CN107675698B - 拉森钢板桩水中围堰闭合结构及操作方法 - Google Patents

拉森钢板桩水中围堰闭合结构及操作方法 Download PDF

Info

Publication number
CN107675698B
CN107675698B CN201710990035.8A CN201710990035A CN107675698B CN 107675698 B CN107675698 B CN 107675698B CN 201710990035 A CN201710990035 A CN 201710990035A CN 107675698 B CN107675698 B CN 107675698B
Authority
CN
China
Prior art keywords
pile
cofferdam
closed
gap
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710990035.8A
Other languages
English (en)
Other versions
CN107675698A (zh
Inventor
林瀚
罗炎波
徐敏
冯杰
李舒扬
岳峰
桑伟
曹超云
尹彩琴
李洋
徐斌
翁士晓
马必利
周一勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Communication Engineering Construction Group Co Ltd
Original Assignee
Ningbo Communication Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communication Engineering Construction Group Co Ltd filed Critical Ningbo Communication Engineering Construction Group Co Ltd
Priority to CN201710990035.8A priority Critical patent/CN107675698B/zh
Publication of CN107675698A publication Critical patent/CN107675698A/zh
Application granted granted Critical
Publication of CN107675698B publication Critical patent/CN107675698B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种拉森钢板桩水中围堰闭合结构及操作方法,涉及桥梁施工领域,其结构包括结构桩、围堰桩、闭合缺口和闭合结构等,该闭合结构是由施打在闭合缺口外侧一定间隙和数量的加强桩、封闭间隙的钢板和橡胶板、定位橡胶板的钢筋笼和填料组成,它克服了水中工程结构施工的拉森钢板桩围堰闭合缺口导致围堰结构强度不足问题,确保施工安全;施工简单,止水效果显著,操作效率高;工程施工完成后,闭合结构与围堰桩同时拆除而重复使用,节约原材料,节能减排;通过理论计算或实际试验,闭合结构内填料可灵活选择,择优选择填料达到经济和实用安全的目的。因此,本发明具有构造简单、使用方便、经费节约、安全可靠等优点,经济效益显著。

Description

拉森钢板桩水中围堰闭合结构及操作方法
技术领域
本发明涉及桥梁施工领域,尤其是指一种拉森钢板桩水中围堰闭合结构及操作方法。
背景技术
每块拉森钢板桩的两边都设有用来连锁相邻板桩的拉钩状锁扣形成一个水密结构,广泛应用于桥梁基础围堰、挡土墙、码头、堤防护岸等工程,可重复使用,绿色环保,施工方便,费用低廉。
对于直线形的拉伸钢板桩围堰和泥土支撑结构,其水密效果十分显著;但对于矩形、菱形等封闭形围堰结构,拉森钢板桩存在两个缺陷:一是在棱角处需采用特制的角桩转角,二是由于打桩误差,最后施工的末号桩与首号桩的拉钩状锁扣难以紧扣闭合,这影响了围堰结构的水密性。因此,用于深水的矩形、菱形、圆形及椭圆形等封闭形围堰结构一般采用双排拉森钢板桩或在封闭围堰外采取高压旋喷注浆等措施,达到形成水密的封闭形围堰结构,这些措施构造复杂、施工繁琐,也增加了工程造价。
发明内容
本发明所要解决的技术问题在于克服现有技术的缺陷而提供一种构造简单、使用方便、经费节约、安全可靠的拉森钢板桩水中围堰闭合结构及操作方法。
本发明的技术问题通过以下技术方案实现:
一种拉森钢板桩水中围堰闭合结构,包括结构桩、多根围堰桩依次相连围合在结构桩外围而形成封闭的围堰、及构成围堰的首号桩和末号桩之间因打桩误差所致的闭合缺口,该闭合缺口处设有弥补闭合缺口止水性能的闭合结构,所述的闭合结构包括多根施打在闭合缺口外侧并依次相连形成一排的加强桩,该一排加强桩的两端分别设有用于封闭间隙的钢板和橡胶板,且橡胶板设置在钢板内侧,并在两个橡胶板之间设有钢筋笼和填料。
所述的钢板设有三个,该三个钢板分别施打在两个间隙和闭合缺口处,每个钢板底端均穿入地基开挖线(11)以下
Figure 934753DEST_PATH_IMAGE001
=0.5m~1.0m,每个钢板顶端均分别焊接在相邻的围堰桩和加强桩上,每个钢板的宽度均小于间隙宽度或闭合缺口宽度2cm~5cm,钢板与加强桩、围堰桩顶端高程相同。
所述的橡胶板为长条形,厚度1cm~2cm,平均宽度
Figure 505674DEST_PATH_IMAGE002
大于间隙宽度或大于闭合缺口宽度10cm~20cm,该橡胶板底端穿入地基开挖线以下
Figure 100002_DEST_PATH_IMAGE003
=0.5m~1.0m,并密封封闭钢板与加强桩之间、钢板与围堰桩之间、钢板与闭合缺口之间的空隙。
所述的钢筋笼为桶形框架,钢筋笼平面形状比加强桩、围堰桩和钢板围成的最小外尺寸形状均小
Figure 982792DEST_PATH_IMAGE004
Figure 597444DEST_PATH_IMAGE004
=5cm~8cm,钢筋笼底部穿入地基开挖线以下
Figure 35378DEST_PATH_IMAGE003
=0.5m~1.0m,钢筋笼外侧底端的两个间隙和闭合缺口处用钢丝绳绑扎橡胶板,该钢丝绳从底部延伸至钢筋笼顶端。
所述的填料为泥结碎石或低标号水泥混凝土,钢筋笼和橡胶板放置到位后,填筑在围堰桩、加强桩和钢板共同围合而成的空间内,从水下地基填筑至围堰桩顶部。
所述的加强桩数量视闭合缺口的宽度、水深和地基性质而定,以闭合缺口为中心每侧设置3~5个,平均长度
Figure 100002_DEST_PATH_IMAGE005
,至少穿入地基开挖线以下
Figure 365251DEST_PATH_IMAGE003
=0.5m~1.0m,顶部高度与围堰桩相平,纵向与围堰桩平行,横向的间隙为加强桩与围堰桩之间的净距离,并分别设在加强桩的两端,间隙的宽度由闭合缺口长度、水深和地基性质而定,净宽度0.5m~1.0m。
所述的围堰桩和加强桩均为拉森钢板桩,该拉森钢板桩为U形钢板桩,两侧分别设置拉钩状锁扣,每相邻两根拉森钢板桩之间相互紧扣闭合连接,围堰的四角处设置相连的转角桩,该转角桩的夹角
Figure 759192DEST_PATH_IMAGE006
由围堰棱角的角度大小而定;所述的拉森钢板桩长度由水深、水下地质和工程结构确定。
所述的围堰为封闭形状的多边形、圆形及椭圆形,所述的闭合缺口位置由首号桩和末号桩的位置确定,并设置在围堰桩受力和变形较小处。
所述橡胶板的平均长度×平均宽度×平均高度为
Figure DEST_PATH_IMAGE007
,围堰内施工工程结构时需挖深至地基开挖线的深度为
Figure 498741DEST_PATH_IMAGE008
,闭合结构内填料单位面积的容重为
Figure DEST_PATH_IMAGE009
,围堰外水面至地基顶面深度为
Figure 548605DEST_PATH_IMAGE010
,填料下地基土内的孔隙水在填料的压力作用下产生附加水压力,该附加水压力使地基土内的孔隙水从填料底面向闭合结构外渗流,地基土单位长度、单位宽度、厚度
Figure 100002_DEST_PATH_IMAGE011
的土体渗透力和渗透力做的功以及止水作用由下列公式计算:
公式一、
闭合结构内单位宽度、单位长度填料高度的线重量为
Figure 399012DEST_PATH_IMAGE012
闭合结构内地基土单位长度、单位宽度、厚度
Figure 100002_DEST_PATH_IMAGE013
土体孔隙水的渗透力为
Figure 663771DEST_PATH_IMAGE014
则闭合结构内土体孔隙水渗透力从填料底至地基开挖线所做的功为
Figure 135072DEST_PATH_IMAGE015
公式二、
围堰外地基开挖线处的平面水压力势能为
Figure 100002_DEST_PATH_IMAGE016
公式三、
通过调节填料类型即闭合结构内填料单位面积的容重
Figure 908119DEST_PATH_IMAGE009
,使
Figure 873801DEST_PATH_IMAGE017
成立;
公式一、公式二、公式三中各符号意义为
Figure 242334DEST_PATH_IMAGE018
——橡胶板的平均宽度,
Figure 635269DEST_PATH_IMAGE019
Figure 535092DEST_PATH_IMAGE020
——闭合结构加强桩的长度,
Figure 783759DEST_PATH_IMAGE019
Figure 757531DEST_PATH_IMAGE021
——闭合结构加强桩进入地基顶面以下的深度,
Figure 570635DEST_PATH_IMAGE019
Figure 629858DEST_PATH_IMAGE008
——围堰内地基顶面至地基开挖线的深度,
Figure 688075DEST_PATH_IMAGE019
Figure 781933DEST_PATH_IMAGE010
——围堰外水面至地基顶面深度,
Figure 765938DEST_PATH_IMAGE019
Figure 100002_DEST_PATH_IMAGE022
——闭合结构内单位宽度、单位长度填料高度的线重量,
Figure 312457DEST_PATH_IMAGE023
Figure 846469DEST_PATH_IMAGE009
——闭合结构内填料单位面积的容重,
Figure 857150DEST_PATH_IMAGE024
Figure 100002_DEST_PATH_IMAGE025
——水的单位面积容重,
Figure 949740DEST_PATH_IMAGE024
Figure 734288DEST_PATH_IMAGE026
——闭合结构内土体孔隙水渗透力从填料底至地基开挖线所做的功,
Figure 445892DEST_PATH_IMAGE027
Figure 514342DEST_PATH_IMAGE028
——围堰外地基开挖线处平面的水压力势能,
Figure 840150DEST_PATH_IMAGE027
Figure 95682DEST_PATH_IMAGE029
——闭合结构内任一地基土单位长度、单位宽度、厚度
Figure 293533DEST_PATH_IMAGE011
土体孔隙水的渗透力;
y——在以地基开挖线为x轴、地基开挖线垂直向下为y轴的坐标系内,闭合结构内任一地基土单位长度、单位宽度、厚度
Figure 216489DEST_PATH_IMAGE011
土体孔隙水的渗透力
Figure 713199DEST_PATH_IMAGE029
至x轴的距离,
Figure 456027DEST_PATH_IMAGE019
Figure 197849DEST_PATH_IMAGE030
——闭合结构内填料与围堰桩、加强桩、橡胶板之间的摩阻力总和,
Figure 975312DEST_PATH_IMAGE023
一种拉森钢板桩水中围堰闭合结构的操作方法,包括如下步骤:
步骤一、施打围堰桩
①打桩机具和拉森钢板桩到位
结构桩完成之后,打桩机具和拉森钢板桩到位;
②测量放样
测量放样拉森钢板桩的围堰位置,由GPS和全站仪配合定位;
③根据围堰桩受力和变形较小处确定围堰的闭合缺口位置,打下首号桩并按照逆时针或顺时针的顺序依次打入其它相连的围堰桩,直至打下最后的末号桩,并测量首号桩与末号桩之间的闭合缺口宽度;
步骤二、施打加强桩和钢板
①加强桩的数量视闭合缺口的宽度、水深和地基性质而定,以闭合缺口为中心每侧设置3~5个,平均长度
Figure 455972DEST_PATH_IMAGE005
,至少穿入地基开挖线以下
Figure 200943DEST_PATH_IMAGE003
=0.5m~1.0m;顶部高度与围堰桩相平,纵向与围堰桩平行,横向的间隙为加强桩与围堰桩之间的净距离,并分别设在加强桩的两端,间隙的宽度为0.5m~1.0m,由闭合缺口长度、水深和地基性质而定;
②根据间隙宽度或闭合缺口的宽度,制作钢板,钢板宽度比间隙宽度或闭合缺口的宽度小2cm~5cm,在两个间隙和闭合缺口处施打钢板;
③在围堰内抽水安装支撑结构;
步骤三、制作钢筋笼、橡胶板并下放
①桶形框架的钢筋笼平面形状比加强桩、围堰桩和钢板围成的最小外尺寸形状均小
Figure 418560DEST_PATH_IMAGE004
Figure 378426DEST_PATH_IMAGE004
=5cm~8cm,以方便钢筋笼插入其中;
②钢筋笼外侧底端两个间隙和闭合缺口处用钢丝绳绑扎橡胶板,钢丝绳从底部延伸至钢筋笼顶端,钢筋笼外侧顶部将橡胶板临时绑扎牢固;
③下放钢筋笼和橡胶板,调整准确钢筋笼位置后用打桩机具将钢筋笼压至地基开挖线以下
Figure 967670DEST_PATH_IMAGE003
=0.5m~1.0m;
④松开钢筋笼顶端绑扎橡胶板的钢丝绳,当填料填筑时,使橡胶板与两个间隙和闭合缺口处的钢板紧贴止水;
步骤四、填筑填料
①根据公式一、公式二和公式三计算闭合结构内填料单位面积的容重
Figure 934358DEST_PATH_IMAGE009
,确定填料类型;
②待闭合结构内土体孔隙水逐渐渗透,填料下沉,再补填填料增强止水效果;
步骤五、工程主结构施工
①围堰内抽水清除地基土;
②在闭合缺口处少量挖除地基土时,观察闭合缺口是否渗漏水,如有渗漏水,立即用钢板从上而下焊接闭合缺口,并在闭合缺口处打入注浆钢管,注入高压水泥浆止水,再逐步挖深地基土直至开挖至地基开挖线,进行工程主结构的施工。
与现有技术相比,本发明主要针对围堰的闭合缺口设计了更加独特的闭合结构,该闭合结构具有以下优点:一、克服了水中工程结构施工的拉森钢板桩围堰闭合缺口导致围堰结构强度不足问题,确保施工安全;二、闭合结构施工简单,止水效果显著,操作效率明显提高;三、工程施工完成后,闭合结构与围堰桩同时拆除,并可重复多次使用,节约原材料,节能减排;四、通过理论计算或实际试验,闭合结构内填料可灵活选择,择优选择填料达到经济实用和安全的目的。因此,本发明具有构造简单、使用方便、经费节约、安全可靠等优点,经济效益显著。
附图说明
图1为本发明的平面示意图。
图2为拉森钢板桩的连接结构示意图。
图3为闭合结构的放大图。
图4为闭合结构地基受力计算图式。
具体实施方式
下面将按上述附图对本发明实施例再作详细说明。
如图1~图4所示,1.地基、11.地基开挖线、2.拉森钢板桩、21.锁扣、22.转角桩、3结构桩、4围堰桩、41.首号桩、42.末号桩、5.闭合缺口、6.闭合结构、61.加强桩、62.间隙、63.钢板、64.橡胶板、65.填料、7.钢筋笼。
拉森钢板桩水中围堰闭合结构及操作方法,如图1所示,涉及桥梁施工领域,其结构包括水泥混凝土浇筑而成的结构桩3和围合在结构桩3外围而形成环形封闭的围堰;所述的结构桩3为工程结构所用桩基,其上用于施工结构桩承台等工程主结构;所述的围堰是围合成多边形、圆形及椭圆形等封闭形围堰结构,起到止水的作用,以便在围堰内无水施工工程结构,该多边形可以是矩形或菱形。
本实施例主要采用了矩形围堰,且该围堰是由多根围堰桩4按照图1箭头所示逆时针方向依次相连围合而成,围堰桩4主要采用了图2所示的拉森钢板桩2,这是一种U形钢板桩,其两侧分别设置拉钩状锁扣21,每相邻两根拉森钢板桩2之间相互紧扣闭合连接,矩形、菱形、圆形及椭圆形等封闭形围堰的四角处设置特制的转角桩22相连,该转角桩的夹角
Figure 267250DEST_PATH_IMAGE006
由围堰棱角的角度大小而定。
所述的拉森钢板桩2长度由水深、水下地质和工程结构确定。封闭形围堰最后施工的末号桩42与首号桩41的拉钩状锁扣21因打桩误差所致而存在难以紧扣闭合的闭合缺口5,这将影响围堰结构的水密性,故在闭合缺口5处需设有弥补闭合缺口止水性能的闭合结构6。闭合缺口5位置由首号桩41和末号桩42的位置确定,一般设置在围堰桩4受力和变形较小处,如矩形围堰设置在短边中心轴线与转角桩22之间。
所述的闭合结构6如图3所示,它是由施打在闭合缺口5外侧一定间隙和数量的加强桩61、封闭间隙62的钢板63和橡胶板64、定位橡胶板64的钢筋笼7和填料65组成。
所述的加强桩61也采用拉森钢板桩2,加强桩61的数量视闭合缺口5的宽度、水深和地基性质而定,以闭合缺口5为中心每侧设置3~5个,平均长度
Figure 770038DEST_PATH_IMAGE005
,至少穿入地基开挖线11以下
Figure 530184DEST_PATH_IMAGE003
=0.5m~1.0m,顶部高度与围堰桩4相平,纵向与围堰桩4平行,多根加强桩61依次相连形成一排,横向的间隙62为加强桩61与围堰桩4之间的净距离,设在加强桩61的两端,间隙62的宽度由闭合缺口5长度、水深和地基性质而定,一般净宽度0.5m~1.0m。
所述的钢板63和橡胶板64为封闭间隙62和止水而用,钢板63施打在间隙62和闭合缺口5处共三个,每个钢板63底端均穿过水下地基1表面,深度由水深、水流速度、地基性质、间隙宽度、工程结构等因素确定,钢板63底端穿入地基开挖线11以下
Figure 984168DEST_PATH_IMAGE003
=0.5m~1.0m,顶端分别与围堰桩4和加强桩61焊接牢固,钢板63的宽度和厚度由间隙62宽度和闭合缺口5的宽度、水深、水流速度、地基1性质等因素确定,钢板63宽度一般小于间隙62宽度或闭合缺口5宽度2cm~5cm;以方便打入在两个间隙62和闭合缺口5处,钢板63与加强桩61、围堰桩4顶端高程相同。
所述的橡胶板64为长条形,设置在钢板63内侧,可密封封闭钢板63与加强桩61之间、钢板63与围堰桩4之间、钢板63与闭合缺口5之间的空隙,起到止水作用,橡胶板64的厚度1cm~2cm,平均宽度
Figure 120751DEST_PATH_IMAGE018
比间隙宽度或闭合缺口5宽度大10cm~20cm,橡胶板64底端穿入地基开挖线11以下
Figure 472186DEST_PATH_IMAGE003
=0.5m~1.0m,。
所述的钢筋笼7为桶形框架,钢筋笼平面形状比加强桩61、围堰桩4和钢板63围成的最小外尺寸形状均小
Figure 403233DEST_PATH_IMAGE004
Figure 344513DEST_PATH_IMAGE004
=5cm~8cm,即钢筋笼7平面尺寸与加强桩61、围堰桩4和钢板63围成的最小外尺寸形状净距为
Figure 347104DEST_PATH_IMAGE004
=5cm~8cm,以方便钢筋笼7插入其中,钢筋笼7底部穿入地基开挖线11以下
Figure 808172DEST_PATH_IMAGE003
=0.5m~1.0m,钢筋笼7外侧底端两个间隙62和闭合缺口5处用钢丝绳绑扎橡胶板64,钢丝绳从底部延伸至钢筋笼7顶端。当钢丝绳与钢筋笼7顶端扣紧时,橡胶板64与钢筋笼7外侧紧贴;当钢丝绳松开时,橡胶板64可沿钢筋笼7外侧移动。钢筋笼7与橡胶板64下放至水下地基1时,钢丝绳与钢筋笼7顶端扣紧;填筑填料65时,松开钢丝绳使橡胶板64与钢板63紧贴起到止水作用。
所述的填料65为泥结碎石或低标号水泥混凝土,钢筋笼7和橡胶板64放置到位后,在围堰桩4、加强桩61和钢板63共同围合而成的空间内填筑,从水下地基填筑至围堰桩4顶部,起到固定橡胶板64和止水作用。
所述橡胶板64的平均长度×平均宽度×平均高度为
Figure 598536DEST_PATH_IMAGE007
,围堰内施工工程结构时需挖深至地基开挖线11的深度为
Figure 27112DEST_PATH_IMAGE031
,闭合结构6内填料65单位面积的容重为
Figure 505498DEST_PATH_IMAGE009
,围堰外水面至地基顶面深度为
Figure 571805DEST_PATH_IMAGE032
,填料下地基土内的孔隙水在填料65的压力作用下产生附加水压力,该附加水压力使地基土内的孔隙水从填料65底面向闭合结构外渗流,地基土单位长度、单位宽度、厚度
Figure 110234DEST_PATH_IMAGE033
的土体渗透力和渗透力做的功以及止水作用如图4所示,主要由下列公式计算:
公式一、
闭合结构6内单位宽度、单位长度填料65高度的线重量为
Figure 573576DEST_PATH_IMAGE012
闭合结构6内地基土单位长度、单位宽度、厚度
Figure 104921DEST_PATH_IMAGE033
土体孔隙水的渗透力为
Figure 275002DEST_PATH_IMAGE014
则闭合结构6内土体孔隙水渗透力从填料65底至地基开挖线11所做的功为
Figure 735064DEST_PATH_IMAGE034
公式二、
围堰外地基开挖线11处的平面水压力势能为
Figure 623386DEST_PATH_IMAGE016
公式三、
通过调节填料65类型即闭合结构内填料单位面积的容重
Figure 692842DEST_PATH_IMAGE009
,使
Figure 983009DEST_PATH_IMAGE035
成立,即闭合结构6内土体孔隙水渗透力从填料底至地基开挖线11所做的功不小于围堰外地基开挖线11处的平面水压力势能,则工程结构施工开挖地基土至地基开挖线过程中,围堰外水不会渗流到围堰内;在填料65作用下,闭合结构6内填料65下的地基土也发生较大程度的固结,其渗流量有限一般不影响围堰内工程结构施工,如闭合结构6内填料65下的地基土渗流量较多时,可采取在闭合缺口5处逐步挖深地基土时,同步用钢板63焊接闭合缺口,起到止水效果。
公式一、公式二、公式三中各符号意义为
Figure 631551DEST_PATH_IMAGE018
——橡胶板64的平均宽度,
Figure 7169DEST_PATH_IMAGE019
Figure 880316DEST_PATH_IMAGE020
——闭合结构6加强桩61的长度,
Figure 87306DEST_PATH_IMAGE019
Figure 138439DEST_PATH_IMAGE021
——闭合结构6加强桩61进入地基1顶面以下的深度,
Figure 752085DEST_PATH_IMAGE019
Figure 914076DEST_PATH_IMAGE036
——围堰内地基1顶面至地基开挖线11的深度,
Figure 428103DEST_PATH_IMAGE019
Figure 384557DEST_PATH_IMAGE032
——围堰外水面至地基1顶面深度,
Figure 485500DEST_PATH_IMAGE019
Figure 451182DEST_PATH_IMAGE022
——闭合结构6内单位宽度、单位长度填料65高度的线重量,
Figure 632764DEST_PATH_IMAGE023
Figure 274967DEST_PATH_IMAGE009
——闭合结构6内填料65单位面积的容重,
Figure 846894DEST_PATH_IMAGE024
Figure 101420DEST_PATH_IMAGE025
——水的单位面积容重,
Figure 340771DEST_PATH_IMAGE024
Figure 153875DEST_PATH_IMAGE026
——闭合结构6内土体孔隙水渗透力从填料65底至地基开挖线11所做的功,
Figure 213098DEST_PATH_IMAGE027
Figure 582900DEST_PATH_IMAGE028
——围堰外地基开挖线11处平面的水压力势能,
Figure 421631DEST_PATH_IMAGE027
Figure 343319DEST_PATH_IMAGE029
——闭合结构6内任一地基土单位长度、单位宽度、厚度
Figure 889838DEST_PATH_IMAGE033
土体孔隙水的渗透力;
y——在以地基开挖线11为x轴、地基开挖线11垂直向下为y轴的坐标系内,闭合结构6内任一地基土单位长度、单位宽度、厚度
Figure 797751DEST_PATH_IMAGE033
土体孔隙水的渗透力
Figure 496848DEST_PATH_IMAGE029
至x轴的距离,
Figure 402487DEST_PATH_IMAGE019
Figure 685570DEST_PATH_IMAGE037
——闭合结构6内填料65与围堰桩4、加强桩61、橡胶板64之间的摩阻力总和,
Figure 334857DEST_PATH_IMAGE023
所述的拉森钢板桩水中围堰闭合结构的施工可按照如下步骤操作:
步骤一、施打围堰桩
①机具和拉森钢板桩2到位
结构桩3完成之后,打桩船等打桩机具和拉森钢板桩2到位;
②测量放样
测量放样拉森钢板桩2的围堰位置,由GPS和全站仪配合定位;
③根据拉森钢板桩2受力和变形较小处确定围堰的闭合缺口5位置,如矩形围堰闭合缺口设置在短边中心轴线与转角桩22之间,先打下首号桩41,再按照逆时针或顺时针的顺序依次打入其它相连的围堰桩4,直至打下最后的末号桩42,并测量首号桩41与末号桩42之间的闭合缺口5宽度;
步骤二、施打加强桩和钢板
①加强桩61的数量视闭合缺口5的宽度、水深和地基性质而定,以闭合缺口5为中心每侧设置3~5个,平均长度
Figure 826144DEST_PATH_IMAGE038
,至少穿入地基开挖线11以下
Figure 965001DEST_PATH_IMAGE003
=0.5m~1.0m;顶部高度与围堰桩4相平,纵向与围堰桩4平行,横向的间隙62为加强桩61与围堰桩4之间的净距离,分别设在加强桩61的两端,间隙62的宽度由闭合缺口5长度、水深和地基性质而定,一般净宽度0.5m~1.0m;
②根据间隙62宽度或闭合缺口5的宽度,制作钢板63,钢板宽度比间隙62宽度或闭合缺口5的宽度小2cm~5cm,在两个间隙62和闭合缺口5处施打钢板63;
③在围堰内抽水安装支撑结构;
步骤三、制作钢筋笼、橡胶板并下放
①桶形框架的钢筋笼7平面形状比加强桩61、围堰桩4和钢板63围成的最小外尺寸形状均小
Figure DEST_PATH_IMAGE039
Figure 673063DEST_PATH_IMAGE039
=5cm~8cm,即钢筋笼7平面尺寸与加强桩61、围堰桩4和钢板63围成的最小外尺寸形状净距为
Figure 876773DEST_PATH_IMAGE039
=5cm~8cm,以方便钢筋笼7插入其中;
②钢筋笼7外侧底端两个间隙62和闭合缺口5处用钢丝绳绑扎橡胶板64,钢丝绳从底部延伸至钢筋笼7顶端,钢筋笼外侧顶部将橡胶板64临时绑扎牢固;
③下放钢筋笼7和橡胶板64,调整准确钢筋笼7位置后用打桩机或其他打桩机具将钢筋笼7压至地基开挖线11以下
Figure 534151DEST_PATH_IMAGE003
=0.5m~1.0m;
④松开钢筋笼7顶端绑扎橡胶板64的钢丝绳,当填料65填筑时,使橡胶板64与两个间隙62和闭合缺口5处的钢板63紧贴止水;
步骤四、填筑填料
①根据公式一、公式二和公式三计算闭合结构内填料65单位面积的容重
Figure 30860DEST_PATH_IMAGE009
,确定填料类型,如泥结碎石或低标号水泥混凝土;
②待闭合结构6内土体孔隙水逐渐渗透,填料下沉,再补填填料65增强止水效果;
步骤五、结构桩承台等工程主结构施工
①围堰内抽水清除地基土,施工结构桩承台等工程主结构;
②在闭合缺口5处少量挖除地基土时,观察闭合缺口5是否渗漏水,如有渗漏水,立即用钢板63从上而下焊接闭合缺口5,并在闭合缺口处打入注浆钢管,注入高压水泥浆止水,再逐步挖深地基土直至开挖至地基开挖线11,施工结构桩承台等工程结构。
本发明所述实施例仅用于说明本发明而不用于限制本发明的范围。此外还应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围内。

Claims (9)

1.一种拉森钢板桩水中围堰闭合结构,包括结构桩(3)、多根围堰桩(4)依次相连围合在结构桩(3)外围而形成封闭的围堰、及构成围堰的首号桩(41)和末号桩(42)之间因打桩误差所致的闭合缺口(5),该闭合缺口处设有弥补闭合缺口(5)止水性能的闭合结构(6),所述的闭合结构(6)包括多根施打在闭合缺口(5)外侧一定间隙(62)和数量的、并依次相连形成一排的加强桩(61),该一排加强桩(61)的两端分别设有用于封闭间隙(62)的钢板(63)和橡胶板(64),且橡胶板(64)设置在钢板(63)内侧,并在两个橡胶板(64)之间设有钢筋笼(7)和填料(65),其特征在于所述的橡胶板(64)的平均长度×平均宽度×平均高度为
Figure DEST_PATH_IMAGE001
,围堰内施工工程结构时需挖深至地基开挖线(11)的深度为
Figure DEST_PATH_IMAGE002
,闭合结构(6)内填料(65)单位面积的容重为
Figure DEST_PATH_IMAGE003
,围堰外水面至地基(1)顶面深度为
Figure DEST_PATH_IMAGE004
,填料(65)下地基土内的孔隙水在填料(65)的压力作用下产生附加水压力,该附加水压力使地基土内的孔隙水从填料底面向闭合结构外渗流,地基土单位长度、单位宽度、厚度
Figure DEST_PATH_IMAGE005
的土体渗透力和渗透力做的功以及止水作用由下列公式计算:
公式一、
闭合结构(6)内单位宽度、单位长度填料(65)高度的线重量为
Figure DEST_PATH_IMAGE006
闭合结构(6)内地基土单位长度、单位宽度、厚度
Figure 25829DEST_PATH_IMAGE007
土体孔隙水的渗透力为
Figure DEST_PATH_IMAGE008
则闭合结构(6)内土体孔隙水渗透力从填料(65)底至地基开挖线(11)所做的功为
Figure 536445DEST_PATH_IMAGE009
公式二、
围堰外地基开挖线(11)处的平面水压力势能为
Figure DEST_PATH_IMAGE010
公式三、
通过调节填料(65)类型即闭合结构内填料单位面积的容重
Figure 207860DEST_PATH_IMAGE003
,使
Figure DEST_PATH_IMAGE011
成立;
公式一、公式二、公式三中各符号意义为
Figure 399807DEST_PATH_IMAGE012
——橡胶板(64)的平均宽度,
Figure DEST_PATH_IMAGE013
Figure DEST_PATH_IMAGE014
——闭合结构(6)加强桩(61)的长度,
Figure 758720DEST_PATH_IMAGE013
Figure DEST_PATH_IMAGE015
——闭合结构(6)加强桩(61)进入地基(1)顶面以下的深度,
Figure 128652DEST_PATH_IMAGE013
Figure 598948DEST_PATH_IMAGE002
——围堰内地基(1)顶面至地基开挖线(11)的深度,
Figure 958035DEST_PATH_IMAGE013
Figure 564597DEST_PATH_IMAGE004
——围堰外水面至地基(1)顶面深度,
Figure 948174DEST_PATH_IMAGE013
Figure DEST_PATH_IMAGE016
——闭合结构(6)内单位宽度、单位长度填料(65)高度的线重量,
Figure DEST_PATH_IMAGE017
Figure 249973DEST_PATH_IMAGE003
——闭合结构(6)内填料(65)单位面积的容重,
Figure 875733DEST_PATH_IMAGE018
Figure DEST_PATH_IMAGE019
——水的单位面积容重,
Figure 992594DEST_PATH_IMAGE018
Figure DEST_PATH_IMAGE020
——闭合结构(6)内土体孔隙水渗透力从填料(65)底至地基开挖线(11)所做的功,
Figure 251799DEST_PATH_IMAGE021
Figure DEST_PATH_IMAGE022
——围堰外地基开挖线(11)处平面的水压力势能,
Figure 32106DEST_PATH_IMAGE021
Figure DEST_PATH_IMAGE023
——闭合结构(6)内任一地基土单位长度、单位宽度、厚度
Figure 431863DEST_PATH_IMAGE005
土体孔隙水的渗透力;
y——在以地基开挖线(11)为x轴、地基开挖线(11)垂直向下为y轴的坐标系内,闭合结构(6)内任一地基土单位长度、单位宽度、厚度
Figure 13017DEST_PATH_IMAGE005
土体孔隙水的渗透力
Figure 36599DEST_PATH_IMAGE023
至x轴的距离,
Figure 968783DEST_PATH_IMAGE013
Figure DEST_PATH_IMAGE024
——闭合结构(6)内填料(65)与围堰桩(4)、加强桩(61)、橡胶板(64)之间的摩阻力总和,
Figure 906652DEST_PATH_IMAGE017
2.根据权利要求1所述的拉森钢板桩水中围堰闭合结构,其特征在于多根所述的加强桩(61)依次相连形成一排,横向的间隙(62)为加强桩(61)与围堰桩(4)之间的净距离,设在加强桩(61)的两端;所述的钢板(63)设有三个,该三个钢板(63)分别施打在两个间隙(62)和闭合缺口(5)处,每个钢板(63)底端均穿入地基开挖线(11)以下
Figure DEST_PATH_IMAGE025
=0.5m~1.0m,每个钢板(63)顶端均分别焊接在相邻的围堰桩(4)和加强桩(61)上,每个钢板(63)的宽度均小于间隙(62)宽度或闭合缺口(5)宽度2cm~5cm,钢板(63)与加强桩(61)、围堰桩(4)顶端高程相同。
3.根据权利要求1所述的拉森钢板桩水中围堰闭合结构,其特征在于所述的橡胶板(64)为长条形,厚度1cm~2cm,平均宽度
Figure DEST_PATH_IMAGE026
大于间隙(62)宽度或大于闭合缺口(5)宽度10cm~20cm,该橡胶板(64)底端穿入地基开挖线(11)以下
Figure DEST_PATH_IMAGE027
=0.5m~1.0m,并密封封闭钢板(63)与加强桩(61)之间、钢板(63)与围堰桩(4)之间、钢板(63)与闭合缺口(5)之间的空隙。
4.根据权利要求2所述的拉森钢板桩水中围堰闭合结构,其特征在于所述的钢筋笼(7)为桶形框架,钢筋笼平面形状比加强桩(61)、围堰桩(4)和钢板(63)围成的最小外尺寸形状均小
Figure DEST_PATH_IMAGE028
Figure 434323DEST_PATH_IMAGE028
=5cm~8cm,钢筋笼(7)底部穿入地基开挖线(11)以下
Figure 162894DEST_PATH_IMAGE027
=0.5m~1.0m,钢筋笼(7)外侧底端的两个间隙(62)和闭合缺口(5)处用钢丝绳绑扎橡胶板(64),该钢丝绳从底部延伸至钢筋笼(7)顶端。
5.根据权利要求1所述的拉森钢板桩水中围堰闭合结构,其特征在于所述的填料(65)为泥结碎石或低标号水泥混凝土,钢筋笼(7)和橡胶板(64)放置到位后,填筑在围堰桩(4)、加强桩(61)和钢板(63)共同围合而成的空间内,从水下地基(1)填筑至围堰桩(4)顶部。
6.根据权利要求1所述的拉森钢板桩水中围堰闭合结构,其特征在于所述的加强桩(61)数量视闭合缺口(5)的宽度、水深和地基性质而定,以闭合缺口(5)为中心每侧设置3~5个,平均长度
Figure DEST_PATH_IMAGE029
,至少穿入地基开挖线(11)以下
Figure 707008DEST_PATH_IMAGE027
=0.5m~1.0m,顶部高度与围堰桩(4)相平,纵向与围堰桩(4)平行,横向的间隙(62)为加强桩与围堰桩(4)之间的净距离,并分别设在加强桩(61)的两端,间隙(62)的宽度由闭合缺口(5)长度、水深和地基性质而定,净宽度0.5m~1.0m。
7.根据权利要求1所述的拉森钢板桩水中围堰闭合结构,其特征在于所述的围堰桩(4)和加强桩(61)均为拉森钢板桩(2),该拉森钢板桩为U形钢板桩,两侧分别设置拉钩状锁扣(21),每相邻两根拉森钢板桩(2)之间相互紧扣闭合连接,围堰的四角处设置相连的转角桩(22),该转角桩的夹角
Figure DEST_PATH_IMAGE030
由围堰棱角的角度大小而定;所述的拉森钢板桩(2)长度由水深、水下地质和工程结构确定。
8.根据权利要求1所述的拉森钢板桩水中围堰闭合结构,其特征在于所述的围堰为封闭形状的多边形、圆形及椭圆形,所述的闭合缺口(5)位置由首号桩(41)和末号桩(42)的位置确定,并设置在围堰桩(4)受力和变形较小处。
9.一种根据权利要求1~8任一项所述的拉森钢板桩水中围堰闭合结构的操作方法,其特征在于该操作方法包括如下步骤:
步骤一、施打围堰桩
①打桩机具和拉森钢板桩(2)到位
结构桩(3)完成之后,打桩机具和拉森钢板桩(2)到位;
②测量放样
测量放样拉森钢板桩(2)的围堰位置,由GPS和全站仪配合定位;
③根据围堰桩(4)受力和变形较小处确定围堰的闭合缺口(5)位置,打下首号桩(41)并按照逆时针或顺时针的顺序依次打入其它相连的围堰桩(4),直至打下最后的末号桩(42),并测量首号桩(41)与末号桩(42)之间的闭合缺口(5)宽度;
步骤二、施打加强桩和钢板
①加强桩(61)的数量视闭合缺口(5)的宽度、水深和地基(1)性质而定,以闭合缺口(5)为中心每侧设置3~5个,平均长度
Figure 418874DEST_PATH_IMAGE029
,至少穿入地基开挖线(11)以下
Figure 427150DEST_PATH_IMAGE027
=0.5m~1.0m;顶部高度与围堰桩(4)相平,纵向与围堰桩(4)平行,横向的间隙(62)为加强桩(61)与围堰桩(4)之间的净距离,并分别设在加强桩(61)的两端,间隙(62)的宽度为0.5m~1.0m,由闭合缺口(5)长度、水深和地基(1)性质而定;
②根据间隙(62)宽度或闭合缺口(5)的宽度,制作钢板(63),钢板宽度比间隙(62)宽度或闭合缺口(5)的宽度小2cm~5cm,在两个间隙(62)和闭合缺口(5)处施打钢板(63);
③在围堰内抽水安装支撑结构;
步骤三、制作钢筋笼、橡胶板并下放
①桶形框架的钢筋笼(7)平面形状比加强桩(61)、围堰桩(4)和钢板(63)围成的最小外尺寸形状均小
Figure 307382DEST_PATH_IMAGE028
Figure 165223DEST_PATH_IMAGE028
=5cm~8cm,以方便钢筋笼插入其中;
②钢筋笼(7)外侧底端两个间隙(62)和闭合缺口(5)处用钢丝绳绑扎橡胶板(64),钢丝绳从底部延伸至钢筋笼(7)顶端,钢筋笼外侧顶部将橡胶板(64)临时绑扎牢固;
③下放钢筋笼(7)和橡胶板(64),调整准确钢筋笼(7)位置后用打桩机具将钢筋笼(7)压至地基开挖线(11)以下
Figure 241632DEST_PATH_IMAGE027
=0.5m~1.0m;
④松开钢筋笼(7)顶端绑扎橡胶板(64)的钢丝绳,当填料(65)填筑时,使橡胶板(64)与两个间隙(62)和闭合缺口(5)处的钢板(63)紧贴止水;
步骤四、填筑填料
①根据公式一、公式二和公式三计算闭合结构内填料(65)单位面积的容重
Figure 871459DEST_PATH_IMAGE003
,确定填料类型;
②待闭合结构(6)内土体孔隙水逐渐渗透,填料(65)下沉,再补填填料增强止水效果;
步骤五、工程主结构施工
①围堰内抽水清除地基土;
②在闭合缺口(5)处少量挖除地基土时,观察闭合缺口(5)是否渗漏水,如有渗漏水,立即用钢板(63)从上而下焊接闭合缺口(5),并在闭合缺口处打入注浆钢管,注入高压水泥浆止水,再逐步挖深地基土直至开挖至地基开挖线(11),进行工程主结构的施工。
CN201710990035.8A 2017-10-23 2017-10-23 拉森钢板桩水中围堰闭合结构及操作方法 Active CN107675698B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710990035.8A CN107675698B (zh) 2017-10-23 2017-10-23 拉森钢板桩水中围堰闭合结构及操作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710990035.8A CN107675698B (zh) 2017-10-23 2017-10-23 拉森钢板桩水中围堰闭合结构及操作方法

Publications (2)

Publication Number Publication Date
CN107675698A CN107675698A (zh) 2018-02-09
CN107675698B true CN107675698B (zh) 2023-02-28

Family

ID=61141353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710990035.8A Active CN107675698B (zh) 2017-10-23 2017-10-23 拉森钢板桩水中围堰闭合结构及操作方法

Country Status (1)

Country Link
CN (1) CN107675698B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372038A (zh) * 2018-12-19 2019-02-22 中铁二局集团有限公司 一种锁扣钢管桩围堰锁扣止水试验装置及方法
CN112942370A (zh) * 2021-02-04 2021-06-11 友谊国际工程咨询股份有限公司 基坑围护装置
CN115233713A (zh) * 2022-08-30 2022-10-25 中交路桥建设有限公司 椭圆形承台的围堰结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000328533A (ja) * 1999-05-20 2000-11-28 Maeda Corp 河川締切止水工法
CN203346871U (zh) * 2013-07-17 2013-12-18 深圳市兴班建筑工程有限公司 一种钢板桩
JP2014015809A (ja) * 2012-07-11 2014-01-30 Okumura Corp 鋼矢板の継手部止水工法及び流出防止金物
CN104153347A (zh) * 2014-08-29 2014-11-19 上海建工七建集团有限公司 地下连续墙墙幅缺口的修补结构及其施工方法
CN104895095A (zh) * 2015-03-26 2015-09-09 中国建筑第六工程局有限公司 一种加固深水基坑钢板桩围堰的方法
CN207392187U (zh) * 2017-10-23 2018-05-22 宁波交通工程建设集团有限公司 拉森钢板桩水中围堰闭合结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000328533A (ja) * 1999-05-20 2000-11-28 Maeda Corp 河川締切止水工法
JP2014015809A (ja) * 2012-07-11 2014-01-30 Okumura Corp 鋼矢板の継手部止水工法及び流出防止金物
CN203346871U (zh) * 2013-07-17 2013-12-18 深圳市兴班建筑工程有限公司 一种钢板桩
CN104153347A (zh) * 2014-08-29 2014-11-19 上海建工七建集团有限公司 地下连续墙墙幅缺口的修补结构及其施工方法
CN104895095A (zh) * 2015-03-26 2015-09-09 中国建筑第六工程局有限公司 一种加固深水基坑钢板桩围堰的方法
CN207392187U (zh) * 2017-10-23 2018-05-22 宁波交通工程建设集团有限公司 拉森钢板桩水中围堰闭合结构

Also Published As

Publication number Publication date
CN107675698A (zh) 2018-02-09

Similar Documents

Publication Publication Date Title
CN103321241B (zh) 深水开敞式组合基础码头及其施工方法
CN107268636A (zh) 一种密封槽及咬合结构的钢筒或钢板桩构成的连续墙基坑用围护及施工法
CN110499772B (zh) 一种岩质河床双层钢板桩围堰施工方法
CN107675698B (zh) 拉森钢板桩水中围堰闭合结构及操作方法
CN101597904B (zh) 一种防水板桩围堰及其施工方法
CN109339065B (zh) 一种深水裸露基岩密排桩支护施工承台的方法
JP2012026211A (ja) 地盤変形防止方法およびそれを用いた地中構造物構築方法
CN102286955B (zh) 钢筋混凝土桩式堤及其施工方法
CN216238598U (zh) 一种在围堰顶部堆填袋装黏土防波堤的双排钢管桩围堰
CN109281313A (zh) 一种预制组合箱型地下连续墙及其施工方法
CN108797653A (zh) 一种利用深基坑围护桩进行结构抗浮的施工方法
CN104929142A (zh) 一种组合围堰结构及其建造施工方法
CN112609717A (zh) 双排钢板桩防渗墙围堰和双排钢板桩防渗墙围堰施工方法
CN206477344U (zh) 基坑支护结构
CN206448285U (zh) 岩层地质条件下无封底混凝土组合式围堰
CN211773702U (zh) 一种软硬岩复杂地层基坑支护结构
CN211143098U (zh) 一种适用于深水条件的特长钢板桩围堰
CN209669900U (zh) 水底强透水砂性土层中隧道建设围堰结构
CN208830321U (zh) 一种支护桩与止水帷幕二合一施工装置
CN207392187U (zh) 拉森钢板桩水中围堰闭合结构
CN109162288B (zh) 锁扣式钢管桩围堰施工装置及施工方法
CN108411934B (zh) 浮式管桩、堤坝挡土结构及其施工方法
JP6938199B2 (ja) 防潮堤パネル、防潮堤および防潮堤構築方法
CN214245784U (zh) 双排钢板桩防渗墙围堰
CN105401586A (zh) 一种简易闭水的无底钢套箱施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: No. 91, Jiefang North Road, Haishu District, Ningbo City, Zhejiang Province

Patentee after: NINGBO COMMUNICATION ENGINEERING CONSTRUCTION GROUP Co.,Ltd.

Address before: No. 91, Jiefang North Road, Haishu District, Wenzhou City, Zhejiang Province, 315010

Patentee before: NINGBO COMMUNICATION ENGINEERING CONSTRUCTION GROUP Co.,Ltd.

CP02 Change in the address of a patent holder