CN109522381A - The hidden installation security detection method of building based on 3DGIS+BIM - Google Patents

The hidden installation security detection method of building based on 3DGIS+BIM Download PDF

Info

Publication number
CN109522381A
CN109522381A CN201811298714.XA CN201811298714A CN109522381A CN 109522381 A CN109522381 A CN 109522381A CN 201811298714 A CN201811298714 A CN 201811298714A CN 109522381 A CN109522381 A CN 109522381A
Authority
CN
China
Prior art keywords
bim
building
3dgis
data
hidden
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811298714.XA
Other languages
Chinese (zh)
Other versions
CN109522381B (en
Inventor
谢明霞
杨爱明
张力
马能武
白峰
马瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGJIANG SPACE INFORMATION TECHNOLOGY ENGINEERING Co Ltd (WUHAN)
Original Assignee
CHANGJIANG SPACE INFORMATION TECHNOLOGY ENGINEERING Co Ltd (WUHAN)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGJIANG SPACE INFORMATION TECHNOLOGY ENGINEERING Co Ltd (WUHAN) filed Critical CHANGJIANG SPACE INFORMATION TECHNOLOGY ENGINEERING Co Ltd (WUHAN)
Priority to CN201811298714.XA priority Critical patent/CN109522381B/en
Publication of CN109522381A publication Critical patent/CN109522381A/en
Application granted granted Critical
Publication of CN109522381B publication Critical patent/CN109522381B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of hidden installation security detection methods of building based on 3DGIS+BIM.It includes the following steps: the semantic conversion library for constructing BIM and 3DGIS;BIM data prediction;BIM data after conversion are loaded into the mobile terminal 3DGIS;The QR two dimensional code of design building object significant points augmented reality safety detection;The hidden installation security detection of building.The present invention has the advantages that improve the hidden installation security detection efficiency of building, versatile.

Description

The hidden installation security detection method of building based on 3DGIS+BIM
Technical field
The present invention relates to a kind of safety detection methods of the hidden facility of building, more specifically say it is based on 3DGIS+ The hidden installation security detection method of the building of BIM.More specifically say it is a kind of use based on 3DGIS, BIM and AR technology In the safety detection method of the hidden facility of building.
Background technique
In the Life cycle of whole building, the period longest of building operation and maintenance, currently, BIM planning, Stages of design and construction using more, in the O&M stage using less, in order to avoid production BIM data in completion of works Become new data fossil afterwards, BIM and 3DGIS are integrated, analyzes energy using the three-dimensional visualization and two-dimensional space of GIS Power gives full play to BIM in the potential using value in O&M stage, make data not only can pipe, can more use.
At this stage when carrying out safety detection to the hidden facility of building, on the one hand with the increasing of building service life Add, frequently, data of the building in the design and construction stage faces the situation that fewer and fewer people knows, related facility to personnel's replacement It is faced with problem long neglected and in disrepair;On the other hand, traditional that the hidden installation security inspection of building is carried out according to design and construction drawing The method of survey situations such as easily misreading, and is not easy to operate to the more demanding of staff's map reading and application ability, and takes off When carrying out safety detection work from drawing, a large amount of under-enumerations, mistake are caused to look into, the problems such as mistake is repaired, to the life of owner and staff Great harm is brought with property safety.
Summary of the invention
The purpose of the invention is to provide a kind of hidden installation security detection method of the building based on 3DGIS+BIM, The present invention integrates 3DGIS and BIM, designed for the two dimensional code of building significant points augmented reality safety detection, knot AR technology is closed, the space management advantage of 3DGIS, the component management advantage of BIM and the virtual three-dimensional model of AR are given full play to Superposition with reality scene enhances display, to guarantee that staff intuitively, quickly and efficiently can position and detect hidden set Apply existing safety problem.
To achieve the goals above, the technical solution of the present invention is as follows: the hidden installation security of building based on 3DGIS+BIM Detection method, characterized by the following steps:
Step 1: the semantic conversion library of building BIM and 3DGIS;
Step 2:BIM data prediction;
Step 3: BIM data after conversion are loaded into the mobile terminal 3DGIS;
Step 4: the QR two dimensional code of design building object significant points augmented reality safety detection;
Step 5: the hidden installation security detection of building.
In the above-mentioned technical solutions, in step 1, according to CityGML and IFC data standard, IFC and CityGML class are defined With the hierarchical system and corresponding relationship of class, including attribute information and semantic information corresponding relationship;Take attribute information and semantic letter into account Breath defines the corresponding relationship of LOD4 in IFC and CityGML, utilizes correspondence setting LOD4 → LOD3 → LOD2 of LOD4 The conversion of → LOD1 → LOD0, to construct the semantic conversion library of BIM Yu each level of 3DGIS.
In the above-mentioned technical solutions, in step 2, according to the semantic conversion library of the BIM of building and 3DGIS, by BIM pattern number According to being converted to CityGML data;
Geometry is carried out from the aspect of merging two from boundary line abbreviation and tri patch to the CityGML data after conversion Abbreviation;Merged based on adjacent line-of-sight course and triangular grid dough sheet and geometry abbreviation is carried out to the CityGML data after conversion;
According to each component original material of BIM model and texture properties information, the material of the CityGML data after defining abbreviation And texture properties.
In the above-mentioned technical solutions, in step 2, merged based on adjacent line-of-sight course and triangular grid dough sheet, after conversion CityGML data carry out geometry abbreviation, while considering boundary line abbreviation and tri patch merging;Wherein, boundary line Abbreviation by adjacent line-of-sight course carry out abbreviation, selecting any vertex of boundary line is starting point, according to clockwise to each vertex into Line identifier successively selects at neighbouring 3 points in polygon edge boundary line as an analytical unit, calculates them since starting point The angle of composed two straight lines, when angle is greater than or equal to given threshold, it is believed that three point on a straight line deletes intermediate point, still So since starting point, successively select judged as an analytical unit at neighbouring 3 points in polygon edge boundary line;Work as folder Angle be less than given threshold when, be not processed, select since second point in polygon edge boundary line adjacent to 3 points as one minute Analysis unit continues to judge;Triangular grid dough sheet abbreviation is judged adjacent by the corner dimension between adjacent side tri patch altogether Whether side tri patch is coplanar altogether, when angle is less than given threshold, then it is assumed that two tri patch are coplanar, by this adjacent side two altogether Tri patch is identified, and then proceedes to that identified adjacent triangular faces are judged and identified, coplanar to being identified as Vertex of surface structure of the tri patch by selecting reference projection face to merge coplanar tri patch is identified as, after connection merging At a face;Traverse all tri patch, until all tri patch judgement finish, to the triangular facet not identified after traversal not into Row processing.Boundary line and tri patch mergingization are carried out by the geometry to the CityGML data after BIM model conversion Letter reduces BIM model data amount, improves load and the rendering efficiency of BIM model, solves to make due to the big data quantity of BIM model The requirement of pairs of computer hardware is high, and the problem of be easy to cause program stuck and collapse.
In the above-mentioned technical solutions, in step 3, using the CityGML data after GDAL reading BIM model conversion, pass through OsgEarth carries out loaded and displayed, and the BIM data after conversion are loaded into the mobile terminal 3DGIS based on osgEarth exploitation.
In the above-mentioned technical solutions, in step 4, the positioning to the hidden facility of building is about virtual and physical space Co-located, this is related to position tracking, locating and tracking and ratio problems, by studying and design covers building emphasis portion Position geospatial location, direction and building keypoint part threedimensional model corresponding with 3DGIS+BIM integrated system portion id information QR two-dimension identification code.
In the above-mentioned technical solutions, in step 4, the QR two dimension of design building object significant points augmented reality safety detection Building significant points are chosen and determined to code, the significance level for being primarily based on user demand and equipment;Then it is being integrated with BIM number According to three-dimensional geographic space scene in roamed, position building significant points;By adjusting scene viewpoint, best view is determined Angle, the spatial position and the BIM model ID number where azimuth information and viewpoint position of acquisition and saving scenario viewpoint, accordingly Generate the two dimensional code for the detection of building significant points augmented reality.
In the above-mentioned technical solutions, in step 5, by scanning QR two-dimension identification code mobile terminal 3DGIS+BIM integrated system In corresponding threedimensional model component information, the camera view that shows of adjustment mobile terminal 3DGIS+BIM application program and orientation, it is right Underground or hidden facility carries out real-time locating and displaying within the walls etc., and to ground or metope visual setting transparency, by checking The arrangement situation of hidden facility, and be aided with distance, angle, area equivalent and calculate and the spatial analysis such as buffer zone analysis, Overlap Analysis Function, to realize the safety detection of the hidden facility augmented reality of building keypoint part based on 3DGIS+BIM.
The present invention has the advantage that
(1) the present invention is based on the BIM of CityGML and IFC data standard and 3DGIS data semantic to convert;Consider boundary line The geometry simplifying method of data after the BIM model conversion that abbreviation and tri patch merge;Cover geospatial coordinates information, Azimuth information, the building significant points two dimensional code design of component ID attribute information;According to the BIM data and 3DGIS of building The conversion method of data, in conjunction with AR technical idea, passes through the building to design by BIM data integration into 3DGIS platform Significant points two dimensional code carries out barcode scanning, adjusts and position view viewpoint and orientation that 3DGIS+BIM application program in mobile terminal is shown, It realizes the Overlapping display of virtual BIM model and real three-dimensional scene, convenient for checking the arrangement situation of hidden facility, and is aided with basic Amount is calculated and spatial analysis functions, to realize the peace of the hidden facility augmented reality of building keypoint part based on 3DGIS+BIM Full inspection is surveyed, and the present invention intuitively rapidly can be positioned and be shown to the hidden facility of building, reduces staff to hidden The fault that facility component carries out in detection process is covered to avoid because traditional to improve the efficiency of detection according to design working drawing The problems such as paper carries out a large amount of under-enumerations existing for the method for the hidden installation security detection of building, mistake is looked into, mistake is repaired, gives owner and work The safety of life and property of personnel brings great the problem of endangering, and the application for meeting the hidden installation security detection of building needs It asks;
(2) with the promotion of the development of indoor positioning technologies and precision, present system can be not required to using QR two dimensional code into Row BIM component auxiliary positioning upgrades to dynamic adjustment three-dimensional scenic viewpoint orientation and angle in real time using real time positioning technology The hidden installation security detection of building;
(3) calculating of the invention and judgment method are simple, and speed is fast, versatile, can be applied not only to building Hidden facility, can also be applied to the safety detection of inbuilt monitoring device, Urban Underground piping lane etc. in waterwork, be worth answering With popularization.
Detailed description of the invention
Fig. 1 is BIM data of the present invention using production, carries out the hidden installation security inspection of building based on 3DGIS+BIM Measuring tool body implementation flow chart.
Fig. 2 is the flow chart of BIM of the present invention and 3DGIS data semantic conversion process.
Fig. 3 is the two dimensional code design flow diagram detected for building significant points augmented reality.
Specific embodiment
The performance that the invention will now be described in detail with reference to the accompanying drawings, but they and do not constitute a limitation of the invention, only It is for example.Keep advantages of the present invention more clear by explanation simultaneously and is readily appreciated that.
As shown in Figure 1, carrying out the building based on 3DGIS+BIM with the underground utilities BIM data instance that Revit is produced Underground utilities facility carries out safety detection:
Step 1: the Revit underground utilities BIM data produced are converted into IFC format
BIM data file is opened in Revit software, BIM data are converted to IFC format by selection export IFC function;
Step 2: the IFC data being converted to are subjected to CityGML semantic conversion
According to the semantic conversion library (as shown in Figure 2) of the BIM of building and 3DGIS, IFC data derived from BIM model are turned It is changed to CityGML data;
Step 3: the merging of triangular grid dough sheet is carried out to the CityGML data after conversion
It is 10 ° that dough sheet merging threshold, which is arranged, adjacent total by judging the corner dimension between adjacent side tri patch altogether Whether side tri patch is coplanar, when angle is less than or equal to 10 °, then it is assumed that two tri patch are coplanar, by this adjacent side altogether Two tri patch are identified, and then proceed to that identified adjacent triangular faces are judged and identified, coplanar to being identified as Tri patch by select reference projection face merged coplanar tri patch is identified as, connection merge after vertex of surface Constitute a face;All tri patch are traversed, until the judgement of all tri patch finishes, not to the triangular facet not identified after traversal It is handled;
Step 4: the CityGML data after merging to tri patch carry out boundary line abbreviation
The angle threshold value that adjacent three point on a straight line is arranged is 160 °, and selecting any vertex of boundary line is starting point, according to suitable When be identified for each vertex, since starting point, successively select in polygon edge boundary line adjacent to 3 points as one minute Unit is analysed, the angle of their composed two straight lines is calculated, when angle is greater than or equal to 160 °, it is believed that three point on a straight line is deleted Except intermediate point, still since starting point, successively select neighbouring 3 points in polygon edge boundary line as an analytical unit into Row judgement;When angle is less than 160 °, be not processed, selected since second point neighbouring 3 points in polygon edge boundary line as One analytical unit continues to judge;
Step 5: the CityGML data after load and visualization lightweight
CityGML formatted data after parsing Revit data conversion and lightweight using GDAL, in independent research Load and three-dimensional visualization in 3DGIS platform mobile terminal, the geographical ring of CityGML data and region after intuitive expression lightweight Border;
Step 6: building building significant points QR two dimensional code
According to the method for design building object significant points safety detection QR two dimensional code as shown in Figure 3, building is covered in building Object keypoint part geospatial location, direction and building keypoint part threedimensional model corresponding with 3DGIS+BIM integrated system The QR two-dimension identification code of portion's id information;
Step 7: the QR two dimensional code of scanning building significant points safety detection, adjustment and positioning virtual three-dimensional scene viewpoint Orientation
By scanning QR two dimensional code, adjustment and viewpoint position and orientation in positioning virtual three-dimensional field;
Step 8: transparent visual processing, the underground concealed pipeline information of locating and displaying are carried out to ground
It is 60% that ground transparency, which is arranged, carries out transparent visual processing to ground, and show underground concealed pipeline information, The intuitive distribution for grasping pipeline, convenient for the lookup, positioning and safety detection of hidden pipeline;
Step 9: utilizing the spaces such as spatial measurings and buffer zone analysis, Overlap Analysis such as distance, angle and area measuring point The functions such as analysis, realize angle between pipeline, oblique distance, net level length, hang down away from and pipe cross-sectional area etc. accurate measurement, assist into The safety detection of the underground concealed pipeline facility of row.
It, can be when carrying out safety detection to the underground concealed pipeline facility of building, using virtual after the present embodiment The superposition of threedimensional model and reality scene enhances display, can intuitively quickly by hidden pipeline facility in Virtual Geographic Environment into Row positioning and displaying obtain the relative positional relationship between pipeline by spatial measuring and analysis, guarantee that staff can be quasi- Really, safety problem existing for pipeline facility is efficiently searched and detected, is built relative to traditional according to design and construction drawing The method for building the hidden pipeline facility safety detection of object can effectively avoid under-enumeration, the problems such as mistake is looked into, mistake is repaired, and improve pipeline facility peace The precision and efficiency that full inspection is surveyed.
The explanation of technical term relevant to the technical program:
3DGIS is the abbreviation of three-dimension GIS, it is a three-dimensional space GIS-Geographic Information System, is able to achieve and reflects in real time, in real time The high-quality such as refraction, dynamic shadow, real-time rendering 3D rendering true to nature.
GIS-Geographic Information System (Geographic Information System or Geo- Information system, It GIS) is sometimes referred to as GeoscienceInformation System, it is a kind of specific highly important space information system, it is in computer Hardware and software system support under, to the related geographic distribution data in earth surface layer (including atmosphere) space all or in part into Row acquisition, storage, management, technological system operation, analyzed, be shown and described.
Building Information Model (Building Information Modeling, BIM) technology is that one kind is set applied to engineering Meter is built, the digitization tool of management, is integrated by digitization to building, informationization model, project planning, operation and It is shared and is transmitted in the lifecycle process of maintenance, engineers and technicians is made to make correct understanding to various architecture informations With efficient reply, the base of collaborative work is provided for design team and each side's construction bodies including building, unit of operation Plinth plays a significant role improving production efficiency, save the cost and shortening the construction period aspect.
CityGML is a kind of format for virtual three-dimensional city model data exchange and storage, CityGML be to Express the generic data model of three-dimensional city template.It defines the type and phase of the most common earth's surface target in city and region Mutual relation, and the attribute for accounting for the geometry of target, topology, semanteme, appearance etc., including between thematic type level, Relationship and space attribute between polymerization, target etc.;These thematic informations are not only a kind of GIF(Graphic Interchange format), while can be with Virtual three-dimensional city model is used for the advanced analysis in various application fields, such as simulation, Urban Data are excavated, facility pipe Reason, special topic topic inquiry etc.;CityGML is a kind of open data model, it realizes virtual three-dimensional city model based on XML Data are stored and are exchanged, it is a kind of application model of GML 3, GML 3 be worked out by OGC and ISO TC 211 it is expansible International standard can be used for Spatial data visualization.
The abbreviation of IFC (Industry Foundation Classes) industrial foundation class;It is IAI tissue (the International Alliance for Interoperability) --- the title of world collaboration Alliance Establishment;It is logical IFC is crossed, communication, productivity, time, cost and quality are promoted in the whole life cycle of construction project, for the building in the whole world Profession is promoted with the process in mechanical discipline and establishes the benchmark of a universal significance in information sharing;Nowadays had more and more Building trade Related product provide the data exchange interface of IFC standard so that multi-specialized design, management integration it is whole Synthesize reality;As the data model standard for being applied to AEC/FM every field, IFC model not only includes that those are seen See, tangible Architectural Elements (such as beam, column, plate, furred ceiling, furniture etc.), also include those abstract concepts (such as Plan, space, tissue, cost etc.);IFC model architecture is made of four levels, is successively resource layer from top to bottom (Resource Layer), core layer (Core Layer), alternation of bed (Interoperability Layer), field layer (Domain Layer);All include a series of information describing module in every layer, and abide by a rule: each level can only The information resources of same level and lower layer are quoted, and the resource on upper layer cannot be quoted, when upper resource changes, lower layer is not It will receive influence.
Industrial design (Industrial Design), abbreviation ID design, refers to based on engineering, aesthetics, economics to work Industry product is designed.
QR code is one kind of two-dimensional bar code, abbreviation of the QR from English Quick Response, the i.e. meaning of fast reaction, Wish that QR code can allow its content quickly to be decoded from inventor;QR code can store additional information than common bar code, also be not necessarily to picture Adjusting to a line scanner is needed in scanning as common bar code;This two dimensional code of QR code can quickly be read, with bar code before It compares, QR code can store richer information, including to text, the address URL and other kinds of data encryption.QR code is in pros Shape, only black-and-white two color.At wherein 3 of 4 corners, be printed on it is smaller, as the square pattern of Back Word;This 3 are to aid in solution The pattern of code software positioning, user need not be aligned, no matter scan at any angle, data still can be correctly read.
Augmented reality (Augmented Reality, abbreviation AR), also referred to as Augmented Reality (TaiWan, China).Enhancing is existing Real technology, it is a kind of by " seamless " the integrated new technology of real world information and virtual world information, is originally in reality It is difficult the entity information (visual information, sound, taste, tactile etc.) experienced in the certain time spatial dimension in the world, passes through The science and technology such as computer are superimposed after analog simulation again, virtual Information application to real world are perceived by human sensory, To reach the sensory experience of exceeding reality;True environment and virtual object have been added to the same picture or sky in real time Between exist simultaneously.
LOD technology, that is, Levels of Detail abbreviation, means detail;LOD technology refers to according to object model Node the location of in display environment and different degree, determine the resource allocation of object rendering, reduce insignificant object Face number and degrees of detail, to obtain efficient rendering operation;" cybercity construction technology " specification regulation, city three-dimensional building Model can be divided into tetra- levels of LOD1, LOD2, LOD3, LOD4 by the difference of performance details, and wherein LOD1 is body block models, LOD2 Refer to that basic roughcast, LOD3 refer to that master pattern, LOD4 refer to refined model.
OsgEarth is realized on the basis of osg based on the three-dimensional digital earth engine library of d engine osg exploitation Tile dispatches plug-in unit, and optional quaternary tree dispatches plug-in unit, more geodatas load plug-in units (including GDAL (Geospatial Data Abstraction Library is an open source raster spatial data transformation warehouse under X/MIT permission agreement, its benefit The various file formats supported are expressed with abstract data model, there are also series of orders row tools for it to carry out data conversion And processing), ogr (being an elementary factor library of open source C++, a part in the library GDAL), WMS (Warehouse Management System, warehouse management system), TMS (Transportation Management System, logistics transportation Management system), filesystem (file system) etc.), plug-in unit is converted in conjunction with a set of Geographical projections, this makes it possible to realize height Effect processing load scheduling geodata realizes the three-dimensional earth in three-dimensional tellurian display;OpenSceneGraph is (referred to as OSG OpenGL technological development) is used, is a set of application programming interfaces (Application based on C++ platform Programming Interface, API), it allows programmer that can more quickly and conveniently create high-performance, cross-platform friendship Mutual formula graphic package.
GDAL (Geospatial Data Abstraction Library) is opening under X/MIT permission agreement Source raster spatial data transformation warehouse;It expresses the various file formats supported using abstract data model;There are also a systems for it Column command-line tool carries out data conversion and processing.
Other unaccounted parts belong to the prior art.

Claims (8)

1. the hidden installation security detection method of building based on 3DGIS+BIM, characterized by the following steps:
Step 1: the semantic conversion library of building BIM and 3DGIS;
Step 2:BIM data prediction;
Step 3: BIM data after conversion are loaded into the mobile terminal 3DGIS;
Step 4: the QR two dimensional code of design building object significant points augmented reality safety detection;
Step 5: the hidden installation security detection of building.
2. the hidden installation security detection method of the building according to claim 1 based on 3DGIS+BIM, feature exist In: in step 1, according to CityGML and IFC data standard, define hierarchical system and corresponding pass of the IFC with CityGML class and class System, including attribute information and semantic information corresponding relationship;Take attribute information and semantic information into account, defines in IFC and CityGML The corresponding relationship of LOD4, using correspondence setting LOD4 → LOD3 → LOD2 → LOD1 → LOD0 conversion of LOD4, thus Construct the semantic conversion library of BIM and each level of 3DGIS.
3. the hidden installation security detection method of the building according to claim 2 based on 3DGIS+BIM, feature exist In: it is CityGML data by BIM model data transformation according to the semantic conversion library of the BIM of building and 3DGIS in step 2;
Geometry is carried out from the aspect of merging two from boundary line abbreviation and tri patch to the CityGML data after conversion Letter;Merged based on adjacent line-of-sight course and triangular grid dough sheet and geometry abbreviation is carried out to the CityGML data after conversion;
According to each component original material of BIM model and texture properties information, the material and texture of the CityGML data after defining abbreviation Attribute.
4. the hidden installation security detection method of the building according to claim 3 based on 3DGIS+BIM, feature exist In: in step 2, merged based on adjacent line-of-sight course and triangular grid dough sheet, geometry is carried out to the CityGML data after conversion Abbreviation, while considering boundary line abbreviation and tri patch merging;Wherein, the abbreviation of boundary line passes through adjacent line-of-sight course Letter, selecting any vertex of boundary line is starting point, according to being identified clockwise to each vertex, since starting point, successively It selects at neighbouring 3 points in polygon edge boundary line as an analytical unit, calculates the angle of their composed two straight lines, When angle is greater than or equal to given threshold, it is believed that three point on a straight line is deleted intermediate point and successively selected still since starting point Neighbouring 3 points in polygon edge boundary line are judged as an analytical unit;When angle is less than given threshold, does not do and locate Reason selects continue to judge as an analytical unit at neighbouring 3 points in polygon edge boundary line since second point;Triangle Whether tri patch is coplanar when grid dough sheet abbreviation judges adjacent total by the adjacent corner dimension altogether between tri patch, when Angle be less than given threshold when, then it is assumed that two tri patch are coplanar, by this it is adjacent altogether two tri patch of side be identified, then after It is continuous that identified adjacent triangular faces are judged and identified, pass through selection reference projection to coplanar tri patch is identified as Face is merged coplanar tri patch is identified as, and the vertex of surface after connection merges constitutes a face;Traverse all triangular facets Piece, until the judgement of all tri patch finishes, to the triangular facet not identified after traversal without processing.
5. the hidden installation security detection method of the building according to claim 4 based on 3DGIS+BIM, feature exist In: in step 3, the CityGML data after BIM model conversion is read using GDAL will by osgEarth progress loaded and displayed BIM data after conversion are loaded into the mobile terminal 3DGIS based on osgEarth exploitation.
6. the hidden installation security detection method of the building according to claim 5 based on 3DGIS+BIM, feature exist In: in step 4, the positioning to the hidden facility of building is about virtual and physical space co-located, this is related to position Tracking, locating and tracking and ratio problems, by study and design cover building keypoint part geospatial location, direction and The QR two-dimension identification code of building keypoint part threedimensional model corresponding with 3DGIS+BIM integrated system portion id information.
7. the hidden installation security detection method of the building according to claim 6 based on 3DGIS+BIM, feature exist In: in step 4, the QR two dimensional code of design building object significant points augmented reality safety detection is primarily based on user demand and sets Building significant points are chosen and determined to standby significance level;Then in the three-dimensional geographic space scene for being integrated with BIM data It is roamed, positions building significant points;By adjusting scene viewpoint, optimal viewing angle is determined, obtain and saving scenario viewpoint Spatial position and azimuth information and viewpoint position where BIM model ID number, accordingly generate for building significant points The two dimensional code of augmented reality detection.
8. the hidden installation security detection method of the building according to claim 7 based on 3DGIS+BIM, feature exist In: in step 5, believed by corresponding threedimensional model component in scanning QR two-dimension identification code mobile terminal 3DGIS+BIM integrated system It is aobvious to carry out positioning in real time to hidden facility for breath, the camera view and orientation that adjustment mobile terminal 3DGIS+BIM application program is shown Show, and to ground or metope visual setting transparency, by checking the arrangement situation of hidden facility, and the amount of being aided with is calculated and space Analytic function, to realize the safety detection of the hidden facility augmented reality of building keypoint part based on 3DGIS+BIM.
CN201811298714.XA 2018-11-02 2018-11-02 Building hidden facility safety detection method based on 3DGIS + BIM Active CN109522381B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811298714.XA CN109522381B (en) 2018-11-02 2018-11-02 Building hidden facility safety detection method based on 3DGIS + BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811298714.XA CN109522381B (en) 2018-11-02 2018-11-02 Building hidden facility safety detection method based on 3DGIS + BIM

Publications (2)

Publication Number Publication Date
CN109522381A true CN109522381A (en) 2019-03-26
CN109522381B CN109522381B (en) 2021-05-04

Family

ID=65774249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811298714.XA Active CN109522381B (en) 2018-11-02 2018-11-02 Building hidden facility safety detection method based on 3DGIS + BIM

Country Status (1)

Country Link
CN (1) CN109522381B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110288861A (en) * 2019-06-25 2019-09-27 惠州学院 A method of based on teaching material virtual display course content in kind
CN110516386A (en) * 2019-08-30 2019-11-29 天津住总机电设备安装有限公司 A method of live coordinate position is determined based on mobile phone B IM construction drawing AR
CN110675508A (en) * 2019-09-10 2020-01-10 长江勘测规划设计研究有限责任公司 BIM model geometric figure simplification method
CN110717672A (en) * 2019-10-10 2020-01-21 贵州百胜工程建设咨询有限公司 BIM-based operation and maintenance management system
CN112199804A (en) * 2020-09-04 2021-01-08 中通服咨询设计研究院有限公司 Method for calculating and drawing wireless network simulation area
CN112581318A (en) * 2020-12-18 2021-03-30 华航环境发展有限公司 Construction safety early warning system based on BIM and positioning technology integration

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102044089A (en) * 2010-09-20 2011-05-04 董福田 Method for carrying out self-adaption simplification, gradual transmission and rapid charting on three-dimensional model
KR101465483B1 (en) * 2013-12-23 2014-11-26 한국건설기술연구원 Bim data processing system for comprising lod data
CN104680331A (en) * 2015-03-18 2015-06-03 国网上海市电力公司 IFC based three-dimensional digital management platform for transmission and transformation project
CN105512588A (en) * 2015-11-25 2016-04-20 安徽云硕科技有限公司 Multi-code parsing conversion system
CN105701295A (en) * 2016-01-14 2016-06-22 昆明安泰得软件股份有限公司 Method for rapid integrated presentation of BIM model and three-dimensional geographical information system
US20170004230A1 (en) * 2015-07-02 2017-01-05 Autodesk, Inc. Method and apparatus for automatically creating a drainage system along a road network in a building information model (bim) computer aided design (cad) three-dimensional (3d) model
CN106952330A (en) * 2017-03-20 2017-07-14 南京师范大学 A kind of mobile terminal three-dimensional city dynamic modelling method based on geographical semantics
CN107085761A (en) * 2017-03-09 2017-08-22 深圳高速工程信息有限公司 Road maintenance methods, devices and systems
CN107679291A (en) * 2017-09-14 2018-02-09 中建三局第建设工程有限责任公司 Construction operation management method, storage device and mobile terminal based on BIM and AR
CN107862153A (en) * 2017-11-23 2018-03-30 国网上海市电力公司 A kind of transformer station digitizes managing and control system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102044089A (en) * 2010-09-20 2011-05-04 董福田 Method for carrying out self-adaption simplification, gradual transmission and rapid charting on three-dimensional model
KR101465483B1 (en) * 2013-12-23 2014-11-26 한국건설기술연구원 Bim data processing system for comprising lod data
CN104680331A (en) * 2015-03-18 2015-06-03 国网上海市电力公司 IFC based three-dimensional digital management platform for transmission and transformation project
US20170004230A1 (en) * 2015-07-02 2017-01-05 Autodesk, Inc. Method and apparatus for automatically creating a drainage system along a road network in a building information model (bim) computer aided design (cad) three-dimensional (3d) model
CN105512588A (en) * 2015-11-25 2016-04-20 安徽云硕科技有限公司 Multi-code parsing conversion system
CN105701295A (en) * 2016-01-14 2016-06-22 昆明安泰得软件股份有限公司 Method for rapid integrated presentation of BIM model and three-dimensional geographical information system
CN107085761A (en) * 2017-03-09 2017-08-22 深圳高速工程信息有限公司 Road maintenance methods, devices and systems
CN106952330A (en) * 2017-03-20 2017-07-14 南京师范大学 A kind of mobile terminal three-dimensional city dynamic modelling method based on geographical semantics
CN107679291A (en) * 2017-09-14 2018-02-09 中建三局第建设工程有限责任公司 Construction operation management method, storage device and mobile terminal based on BIM and AR
CN107862153A (en) * 2017-11-23 2018-03-30 国网上海市电力公司 A kind of transformer station digitizes managing and control system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
周忠等: "基于IFC和CityGML映射转换的BIM与3DGIS集成研究", 《河南科技》 *
张诚浩等: "基于CITYGML标准的BIM三维建筑模型转换", 《计算机科学与应用》 *
汤圣君等: "BIM与GIS数据集成_IFC与CityGML建筑几何语义信息互操作技术", 《土木建筑工程信息技术》 *
邵茜等: "网格模型的三角形折叠化简方法研究", 《计算机仿真》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110288861A (en) * 2019-06-25 2019-09-27 惠州学院 A method of based on teaching material virtual display course content in kind
CN110516386A (en) * 2019-08-30 2019-11-29 天津住总机电设备安装有限公司 A method of live coordinate position is determined based on mobile phone B IM construction drawing AR
CN110675508A (en) * 2019-09-10 2020-01-10 长江勘测规划设计研究有限责任公司 BIM model geometric figure simplification method
CN110675508B (en) * 2019-09-10 2023-04-25 长江勘测规划设计研究有限责任公司 BIM model geometric figure simplifying method
CN110717672A (en) * 2019-10-10 2020-01-21 贵州百胜工程建设咨询有限公司 BIM-based operation and maintenance management system
CN112199804A (en) * 2020-09-04 2021-01-08 中通服咨询设计研究院有限公司 Method for calculating and drawing wireless network simulation area
CN112199804B (en) * 2020-09-04 2023-11-14 中通服咨询设计研究院有限公司 Calculation and drawing method of wireless network simulation area
CN112581318A (en) * 2020-12-18 2021-03-30 华航环境发展有限公司 Construction safety early warning system based on BIM and positioning technology integration

Also Published As

Publication number Publication date
CN109522381B (en) 2021-05-04

Similar Documents

Publication Publication Date Title
CN109522381A (en) The hidden installation security detection method of building based on 3DGIS+BIM
Badenko et al. Scan-to-BIM methodology adapted for different application
Quattrini et al. From TLS to HBIM. High quality semantically-aware 3D modeling of complex architecture
KR20180131471A (en) Apparatus for integrated management of construction errors using 3d scanning with bim and method thereof
Shojaei et al. Visualization requirements for 3D cadastral systems
Fassi et al. A new idea of BIM system for visualization, web sharing and using huge complex 3d models for facility management.
Albourae et al. Architectural heritage visualization using interactive technologies
US9892474B2 (en) Computing system and method for visualizing integrated real estate data
Moyano et al. Operability of point cloud data in an architectural heritage information model
Centofanti et al. Architectural 3D modeling in historical buildings knowledge and restoration processes
CN102750618A (en) {0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof
Behzadan et al. Scalable algorithm for resolving incorrect occlusion in dynamic augmented reality engineering environments
US20230298241A1 (en) Equipment management method, equipment management device, equipment management program, and recording medium
Agugiaro et al. A web-based interactive tool for multi-resolution 3D models of a Maya archaeological site
Remondino et al. 3D documentation of 40 kilometers of historical porticoes–the challenge
Palestini et al. Integrated photogrammetric survey and bim modelling for the protection of school heritage, applications on a case study
Yang et al. An application of digital point cloud to historic architecture in digital archives
Yang et al. Complementarity of historic building information modelling and geographic information systems
Ren et al. Architecture in an age of augmented reality: applications and practices for mobile intelligence BIM-based AR in the entire lifecycle
Shih et al. 3D scan for the digital preservation of a historical temple in Taiwan
Nguyen et al. Practical workflow for cultural heritage digitalization and management: a case study in Vietnam
Richards-Rissetto et al. Procedural modeling for ancient Maya cityscapes initial methodological challenges and solutions
Virtanen et al. Browser based 3D for the built environment
Fernández-Palacios et al. Augmented reality for archaeological finds
Dore Procedural Historic Building Information Modelling (HBIM) for recording and documenting European classical architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant