CN112102485A - Method for carrying out space intelligent management based on AR technology - Google Patents

Method for carrying out space intelligent management based on AR technology Download PDF

Info

Publication number
CN112102485A
CN112102485A CN202010920327.6A CN202010920327A CN112102485A CN 112102485 A CN112102485 A CN 112102485A CN 202010920327 A CN202010920327 A CN 202010920327A CN 112102485 A CN112102485 A CN 112102485A
Authority
CN
China
Prior art keywords
space
dimensional model
technology
equipment
intelligent management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010920327.6A
Other languages
Chinese (zh)
Inventor
孙孝华
鲁照香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202010920327.6A priority Critical patent/CN112102485A/en
Publication of CN112102485A publication Critical patent/CN112102485A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/006Mixed reality
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2200/00Indexing scheme for image data processing or generation, in general
    • G06T2200/04Indexing scheme for image data processing or generation, in general involving 3D image data

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Geometry (AREA)
  • Computer Graphics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Sensing (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a method for carrying out space intelligent management based on an AR technology, and belongs to the technical field of space intelligent management. In a specific field space, the AR technology is applied to sense and position the surrounding environment, and a pre-established virtual three-dimensional model image is stably presented in the space, so that the three-dimensional model is superposed with the real environment, the function of quickly identifying and analyzing the field space by using personnel is assisted, safety appliances, construction equipment, material stacking and the like of a construction site are effectively controlled, the efficiency is improved, the risk is reduced, the project construction and operation and maintenance management level is improved, the defect that a space management method in the prior art is not visual enough or has higher requirements is overcome, and the method is a future development direction.

Description

Method for carrying out space intelligent management based on AR technology
Technical Field
The invention relates to the technical field of space intelligent management, in particular to a method for carrying out space intelligent management based on an AR technology.
Background
The AR technology is a brand-new man-machine interaction technology, and is a high-level man-machine interface of a computer with basic characteristics of interactivity and conception. The AR technology can realize real-time information display, superimpose the three-dimensional virtual information on the real world, continuously update the virtual information according to different tracked marks, and perform real-time display. The daily management of the construction site directly influences the improvement of production safety, quality and efficiency. In the project process, whether the space and the plane arrangement of a construction site are planned and implemented in place or not is planned, and the safety devices, construction equipment and material stacking inspection of the construction site is a problem to be faced by site managers every day. Therefore, a space intelligent management method is needed to solve the problem.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and therefore provides a method for performing space intelligent management based on an AR technology.
In order to achieve the purpose, the invention adopts the following technical scheme:
a method for carrying out space intelligent management based on AR technology comprises the following steps:
firstly, manufacturing a space three-dimensional model, and importing space management platform software of AR equipment;
secondly, performing key arrangement on appliances, equipment or materials needing to be controlled, and setting triggering conditions;
thirdly, calling a three-dimensional model in a specific space by using an AR (augmented reality) recognition camera to be combined with a real environment for comparison;
step four, the AR program finds whether the field appliances, equipment or materials are in the preset placing positions or not through the triggering conditions;
and step five, whether the position is correct or not is indicated through the highlighting of different colors, and if the position needs to be modified, the position is confirmed after the position is placed through the monomer components prefabricated in the program.
Preferably, the unmanned aerial vehicle image is used for carrying out three-dimensional model construction on a three-dimensional field model, or geographic information is subjected to three-dimensional transformation through Civil-like terrain software and then combined with BIM modeling software to manufacture a space three-dimensional model.
Preferably, the AR recognition camera is one of a smartphone, a tablet computer or AR glasses with a camera.
Preferably, the augmented reality technology is applied to sense and position the surrounding environment, and the pre-established virtual three-dimensional model image is stably presented in the space, so that the three-dimensional model and the real environment are superposed, and the three-dimensional model image at the designated position is presented along with the movement and direction transition of the equipment.
Preferably, the AR identification technology is used for actively identifying appliances, equipment or materials needing to be controlled and warning, passive monitoring is changed into active monitoring, key objects are found more quickly and accurately, and perception and interaction experience is improved.
Preferably, the method can also be applied to operation and maintenance management of buildings, important equipment and objects in the buildings can be controlled according to the method, whether the fire fighting equipment is placed in place or not can be found and corrected in time if the fire fighting equipment is moved to other positions.
Compared with the prior art, the invention has the following beneficial effects:
according to the method for carrying out space intelligent management based on the AR technology, provided by the invention, in a specific field space, the AR technology is applied to sense and position the surrounding environment, and a pre-established virtual three-dimensional model image is stably presented in the space, so that the three-dimensional model is superposed with the real environment, the function of rapidly identifying and analyzing the field space by using personnel is assisted, safety appliances, construction equipment, material stacking and the like of a construction field are effectively controlled, the efficiency is improved, the risk is reduced, the project construction and operation and maintenance management level is improved, the defect that the space management method in the prior art is not visual enough or has higher requirements is overcome, and the method is a future development direction.
Drawings
Fig. 1 is a schematic flow chart of a method for performing space intelligent management based on AR technology.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the invention.
Examples
Referring to fig. 1, a method for performing spatial intelligent management based on AR technology includes the following steps:
firstly, manufacturing a space three-dimensional model, and importing space management platform software of AR equipment;
secondly, performing key arrangement on appliances, equipment or materials needing to be controlled, and setting triggering conditions;
thirdly, calling a three-dimensional model in a specific space by using an AR (augmented reality) recognition camera to be combined with a real environment for comparison;
step four, the AR program finds whether the field appliances, equipment or materials are in the preset placing positions or not through the triggering conditions;
and step five, whether the position is correct or not is indicated through the highlighting of different colors, and if the position needs to be modified, the position is confirmed after the position is placed through the monomer components prefabricated in the program.
In a further preferred scheme of this embodiment, the unmanned aerial vehicle image is used to perform a three-dimensional model to construct a three-dimensional field model, or geographic information is three-dimensionally transformed by Civil-like terrain software and then a spatial three-dimensional model is created by combining BIM modeling software.
In a further preferred aspect of this embodiment, the AR recognition camera is one of a smartphone, a tablet computer, or AR glasses with a camera.
In a further preferred embodiment of the present invention, an augmented reality technology is applied to sense and locate the surrounding environment, and a pre-established virtual three-dimensional model image is stably presented in space, so that the three-dimensional model is superimposed on the real environment, and the three-dimensional model image at the specified position is presented along with the movement and direction transition of the device.
According to a further preferable scheme of the embodiment, the AR identification technology is used for actively identifying appliances, equipment or materials needing to be controlled and warning, passive monitoring is changed into active monitoring, key objects are found more quickly and accurately, and perception and interaction experience is improved.
According to a further preferable scheme of the embodiment, the method can also be applied to operation and maintenance management of buildings, important equipment and objects in the buildings can be controlled according to the method, whether the fire fighting equipment is placed in place or not can be found and corrected in time if the fire fighting equipment is moved to other positions.
According to the method for carrying out space intelligent management based on the AR technology, provided by the invention, in a specific field space, the AR technology is applied to sense and position the surrounding environment, and a pre-established virtual three-dimensional model image is stably presented in the space, so that the three-dimensional model is superposed with the real environment, the function of rapidly identifying and analyzing the field space by using personnel is assisted, safety appliances, construction equipment, material stacking and the like of a construction field are effectively controlled, the efficiency is improved, the risk is reduced, the project construction and operation and maintenance management level is improved, the defect that the space management method in the prior art is not visual enough or has higher requirements is overcome, and the method is a future development direction.
The above description is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto. The substitution may be of partial structures, devices, method steps, or may be a complete solution. The technical solution and the inventive concept of the present invention should be equally replaced or changed and should be covered within the protection scope of the present invention.

Claims (6)

1. A method for carrying out space intelligent management based on AR technology is characterized by comprising the following steps:
firstly, manufacturing a space three-dimensional model, and importing space management platform software of AR equipment;
secondly, performing key arrangement on appliances, equipment or materials needing to be controlled, and setting triggering conditions;
thirdly, calling a three-dimensional model in a specific space by using an AR (augmented reality) recognition camera to be combined with a real environment for comparison;
step four, the AR program finds whether the field appliances, equipment or materials are in the preset placing positions or not through the triggering conditions;
and step five, whether the position is correct or not is indicated through the highlighting of different colors, and if the position needs to be modified, the position is confirmed after the position is placed through the monomer components prefabricated in the program.
2. The method for performing intelligent management on space based on AR technology according to claim 1, wherein the unmanned aerial vehicle image is used for performing three-dimensional model construction on a three-dimensional field model, or geographic information is subjected to three-dimensional transformation through Civil-like terrain software and then a spatial three-dimensional model is manufactured by combining BIM modeling software.
3. The method of claim 1, wherein the AR recognition camera is one of a smartphone with a camera, a tablet computer or AR glasses.
4. The method of claim 1, wherein the augmented reality technology is used to sense and position the surrounding environment, and the pre-established virtual three-dimensional model image is stably displayed in the space, so that the three-dimensional model and the real environment are overlaid to display the three-dimensional model image at the designated position along with the movement and direction change of the device.
5. The method according to claim 1, wherein the AR recognition technology is used to actively recognize appliances, devices or materials to be managed and control, and warn, and the passive monitoring is changed to the active monitoring, so that key objects can be found more quickly and accurately, and the experience of perception and interaction can be improved.
6. The method for space intelligent management based on AR technology as claimed in claim 1, wherein the method can also be applied to operation and maintenance management of buildings, important equipment and objects in the buildings can be managed and controlled according to the method, whether fire fighting equipment is put in place or not, and if the fire fighting equipment is moved to other positions, the fire fighting equipment needs to be found and corrected in time.
CN202010920327.6A 2020-09-04 2020-09-04 Method for carrying out space intelligent management based on AR technology Pending CN112102485A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010920327.6A CN112102485A (en) 2020-09-04 2020-09-04 Method for carrying out space intelligent management based on AR technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010920327.6A CN112102485A (en) 2020-09-04 2020-09-04 Method for carrying out space intelligent management based on AR technology

Publications (1)

Publication Number Publication Date
CN112102485A true CN112102485A (en) 2020-12-18

Family

ID=73757721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010920327.6A Pending CN112102485A (en) 2020-09-04 2020-09-04 Method for carrying out space intelligent management based on AR technology

Country Status (1)

Country Link
CN (1) CN112102485A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404318A (en) * 2021-07-06 2021-09-17 中建八局第三建设有限公司 BIM (building information modeling), UWB (ultra wide band) and AR (augmented reality) technology based temporary edge opening construction control method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107679291A (en) * 2017-09-14 2018-02-09 中建三局第建设工程有限责任公司 Construction operation management method, storage device and mobile terminal based on BIM and AR
CN108053486A (en) * 2017-11-10 2018-05-18 上海建工五建集团有限公司 Construction method and system based on virtual technology
CN109064133A (en) * 2018-07-27 2018-12-21 福建京力信息科技有限公司 A kind of engineering whole process management system based on BIM+AR
CN109767095A (en) * 2018-12-28 2019-05-17 中交一航局安装工程有限公司 A kind of construction system and its implementation based on BIM model and AR technology
CN110880200A (en) * 2019-11-15 2020-03-13 国网福建省电力有限公司 Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107679291A (en) * 2017-09-14 2018-02-09 中建三局第建设工程有限责任公司 Construction operation management method, storage device and mobile terminal based on BIM and AR
CN108053486A (en) * 2017-11-10 2018-05-18 上海建工五建集团有限公司 Construction method and system based on virtual technology
CN109064133A (en) * 2018-07-27 2018-12-21 福建京力信息科技有限公司 A kind of engineering whole process management system based on BIM+AR
CN109767095A (en) * 2018-12-28 2019-05-17 中交一航局安装工程有限公司 A kind of construction system and its implementation based on BIM model and AR technology
CN110880200A (en) * 2019-11-15 2020-03-13 国网福建省电力有限公司 Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404318A (en) * 2021-07-06 2021-09-17 中建八局第三建设有限公司 BIM (building information modeling), UWB (ultra wide band) and AR (augmented reality) technology based temporary edge opening construction control method

Similar Documents

Publication Publication Date Title
CN109978409B (en) Multi-engineering enterprise-level intelligent construction site block chain management method
CN104484523B (en) A kind of augmented reality induction maintenance system realizes apparatus and method for
CN107879260B (en) Tower crane collision avoidance system and security system based on BIM
DE102019122343A1 (en) DEVIATION CORRECTION FOR INDUSTRIAL APPLICATIONS WITH EXTENDED REALITY
CN106791700B (en) Enterprise critical area personnel path safety monitoring system and method
CN108038910A (en) The implementation method of substation's main equipment Virtual Reality Demonstration
CN112818768A (en) Transformer substation reconstruction and extension violation behavior intelligent identification method based on meta-learning
DE102021120250A1 (en) Fast activation techniques for industrial augmented reality applications
CN108255932B (en) Roaming browsing method and system of digital factory based on three-dimensional digital platform
CN111222190A (en) Ancient building management system
CN109767095A (en) A kind of construction system and its implementation based on BIM model and AR technology
CN107422710A (en) The method and system of assembling product or plant maintenance are aided in based on AR
CN112102485A (en) Method for carrying out space intelligent management based on AR technology
CN116030226A (en) Reality visualization method, system, equipment and medium for power distribution network operation
CN114764900A (en) Boundary-crossing violation monitoring method for field operation of transformer substation
CN113741368A (en) Power enterprise safety production management method based on management and control of Internet of things
CN114326517B (en) Remote management method and system based on virtual reality
CN111668935B (en) Substation operation preparation management method and system based on EIM
CN115859689B (en) Panoramic visualization digital twin application method
CN112506155A (en) PC component production simulation and intelligent control system
CN115065936B (en) Three-dimensional visual positioning method based on light building information model and Bluetooth technology
CN116258343A (en) Building construction monitoring method
CN114049427B (en) VR scene-based intelligent substation secondary circuit information roaming method
DE102018123635A1 (en) 3D MAPPING OF A PROCESS CONTROL ENVIRONMENT
CN115879736A (en) Simulation building system and method for island type assembly production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination