CN107679291A - Construction operation management method, storage device and mobile terminal based on BIM and AR - Google Patents
Construction operation management method, storage device and mobile terminal based on BIM and AR Download PDFInfo
- Publication number
- CN107679291A CN107679291A CN201710829274.5A CN201710829274A CN107679291A CN 107679291 A CN107679291 A CN 107679291A CN 201710829274 A CN201710829274 A CN 201710829274A CN 107679291 A CN107679291 A CN 107679291A
- Authority
- CN
- China
- Prior art keywords
- bim
- information
- location information
- management method
- operation management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K7/00—Methods or arrangements for sensing record carriers, e.g. for reading patterns
- G06K7/10—Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
- G06K7/14—Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation using light without selection of wavelength, e.g. sensing reflected white light
- G06K7/1404—Methods for optical code recognition
- G06K7/1408—Methods for optical code recognition the method being specifically adapted for the type of code
- G06K7/1417—2D bar codes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of construction operation management method based on BIM and AR, comprise the following steps:The BIM model datas currently built are obtained, and BIM models are divided into multiple building blocks;When mobile terminal, which receives the AR that user sends, checks instruction, obtain when preceding camera scans outdoor scene place image corresponding to obtained location information and current location information;Show the electromechanical pipeline model corresponding to current location information and information and be superimposed on the image of outdoor scene place so that user checks electromechanical pipeline model hiding inside currently practical region.Construction operation management method proposed by the present invention based on BIM and AR, facilitates and its internal structure is checked after the completion of construction.
Description
Technical field
The present invention relates to BIM technology and augmented reality field, more particularly to a kind of applying based on BIM and AR
Labour movement dimension management method, storage device and mobile terminal.
Background technology
In building field, after acceptance of concealed work is completed in work progress, its internal reinforcing bar can not be just viewed
Arrangement, complex node internal structure.During later stage O&M, it is necessary to take apart ceiling can just view be hidden in inside pipeline walk
To and information, so as to being made troubles to maintenance.
The content of the invention
It is a primary object of the present invention to provide a kind of construction operation management method based on BIM and AR, storage device and
Mobile terminal, it is intended to convenient that its internal structure is checked after the completion of construction.
To achieve the above object, the present invention provides a kind of construction operation management method based on BIM and AR, including following step
Suddenly:
The BIM model datas currently built are obtained, and BIM models are divided into by multiple building blocks according to location information;
When receiving the AR that user sends and checking instruction, obtain when preceding camera scans obtained location information and current fixed
Outdoor scene place image corresponding to the information of position;
Electromechanical pipeline model and information corresponding to display current location information are simultaneously superimposed on the image of outdoor scene place so that user looks into
See electromechanical pipeline model hiding inside currently practical region.
Preferably, it is described to show electromechanical pipeline model and information corresponding to current location information and be superimposed on outdoor scene place shadow
Also include after the step of checking electromechanical pipeline model hiding inside currently practical region as on for user:
When receiving the VR that user sends and checking instruction, obtain when preceding camera scan obtained location information and with BIM moulds
The location information to be prestored in type is matched;
Show that complete professional dummy model and information are so that user checks BIM moulds corresponding to current region corresponding to current location information
Type.
Preferably, it is described to show that complete professional dummy model and information are so that user checks currently corresponding to current location information
Also include afterwards the step of BIM models corresponding to region:
When receiving the component that user sends according to the BIM models currently shown and checking instruction, show in BIM models and currently select
The component information selected.
Preferably, the electromechanical pipeline model and information include hiding electric wire information inside BIM models, water pipe information,
Airduct information and crane span structure information.
Preferably, it is described to show electromechanical pipeline model and information corresponding to current location information and be superimposed on outdoor scene place shadow
Also include after the step of checking electromechanical pipeline model hiding inside currently practical region as on for user:
When receiving the remote control commands that user sends according to BIM models, the electromechanical equipment chosen to user sends control
Instruction.
Preferably, the location information is Quick Response Code.
Present invention further propose that a kind of storage device, is stored with multiple instruction, it is described to instruct for processor loading simultaneously
Perform:
The BIM model datas currently built are obtained, and BIM models are divided into by multiple building blocks according to location information;
When receiving the AR that user sends and checking instruction, obtain when preceding camera scans obtained location information and current fixed
Outdoor scene place image corresponding to the information of position;
Electromechanical pipeline model and information corresponding to display current location information are simultaneously superimposed on the image of outdoor scene place so that user looks into
See electromechanical pipeline model hiding inside currently practical region.
Present invention further propose that a kind of mobile terminal, including processor, for realizing each instruction;And including above-mentioned
Storage device.
Preferably, the mobile terminal is tablet personal computer or mobile phone.
Construction operation management method proposed by the present invention based on BIM and AR, solves concealed work in work progress and tests
Harvest into afterwards, the problem of its internal reinforcing bar arrangement, complex node internal structure can not be viewed.It need not be torn open during later stage O&M
Kaitian's card can also view the pipeline trend and information for being hidden in inside, convenient for users.Believed simultaneously by positioning
BIM models are divided into multiple building blocks by breath, realize accurate division.Based on BIM and AR construction operation management side Guttae Phacosylini
Reality scene and dummy model are combined with mobile terminal, take virtual technology to scene, enhancing model is true reality
True feeling.
Brief description of the drawings
Fig. 1 is mobile terminal of the present invention in the operating diagram using process;
Fig. 2 is the schematic flow sheet of the first embodiment of construction operation management method of the present invention based on BIM and AR;
Fig. 3 is the schematic flow sheet of the second embodiment of construction operation management method of the present invention based on BIM and AR.
In figure, 1-Quick Response Code;2-mobile terminal;3-BIM-AR manages APP;4-real scene.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention passes in and out a kind of construction operation management method based on BIM and AR.
Reference picture 1, it is proposed by the present invention based on BIM and AR construction operation management method first embodiment in, including
Following steps:
Step S10, the BIM model datas currently built are obtained, and BIM models are divided into by multiple building blocks according to location information;
Step S20, when receiving the AR that user sends and checking instruction, obtain when preceding camera scan obtained location information with
And outdoor scene place image corresponding to current location information;
Step S30, show current location information corresponding to electromechanical pipeline model and information and be superimposed on the image of outdoor scene place with
Electromechanical pipeline model hiding inside currently practical region is checked for user.
Specifically, electromechanical pipeline model information includes the electric wire information inside hiding BIM models, water pipe information, airduct letter
Breath and crane span structure information.In the present embodiment, location information is Quick Response Code, and certain location information can also be bar code etc., this hair
It is bright that this is not construed as limiting.Electric wire information includes trend, electric current and the magnitude of voltage of circuit.Building block is a certain area in BIM models
The models in domain, BIM models are divided into multiple building blocks, the actual area of Current Scan is only shown when such user checks,
User is facilitated to check the details of current region.
BIM-AR management APP are may be configured as based on BIM and AR construction operation management method, load on mobile terminal
(Mobile phone or tablet personal computer)In.When BIM models import BIM-AR management APP, the lattice BIM model conversions into fbx or max
Formula, then the model of this form is loaded into BIM-AR management APP.
The set location of the architectural multiple Quick Response Codes of entity is as two microcode positions in BIM models.Entity is architectural to be set
Multiple measurement points are put, each measurement point correspondingly places Quick Response Code.Reach the purpose of positioning by the way that actual situation two Quick Response Codes are overlapping.
User when in use, need to recall BIM models in tablet personal computer, then, it is architectural open camera scanning entity
The Quick Response Code of setting, you can model and information are checked by mobile terminal.
The construction operation management method based on BIM and AR that the present embodiment proposes, solves concealed work in work progress
Check and accept after completing, the problem of its internal reinforcing bar arrangement, complex node internal structure can not be viewed.Need not during later stage O&M
The pipeline trend and information for being hidden in inside can also be viewed by taking ceiling apart, convenient for users.Pass through positioning simultaneously
BIM models are divided into multiple building blocks by information, realize accurate division.Can based on BIM and AR construction operation management method
Reality scene and dummy model are combined using mobile terminal, take virtual technology to scene, enhancing model is in reality
The sense of reality.
Further, also include after step S30:
Step S40, when receiving the VR that user sends and checking instruction, obtain when preceding camera scans obtained location information simultaneously
Matched with the location information to be prestored in BIM models;
Step S50, show that complete professional dummy model and information are so that user checks current region pair corresponding to current location information
The BIM models answered.
That is, being provided with both of which in mobile terminal, one kind is VR patterns, now, is shown on mobile terminals
Full Professional Model, it is seen that be the same angle consistent with reality scene, the entirely virtual BIM models with orientation, realize and moving
Dummy model is shown in dynamic terminal.Another is AR patterns, on mobile terminals concealed structure and BUILDINGS MODELS, is opened electromechanical
Model, real scene is caught by rear camera, virtual electromechanical pipeline model is superimposed on the basis of real scene, and
The information of electromechanical pipeline can be checked, realizes the scene of virtual reality fusion, realizes the effect of augmented reality.
Further, also include after step S50:
Step S60, when receiving the component that user sends according to the BIM models currently shown and checking instruction, show BIM models
In the component information that currently selects.
In VR patterns, when user selects some component by mobile terminal, you can show the component details.Specifically
Ground, BIM-AR management APP pass through by specialty(Divide the specialties such as building, structure, electromechanics, curtain wall, steel construction), category(Point wall,
The classifications such as beam, plate, post, ceiling), by component(Single BIM components)Deng the hiding of selectivity, the function of display model, reach
VR and AR mode checks model and information.
The second embodiment of construction operation management method proposed by the present invention based on BIM and AR.The present embodiment and above-mentioned first
Unlike embodiment, also include after step S30:
Step S70, when receiving the remote control commands that user sends according to BIM models, to the electromechanical equipment of user's selection
Send control instruction.
That is, mobile terminal is additionally provided with IOT(Internet of Things)Pattern, can be by various information sensings
Equipment, such as rfid device, infrared inductor, global positioning system, a variety of devices of laser scanner are combined with internet
The huge network for getting up and being formed.The BIM models that mobile terminal is shown have individual virtual switch and actual Internet of things hardware
It is connected, user is by controlling virtual switch can to realize the opening and closing of control device, while mobile terminal completes letter
The display of breath and the control of hardware.User is realized by this mode actual electromechanical equipment can control by mobile terminal,
Greatly facilitate user's use.
A kind of present invention further propose that storage device.
In this preferred embodiment, a kind of storage device is stored with multiple instruction, and described instruct loads and held for processor
OK:
The BIM model datas currently built are obtained, and BIM models are divided into by multiple building blocks according to location information;
When receiving the AR that user sends and checking instruction, obtain when preceding camera scans obtained location information and current fixed
Outdoor scene place image corresponding to the information of position;
Corresponding to display current location information in building block electromechanical pipeline model information and be superimposed on the image of outdoor scene place for
User checks electromechanical pipeline model hiding inside currently practical region.
A kind of present invention further propose that mobile terminal.
In this preferred embodiment, a kind of mobile terminal, including processor, for realizing each instruction;And including above-mentioned
Storage device.The mobile terminal is tablet personal computer or mobile phone.
The use process of this mobile terminal is as follows.
(1)BIM models are loaded into BIM-AR management APP:Form BIM model conversions into fbx or max, by this lattice
The model of formula is loaded into BIM-AR management APP;
(2)It is accurate to place Quick Response Code:Quick Response Code is accurately placed in measurement point, the Quick Response Code is for carrying out the accurate fixed of model
Position;
(3)Mobile scanning terminal QRCODE codes position:Use mobile terminal(Tablet personal computer or mobile phone)After scanning Quick Response Code positioning, i.e.,
Mobile terminal can be passed through(Tablet personal computer or mobile phone)Check model and information;
(4)User's unrestricted choice VR or AR mode check model and information.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair
The equivalent structure transformation that bright specification and accompanying drawing content are made, or other related technical areas are directly or indirectly used in,
Similarly it is included within the scope of the present invention.
Claims (9)
- A kind of 1. construction operation management method based on BIM and AR, it is characterised in that comprise the following steps:The BIM model datas currently built are obtained, and BIM models are divided into by multiple building blocks according to location information;When receiving the AR that user sends and checking instruction, obtain when preceding camera scans obtained location information and current fixed Outdoor scene place image corresponding to the information of position;Electromechanical pipeline model and information corresponding to display current location information are simultaneously superimposed on the image of outdoor scene place so that user looks into See electromechanical pipeline model hiding inside currently practical region.
- 2. the construction operation management method based on BIM and AR as claimed in claim 1, it is characterised in that the display is current Electromechanical pipeline model and information corresponding to location information are simultaneously superimposed on the image of outdoor scene place so that user checks currently practical area Also include afterwards the step of hiding electromechanical pipeline model inside domain:When receiving the VR that user sends and checking instruction, obtain when preceding camera scan obtained location information and with BIM moulds The location information to be prestored in type is matched;Show that complete professional dummy model and information are so that user checks BIM moulds corresponding to current region corresponding to current location information Type.
- 3. the construction operation management method based on BIM and AR as claimed in claim 2, it is characterised in that the display is current After complete professional dummy model corresponding to location information and information are for the step of user checks BIM models corresponding to current region Also include:When receiving the component that user sends according to the BIM models currently shown and checking instruction, show in BIM models and currently select The component information selected.
- 4. the construction operation management method based on BIM and AR as claimed in claim 1, it is characterised in that the electromechanical pipeline Model and information include hiding electric wire information, water pipe information, airduct information and the crane span structure information inside BIM models.
- 5. the construction operation management method based on BIM and AR as claimed in claim 1, it is characterised in that the display is current Electromechanical pipeline model and information corresponding to location information are simultaneously superimposed on the image of outdoor scene place so that user checks currently practical area Also include afterwards the step of hiding electromechanical pipeline model inside domain:When receiving the remote control commands that user sends according to BIM models, the electromechanical equipment chosen to user sends control Instruction.
- 6. the construction operation management method based on BIM and AR as claimed in claim 1, it is characterised in that the location information For Quick Response Code.
- 7. a kind of storage device, it is characterised in that be stored with multiple instruction, described instruct loads and performed for processor:The BIM model datas currently built are obtained, and BIM models are divided into by multiple building blocks according to location information;When receiving the AR that user sends and checking instruction, obtain when preceding camera scans obtained location information and current fixed Outdoor scene place image corresponding to the information of position;Electromechanical pipeline model and information corresponding to display current location information are simultaneously superimposed on the image of outdoor scene place so that user looks into See electromechanical pipeline model hiding inside currently practical region.
- 8. a kind of mobile terminal, it is characterised in that including processor, for realizing each instruction;And including such as claim 7 institute The storage device stated.
- 9. mobile terminal as claimed in claim 8, it is characterised in that the mobile terminal is tablet personal computer or mobile phone.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710829274.5A CN107679291A (en) | 2017-09-14 | 2017-09-14 | Construction operation management method, storage device and mobile terminal based on BIM and AR |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710829274.5A CN107679291A (en) | 2017-09-14 | 2017-09-14 | Construction operation management method, storage device and mobile terminal based on BIM and AR |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107679291A true CN107679291A (en) | 2018-02-09 |
Family
ID=61136072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710829274.5A Pending CN107679291A (en) | 2017-09-14 | 2017-09-14 | Construction operation management method, storage device and mobile terminal based on BIM and AR |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107679291A (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108510596A (en) * | 2018-03-30 | 2018-09-07 | 北京华麒通信科技股份有限公司 | A kind of Design of Indoor Signal Distributed System method, apparatus, medium and equipment |
CN108874340A (en) * | 2018-06-13 | 2018-11-23 | 深圳市智汇幕墙科技有限公司 | A kind of visualization building curtain wall management method and device |
CN108921946A (en) * | 2018-06-25 | 2018-11-30 | 中国人民解放军陆军工程大学 | A kind of hidden pipeline of engineering based on BIM+AR measures and spatial position automatic matching method |
CN109242979A (en) * | 2018-09-05 | 2019-01-18 | 国家电网公司 | A kind of hidden pipeline visualization system and method based on mixed reality technology |
CN109341001A (en) * | 2018-10-15 | 2019-02-15 | 珠海格力电器股份有限公司 | A kind of method and device that the equipment electricity based on PV air-conditioner is shown |
CN109492271A (en) * | 2018-10-22 | 2019-03-19 | 上海建工四建集团有限公司 | A kind of geometrical model light-weight technologg method in the BIM towards operation management |
CN109522381A (en) * | 2018-11-02 | 2019-03-26 | 长江空间信息技术工程有限公司(武汉) | The hidden installation security detection method of building based on 3DGIS+BIM |
CN109523105A (en) * | 2018-08-27 | 2019-03-26 | 中铁上海工程局集团有限公司 | A kind of visualization Risk Identification and equipment based on bim Yu ar technology |
CN110234075A (en) * | 2019-06-17 | 2019-09-13 | 滁州学院 | Fireman's positioning and vital sign monitoring method under a kind of complexity emergency management and rescue environment |
CN111179461A (en) * | 2019-12-30 | 2020-05-19 | 万翼科技有限公司 | BIM (building information modeling) -based routing inspection record generation method and equipment and storage medium |
CN112102485A (en) * | 2020-09-04 | 2020-12-18 | 中国十七冶集团有限公司 | Method for carrying out space intelligent management based on AR technology |
CN112907211A (en) * | 2021-03-02 | 2021-06-04 | 惠州城际工程咨询有限公司 | BIM-based project progress supervision method, device, equipment and storage medium |
CN113066195A (en) * | 2021-03-17 | 2021-07-02 | 广东电网有限责任公司梅州供电局 | Power equipment inspection method and device, AR glasses and storage medium |
CN113239443A (en) * | 2021-06-03 | 2021-08-10 | 广州中硕建筑设计院有限公司 | Intelligent space display structure design modeling method based on BIM software |
CN113496554A (en) * | 2020-04-01 | 2021-10-12 | 以见科技(上海)有限公司 | Method and equipment for processing building information model |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104484033A (en) * | 2014-11-21 | 2015-04-01 | 上海同筑信息科技有限公司 | BIM based virtual reality displaying method and system |
CN105023201A (en) * | 2015-07-24 | 2015-11-04 | 中建三局第一建设工程有限责任公司 | Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data |
CN105955463A (en) * | 2016-04-26 | 2016-09-21 | 王立峰 | BIM (Building Information Modeling)-based VR (Virtual Reality) virtual feeling system |
CN106897817A (en) * | 2017-01-22 | 2017-06-27 | 朗坤智慧科技股份有限公司 | A kind of construction speed Visualized management system and method based on augmented reality |
-
2017
- 2017-09-14 CN CN201710829274.5A patent/CN107679291A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104484033A (en) * | 2014-11-21 | 2015-04-01 | 上海同筑信息科技有限公司 | BIM based virtual reality displaying method and system |
CN105023201A (en) * | 2015-07-24 | 2015-11-04 | 中建三局第一建设工程有限责任公司 | Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data |
CN105955463A (en) * | 2016-04-26 | 2016-09-21 | 王立峰 | BIM (Building Information Modeling)-based VR (Virtual Reality) virtual feeling system |
CN106897817A (en) * | 2017-01-22 | 2017-06-27 | 朗坤智慧科技股份有限公司 | A kind of construction speed Visualized management system and method based on augmented reality |
Non-Patent Citations (3)
Title |
---|
XIANGYU WANG等: "BIM + AR: Onsite Information Sharing and", <PROCEEDINGS OF THE 2012 IEEE 16TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN> * |
互联立方BIM咨询: "看全球顶尖的BIM玩法:在增强现实(AR)领域的BIM应用", 《HTTPS://WWW.SOHU.COM/A/191563900_769918》 * |
兰狐狸: "BIM技术在运维管理中的应用,BIM管理", 《HTTP://WWW.360DOC.COM/CONTENT/15/0726/22/9667630_487601832.SHTML》 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108510596A (en) * | 2018-03-30 | 2018-09-07 | 北京华麒通信科技股份有限公司 | A kind of Design of Indoor Signal Distributed System method, apparatus, medium and equipment |
CN108874340A (en) * | 2018-06-13 | 2018-11-23 | 深圳市智汇幕墙科技有限公司 | A kind of visualization building curtain wall management method and device |
CN108921946A (en) * | 2018-06-25 | 2018-11-30 | 中国人民解放军陆军工程大学 | A kind of hidden pipeline of engineering based on BIM+AR measures and spatial position automatic matching method |
CN109523105A (en) * | 2018-08-27 | 2019-03-26 | 中铁上海工程局集团有限公司 | A kind of visualization Risk Identification and equipment based on bim Yu ar technology |
CN109242979A (en) * | 2018-09-05 | 2019-01-18 | 国家电网公司 | A kind of hidden pipeline visualization system and method based on mixed reality technology |
CN109341001A (en) * | 2018-10-15 | 2019-02-15 | 珠海格力电器股份有限公司 | A kind of method and device that the equipment electricity based on PV air-conditioner is shown |
CN109341001B (en) * | 2018-10-15 | 2020-03-06 | 珠海格力电器股份有限公司 | Photovoltaic air conditioner-based equipment electric quantity display method and device |
CN109492271B (en) * | 2018-10-22 | 2020-06-30 | 上海建工四建集团有限公司 | Operation and maintenance management-oriented geometric model lightweight processing method in BIM |
CN109492271A (en) * | 2018-10-22 | 2019-03-19 | 上海建工四建集团有限公司 | A kind of geometrical model light-weight technologg method in the BIM towards operation management |
CN109522381A (en) * | 2018-11-02 | 2019-03-26 | 长江空间信息技术工程有限公司(武汉) | The hidden installation security detection method of building based on 3DGIS+BIM |
CN109522381B (en) * | 2018-11-02 | 2021-05-04 | 长江空间信息技术工程有限公司(武汉) | Building hidden facility safety detection method based on 3DGIS + BIM |
CN110234075A (en) * | 2019-06-17 | 2019-09-13 | 滁州学院 | Fireman's positioning and vital sign monitoring method under a kind of complexity emergency management and rescue environment |
CN111179461A (en) * | 2019-12-30 | 2020-05-19 | 万翼科技有限公司 | BIM (building information modeling) -based routing inspection record generation method and equipment and storage medium |
CN113496554A (en) * | 2020-04-01 | 2021-10-12 | 以见科技(上海)有限公司 | Method and equipment for processing building information model |
CN112102485A (en) * | 2020-09-04 | 2020-12-18 | 中国十七冶集团有限公司 | Method for carrying out space intelligent management based on AR technology |
CN112907211A (en) * | 2021-03-02 | 2021-06-04 | 惠州城际工程咨询有限公司 | BIM-based project progress supervision method, device, equipment and storage medium |
CN113066195A (en) * | 2021-03-17 | 2021-07-02 | 广东电网有限责任公司梅州供电局 | Power equipment inspection method and device, AR glasses and storage medium |
CN113239443A (en) * | 2021-06-03 | 2021-08-10 | 广州中硕建筑设计院有限公司 | Intelligent space display structure design modeling method based on BIM software |
CN113239443B (en) * | 2021-06-03 | 2022-07-05 | 广州中硕建筑设计院有限公司 | Intelligent space display structure design modeling method based on BIM software |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107679291A (en) | Construction operation management method, storage device and mobile terminal based on BIM and AR | |
CN107632824B (en) | A kind of generation method of augmented reality module, generating means and generate system | |
CN103076877B (en) | Posture is used to interact with the mobile device in vehicle | |
O'Neill et al. | A testbed for evaluating human interaction with ubiquitous computing environments | |
KR102442137B1 (en) | Apparatus, method and computer-readable storage medium for generating digital twin space linked with webgl-based url link | |
CN107832712A (en) | Biopsy method, device and computer-readable recording medium | |
CN108876732A (en) | Face U.S. face method and device | |
CN106775328B (en) | Multi-person interaction method and system based on digital artistic landscape device | |
CN109543011A (en) | Question and answer data processing method, device, computer equipment and storage medium | |
CN112927260B (en) | Pose generation method and device, computer equipment and storage medium | |
CN105872201A (en) | Method for remotely controlling document display through intelligent terminal, intelligent terminal and computer equipment | |
CN109657539A (en) | Face value evaluation method and device, readable storage medium and electronic equipment | |
CN111062074B (en) | Building space quality virtual simulation and intelligent evaluation method | |
CN114998491A (en) | Digital human driving method, device, equipment and storage medium | |
CN109508090A (en) | A kind of augmented reality display board system having interactivity | |
CN111381679A (en) | AR-based assembly type building construction training method and device and computing equipment | |
CN106502401B (en) | Image control method and device | |
CN108230202A (en) | A kind of fire-fighting simulative training system and method | |
CN108762726A (en) | Basic framework development platform and the method played by Platform Designing | |
US11423628B2 (en) | System and method for converting a two-dimensional floor plan into an interactable three-dimensional simulation | |
CN108537165A (en) | Method and apparatus for determining information | |
CN114693187B (en) | Operation analysis method and device of tower crane cluster, storage medium and terminal | |
JP7130215B1 (en) | Planned building confirmation system | |
KR20230046380A (en) | Method for providing marketing service using Augmented Reality | |
CN114299271A (en) | Three-dimensional modeling method, three-dimensional modeling apparatus, electronic device, and readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180209 |
|
RJ01 | Rejection of invention patent application after publication |