CN107680149A - Project tendency drawing drawing method, device and server - Google Patents

Project tendency drawing drawing method, device and server Download PDF

Info

Publication number
CN107680149A
CN107680149A CN201710934098.1A CN201710934098A CN107680149A CN 107680149 A CN107680149 A CN 107680149A CN 201710934098 A CN201710934098 A CN 201710934098A CN 107680149 A CN107680149 A CN 107680149A
Authority
CN
China
Prior art keywords
line
task
flame
project
deadline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710934098.1A
Other languages
Chinese (zh)
Inventor
余彦佐
卢亮
欧阳逸滨
陈洁萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Sisanjiujiu Information Technology Co Ltd
Original Assignee
Guangzhou Sisanjiujiu Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Sisanjiujiu Information Technology Co Ltd filed Critical Guangzhou Sisanjiujiu Information Technology Co Ltd
Priority to CN201710934098.1A priority Critical patent/CN107680149A/en
Publication of CN107680149A publication Critical patent/CN107680149A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/002D [Two Dimensional] image generation
    • G06T11/20Drawing from basic elements, e.g. lines or circles
    • G06T11/203Drawing of straight lines or curves
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of project tendency drawing drawing method, device and server, it is related to project management techniques field, this method includes:Superposition after-flame line is drawn according to the Start Date of each task groups and deadline;Job change line is drawn according to task increase and decrease amount;Superposition after-flame line is added into drafting with job change line to obtain referring to progress line;By drawing project trend graph with reference to progress line and actual task line.The embodiment of the present invention can be drawn with reference to progress line and actual task line respectively, this is superimposed to obtain with reference to progress line by the superposition after-flame line and job change line of each task groups, this can be with accurate description development of projects with reference to progress line, by reference to the contrast directly perceived of progress line and actual task line, manager and executor can pass through comparative analysis actual task line and the difference with reference to progress line, the progress issue in Project Process is found in time, so as to preferably carry out overall observation and control to project.

Description

Project tendency drawing drawing method, device and server
Technical field
The present invention relates to project management techniques field, more particularly, to a kind of project tendency drawing drawing method, device kimonos Business device.
Background technology
In existing after-flame figure, it is item setup start time and terminal, allows tasks leave quantity to successively decrease by fixed rate To terminal.But be frequently not to be successively decreased according to fixed rate in the practical implementation of project, and can be at certain The individual period carries out the additions and deletions operation of task, and existing after-flame figure can be very big with actual error, is not easy to overall to project Control.
For above-mentioned after-flame figure it is big to item description error the problem of, not yet propose effective solution at present.
The content of the invention
In view of this, can be with it is an object of the invention to provide a kind of project tendency drawing drawing method, device and server Accuracy is improved, overall observation and control preferably can be carried out to project.
In a first aspect, the embodiments of the invention provide a kind of project tendency drawing drawing method, including:According to each task groups Start Date and the deadline draw superposition after-flame line;Job change line is drawn according to task increase and decrease amount;After-flame line will be superimposed Drafting is added with job change line to obtain referring to progress line;By drawing project trend graph with reference to progress line and actual task line.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the first of first aspect, wherein, root The step of superposition after-flame line being drawn according to the Start Date of each task groups and deadline, including:According to opening for each task groups Date, deadline and the number of tasks of beginning draw after-flame line respectively;Each after-flame figure is overlapped into drafting to obtain being superimposed after-flame line.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide second of first aspect Possible embodiment, wherein, after-flame line is drawn according to the Start Date, deadline and number of tasks of each task groups respectively Step, including:It is ranked up according to the Start Date of each task, is arranged when Start Date is identical according to the deadline Sequence;After-flame line drafting is carried out respectively to each task according to ranking results.
With reference to second of possible embodiment of first aspect, the embodiments of the invention provide the third of first aspect Possible embodiment, in addition to:When Start Date and the deadline all same of at least two task groups, merge task Group, and after-flame line drafting is carried out to the task groups that merging obtains.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 4th of first aspect kind, in addition to: The end time of previous task group will be arranged between at the beginning of task groups.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 5th of first aspect kind, in addition to: When task is not provided with deadline, it will subtract one with reference to progress line on the day of task completion.
Second aspect, the embodiment of the present invention also provide a kind of project trend graph drawing apparatus, including:After-flame line is superimposed to draw Module, superposition after-flame line is drawn for the Start Date according to each task groups and deadline;Job change line drafting module, For drawing job change line according to task increase and decrease amount;With reference to progress line drafting module, become for after-flame line and task will to be superimposed Change line addition drafting to obtain referring to progress line;Project trend graph drafting module, for by being painted with reference to progress line and actual task line Project trend graph processed.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the first of second aspect, wherein, fold After-flame line drafting module is added to be additionally operable to:After-flame is drawn according to the Start Date, deadline and number of tasks of each task groups respectively Line;Each after-flame line is overlapped into drafting to obtain being superimposed after-flame line.
The third aspect, the embodiment of the present invention also provide a kind of server, and the device includes processor, memory, bus and Communication interface, processor, communication interface and memory are connected by bus;Memory is used for storage program;Processor, for leading to Cross bus and call the program of storage in memory, the method for performing any one of first aspect and its possible embodiment.
Fourth aspect, the embodiment of the present invention also provide a kind of computer-readable storage medium, for save as second aspect and its Computer software instructions used in any one of possible embodiment device.
The embodiment of the present invention brings following beneficial effect:
Project tendency drawing drawing method, device and server provided in an embodiment of the present invention, it can respectively draw and refer to Line and actual task line are spent, this is superimposed to obtain with reference to progress line by the superposition after-flame line and job change line of each task groups, should With reference to progress line can with accurate description development of projects, by reference to the contrast directly perceived of progress line and actual task line, manager and Executor can have found that the progress in Project Process is asked in time by comparative analysis actual task line and the difference with reference to progress line Topic, so as to preferably carry out overall observation and control to project.
Other feature and advantage of the disclosure will illustrate in the following description, or, Partial Feature and advantage can be with Deduce from specification or unambiguously determine, or the above-mentioned technology by implementing the disclosure can be learnt.
To enable the above-mentioned purpose of the disclosure, feature and advantage to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of schematic flow sheet of project tendency drawing drawing method provided in an embodiment of the present invention;
Fig. 2 is project trend graph drawing process schematic diagram provided in an embodiment of the present invention;
Fig. 3 is the schematic flow sheet of another project tendency drawing drawing method provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of project trend graph provided in an embodiment of the present invention;
Fig. 5 is comparison procedure flow chart provided in an embodiment of the present invention;
Fig. 6 is a kind of structural representation of task management device provided in an embodiment of the present invention;
Fig. 7 is a kind of structural representation of server provided in an embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention Technical scheme be clearly and completely described, it is clear that described embodiment is part of the embodiment of the present invention, rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
After-flame figure (burn down chart) is before project completion, and a kind of of work completed to needs visualizes Represent, including Y-axis (work) and X-axis (time), the time is typically in units of day.In the ideal case, the after-flame figure is one At the uniform velocity downward straightway, with the completion of residue work, " burning-up " to zero.After-flame figure provides to project team member and manager One common view of work progress.After-flame figure is not accurate enough to item description at present, due to the execution of project be not according to What fixed rate was successively decreased, and the increase and decrease operation of task can be carried out in some period, error is larger to be unfavorable for project Overall control, based on this, a kind of project tendency drawing drawing method, device and server provided in an embodiment of the present invention, in project On the basis of managing common after-flame figure, the deadline of being set with reference to user for task, " the after-flame of more reference significance is drawn out Figure ", can improve accuracy, preferably can carry out overall observation and control to project.
For ease of understanding the present embodiment, a kind of project trend graph disclosed in the embodiment of the present invention is drawn first Method describes in detail.
Embodiment 1
The embodiments of the invention provide a kind of project tendency drawing drawing method, Fig. 1 is a kind of project tendency drawing drawing method Schematic flow sheet, comprise the following steps:
Step S102, superposition after-flame line is drawn according to the Start Date of each task groups and deadline.
Because a project may include multiple tasks group, each task groups comprise at least a task, entered to project , it is necessary to consider the progress of all tasks during row whole description.In the Start Date and deadline of known each task groups In the case of, first the initiating events of each task groups can be merged and draw superposition after-flame line again, can also be respectively to each Business group draws after-flame line and is overlapped to obtain superposition after-flame line again respectively.Above-mentioned after-flame line and superposition after-flame line, using negative value, Represent the task decrement changed with the date.
It is above-mentioned each task groups drawn with after-flame line be respectively overlapped to obtain the mode of superposition after-flame line again specifically include Following steps:After-flame line is drawn according to the Start Date, deadline and number of tasks of each task groups respectively;By each after-flame line Drafting is overlapped to obtain being superimposed after-flame line.
The above-mentioned process for drawing after-flame line respectively can be carried out, it is necessary to first arrange each task groups sequentially in time Sequence, it can specifically carry out in such a way:It is ranked up according to the Start Date of each task groups, when Start Date is identical It is ranked up according to the deadline;Each task groups are carried out with after-flame line drafting respectively according to ranking results.
In view of the Start Date of two or more task groups and deadline all same be present, in above-mentioned feelings During condition, the two or more task groups are merged, and after-flame line drafting is carried out to the task groups that merging obtains.
Step S104, job change line is drawn according to task increase and decrease amount.
During project progress, newly-increased task be present or delete task, in order to obtain to development of projects Accurate description is, it is necessary to daily task increase and decrease is also contemplated for into, according to the completion of each task groups of daily task increase and decrease combination Information summary is identified project progress.
Step S106, superposition after-flame line and the superposition drafting of job change line are obtained referring to progress line.
After obtaining being superimposed after-flame line and job change line, both are overlapped drafting and obtains referring to progress line, can be with The plan of accurate response project, this represents the planned deadline with reference to progress line, and the every workday answers remaining to be done Task quantity.
Step S108, by drawing project trend graph with reference to progress line and actual task line.
The actual task line is to draw what is drawn according to the real surplus task quantity collected daily, represents actual task number Measure situation of change.Can intuitively it be shown by the project plan with reference to curve of progress, the change of following task quantity to be done, so as to Supporting item manager preferably arranges project process.By that will refer to progress line and actual task line while be drawn on project In gesture figure, contrast directly perceived can be provided, manager and executor can be by comparative analysis actual task lines and with reference to progress line Difference, in time find Project Process progress issue.
Above-mentioned project tendency drawing drawing method provided in an embodiment of the present invention, can draw with reference to progress line and reality respectively Task line, this is superimposed to obtain with reference to progress line by the superposition after-flame line and job change line of each task groups, and this refers to progress line Can be with accurate description development of projects, by reference to the contrast directly perceived of progress line and actual task line, manager and executor can be with By comparative analysis actual task line and the difference with reference to progress line, the progress issue in Project Process is found in time, so as to more Overall observation and control are carried out to project well.
Project trend graph drawing process schematic diagram shown in Figure 2, it illustrated therein is the after-flame using each task groups Line carries out the mode that line segment superposition drafting mode draws superposition after-flame line, and abscissa is working day, and ordinate is task quantity, indulges The positive of axle represents increase or remaining task quantity, and negative sense represents to complete or the task quantity of reduction.Curve X1 in Fig. 2, X2, X3 represent the completion curve (with the after-flame figure of negative number representation) of three task groups, and it can be divided into front and rear two sections, front half section bag Two end points, such as A, B as depicted are included, A points are Task Initiation Date, and task of completing is 0;B points are the task deadline, Completion task is 2.The task groups can represent a certain group of identical date created and the multiple tasks of deadline, curve X1, X2, X3 represent every workday in the task groups should reduction number of tasks.The second half section of above-mentioned curve is parallel to transverse axis Straight line, the number of tasks of reduction also no longer changes after the deadline.
Curve y2 is curve X1, X2, X3 superposition in Fig. 2, that is, is superimposed after-flame line, represents that the every workday adds up to reduce The task quantity that should complete;Curve y1 is the task quantity for accumulating (or reduction) every workday in Fig. 2, and expression is Task number change caused by increase and decrease operation in project management process to task.Curve Y is with reference to progress line, by song in Fig. 2 Line y2 and curve y1 superposition draftings obtain, and represent the planned deadline, the every workday answers remaining number of tasks to be done Amount.Regathered on the basis of Fig. 2 after data draw actual task line and can obtain project trend graph, by contrasting actual task Line and reference progress line can help project administrator to find progress in time with both comparative analyses difference in Project Process Problem.
In the above method at the beginning of task between, set automatically by system.Reason is that in actual applications, user is seldom Between going at the beginning of active setting task, it is therefore desirable to which system sets the time started automatically.The core that job start time is set Heart principle is:User finish a task do again it is next, so in the ideal situation, at the beginning of a task between just It it is deadline when a upper task actually accomplishes, the deadline in the project plan is exactly the deadline that user is set.
In the specific implementation, the task of deadline of being not provided with also be present, because the task just could not without deadline yet After-flame line is grouped and drawn to it, when task is not provided with deadline, will be subtracted on the day of task completion with reference to progress line One.In actual applications, user each task may not necessarily set deadline, it is therefore desirable to ensure not set by a mechanism Putting the task of deadline can be subtracted, so as to avoid referring to curve of progress distortion, if this mechanism is exactly to be not provided with ending Time, then when task is completed, subtract 1 in that day that task is completed with reference to progress.If being not provided with deadline, the task Reference task number curve and actual task number curve be overlapping.
Above-mentioned project tendency drawing drawing method provided in an embodiment of the present invention, can draw with reference to progress line and reality respectively Task line, this is superimposed to obtain with reference to progress line by the superposition after-flame line and job change line of each task groups, can make user more Overall observation and control are carried out to project well.
Embodiment 2
The embodiments of the invention provide a kind of project tendency drawing drawing method, to carry out the after-flame of task according to time-sequencing Line illustrates exemplified by drawing.Fig. 3 is a kind of schematic flow sheet of project tendency drawing drawing method, is comprised the following steps:
Step S302, ascending sort is carried out by the task creation time, is ended when the task creation time is identical according to task Time carries out ascending sort.Wherein, the task creation time is create_time, uses below c expressions;Task deadline As target_time, use below t expressions.It is ranked up according to the Start Date of each task groups, it is identical in Start Date When be ranked up according to the deadline;Also, each task groups are carried out with after-flame line drafting respectively according to ranking results.
Step S304, merge task creation time and task deadline identical task.It will appoint in this step Creation time of being engaged in and task deadline identical task merging, refer to above-mentioned task being divided to same task groups, so as to The drafting of after-flame line can be carried out jointly.
Step S306, it is c to draw task creation time and task deadlinen~tn, the after-flame line of n=1 task.
Step S308, judges tn<tn+1Whether set up.If it is step S310 is performed;If otherwise perform step S312。
Step S310, judges tn<cnWhether+1 set up.If it is step S312 is performed;If otherwise perform step S314。
Step S312, it is c to draw task creation time and task deadlinen+1~tn+1Task after-flame line.
Step S314, it is c to draw task creation time and task deadlinen~tn+1Task after-flame line.
Step S316, judge whether to have drawn the after-flame line of whole tasks.If it is step S320 is performed;If otherwise Perform step S318.
Step S318, is performed to n plus 1 operates.
Step S320, all of above after-flame line is added to obtain superposition after-flame line y1.
Specifically, after-flame line is drawn according to the Start Date, deadline and number of tasks of each task groups respectively;Will be each The after-flame line is overlapped drafting and obtains being superimposed after-flame line.
Step S322, draw job change line y2.
Step S324, it is superimposed above-mentioned y1 and y2 and obtains referring to progress line Y;
Step S326, actual task line is drawn in figure to compare.The signal of project trend graph shown in Figure 4 Figure, illustrated therein is with reference to progress line (upside broken line) and actual task line (downside broken line).
Above-mentioned project tendency drawing drawing method provided in an embodiment of the present invention, can draw with reference to progress line and reality respectively Task line, this is superimposed to obtain with reference to progress line by the superposition after-flame line and job change line of each task groups, can make user more Overall observation and control are carried out to project well.
Embodiment 3
The embodiments of the invention provide a kind of project tendency drawing drawing method, mainly comprise the following steps:Definition receives number According to form, preprocessed data and drafting.Wherein drawing process is carried out according to the method in above-described embodiment.
(1) definition receives data format
Rear end returns to daily task incrementss, do not complete task amount and is not provided with the value of deadline task performance, And there is provided the task creation time of deadline and deadline data.If without data, just do not returned.Can be with The data that same day task changes are returned, include the master data information of each task.
(2) preprocessed data
The ascending sort of creation time first is carried out to the task groups provided with the deadline of return, if creation time is identical If, it is used as the basis of sequence by the deadline of setting, all tasks is then subjected to time precision processing, sets small When, minute and number of seconds be 0, unified time accuracy specifications.In sequencer procedure, Concept of Magnitude is introduced, is stored in target_ In line_data objects, the key of this object carries out storage index with { create_time } _ { target_time }.If appoint If the creation time of business is identical with deadline, then this value target_line_data [key] is with regard to carrying out+1.Then count The cumulative task line segment provided with deadline is calculated, target_line_data had been ranked, and passed through neighbouring two values Deadline contrast.Key need to be split when contrast.What fractionation obtained is an array, and temp [0] is to create Time, temp [1] are the deadlines of task.First value is now set as old_temp, second value is temp, compares both Creation time and deadline.Comparison procedure flow chart is as shown in figure 5, illustrated therein is according to logical transition rule, Ke Yizhuan Change into, if met simultaneously
old_temp[1]<temp[1]&&old_temp[1]>=temp [0], then start_day=old_temp [1], Otherwise start_day=temp [0].
That is, meeting that condition just draws line segment [old_temp [1], temp [1]], it is unsatisfactory for just drawing line segment [temp[0],temp[1]]。
(3) draw
Such as can be drawn using ECharts softwares, it provides the drafting scheme of line chart, only needs herein Point obtained by calculating before be entered into inside series series object corresponding to ECharts.
Embodiment 4
The embodiments of the invention provide a kind of project trend graph drawing apparatus, task management device shown in Figure 6 Structural representation, including it is superimposed after-flame line drafting module 61, job change line drafting module 62, with reference to progress line drafting module 63 It is as follows with project trend graph drafting module 64, the function of above-mentioned each module:
After-flame line drafting module 61 is superimposed, superposition combustion is drawn for the Start Date according to each task groups and deadline Line to the greatest extent;
Job change line drafting module 62, for drawing job change line according to task increase and decrease amount;
With reference to progress line drafting module 63, the progress of referring to is obtained for superposition after-flame line to be added into drafting with job change line Line;
Project trend graph drafting module 64, for by drawing project trend graph with reference to progress line and actual task line.
Above-mentioned superposition after-flame line drafting module is additionally operable to:According to the Start Date, deadline and task of each task groups Number draws after-flame line respectively;Each after-flame line is overlapped into drafting to obtain being superimposed after-flame line.
It is apparent to those skilled in the art that for convenience and simplicity of description, the device of foregoing description Specific work process, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
Referring to Fig. 7, the embodiment of the present invention also provides a kind of server 100, including:Processor 70, memory 71, bus 72 With communication interface 73, processor 70, communication interface 73 and memory 71 are connected by bus 72;Processor 70 is used to perform storage The executable module stored in device 71, such as computer program.
Wherein, memory 71 may include high-speed random access memory (RAM, Random Access Memory), Non-labile memory (non-volatile memory), for example, at least a magnetic disk storage may also be included.By extremely A few communication interface 73 (can be wired or wireless) is realized logical between the system network element and at least one other network element Letter connection, can use internet, wide area network, LAN, Metropolitan Area Network (MAN) etc..
Bus 72 can be isa bus, pci bus or eisa bus etc..It is total that bus can be divided into address bus, data Line, controlling bus etc..For ease of represent, scheme XX in only represented with a four-headed arrow, it is not intended that an only bus or A type of bus.
Wherein, memory 71 is used for storage program, and processor 70 is after execute instruction is received, configuration processor, foregoing The method performed by device that the stream process that inventive embodiments any embodiment discloses defines can apply in processor 70, or Person is realized by processor 70.
Processor 70 is probably a kind of IC chip, has the disposal ability of signal.In implementation process, above-mentioned side Each step of method can be completed by the integrated logic circuit of the hardware in processor 70 or the instruction of software form.Above-mentioned Processor 70 can be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network Processor (Network Processor, abbreviation NP) etc.;It can also be digital signal processor (Digital Signal Processing, abbreviation DSP), application specific integrated circuit (Application Specific Integrated Circuit, referred to as ASIC), ready-made programmable gate array (Field-Programmable Gate Array, abbreviation FPGA) or other are programmable Logical device, discrete gate or transistor logic, discrete hardware components.It can realize or perform in the embodiment of the present invention Disclosed each method, step and logic diagram.General processor can be microprocessor or the processor can also be appointed What conventional processor etc..The step of method with reference to disclosed in the embodiment of the present invention, can be embodied directly in hardware decoding processing Device performs completion, or performs completion with the hardware in decoding processor and software module combination.Software module can be located at Machine memory, flash memory, read-only storage, programmable read only memory or electrically erasable programmable memory, register etc. are originally In the ripe storage medium in field.The storage medium is located at memory 71, and processor 70 reads the information in memory 71, with reference to Its hardware completes the step of above method.
The computer program product for the progress task management method that the embodiment of the present invention is provided, including store processor The computer-readable recording medium of executable non-volatile program code, the instruction that described program code includes can be used for performing Method described in previous methods embodiment, specific implementation can be found in embodiment of the method, will not be repeated here.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, can be with Realize by another way.Device embodiment described above is only schematical, for example, the division of the unit, Only a kind of division of logic function, can there is other dividing mode when actually realizing, in another example, multiple units or component can To combine or be desirably integrated into another system, or some features can be ignored, or not perform.It is another, it is shown or beg for The mutual coupling of opinion or direct-coupling or communication connection can be by some communication interfaces, device or unit it is indirect Coupling or communication connection, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
If the function is realized in the form of SFU software functional unit and is used as independent production marketing or in use, can be with It is stored in the executable non-volatile computer read/write memory medium of a processor.Based on such understanding, the present invention The part that is substantially contributed in other words to prior art of technical scheme or the part of the technical scheme can be with software The form of product is embodied, and the computer software product is stored in a storage medium, including some instructions are causing One computer equipment (can be personal computer, server, or network equipment etc.) performs each embodiment institute of the present invention State all or part of step of method.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read- Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with The medium of store program codes.
Finally it should be noted that:Embodiment described above, it is only the embodiment of the present invention, to illustrate the present invention Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light Change is readily conceivable that, or equivalent substitution is carried out to which part technical characteristic;And these modifications, change or replacement, do not make The essence of appropriate technical solution departs from the spirit and scope of technical scheme of the embodiment of the present invention, should all cover the protection in the present invention Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (10)

  1. A kind of 1. project tendency drawing drawing method, it is characterised in that including:
    Superposition after-flame line is drawn according to the Start Date of each task groups and deadline;
    Job change line is drawn according to task increase and decrease amount;
    The superposition after-flame line and job change line superposition drafting are obtained referring to progress line;
    By described project trend graph is drawn with reference to progress line and actual task line.
  2. 2. according to the method for claim 1, it is characterised in that the Start Date and deadline according to each task groups Phase draws the step of superposition after-flame line, including:
    After-flame line is drawn according to the Start Date, deadline and number of tasks of each task groups respectively;
    Each after-flame line is overlapped into drafting to obtain being superimposed after-flame line.
  3. 3. according to the method for claim 2, it is characterised in that Start Date according to each task groups, deadline The step of phase and number of tasks draw after-flame line respectively, including:
    It is ranked up according to the Start Date of each task groups, is carried out when the Start Date is identical according to the deadline Sequence;
    After-flame line drafting is carried out respectively to each task groups according to ranking results.
  4. 4. according to the method for claim 3, it is characterised in that also include:
    When the Start Date and the deadline all same of at least two task groups, merge the task groups, And after-flame line drafting is carried out to the task groups that merging obtains.
  5. 5. according to the method for claim 1, it is characterised in that also include:
    The end time of previous task group will be arranged between at the beginning of the task groups.
  6. 6. according to the method for claim 1, it is characterised in that also include:
    When the task is not provided with deadline, subtract one with reference to progress line by described on the day of task completion.
  7. A kind of 7. project trend graph drawing apparatus, it is characterised in that including:
    After-flame line drafting module is superimposed, superposition after-flame line is drawn for the Start Date according to each task groups and deadline;
    Job change line drafting module, for drawing job change line according to task increase and decrease amount;
    With reference to progress line drafting module, for the superposition after-flame line is added with the job change line drafting obtain referring into Spend line;
    Project trend graph drafting module, for drawing project trend graph with reference to progress line and actual task line by described.
  8. 8. device according to claim 7, it is characterised in that the superposition after-flame line drafting module is additionally operable to:
    After-flame line is drawn according to the Start Date, deadline and number of tasks of each task groups respectively;
    Each after-flame line is overlapped into drafting to obtain being superimposed after-flame line.
  9. 9. a kind of server, it is characterised in that described device includes processor, memory, bus and communication interface, the processing Device, communication interface and memory are connected by the bus;
    The memory is used for storage program;
    The processor, for calling the program being stored in the memory by the bus, perform the claim Any methods describeds of 1-6.
  10. 10. a kind of computer-readable storage medium, it is characterised in that for saving as used in any one of claim 7 to 8 described device Computer software instructions.
CN201710934098.1A 2017-10-09 2017-10-09 Project tendency drawing drawing method, device and server Pending CN107680149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710934098.1A CN107680149A (en) 2017-10-09 2017-10-09 Project tendency drawing drawing method, device and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710934098.1A CN107680149A (en) 2017-10-09 2017-10-09 Project tendency drawing drawing method, device and server

Publications (1)

Publication Number Publication Date
CN107680149A true CN107680149A (en) 2018-02-09

Family

ID=61138781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710934098.1A Pending CN107680149A (en) 2017-10-09 2017-10-09 Project tendency drawing drawing method, device and server

Country Status (1)

Country Link
CN (1) CN107680149A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109016161A (en) * 2018-06-22 2018-12-18 郑州市泰科工控自动化有限公司 Intelligent distribution and device
CN112967022A (en) * 2021-03-05 2021-06-15 广州地铁设计研究院股份有限公司 Efficient accounting system and method for project income and cost
CN113450018A (en) * 2021-07-16 2021-09-28 中国化学工程第十一建设有限公司 Project progress processing method, device and equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103533029A (en) * 2013-09-26 2014-01-22 广州中国科学院软件应用技术研究所 Gantt chart data loading method and system
CN103745287A (en) * 2013-03-01 2014-04-23 王新 Software project progress management method and system
CN104123214A (en) * 2013-04-26 2014-10-29 阿里巴巴集团控股有限公司 Method and system for measuring and displaying task executing progress based on runtime data
US20160364210A1 (en) * 2015-06-09 2016-12-15 International Business Machines Corporation System, apparatus, and method to facilitate management of agile software development projects
CN107122188A (en) * 2017-04-26 2017-09-01 网易(杭州)网络有限公司 The method and device of project process bar image generation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103745287A (en) * 2013-03-01 2014-04-23 王新 Software project progress management method and system
CN104123214A (en) * 2013-04-26 2014-10-29 阿里巴巴集团控股有限公司 Method and system for measuring and displaying task executing progress based on runtime data
CN103533029A (en) * 2013-09-26 2014-01-22 广州中国科学院软件应用技术研究所 Gantt chart data loading method and system
US20160364210A1 (en) * 2015-06-09 2016-12-15 International Business Machines Corporation System, apparatus, and method to facilitate management of agile software development projects
CN107122188A (en) * 2017-04-26 2017-09-01 网易(杭州)网络有限公司 The method and device of project process bar image generation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HANDSOMMAN: "燃尽图的学习与理解", 《HTTPS://WWW.CNBLOGS.COM/HANDSOMEMANWHB/P/5862610.HTML》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109016161A (en) * 2018-06-22 2018-12-18 郑州市泰科工控自动化有限公司 Intelligent distribution and device
CN112967022A (en) * 2021-03-05 2021-06-15 广州地铁设计研究院股份有限公司 Efficient accounting system and method for project income and cost
CN113450018A (en) * 2021-07-16 2021-09-28 中国化学工程第十一建设有限公司 Project progress processing method, device and equipment and storage medium

Similar Documents

Publication Publication Date Title
CN105700888B (en) A kind of visualization quick development platform based on jbpm workflow engine
US11270066B2 (en) Temporary formatting and charting of selected data
CN110610406B (en) Business process configuration method and device, computer equipment and storage medium
CN106897806A (en) Workflow creation method and system, operation system
CN107680149A (en) Project tendency drawing drawing method, device and server
CN104778124A (en) Automatic testing method for software application
CN105373522A (en) Gesture-based on-chart data filtering
JP2008158971A (en) Work schedule management program, work schedule management method, and work schedule management device
CN101571810B (en) Method for implementing program, method for verifying program result, devices and system
US7805284B2 (en) Simulation model defining system for generating a simulation program for a simulator simulating a behavior of economy or society regarded as a system of phenomena and events
CN108255620A (en) A kind of business logic processing method, apparatus, service server and system
US20190171446A1 (en) Value stream graphs across heterogeneous software development platforms
CN109637592A (en) The calculating task management and analysis and its operation method that molecular force field parameter generates
CN110414926A (en) Account management method, device and computer readable storage medium
CN111823229A (en) Mechanical arm control flow generation method, device, equipment and storage medium
CN104156269B (en) A kind of method for visualizing of the software and hardware optimal dividing based on Timed Automata
CN108875048A (en) Report form generation method, device, electronic equipment and readable storage medium storing program for executing
CN110427259A (en) A kind of task processing method and device
CN104050206A (en) Material bill rapid exporting method and system thereof
CN108764854B (en) Project control method, project control device, electronic equipment and medium
CN109814976A (en) A kind of functional module arrangement method and device
CN108595264A (en) Refresh tasks distribution method, electronic equipment and computer readable storage medium
JPH06348720A (en) Production development control display device
JPH0625991B2 (en) Process planning support device
CN110689922B (en) Method and system for GC content analysis of automatic parallelization knockout strategy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209