CN109949011A - A kind of strip foundation pit construction system based on BIM - Google Patents
A kind of strip foundation pit construction system based on BIM Download PDFInfo
- Publication number
- CN109949011A CN109949011A CN201910224585.8A CN201910224585A CN109949011A CN 109949011 A CN109949011 A CN 109949011A CN 201910224585 A CN201910224585 A CN 201910224585A CN 109949011 A CN109949011 A CN 109949011A
- Authority
- CN
- China
- Prior art keywords
- responsible person
- foundation pit
- bim
- database
- process responsible
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The strip foundation pit construction system based on BIM that the present invention relates to a kind of, it is related to Building Information Model information technology field, it solves since the responsible person of different processes is different, when usually will appear a process completion, next process responsible person is not notified in time, so that the problem of delaying integral construction efficiency, it includes controlling terminal, process completes three-dimensional visualization model database when construction, the three-dimensional panorama data acquisition device of acquisition strip foundation pit construction scene three-dimensional panorama data in real time, three-dimensional panorama data are converted as the conversion equipment of three-dimensional visualization model, and, it is stored with process responsible person's cell-phone number database of process and corresponding process responsible person cell-phone number, short message sending device.The present invention has the responsible person for notifying next process at the first time when previous process is completed, and improves the effect of integral construction efficiency indirectly.
Description
Technical field
The present invention relates to Building Information Model information technology fields, more particularly, to a kind of strip foundation pit based on BIM
Construction system.
Background technique
Domestic skyscraper current at present goes in a big way upsurge, and the underground space in city obtains profound development and utilization, builds
Building cutting depth in engineering is more than that the deep-foundation pit engineering of 20m gradually increases.Such deep layer foundation pit constructs in densely populated area more
Domain, difficulty is big, and construction environment is complicated.In this case, how scientific design deep foundation pit support, reduce ambient enviroment to depth
The restriction and influence of base pit engineering quality, the construction quality for promoting deep basal pit become the common recognition of numerous building engineers.As one
System and abnormal grand architectural engineering, deep foundation pit construction involve a wide range of knowledge, construction environment is complicated, by from underground structure,
Geological conditions and construction site etc. are many-sided to be influenced.Architects are needed to carry out planning of science activities, reasonable construction and section school superintendent
It surveys, BIM technology provides good condition thus.The specialized work with digitization managed is built as engineering design is applied to
Tool, BIM technology can all be used by modeling and Data Integration in the design phase of project, project construction and management phase etc.,
Especially in the design at project initial stage, using the progress and project amount of the in-depth of BIM technology guiding construction, control construction, substantially
Degree promotes the integrated degree of architectural engineering, can improve the efficiency and quality in whole building engineering.
Existing strip foundation pit construction process includes following process: smooth location, construction steel tubular pole, is opened line setting
Earth excavation, anchor cable, anchor pole and concrete ejection face carry out lower layer's branch after the soil excavation of upper layer according to layer cooperation interspersed construction is excavated
Protection structure construction and rock blasting, although the construction of current strip foundation pit is constructed according to above-mentioned operation, due to
The responsible person of different processes is different, and when usually will appear a process completion, next process responsible person is not obtained in time
Notice, so that delaying integral construction efficiency, there is room for improvement.
Summary of the invention
It is next with notifying at the first time when previous process is completed that the object of the present invention is to provide one kind
The responsible person of process improves the strip foundation pit construction system based on BIM of the effect of integral construction efficiency indirectly.
Foregoing invention purpose of the invention has the technical scheme that
A kind of strip foundation pit construction system based on BIM, including controlling terminal, the strip foundation pit construction system based on BIM
Further include be stored with process and be corresponding to it process complete construction when institute matched three-dimensional visualization model process complete apply
The three-dimensional panorama data of working hour three-dimensional visualization model database, in real time acquisition strip foundation pit construction scene three-dimensional panorama data
Acquisition device converts three-dimensional panorama data as the conversion equipment of three-dimensional visualization model, and, it is stored with process and corresponding work
Process responsible person's cell-phone number database, the short message sending device of sequence responsible person's cell-phone number;
Controlling terminal obtains the three-dimensional visualization model of construction site by conversion equipment, while according to process order one by one in work
Three-dimensional visualization model database transfers out theory three-dimensional Visualization Model when each process is completed when sequence completes construction, passes through
The three-dimensional visualization model and theory three-dimensional Visualization Model of construction site are compared, if compare it is consistent, controlling terminal with
Next process of corresponding process inquires the hand of next process responsible person as query object in process responsible person's cell-phone number
Machine number simultaneously sends corresponding prompt information by short message sending device.
By using above-mentioned technical proposal, three-dimensional visualization model database when completing construction by controlling terminal, process,
The setting of three-dimensional panorama data acquisition device, conversion equipment can effectively analyze whether the process is completed, complete in corresponding process
At when, next process responsible person can be notified to carry out the operation of next process in time.
The present invention is further arranged to: the strip foundation pit construction system based on BIM further includes being stored with process and right
It answers to shift to an earlier date needed for process and shifts to an earlier date preparation database needed for preparation and the process of corresponding time;
Controlling terminal is shifted to an earlier date preparation data base querying needed for process and is gone out next work using next process as query object
Shift to an earlier date preparation and corresponding time needed for sequence, and loads in the short message transmitted by short message sending device.
By using above-mentioned technical proposal, by shifting to an earlier date preparation database needed for process, the setting of controlling terminal can
With the preparation that will be done needed for next process and corresponding time, notified in time in place by short message sending device, to mention indirectly
Linking between high entirety process, improves the efficiency of whole strip foundation pit construction process.
The present invention is further arranged to: the strip foundation pit construction system based on BIM further includes being stored with process and right
The process completed percentage notification database for answering process completed percentage to notify;
Controlling terminal is using current working procedure as query object when process is completed to construct in three-dimensional visualization model database
Corresponding process is obtained in ideal three-dimensional Visualization Model when completing of constructing, and with the reality by conversion equipment acquisition construction site
When three-dimensional visualization model be compared;
If real-time three-dimensional Visualization Model is reasonable to think that three-dimensional visualization model ratio reaches, using current process as query object in
When the process completed percentage that process completed percentage notification database is inquired, under being notified at this time by short message sending device
One process responsible person.
It, can be by the setting of process completed percentage notification database, controlling terminal by using above-mentioned technical proposal
When current process completes certain proportion, the responsible person of the next process of prior notice sets out and is ready in time.
The present invention is further arranged to: defining the responsible artificial multiple of each process, and the mobile phone of each process responsible person
In be mounted on mobile phone tracker, the strip foundation pit construction system based on BIM further includes route planning device;
It is negative that controlling terminal inquires each process using next process responsible person as query object in mobile phone tracker one by one
People position is blamed, and using each process responsible person position as starting point, the preset process construction site of controlling terminal is made
For terminal, pass course device for planning cooks up the distance that each process responsible person reaches corresponding process scene, and with each work
Process responsible person corresponding to the shortest distance is as short message sending device institute in the distance at the corresponding process scene of sequence responsible person arrival
The object of notice.
By using above-mentioned technical proposal, when having multiple responsible persons there are a process, by mobile phone tracker,
Route planning device can determine the process responsible person closest to next process location, and by short message sending device into
Row notice, to improve the operating efficiency of corresponding process indirectly.
The present invention is further arranged to: the strip foundation pit construction system based on BIM further includes being stored with process responsible person
And process responsible person's running speed database of corresponding process responsible person running speed;
If the shortest distance for reaching process scene in all responsible persons of process is more than the preset distance range of controlling terminal, one by one
The distance for reaching scene using process responsible person is responsible for man-powered vehicle in process using process responsible person as query object as dividend
The process responsible person running speed that speed data library is inquired is arrived as divisor using the quotient of the two as each process responsible person
The time is expended up to needed for process scene, and is notified using shortest process responsible person of required consuming time as short message sending device
Object.
It, can be with by the setting of process responsible person's running speed database, controlling terminal by using above-mentioned technical proposal
All process steps responsible person apart from process location distance all farther out when, also may require that at this time consideration by way of driving
Scene is reached, considers to reach pair that the most fast process responsible person in the scene of capable of reaching is notified as short message sending device at this time
As.
The present invention is further arranged to: the strip foundation pit construction system based on BIM further includes being stored with process responsible person
And process responsible person's Working state data library of corresponding process responsible person currently other work;The time is expended most needed for if it exists
Short process is responsible artificial multiple, then using shortest process responsible person of required consuming time as query object in process responsible person
Inquire whether corresponding process responsible person there are other job placements in Working state data library, with the work without other job placements
The object that sequence responsible person is notified as short message sending device.
It, can be with by the setting in process responsible person's Working state data library, controlling terminal by using above-mentioned technical proposal
When consuming time shortest process needed for occurring is responsible for artificial multiple, the process without other job placements is selected at this time
The object that responsible person is notified as short message sending device.
The present invention is further arranged to: the strip foundation pit construction system based on BIM further includes being stored with process responsible person
And corresponding process responsible person it is required in preparation it is noted that item process responsible person's points for attention database and
It is stored with the be inclined to color database of process responsible person that process responsible person is inclined to warning color;
Controlling terminal inquires corresponding work in process responsible person's points for attention database using process responsible person as query object
Sequence responsible person's points for attention, while using process responsible person as query object in the be inclined to color data library inquiry of process responsible person
The be inclined to color of process responsible person is corresponded to out, and corresponding process responsible person points for attention please be inclined to face by process responsible person
Color carries out respective markers.
By using above-mentioned technical proposal, pass through process responsible person's points for attention database, the be inclined to face of process responsible person
Under the precondition for the process responsible person that the setting of color database can notify needed for determining, the attention to process responsible person
Item is to warn color to be marked.
The present invention is further arranged to: the strip foundation pit construction system based on BIM further includes verbal announcement module;
While short message sending device sends short message, it is logical that controlling terminal synchronous averaging verbal announcement module synchronizes voice
Know.
By using above-mentioned technical proposal, can be notified by short message sending device by the setting of verbal announcement module
While carry out verbal announcement, preferably to cause the attention of process responsible person.
In conclusion advantageous effects of the invention are as follows: three-dimensional visualization model data when completing to construct by process
Library, three-dimensional panorama data acquisition device, conversion equipment, process responsible person's cell-phone number database, short message sending device, controlling terminal
Setting can previous process complete when by short massage notice to next process responsible person, and pass through process needed for
Preparation database allows next process responsible person to be ready in advance in advance.
Detailed description of the invention
Fig. 1 is the system block diagram one of the strip foundation pit construction system the present invention is based on BIM.
Fig. 2 is the system block diagram two of the strip foundation pit construction system the present invention is based on BIM.
In figure, 1, process complete construction when three-dimensional visualization model database;2, three-dimensional panorama data acquisition device;3, turn
Changing device;4, process responsible person cell-phone number database;5, short message sending device;6, shift to an earlier date preparation database needed for process;
7, process completed percentage notification database;8, mobile phone tracker;9, route planning device;10, process responsible person running speed number
According to library;11, process responsible person Working state data library;12, the be inclined to color database of process responsible person;13, process responsible person
Points for attention database;14, verbal announcement module;15, controlling terminal.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Referring to Fig.1, for a kind of strip foundation pit construction system based on BIM disclosed by the invention include controlling terminal 15,
Further include be stored with process and be corresponding to it process complete construction when institute matched three-dimensional visualization model process complete apply
The three-dimensional panorama number of working hour three-dimensional visualization model database 1, in real time acquisition strip foundation pit construction scene three-dimensional panorama data
According to acquisition device 2, three-dimensional panorama data are converted as the conversion equipment 3 of three-dimensional visualization model, and, it is stored with process and right
Answer process responsible person's cell-phone number database 4, the short message sending device 5 of process responsible person's cell-phone number, wherein short message sending device 5
Preferably Short message alarm, three-dimensional panorama data acquisition device 2 are 360 degree of full-view cameras, can be without blind monitoring area coverage
400 or so square metres, it is equipped with a fish eye lens, possesses 360 degree of panoramic views, 360 degree of full-view cameras can replace
More common video cameras, have accomplished seamless monitoring, and conversion equipment 3 is preferably drawn accordingly according to three-dimensional panorama data information automatically
The software of three-dimensional visualization model, controlling terminal 15 are preferably central processing unit.
Controlling terminal 15 obtains the three-dimensional visualization model of construction site by conversion equipment 3, while according to process order
Three-dimensional visualization model database 1 transfers out theory three-dimensional visualization when each process is completed when process is completed to construct one by one
Model is compared by the three-dimensional visualization model and theory three-dimensional Visualization Model of construction site, if comparing unanimously, is controlled
Terminal 15 processed inquires next process in process responsible person's cell-phone number as query object using the next process for corresponding to process
The cell-phone number of responsible person simultaneously sends corresponding prompt information by short message sending device 5.
As shown in Fig. 2, next process can be allowed when notifying next process responsible person by further contemplating
Responsible person is ready in advance, and the strip foundation pit construction system based on BIM further includes being stored with process and corresponding process institute
It need to shift to an earlier date and shift to an earlier date preparation database 6 needed for preparation and the process of corresponding time.
Controlling terminal 15 is shifted to an earlier date preparation database 6 needed for process and is inquired using next process as query object
Shift to an earlier date preparation and corresponding time needed for next process out, and loads in the short message transmitted by short message sending device 5.
In addition in view of when current process completes certain proportion, can prior notice to the responsible of next process
People allows next process responsible person to be ready in advance, and the strip foundation pit construction system based on BIM further includes being stored with process
And the process completed percentage notification database 7 of corresponding process completed percentage notice.
Three-dimensional visualization model number when process is completed to construct using current working procedure as query object of controlling terminal 15
It constructs according to corresponding process is obtained in library 1 in ideal three-dimensional Visualization Model when completing of constructing, and with being obtained by conversion equipment 3
The real-time three-dimensional Visualization Model at scene is compared;If real-time three-dimensional Visualization Model is reasonable to think three-dimensional visualization model
Ratio reaches, and completes ratio in the process that process completed percentage notification database 7 is inquired using current process as query object
When example, next process responsible person is notified by short message sending device 5 at this time.
It further contemplates in actual application that there are multiple responsible persons for each process in fact, how to filter out distance
The nearest process responsible person of next process operations, and mobile phone tracker 8, base are mounted in the mobile phone of each process responsible person
In the strip foundation pit construction system of BIM further include route planning device 9.
Application process based on above-mentioned technical characteristic is as follows: controlling terminal 15 is one by one using next process responsible person as looking into
It askes object and inquires each process responsible person position in mobile phone tracker 8, and with each process responsible person position
As starting point, for the preset process construction site of controlling terminal 15 as terminal, pass course device for planning 9 cooks up each process
Responsible person reaches the distance at corresponding process scene, and reaches most short distance in the distance at corresponding process scene with each process responsible person
The object notified from corresponding process responsible person as short message sending device 5.
It further contemplates when the responsible distance per capita apart from next process location of the process notified is farther away
It waits, is responsible for that scene can be reached by the way of driving per capita at this time, the strip foundation pit construction system based on BIM further includes storage
There are process responsible person's running speed database 10 of process responsible person and corresponding process responsible person running speed.
If the shortest distance for reaching process scene in all responsible persons of process is more than the preset distance range of controlling terminal 15,
The distance at scene is then reached as dividend using process responsible person one by one, it is responsible in process using process responsible person as query object
The process responsible person running speed that man-powered vehicle speed data library 10 is inquired is as divisor, using the quotient of the two as each process
Responsible person, which reaches, expends the time needed for process scene, and dress is sent using shortest process responsible person of required consuming time as short message
Set 5 objects notified.
In addition when required consuming time shortest work is responsible for artificial multiple, it is by current process responsible person at this time
It is no to have other things as judgment basis, specifically it is provided that the strip foundation pit construction system based on BIM further includes being stored with
Process responsible person's Working state data library 11 of process responsible person and corresponding process responsible person currently other work;Institute if it exists
It is responsible artificial multiple that time shortest process need to be expended, then using shortest process responsible person of required consuming time as query object
Inquire whether corresponding process responsible person there are other job placements in process responsible person's Working state data library 11, there is no it
The object that the process responsible person of his job placement is notified as short message sending device 5.
Furthermore it to guarantee that the process responsible person that short message sending device 5 is notified can be ready in advance work, is based on
The strip foundation pit construction system of BIM further includes being stored with process responsible person and corresponding process responsible person in preparation when institute
It should be noted that item process responsible person's points for attention database 13 and be stored with the be inclined to warning color of process responsible person
The be inclined to color database 12 of process responsible person.
The application process of above-mentioned technical characteristic is as follows: controlling terminal 15 is negative in process using process responsible person as query object
Corresponding process responsible person points for attention are inquired in duty people's points for attention database 13, while using process responsible person as inquiry pair
As inquiring corresponding the be inclined to color of process responsible person in the be inclined to color database 12 of process responsible person, and corresponding process is born
Duty people's points for attention please be inclined to color by process responsible person and carry out respective markers.
In addition, the strip foundation pit construction system based on BIM further includes verbal announcement module 14, verbal announcement module 14 is excellent
It is selected as phonetic alarm, while short message sending device 5 sends short message, 15 synchronous averaging verbal announcement module 14 of controlling terminal
Synchronize verbal announcement.
The implementation principle of the present embodiment are as follows:
Three-dimensional visualization model database 1 when completing construction by controlling terminal 15, process, three-dimensional panorama data acquisition device 2,
Conversion equipment 3 can determine the progress of process, when previous process is completed, pass through process responsible person's mobile phone number
Next process responsible person can be notified in time according to library 4, short message sending device 5, and by shifting to an earlier date preparation needed for process
Notice arrives correspondence in time for database 6, the be inclined to color database 12 of process responsible person, process responsible person's points for attention database 13
Process responsible person.
And when determination specific process responsible person, by process completed percentage notification database 7, mobile phone tracker 8,
Route planning device 9;, process responsible person's running speed database 10, process responsible person's Working state data library 11 setting can
To select specifically to notify object by distance when corresponding process responsible person is closer apart from process location, and in institute
Have process responsible person distance farther out when select arrive scene pair that responsible person is notified as short massage notice device faster
As.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. a kind of strip foundation pit construction system based on BIM, including controlling terminal (15), which is characterized in that the length based on BIM
Bar shaped foundation pit construction system further includes being stored with process and the process that is corresponding to it completes institute's matched three-dimensional visualization when construction
It is live three-dimensional complete that the process of model completes three-dimensional visualization model database (1) when construction, real-time acquisition strip foundation pit construction
The three-dimensional panorama data acquisition device (2) of scape data converts three-dimensional panorama data as the conversion equipment of three-dimensional visualization model
(3), and, process responsible person's cell-phone number database (4), the short message hair of process and corresponding process responsible person cell-phone number are stored with
Send device (5);
Controlling terminal (15) obtains the three-dimensional visualization model of construction site by conversion equipment (3), while according to process order
The theory three-dimensional that three-dimensional visualization model database (1) is transferred out when each process is completed when process is completed to construct one by one is visual
Change model, is compared by the three-dimensional visualization model and theory three-dimensional Visualization Model of construction site, if comparing unanimously,
Controlling terminal (15) is inquired as query object in process responsible person's cell-phone number database (4) using the next process for corresponding to process
Out the cell-phone number of next process responsible person and corresponding prompt information is sent by short message sending device (5).
2. the strip foundation pit construction system according to claim 1 based on BIM, it is characterised in that: the strip based on BIM
Shape foundation pit construction system further includes being stored with needed for process and corresponding process preparation and the process of corresponding time institute in advance
Preparation database (6) need to be shifted to an earlier date;
Controlling terminal (15) is using next process as query object, preparation database (6) inquiry in advance needed for process
Shift to an earlier date preparation and corresponding time needed for next process out, and loads in the short message transmitted by short message sending device (5).
3. the strip foundation pit construction system according to claim 2 based on BIM, it is characterised in that: the strip based on BIM
Shape foundation pit construction system further includes being stored with the process completed percentage notification data of process and corresponding process completed percentage notice
Library (7);
Controlling terminal (15) three-dimensional visualization model data when process is completed to construct using current working procedure as query object
Corresponding process is obtained in library (1) to apply in ideal three-dimensional Visualization Model when completing of constructing, and with obtaining by conversion equipment (3)
The real-time three-dimensional Visualization Model at work scene is compared;
If real-time three-dimensional Visualization Model is reasonable to think that three-dimensional visualization model ratio reaches, using current process as query object in
When the process completed percentage that process completed percentage notification database (7) is inquired, pass through short message sending device (5) at this time
Notify next process responsible person.
4. the strip foundation pit construction system according to claim 3 based on BIM, it is characterised in that: define each process
It is responsible artificial multiple, and mobile phone tracker (8), the strip based on BIM are mounted in the mobile phone of each process responsible person
Foundation pit construction system further includes route planning device (9);
Controlling terminal (15) is inquired in mobile phone tracker (8) using next process responsible person as query object each one by one
Process responsible person position, and using each process responsible person position as starting point, controlling terminal (15) preset process
Construction site as terminal, pass course device for planning (9) cook up each process responsible person reach corresponding process scene away from
From, and process responsible person corresponding to the shortest distance is reached in the distance at corresponding process scene as short using each process responsible person
The object that letter sending device (5) is notified.
5. the strip foundation pit construction system according to claim 4 based on BIM, it is characterised in that: the strip based on BIM
Shape foundation pit construction system further includes the process responsible person's row for being stored with process responsible person and corresponding process responsible person running speed
Vehicle speed database (10);
If the shortest distance for reaching process scene in all responsible persons of process is more than controlling terminal (15) preset distance range,
One by one using process responsible person reach scene distance as dividend, using process responsible person as query object in process responsible person
The process responsible person running speed that running speed database (10) is inquired is as divisor, using the quotient of the two as each process
Responsible person, which reaches, expends the time needed for process scene, and dress is sent using shortest process responsible person of required consuming time as short message
Set the object that (5) are notified.
6. the strip foundation pit construction system according to claim 5 based on BIM, it is characterised in that: the strip based on BIM
Shape foundation pit construction system further includes that the process for being stored with process responsible person and corresponding to process responsible person currently other work is responsible for
People's Working state data library (11);Expended needed for if it exists time shortest process be responsible for it is artificial multiple, then with required consuming when
Between shortest process responsible person as query object inquire corresponding process in process responsible person's Working state data library (11)
Whether responsible person has other job placements, using the process responsible person without other job placements as short message sending device (5) institute
The object of notice.
7. the strip foundation pit construction system according to claim 6 based on BIM, it is characterised in that: the strip based on BIM
Shape foundation pit construction system further include be stored with process responsible person and corresponding process responsible person it is required in preparation it is noted that
Item process responsible person's points for attention database (13) and be stored with process responsible person be inclined to warning color process
The be inclined to color database of responsible person (12);
Controlling terminal (15) inquiry in process responsible person's points for attention database (13) using process responsible person as query object
Process responsible person's points for attention are corresponded to out, while using process responsible person as query object in the be inclined to number of colours of process responsible person
Corresponding the be inclined to color of process responsible person is inquired according to library (12), and corresponding process responsible person points for attention are responsible for by process
People please be inclined to color and carry out respective markers.
8. the strip foundation pit construction system according to claim 7 based on BIM, it is characterised in that: the strip based on BIM
Shape foundation pit construction system further includes verbal announcement module (14);
While short message sending device (5) send short message, controlling terminal (15) synchronous averaging verbal announcement module (14) is carried out
Simultaneous voice notice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910224585.8A CN109949011A (en) | 2019-03-23 | 2019-03-23 | A kind of strip foundation pit construction system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910224585.8A CN109949011A (en) | 2019-03-23 | 2019-03-23 | A kind of strip foundation pit construction system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109949011A true CN109949011A (en) | 2019-06-28 |
Family
ID=67011512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910224585.8A Pending CN109949011A (en) | 2019-03-23 | 2019-03-23 | A kind of strip foundation pit construction system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109949011A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112801409A (en) * | 2021-02-26 | 2021-05-14 | 上海博联工程监理有限公司 | BIM-based project supervision information management method, system and storage medium |
CN114708120A (en) * | 2022-06-06 | 2022-07-05 | 深圳大学 | Foundation pit support construction quality control method, system and terminal based on BIM |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106815439A (en) * | 2017-01-20 | 2017-06-09 | 上海市地下空间设计研究总院有限公司 | Municipal Engineering Construction monitoring method and its system based on BIM |
CN108470315A (en) * | 2018-02-11 | 2018-08-31 | 浙江联建工程设计有限公司 | Project progress monitor system based on BIM |
CN108596423A (en) * | 2018-03-02 | 2018-09-28 | 重庆机电装备技术研究院有限公司 | A kind of trackways engineering construction progress msg management method based on BIM |
CN108711129A (en) * | 2018-06-05 | 2018-10-26 | 厦门万嘉生态科技有限公司 | Intelligent environmental sanitation system |
CN109360123A (en) * | 2018-10-22 | 2019-02-19 | 上海建工四建集团有限公司 | A kind of multi-specialized execution management method therefor and system based on room |
CN109903019A (en) * | 2019-03-05 | 2019-06-18 | 深圳市国晨工程造价咨询有限公司 | Project progress monitor system based on BIM |
-
2019
- 2019-03-23 CN CN201910224585.8A patent/CN109949011A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106815439A (en) * | 2017-01-20 | 2017-06-09 | 上海市地下空间设计研究总院有限公司 | Municipal Engineering Construction monitoring method and its system based on BIM |
CN108470315A (en) * | 2018-02-11 | 2018-08-31 | 浙江联建工程设计有限公司 | Project progress monitor system based on BIM |
CN108596423A (en) * | 2018-03-02 | 2018-09-28 | 重庆机电装备技术研究院有限公司 | A kind of trackways engineering construction progress msg management method based on BIM |
CN108711129A (en) * | 2018-06-05 | 2018-10-26 | 厦门万嘉生态科技有限公司 | Intelligent environmental sanitation system |
CN109360123A (en) * | 2018-10-22 | 2019-02-19 | 上海建工四建集团有限公司 | A kind of multi-specialized execution management method therefor and system based on room |
CN109903019A (en) * | 2019-03-05 | 2019-06-18 | 深圳市国晨工程造价咨询有限公司 | Project progress monitor system based on BIM |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112801409A (en) * | 2021-02-26 | 2021-05-14 | 上海博联工程监理有限公司 | BIM-based project supervision information management method, system and storage medium |
CN112801409B (en) * | 2021-02-26 | 2022-04-19 | 上海博联工程监理有限公司 | BIM-based project supervision information management method, system and storage medium |
CN114708120A (en) * | 2022-06-06 | 2022-07-05 | 深圳大学 | Foundation pit support construction quality control method, system and terminal based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190272676A1 (en) | Local positioning system for augmented reality applications | |
CN104966154A (en) | BIM technology-based temporary water and temporary electricity management method and system | |
CN109557934B (en) | Unmanned aerial vehicle cruise control method and device based on fabricated building platform | |
KR101548647B1 (en) | Processor for visualization of three dimensional geo-spatial information | |
CN106815439A (en) | Municipal Engineering Construction monitoring method and its system based on BIM | |
CN104680318A (en) | BIM-based engineering personnel control system and method | |
US20210349476A1 (en) | Method and apparatus for controlling cruise of unmanned air vehicle based on prefabricated construction platform | |
CN109345626A (en) | One kind is for cubic metre of earth and stone measurement and construction system | |
CN107289928A (en) | A kind of three-dimensional visualization is applied to arenas, the indoor navigation system in library | |
CN103092908A (en) | Parameterized graphical representation of buildings | |
CN104519509A (en) | Wireless network monitoring device in wireless communication system, method used in wireless communication system and device in wireless communication system | |
CN109949011A (en) | A kind of strip foundation pit construction system based on BIM | |
CN104729499A (en) | Bluetooth technology-based method for positioning mobile terminal by indoor robot | |
CN110516386A (en) | A method of live coordinate position is determined based on mobile phone B IM construction drawing AR | |
CN110532719A (en) | A kind of construction site Method of Earthwok Calculation and device | |
Gunduz et al. | Integration of BIM, web maps and IoT for supporting comfort analysis | |
CN108491649A (en) | A kind of design method and processing equipment of wind power plant digital Platform | |
CN109767095A (en) | A kind of construction system and its implementation based on BIM model and AR technology | |
CN110505452A (en) | A kind of capital construction power transmission engineering Schedule monitoring method and monitoring system | |
CN110770798A (en) | Information processing apparatus, information processing method, and program | |
CN112446083A (en) | Monitoring simulation method based on BIM technology | |
AU2012262658A1 (en) | Construction management system and method | |
CN109801548B (en) | Pipe network inspection and maintenance terminal based on augmented reality | |
CN109961212A (en) | One kind is based on the visual construction speed dynamic management BIM system of work surface | |
CN112214820A (en) | BIM-based engineering inspection method and device, storage medium and equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190628 |
|
RJ01 | Rejection of invention patent application after publication |