A kind of construction system and its implementation based on BIM model and AR technology Download PDF

Info

Publication number
CN109767095A
CN109767095A CN201811620181.2A CN201811620181A CN109767095A CN 109767095 A CN109767095 A CN 109767095A CN 201811620181 A CN201811620181 A CN 201811620181A CN 109767095 A CN109767095 A CN 109767095A
Authority
CN
China
Prior art keywords
adaptive
madal
bim
mobile terminal
mutual inductance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811620181.2A
Other languages
Chinese (zh)
Inventor
李彦鹏
王亚军
杨晓东
廖闯
吴成成
张琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
CCCC First Harbor Installation Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
CCCC First Harbor Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, CCCC First Harbor Installation Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201811620181.2A priority Critical patent/CN109767095A/en
Publication of CN109767095A publication Critical patent/CN109767095A/en
Pending legal-status Critical Current

Links

Landscapes

  • Telephone Function (AREA)

Abstract

The present invention is a kind of construction system and its implementation based on BIM model and AR technology, and construction system includes BIM threedimensional model, adaptive AR madal, AR mobile terminal, AR control system and intelligent mutual inductance equipment;Adaptive AR madal is used with BIM threedimensional model and is bi-directionally connected, adaptive AR madal is connected with AR control system, AR control system is connected with AR mobile terminal, intelligent mutual inductance equipment, and AR mobile terminal is connected with adaptive AR madal, is bi-directionally connected between the AR mobile terminal and intelligent mutual inductance equipment.Implementation method are as follows: establish BIM threedimensional model;Make adaptive AR madal;The interconnection of BIM threedimensional model, adaptive AR madal;Visualize the foundation of construction system;Operation.The present invention effectively raises working efficiency, saves resource, reduces costs, and is advantageously implemented sustainable development.

Description

A kind of construction system and its implementation based on BIM model and AR technology
Technical field
The present invention relates to construction system regions more particularly to a kind of construction systems based on BIM model and AR technology And its implementation.
Background technique
Construction system is a huge system, from the design of building, construction, operation up to whole building the full longevity The centre of life, the information being related to are very huge.
Before previous construction operation, construction personnel, which requires a great deal of time, consults national industry standard, design The data such as drawing, owner's unit Technical specification, equipment operation Guide Book are not also closed in whole building work progress Suitable tutorial message, construction period, cost are controlled without rationally effective approach, and there is also each for construction safety construction Kind is insufficient.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of construction system based on BIM model and AR technology is provided And its implementation.
The present invention to achieve the above object, using following technical scheme:
A kind of construction system based on BIM model and AR technology, including BIM threedimensional model, adaptive AR madal, AR are mobile Terminal, AR control system and intelligent mutual inductance equipment;
With BIM threedimensional model using being bi-directionally connected, the adaptive AR madal and AR control are the adaptive AR madal System is connected, and AR control system is connected with AR mobile terminal, intelligent mutual inductance equipment, the AR mobile terminal and adaptive AR madal phase Even, it is bi-directionally connected between the AR mobile terminal and intelligent mutual inductance equipment.
The BIM threedimensional model includes architecture information, national industry standard and respective type case.
The intelligence mutual inductance equipment includes intelligent glasses, Intelligent bracelet.
The AR mobile terminal is equipped with internet connecting pin, bluetooth connection end, electromagnetic wave receiving end and GPS positioning device.
The implementation method of the above-mentioned construction system based on BIM model and AR technology, specific steps are as follows:
S1, BIM threedimensional model is established
The related data of architecture information, national industry standard, respective type case is summarized, and establishes specification BIM threedimensional model;
S2, production adaptive AR madal
On the basis of BIM threedimensional model, Deepen Design, production are carried out to BIM threedimensional model using JAVA, C++ software Adaptive AR madal;
The interconnection of S3, BIM threedimensional model, adaptive AR madal
BIM threedimensional model and adaptive AR madal are bi-directionally connected, it is interrelated;
S4, the foundation for visualizing construction system
Adaptive AR madal is attached with the AR mobile terminal for being connected with intelligent mutual inductance equipment, and adaptive AR madal passes through AR Control system controls AR mobile terminal, intelligent mutual inductance equipment, completes the foundation of visualization construction system;
S5, operation
Staff enters working region and dresses intelligent mutual inductance equipment, opens AR mobile terminal, adaptive AR madal starts The feedback signal of intelligent mutual inductance equipment is received, signal includes geographical location, vital sign, first person image, AR control The host of system receives after signal through dipper system triangulation location technology projection in adaptive AR madal, realize reality with Virtual superposition, staff directly observes real being superimposed with AR model;
Danger zone is set in adaptive AR madal, after construction personnel enters danger zone in work progress, intelligence Mutual inductance equipment automatically turns on sign detection, such as finds the sign numerical exception of blood pressure, heart rate, and intelligent glasses would automatically turn on first Multi-view image, Intelligent bracelet issue to surrounding and call for help acoustic and light information, dial crisis phone only by Bluetooth function, while adaptive Red fast blink prompt in AR model, AR mobile terminal sound the alarm and continue detection, casting scene, time, people Blood pressure and heart rate, neighbouring personnel's arrival the wounded position can open the camera of intelligent glasses as AR control system to member in real time Host share first person image, doctor can be allowed to the condition of the injury severity of the wounded and to the position that accident occurs Confirmation.
The beneficial effects of the present invention are: staff of the present invention dresses intelligent mutual inductance equipment, AR mobile terminal is opened, is realized Reality with virtually be superimposed, staff directly observe real being superimposed with AR model, by being based on the realization AR increasing of BIM threedimensional model The visualization construction system of strong reality can help to realize the integrated of architecture information, from the design of building, construction, operation up to The termination of life cycle management is built, various information are incorporated into always in a three-dimensional model information database, design team, construction The all parties such as unit, installation fishery department and owner can be cooperated based on BIM threedimensional model, be effectively raised Working efficiency saves resource, reduces costs, and is advantageously implemented sustainable development.
Detailed description of the invention
Fig. 1 is system block diagram of the invention;
It is described in detail below with reference to the embodiment of the present invention referring to attached drawing.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
As shown in Figure 1, a kind of construction system based on BIM model and AR technology, including BIM threedimensional model, adaptive AR Model, AR mobile terminal, AR control system and intelligent mutual inductance equipment;
With BIM threedimensional model using being bi-directionally connected, the adaptive AR madal and AR control are the adaptive AR madal System is connected, and AR control system is connected with AR mobile terminal, intelligent mutual inductance equipment, the AR mobile terminal and adaptive AR madal phase Even, it is bi-directionally connected between the AR mobile terminal and intelligent mutual inductance equipment.
The BIM threedimensional model includes architecture information, national industry standard and respective type case.
The intelligence mutual inductance equipment includes intelligent glasses, Intelligent bracelet.
The AR mobile terminal is equipped with internet connecting pin, bluetooth connection end, electromagnetic wave receiving end and GPS positioning device.
The implementation method of the above-mentioned construction system based on BIM model and AR technology, specific steps are as follows:
S1, BIM threedimensional model is established
The related data of architecture information, national industry standard, respective type case is summarized, and establishes specification BIM threedimensional model;
S2, production adaptive AR madal
On the basis of BIM threedimensional model, Deepen Design, production are carried out to BIM threedimensional model using JAVA, C++ software Adaptive AR madal;
The interconnection of S3, BIM threedimensional model, adaptive AR madal
BIM threedimensional model and adaptive AR madal are bi-directionally connected, it is interrelated;
S4, the foundation for visualizing construction system
Adaptive AR madal is attached with the AR mobile terminal for being connected with intelligent mutual inductance equipment, and adaptive AR madal passes through AR Control system controls AR mobile terminal, intelligent mutual inductance equipment, completes the foundation of visualization construction system;
S5, operation
Staff enters working region and dresses intelligent mutual inductance equipment, opens AR mobile terminal, adaptive AR madal starts The feedback signal of intelligent mutual inductance equipment is received, signal includes geographical location, vital sign, first person image, AR control The host of system receives after signal through dipper system triangulation location technology projection in adaptive AR madal, realize reality with Virtual superposition, staff directly observes real being superimposed with AR model;
Danger zone is set in adaptive AR madal, after construction personnel enters danger zone in work progress, intelligence Mutual inductance equipment automatically turns on sign detection, such as finds the sign numerical exception of blood pressure, heart rate, and intelligent glasses would automatically turn on first Multi-view image, Intelligent bracelet issue to surrounding and call for help acoustic and light information, dial crisis phone only by Bluetooth function, while adaptive Red fast blink prompt in AR model, AR mobile terminal sound the alarm and continue detection, casting scene, time, people Blood pressure and heart rate, neighbouring personnel's arrival the wounded position can open the camera of intelligent glasses as AR control system to member in real time Host share first person image, doctor can be allowed to the condition of the injury severity of the wounded and to the position that accident occurs Confirmation.
BIM threedimensional model is to be using digitizing technique by establishing virtual architectural engineering threedimensional model in the present invention This model provides the complete and consistent architectural engineering information bank of actual conditions.The information bank not only includes description building Geological information, professional attributes and the status information of component further comprise the state letter of non-component object (such as space, motor behavior) Breath includes the threedimensional model of architectural engineering information by this, substantially increases the Information Integration degree of architectural engineering, thus An engineering information exchange and shared platform are provided for the related side of construction-engineering project.
BIM threedimensional model can help to realize the integrated of architecture information, from the design of building, construction, operation up to building The termination of life cycle management, various information are incorporated into always in a three-dimensional model information database, design team, work order The all parties such as position, installation fishery department and owner can be cooperated based on BIM threedimensional model, effectively raise work Make efficiency, save resource, reduce costs, is advantageously implemented sustainable development.
AR technology is also known as augmented reality, it is a kind of that real world information and virtual world information is " seamless " integrated New technology, be script is difficult to experience in the certain time spatial dimension of real world entity information (visual information, Sound etc.), it by science and technology such as computers, is superimposed again after analog simulation, by virtual Information application to real world, by the mankind Sense organ is perceived, to reach the sensory experience of exceeding reality.True environment and virtual object have been added to together in real time One picture or space exist simultaneously.
Staff dresses intelligent mutual inductance equipment in the present invention, opens AR mobile terminal, realize reality be virtually superimposed, work Make personnel and directly observe reality to be superimposed with AR model.
Before previous construction operation, construction personnel need to spend a lot of time access national industry standard, design drawing, owner's unit The data such as Technical specification, equipment operation Guide Book;And image analysis can be used by adaptive AR madal will be in model The information materials automatic indexing such as design and specification about a certain position, and similar Project case on internet is provided and is referred to.
Use of the present invention in reality:
The anticollision detection function of BIM threedimensional model is in use to adaptive AR madal, adaptive AR madal can provide solution Certainly scheme realizes dummy model modification movement.Such as settable system is red to the structure tag of conflict;Internet is like case The locations of structures of example is labeled as yellow;It is automatic to carry out anticollision testing inspection after selecting reasonable plan moving structure position, pass through Shift position is green afterwards.
Adaptive AR madal can be as accurate as some visual or not visible part, if you need to which repair can during later period operation Directly to realize perspective by wearing intelligent glasses.Intelligent glasses can play the clear and accurate informing service worker of demonstration picture Existent in the not visible region of the position naked eyes of failure is asked more accurately to select material, to solve burst faster Topic.The mankind learn things 80% and increase the infiltration rate training that worker training is by image and the intuitive image demonstration of text Decrease the probability caused danger to worker.
The life cycle of entire project realizes visualization, typing site operation equipment and materials information in BIM threedimensional model, item The information such as service life, material, the place of production, the market price of each position of mesh or even part can inquire retrospect.By being based on BIM tri- Dimension module realizes the visualization construction system of AR augmented reality, accomplishes effectively to control to construction period, cost.
All kinds of construction technologies have unavoidable hazards region in work progress, and danger zone is arranged in a model.When When construction personnel enters danger zone in work progress, intelligent mutual inductance equipment is given a warning and yellow is dodged in adaptive AR madal Bright prompt.Into after danger zone, intelligent mutual inductance equipment automatically turns on sign detection, such as discovery blood pressure, heart rate vital sign Numerical exception intelligence mutual inductance equipment will issue calling for help information to surrounding and dial crisis phone only by Bluetooth function, while adaptive Answer in AR model red fast blink prompt, AR mobile terminal sound the alarm and continue detection, casting scene, the time, The real-time blood pressure of personnel and heart rate.By realizing the visualization construction system of AR augmented reality based on BIM threedimensional model, to emphasis portion Position construction safety carries out real-time monitoring.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way Limitation, as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved direct application It is within the scope of the present invention in other occasions.

Claims (5)

1. a kind of construction system based on BIM model and AR technology, which is characterized in that including BIM threedimensional model, adaptive AR mould Type, AR mobile terminal, AR control system and intelligent mutual inductance equipment;
The adaptive AR madal is used with BIM threedimensional model and is bi-directionally connected, the adaptive AR madal and AR control system phase Even, AR control system is connected with AR mobile terminal, intelligent mutual inductance equipment, and the AR mobile terminal is connected with adaptive AR madal, It is bi-directionally connected between the AR mobile terminal and intelligent mutual inductance equipment.
2. a kind of construction system based on BIM model and AR technology according to claim 1, which is characterized in that the BIM Threedimensional model includes architecture information, national industry standard and respective type case.
3. a kind of construction system based on BIM model and AR technology according to claim 2, which is characterized in that the intelligence Energy mutual inductance equipment includes intelligent glasses, Intelligent bracelet.
4. a kind of construction system based on BIM model and AR technology according to claim 3, which is characterized in that the AR Mobile terminal is equipped with internet connecting pin, bluetooth connection end, electromagnetic wave receiving end and GPS positioning device.
5. a kind of implementation method of the construction system as claimed in claim 4 based on BIM model and AR technology, feature exist In specific steps are as follows:
S1, BIM threedimensional model is established
The related data of architecture information, national industry standard, respective type case is summarized, and establishes the BIM tri- of specification Dimension module;
S2, production adaptive AR madal
On the basis of BIM threedimensional model, Deepen Design is carried out to BIM threedimensional model using JAVA, C++ software, is made adaptive Answer AR model;
The interconnection of S3, BIM threedimensional model, adaptive AR madal
BIM threedimensional model and adaptive AR madal are bi-directionally connected, it is interrelated;
S4, the foundation for visualizing construction system
Adaptive AR madal is attached with the AR mobile terminal for being connected with intelligent mutual inductance equipment, and adaptive AR madal is controlled by AR System controls AR mobile terminal, intelligent mutual inductance equipment, completes the foundation of visualization construction system;
S5, operation
Staff enters working region and dresses intelligent mutual inductance equipment, opens AR mobile terminal, adaptive AR madal starts to receive The feedback signal of intelligent mutual inductance equipment, signal include geographical location, vital sign, first person image, AR control system Host receive after signal through dipper system triangulation location technology projection in adaptive AR madal, realize reality with it is virtual Superposition, staff directly observes real being superimposed with AR model;
Danger zone is set in adaptive AR madal, after construction personnel enters danger zone in work progress, intelligent mutual inductance Equipment automatically turns on sign detection, such as finds the sign numerical exception of blood pressure, heart rate, and intelligent glasses would automatically turn on the first visual angle Image, Intelligent bracelet issue to surrounding and call for help acoustic and light information, dial crisis phone only by Bluetooth function, while in adaptive AR mould Red fast blink prompt in type, AR mobile terminal sound the alarm and continue detection, casting scene, time, Ren Yuanshi When blood pressure and heart rate, neighbouring personnel reach the wounded position can open intelligent glasses camera be AR control system master Machine shares first person image, and doctor can be allowed to the condition of the injury severity of the wounded and to the position of accident occurs really Recognize.
CN201811620181.2A 2018-12-28 2018-12-28 A kind of construction system and its implementation based on BIM model and AR technology Pending CN109767095A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811620181.2A CN109767095A (en) 2018-12-28 2018-12-28 A kind of construction system and its implementation based on BIM model and AR technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811620181.2A CN109767095A (en) 2018-12-28 2018-12-28 A kind of construction system and its implementation based on BIM model and AR technology

Publications (1)

Publication Number Publication Date
CN109767095A true CN109767095A (en) 2019-05-17

Family

ID=66451729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811620181.2A Pending CN109767095A (en) 2018-12-28 2018-12-28 A kind of construction system and its implementation based on BIM model and AR technology

Country Status (1)

Country Link
CN (1) CN109767095A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110542004A (en) * 2019-10-10 2019-12-06 中信国安建工集团有限公司 building construction method based on BIM
CN110718043A (en) * 2019-10-17 2020-01-21 辽宁中航信诺科技有限公司 Hazardous area inspection and alarm method based on AR artificial intelligence equipment
CN111459289A (en) * 2020-04-30 2020-07-28 天津大学 BIM information visualization system and method based on mobile augmented reality
CN111914331A (en) * 2020-08-07 2020-11-10 中国十七冶集团有限公司 Intelligent quality problem searching method based on BIM + AR technology
CN112102485A (en) * 2020-09-04 2020-12-18 中国十七冶集团有限公司 Method for carrying out space intelligent management based on AR technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107037881A (en) * 2017-03-24 2017-08-11 广西七三科技有限公司 The interactive demonstration method and system of GIS and BIM augmented realities in piping lane, subway work
US20180357824A1 (en) * 2017-06-08 2018-12-13 Baidu Online Network Technology (Beijing) Co., Ltd Augmented Reality Positioning Method and Apparatus for Location-Based Service LBS
CN109064133A (en) * 2018-07-27 2018-12-21 福建京力信息科技有限公司 A kind of engineering whole process management system based on BIM+AR

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107037881A (en) * 2017-03-24 2017-08-11 广西七三科技有限公司 The interactive demonstration method and system of GIS and BIM augmented realities in piping lane, subway work
US20180357824A1 (en) * 2017-06-08 2018-12-13 Baidu Online Network Technology (Beijing) Co., Ltd Augmented Reality Positioning Method and Apparatus for Location-Based Service LBS
CN109064133A (en) * 2018-07-27 2018-12-21 福建京力信息科技有限公司 A kind of engineering whole process management system based on BIM+AR

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱锋: "BIM+VR/AR工程建设与管理体系的建构", 《建筑设计管理》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110542004A (en) * 2019-10-10 2019-12-06 中信国安建工集团有限公司 building construction method based on BIM
CN110542004B (en) * 2019-10-10 2023-12-22 中信国安建工集团有限公司 Building construction method based on BIM
CN110718043A (en) * 2019-10-17 2020-01-21 辽宁中航信诺科技有限公司 Hazardous area inspection and alarm method based on AR artificial intelligence equipment
CN110718043B (en) * 2019-10-17 2021-07-30 辽宁中航信诺科技有限公司 Hazardous area inspection and alarm method based on AR artificial intelligence equipment
CN111459289A (en) * 2020-04-30 2020-07-28 天津大学 BIM information visualization system and method based on mobile augmented reality
CN111914331A (en) * 2020-08-07 2020-11-10 中国十七冶集团有限公司 Intelligent quality problem searching method based on BIM + AR technology
CN112102485A (en) * 2020-09-04 2020-12-18 中国十七冶集团有限公司 Method for carrying out space intelligent management based on AR technology

Similar Documents

Publication Publication Date Title
CN109767095A (en) A kind of construction system and its implementation based on BIM model and AR technology
CN107879260B (en) Tower crane collision avoidance system and security system based on BIM
US10769741B2 (en) Emergency response augmented reality-based notification
CN204465738U (en) A kind of disaster relief rescue visible system
CN110189106B (en) Underground space intelligent constructor management system based on RFID and BIM technology
CN106595565A (en) BIM-based intelligent monitoring system
CN104680318A (en) BIM-based engineering personnel control system and method
CN108446889A (en) A kind of exchange method of construction site and construction speed platform
CN106815439A (en) Municipal Engineering Construction monitoring method and its system based on BIM
CN105847769A (en) Construction site behavior analysis system and analysis method
CN109239697A (en) One kind being based on three-dimensional visualization employee real-time positioning system and method
CN111127974A (en) Virtual reality and augmented reality three-dimensional application service platform for transformer substation operation
CN110363118A (en) Behavior monitoring method, apparatus, system and the storage medium of target object
CN110770798A (en) Information processing apparatus, information processing method, and program
CN107566783B (en) System and method for immersive and collaborative video surveillance
Wang et al. Development of an internet-of-things-based technology system for construction safety hazard prevention
CN103839186A (en) Mine operating condition 3D visualization method based on object-message tree
CN206639370U (en) A kind of aerial alarm delivery system of people's air defense based on remotely pilotless machine
CN105138130A (en) Information communication instructing method and system in same scene at different places
CN110335173A (en) Based on BIM construction management platform and comprehensive monitoring system
CN116304244A (en) Three-dimensional visualized information system for coal mine production based on Internet of things and sensor technology
CN110287566A (en) A kind of system that tunnel piercing progress and process are controlled based on BIM
CN109949011A (en) A kind of strip foundation pit construction system based on BIM
CN109190360A (en) It is associated with the robot identity card system of robot classification
KR20230164790A (en) A work assistance system using the image recognition-based virtual object registration method in the industrial field

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517

RJ01 Rejection of invention patent application after publication