令校验方法及系统 | |
CN101527011B (zh) | 一种实时故障处理流程自动导航方法和装置 | |
CN111126970A (zh) | 一种基于数据一致性的运营管理系统及方法 | |
CN104199854A (zh) | 石化装置风险注册方法 | |
CN107918816A (zh) | 水务巡查系统 | |
CN107944999A (zh) | 一种审核费用项目的自动执行方法及装置 | |
CN114566159A (zh) | 一种基于校核操作的电气票流转方法及装置 | |
CN109840859A (zh) | 水泥工程建设项目智能管理系统 | |
Kim et al. | Design and implementation of HuREX analysis supporting interface for HRA data extraction | |
CN107844838A (zh) | 电网调度自动化主站运维操作票系统及全过程防误方法 | |
CN115439106A (zh) | 一种用于资金集中结算的智能财务机器人系统 | |
CN115378136A (zh) | 一种电网二次设备安全风险智能预警方法及预警装置 | |
CN112542892B (zh) | 变电站调控一体化控制方法及控制装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Lu Jun Inventor after: Yang Ruzhen Inventor after: Zhu Ning Inventor after: Wang Yue Inventor after: Zhou Li Inventor after: Wang Dan Inventor after: You Bing Inventor after: Cai Hongwei Inventor after: Zhang Lei Inventor after: Li Pei Inventor after: Shang Hailong Inventor after: Wan Shu Inventor after: Liu Renpeng Inventor after: He Lin Inventor before: You Bing Inventor before: Wan Shu Inventor before: Liu Renpeng Inventor before: Yang Ruzhen Inventor before: Zhu Ning Inventor before: Wang Yue Inventor before: Lu Jun Inventor before: Cai Hongwei Inventor before: Wang Dan Inventor before: Zhou Li Inventor before: Shang Hailong Inventor before: He Lin Inventor before: Zhang Lei Inventor before: Li Pei |
|
GR01 | Patent grant | ||
GR01 | Patent grant |