CN107653829B - A kind of winter bridge surface deicer - Google Patents

A kind of winter bridge surface deicer Download PDF

Info

Publication number
CN107653829B
CN107653829B CN201711023304.XA CN201711023304A CN107653829B CN 107653829 B CN107653829 B CN 107653829B CN 201711023304 A CN201711023304 A CN 201711023304A CN 107653829 B CN107653829 B CN 107653829B
Authority
CN
China
Prior art keywords
plate
guide sleeve
scraper plate
upper wall
deicing vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711023304.XA
Other languages
Chinese (zh)
Other versions
CN107653829A (en
Inventor
龚明操
李睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyi Pengli Machinery Co ltd
Original Assignee
Xuzhou Kowloon Electronic Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Kowloon Electronic Information Technology Co Ltd filed Critical Xuzhou Kowloon Electronic Information Technology Co Ltd
Priority to CN201711023304.XA priority Critical patent/CN107653829B/en
Publication of CN107653829A publication Critical patent/CN107653829A/en
Application granted granted Critical
Publication of CN107653829B publication Critical patent/CN107653829B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H5/00Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
    • E01H5/12Apparatus or implements specially adapted for breaking, disintegrating, or loosening layers of ice or hard snow with or without clearing or removing ; Roughening ice or hard snow by means of tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning Of Streets, Tracks, Or Beaches (AREA)
  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)

Abstract

The present invention relates to a kind of deicer more particularly to a kind of winter bridge surface deicers.The winter bridge surface deicer that the technical problem to be solved in the present invention is to provide one kind can effectively remove bridge floor ice cube, improves driving safety.In order to solve the above-mentioned technical problems, the present invention provides such a winter bridge surface deicers, include deicing vehicle etc.;Left side is connected with regulating mechanism in deicing vehicle upper wall, scraper plate is connected on regulating mechanism, it is intermediate on the inside of deicing vehicle upper wall to be connected with oscilaltion mechanism, chopper plate is connected in oscilaltion mechanism, the outer left side of deicing vehicle upper wall is connected with battery, is connected between the motor in battery and oscilaltion mechanism by electric wire.Invention achieves the effects that can be effectively removed bridge floor ice cube, improve driving safety, by being provided with regulating mechanism and oscilaltion mechanism, the ice cube being secured firmly on bridge floor can be subjected to break process in this way, the solution rate for accelerating ice cube prevents the traveling for influencing vehicle and the walking of passerby.

Description

A kind of winter bridge surface deicer
Technical field
The present invention relates to a kind of deicer more particularly to a kind of winter bridge surface deicers.
Background technique
Bridge refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. that can smoothly pass through.It is modern to adapt to The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic need and set up make Current more convenient and fast building.Bridge is generally made of superstructure, substructure, support and attached structure, top knot Structure is also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Support is spanning knot The load transfer device of the bearing place setting of structure and bridge pier or abutment;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection, Training works etc..
Present winter temperature is relatively low, is especially easy to freeze on the north, bridge floor, after icing before it is unusual It slides, either pedestrian or automobile, accident all easily occurs.
Therefore it needs to research and develop a kind of winter bridge deicing dress that can be effectively removed bridge floor ice cube, improve driving safety It sets, to overcome winter bridge floor ice cube to will affect passerby's walking and the shortcomings that vehicle driving.
Summary of the invention
(1) technical problems to be solved
The shortcomings that present invention is in order to overcome winter bridge floor ice cube to will affect passerby's walking and vehicle driving, the invention solves The technical issues of be to provide a kind of winter bridge surface deicer that can be effectively removed bridge floor ice cube, improve driving safety.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a winter bridge surface deicers, include Deicing vehicle, regulating mechanism, scraper plate, oscilaltion mechanism, chopper plate and battery, the interior left side of deicing vehicle upper wall are connected with adjusting machine Structure, is connected with scraper plate on regulating mechanism, intermediate on the inside of deicing vehicle upper wall to be connected with oscilaltion mechanism, connects in oscilaltion mechanism It is connected to chopper plate, the outer left side of deicing vehicle upper wall is connected with battery, passes through between the motor in battery and oscilaltion mechanism Electric wire connection.
Preferably, regulating mechanism includes the first sliding rail, the first sliding block, guide rod, fixed plate, mounting plate, bolt and liter Bar drops, and left side is connected with the first sliding rail in deicing vehicle upper wall, and slidingtype is connected with the first sliding block, the first sliding block bottom on the first sliding rail Portion is connected with guide rod, and pilot hole is provided on guide rod, elevating lever is equipped in pilot hole, elevating lever passes through pilot hole, elevating lever Bottom end is connect with scraper plate, and the bottom right of the left upper portion of scraper plate and the first sliding rail is respectively connected with mounting plate, the left side of guide rod It is connected with fixed plate, the first threaded hole is provided on mounting plate, fixed plate and scraper plate, the mounting plate of the left upper portion of scraper plate is located at The front side of fixed plate, the mounting plate of the bottom right of the first sliding rail are located at the front side of scraper plate, are connected in the first threaded hole by bolt The mode connect is connected with bolt.
Preferably, oscilaltion mechanism includes motor, runner, the first guide rail, the first guide sleeve, spring and lifting frame, is removed Intermediate on the inside of ice machine upper wall to be connected with motor, the output shaft front end bias of motor is connected with runner, left and right two in deicing vehicle upper wall Side is respectively connected with the first guide rail, and the first guide rail is located at the left and right sides of motor, and slidingtype is connected with the first guide sleeve on the first guide rail, It is connected with lifting frame between first guide sleeve of the left and right sides, is respectively connected with bullet between deicing vehicle upper wall inside at the top of the first guide sleeve Spring, lifting frame bottom wall centre and chopper plate top are connect.
Preferably, further include having to be moved forward and backward mechanism and scraping blade, connect on the first guide sleeve of left side the first guide rail bottom and left side It is connected to back-and-forth motion mechanism, actuator base is moved forward and backward and is connected with scraping blade, contacted at the top of scraping blade bottom and scraper plate, be moved forward and backward machine Structure includes the second guide rail, the second guide sleeve, first connecting rod and the second connecting rod, and the first guide rail bottom is connected with the second guide rail, Slidingtype is connected with the second guide sleeve on second guide rail, and rotary type is connected with first connecting rod between the second guide sleeve and the first guide sleeve, Second guide sleeve bottom is connected with the second connecting rod, connect at the top of the second connecting rod bottom end and scraping blade.
Preferably, further include having cleaning brush, front and back is connected on the first guide sleeve of bottom and right side of the first guide rail of right side and is moved Motivation structure is moved forward and backward the mode that actuator base is connected through a screw thread and is connected with cleaning brush.
It preferably, further include having endless glide, the second sliding block, rotary box, outer gear ring, rack gear and crossing sieve, on deicing vehicle Right side is connected with endless glide in wall, and slidingtype is connected with the second sliding block in endless glide, and the second slider bottom is connected with rotation Case, rotation box outer wall lower part are connected with outer gear ring, are connected with rack gear on the right side of second guide sleeve in left side, and rack gear is engaged with outer gear ring, Rotary box bottom was connected with sieve.
It preferably, further include having fixed link and fixed blade, right side is connected with fixed link, fixed link position in deicing vehicle upper wall Among endless glide, fixed blade is uniformly connected in fixed link, fixed blade is located in rotary box.
Working principle: when needing the ice to bridge surface to be removed, which is transported to by staff first Required place, then staff makes scraper plate downwards by regulating mechanism and moves right, make the bottom of scraper plate with Ground face contact, then oscilaltion mechanism drives chopper plate constantly to move up and down, and the chopper plate of up and down motion can be by bridge floor Upper ice cube is broken, and staff pushes to the right deicing vehicle, and scraper plate moves right, the scraper plate moved right can by into The tentatively broken ice face of row is scraped from bridge floor, and battery can provide the power of rotation for motor, will can firmly consolidate in this way The ice cube being scheduled on bridge floor carries out break process, accelerates the solution rate of ice cube, prevents from influencing the traveling of vehicle and the row of passerby It walks.
Because regulating mechanism includes the first sliding rail, the first sliding block, guide rod, fixed plate, mounting plate, bolt and lifting Bar, the interior left side of deicing vehicle upper wall are connected with the first sliding rail, and slidingtype is connected with the first sliding block, the first slider bottom on the first sliding rail It is connected with guide rod, pilot hole is provided on guide rod, elevating lever is equipped in pilot hole, elevating lever passes through pilot hole, elevating lever bottom End is connect with scraper plate, and the bottom right of the left upper portion of scraper plate and the first sliding rail is respectively connected with mounting plate, is connected on the left of guide rod It is connected to fixed plate, the first threaded hole is provided on mounting plate, fixed plate and scraper plate, the mounting plate of the left upper portion of scraper plate is located at solid The front side of fixed board, the mounting plate of the bottom right of the first sliding rail are located at the front side of scraper plate, are bolted in the first threaded hole Mode be connected with bolt.When needing contacts scraper plate and bridge floor, staff first moves down scraper plate, when on scraper plate When the first threaded hole and the first threaded hole on the downside of fixed plate of mounting plate are located at same horizontal line, bolt is screwed by staff Into the first threaded hole, scraper plate bottom is contacted with bridge floor at this time, and then move right the first sliding block, when the first screw thread on scraper plate When the first threaded hole on the mounting plate of hole and the first sliding rail bottom right is located at same horizontal line, bolt is screwed by staff Into the first threaded hole, thus scraper plate is fixed, it can be quickly by ice cube under bridge floor shovel using scraper plate.Work as deicing After completion, first by the spiral shell in the first threaded hole on the first threaded hole and the first sliding rail bottom right mounting plate on scraper plate Bolt is removed, and is moved to the left scraper plate, the first threaded hole and the first spiral shell on the downside of fixed plate for then removing scraper plate upper mounting plate Bolt in pit, and the first threaded hole of scraper plate upper mounting plate and the first threaded hole on the upside of fixed plate is made to be located at same water Horizontal line, and bolt is screwed into corresponding first threaded hole, so when not in use will when scraper plate not with bridge Face contact effectively protects scraper plate.
Because oscilaltion mechanism includes motor, runner, the first guide rail, the first guide sleeve, spring and lifting frame, deicing vehicle Intermediate on the inside of upper wall to be connected with motor, the output shaft front end bias of motor is connected with runner, and the left and right sides is equal in deicing vehicle upper wall It is connected with the first guide rail, the first guide rail is located at the left and right sides of motor, and slidingtype is connected with the first guide sleeve on the first guide rail, left and right It is connected with lifting frame between first guide sleeve of two sides, is respectively connected with spring between deicing vehicle upper wall inside at the top of the first guide sleeve, It is connect among lifting frame bottom wall with chopper plate top.When needing to carry out deicing, staff controls motor and runner is driven not stop Rotation, since runner is eccentric connection, in this way under the squeezing action of the elastic force effect of spring and runner, lifting frame is continuous It moves up and down, so that chopper plate be driven ceaselessly to move up and down, so that the ice cube of bridge floor is carried out break process, facilitates left side Scraper plate scrapes ice cube, improves the effect except speed of icing.
Because further including having to be moved forward and backward mechanism and scraping blade, it is connected on the first guide sleeve of left side the first guide rail bottom and left side It is moved forward and backward mechanism, actuator base is moved forward and backward and is connected with scraping blade, contacted at the top of scraping blade bottom and scraper plate, be moved forward and backward mechanism packet Including the second guide rail, the second guide sleeve, first connecting rod and the second connecting rod, the first guide rail bottom is connected with the second guide rail, and second Slidingtype is connected with the second guide sleeve on guide rail, and rotary type is connected with first connecting rod between the second guide sleeve and the first guide sleeve, and second Guide sleeve bottom is connected with the second connecting rod, connect at the top of the second connecting rod bottom end and scraping blade.It is moved down when on first guide sleeve in left side When dynamic, under the drive of first connecting rod, the second guide sleeve is constantly moved forward and backward on the second guide rail, to drive scraping blade continuous Back-and-forth motion because scraper plate, when carrying out deicing, the ice disintegrating slag under shoveling can constantly be deposited in the right wall lower part of scraper plate, scraper plate The ice cube of right wall lower part is once accumulated more, just will affect scraper plate bottom to the crushing effect of bridge floor ice cube, and on scraper plate compared with More ice cubes will increase the weight of whole device, to increase the difficulty of staff's pushing device, so the scraping blade being moved forward and backward Ice cube on scraper plate can be scraped, prevent the ice cube scraped from influencing scraper plate and continue to scrape the effect of ice, and alleviate entire dress Weight when setting forward allows staff's more easily pushing meanss.
Because further including having cleaning brush, back-and-forth motion machine is connected on the first guide sleeve of bottom and right side of the first guide rail of right side Structure is moved forward and backward the mode that actuator base is connected through a screw thread and is connected with cleaning brush.When first guide sleeve on right side moves up and down, meeting So that second guide sleeve on right side is moved forward and backward on the second guide rail, so that cleaning brush is driven to be moved forward and backward, the cleaning of back-and-forth motion Brush can clear away some stones or other harder things in ice face, in this way it is prevented that chopper plate is being transported up and down Hard thing is encountered in dynamic process and is damaged, and when not needing using cleaning brush, the bolt of fixed cleaning brush is taken Out, to remove cleaning brush, cleaning brush can be effectively protected.
Because further including having endless glide, the second sliding block, rotary box, outer gear ring, rack gear and crossing sieve, in deicing vehicle upper wall Right side is connected with endless glide, and slidingtype is connected with the second sliding block in endless glide, and the second slider bottom is connected with rotary box, rotation Turnning box outer wall lower part is connected with outer gear ring, is connected with rack gear on the right side of second guide sleeve in left side, rack gear is engaged with outer gear ring, rotary box Bottom was connected with sieve.So suitable Nacl is added in rotary box first before deicing, second when right side is led When set is constantly moved forward and backward, rack gear is also constantly moved forward and backward, and outer gear ring constantly rotates clockwise and anticlockwise, and rotary box is not Disconnected rotation clockwise and anticlockwise, Nacl are constantly dropped out from screen bottom excessively, and the Nacl dropped out in ice face can Accelerate the solution rate of ice cube, making deicing, faster effect is more preferable.
Because further including having fixed link and fixed blade, right side is connected with fixed link in deicing vehicle upper wall, and fixed link is located at Among endless glide, fixed blade is uniformly connected in fixed link, fixed blade is located in rotary box.When rotary box is continuous It rotates clockwise and anticlockwise, fixed link and fixed blade play the role of a stirring Nacl, can effectively smash rotation The salt block to agglomerate in turnning box.
(3) beneficial effect
Invention achieves the effects that can be effectively removed bridge floor ice cube, improve driving safety, by being provided with adjusting machine The ice cube being secured firmly on bridge floor can be carried out break process in this way, accelerate the dissolution of ice cube by structure and oscilaltion mechanism Speed prevents the traveling for influencing vehicle and the walking of passerby, is provided with and is moved forward and backward mechanism and scraping blade, prevent the ice cube shadow scraped It rings scraper plate to continue to scrape the effect of ice, and alleviates weight when whole device moves ahead, push away staff more easily Dynamic device, is provided with cleaning brush, sample it is prevented that chopper plate encounter hard thing during up and down motion and by Damage is additionally provided with endless glide, the second sliding block, rotary box, outer gear ring, rack gear and crosses sieve, can accelerate ice cube in this way Solution rate, making deicing, faster effect is more preferable, and is provided with fixed link and fixed blade, and fixed link and fixed blade play The effect of one stirring Nacl, can effectively smash the salt block to agglomerate in rotary box.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the schematic view of the front view that the present invention is moved forward and backward mechanism.
Fig. 4 is the left view structure of the second guide rail of the present invention, the second guide sleeve, the first guide rail, the first guide sleeve and first connecting rod Schematic diagram.
Fig. 5 is the third schematic view of the front view of the invention.
Fig. 6 is the 4th kind of schematic view of the front view of the invention.
Fig. 7 is the 5th kind of schematic view of the front view of the invention.
The label in accompanying drawing is: 1- deicing vehicle, 2- regulating mechanism, the first sliding rail of 201-, the first sliding block of 202-, 203- guiding Bar, 204- fixed plate, 205- mounting plate, the first threaded hole of 206-, 207- bolt, 208- pilot hole, 209- elevating lever, 3- are scraped Plate, 4- oscilaltion mechanism, 401- motor, 402- runner, the first guide rail of 403-, the first guide sleeve of 404-, 405- spring, 406- liter Frame, 5- chopper plate drop, and 6- is moved forward and backward mechanism, the second guide rail of 601-, the second guide sleeve of 602-, 603- first connecting rod, 604- the Two connecting rods, 7- scraping blade, 8- cleaning brush, 9- endless glide, the second sliding block of 10-, 11- rotary box, 12- outer gear ring, 13- rack gear, 14- crosses sieve, 15- fixed link, 16- fixed blade, 17- battery.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of winter bridge surface deicer, as shown in figs. 1-7, include deicing vehicle 1, regulating mechanism 2, scraper plate 3, on Lower elevating mechanism 4, chopper plate 5 and battery 17, the interior left side of 1 upper wall of deicing vehicle are connected with regulating mechanism 2, connect on regulating mechanism 2 It is connected to scraper plate 3,1 upper wall of deicing vehicle inside is intermediate to be connected with oscilaltion mechanism 4, is connected with chopper plate in oscilaltion mechanism 4 5, the outer left side of 1 upper wall of deicing vehicle is connected with battery 17, passes through between the motor 401 in battery 17 and oscilaltion mechanism 4 Electric wire connection.
Embodiment 2
A kind of winter bridge surface deicer, as shown in figs. 1-7, include deicing vehicle 1, regulating mechanism 2, scraper plate 3, on Lower elevating mechanism 4, chopper plate 5 and battery 17, the interior left side of 1 upper wall of deicing vehicle are connected with regulating mechanism 2, connect on regulating mechanism 2 It is connected to scraper plate 3,1 upper wall of deicing vehicle inside is intermediate to be connected with oscilaltion mechanism 4, is connected with chopper plate in oscilaltion mechanism 4 5, the outer left side of 1 upper wall of deicing vehicle is connected with battery 17, passes through between the motor 401 in battery 17 and oscilaltion mechanism 4 Electric wire connection.
Regulating mechanism 2 include the first sliding rail 201, the first sliding block 202, guide rod 203, fixed plate 204, mounting plate 205, Bolt 207 and elevating lever 209, the interior left side of 1 upper wall of deicing vehicle are connected with the first sliding rail 201, and slidingtype connects on the first sliding rail 201 There is the first sliding block 202,202 bottom of the first sliding block is connected with guide rod 203, pilot hole 208, pilot hole are provided on guide rod 203 Elevating lever 209 is equipped in 208, elevating lever 209 passes through pilot hole 208, and 209 bottom end of elevating lever is connect with scraper plate 3, a left side for scraper plate 3 The bottom right of upper lateral part and the first sliding rail 201 is respectively connected with mounting plate 205, and the left side of guide rod 203 is connected with fixed plate 204, the first threaded hole 206, the mounting plate of the left upper portion of scraper plate 3 are provided on mounting plate 205, fixed plate 204 and scraper plate 3 205 are located at the front side of fixed plate 204, and the mounting plate 205 of the bottom right of the first sliding rail 201 is located at the front side of scraper plate 3, the first spiral shell Bolt 207 is connected in pit 206 by bolted connection.
Embodiment 3
A kind of winter bridge surface deicer, as shown in figs. 1-7, include deicing vehicle 1, regulating mechanism 2, scraper plate 3, on Lower elevating mechanism 4, chopper plate 5 and battery 17, the interior left side of 1 upper wall of deicing vehicle are connected with regulating mechanism 2, connect on regulating mechanism 2 It is connected to scraper plate 3,1 upper wall of deicing vehicle inside is intermediate to be connected with oscilaltion mechanism 4, is connected with chopper plate in oscilaltion mechanism 4 5, the outer left side of 1 upper wall of deicing vehicle is connected with battery 17, passes through between the motor 401 in battery 17 and oscilaltion mechanism 4 Electric wire connection.
Regulating mechanism 2 include the first sliding rail 201, the first sliding block 202, guide rod 203, fixed plate 204, mounting plate 205, Bolt 207 and elevating lever 209, the interior left side of 1 upper wall of deicing vehicle are connected with the first sliding rail 201, and slidingtype connects on the first sliding rail 201 There is the first sliding block 202,202 bottom of the first sliding block is connected with guide rod 203, pilot hole 208, pilot hole are provided on guide rod 203 Elevating lever 209 is equipped in 208, elevating lever 209 passes through pilot hole 208, and 209 bottom end of elevating lever is connect with scraper plate 3, a left side for scraper plate 3 The bottom right of upper lateral part and the first sliding rail 201 is respectively connected with mounting plate 205, and the left side of guide rod 203 is connected with fixed plate 204, the first threaded hole 206, the mounting plate of the left upper portion of scraper plate 3 are provided on mounting plate 205, fixed plate 204 and scraper plate 3 205 are located at the front side of fixed plate 204, and the mounting plate 205 of the bottom right of the first sliding rail 201 is located at the front side of scraper plate 3, the first spiral shell Bolt 207 is connected in pit 206 by bolted connection.
Oscilaltion mechanism 4 includes motor 401, runner 402, the first guide rail 403, the first guide sleeve 404,405 and of spring Frame 406 is gone up and down, 1 upper wall of deicing vehicle inside is intermediate to be connected with motor 401, and the output shaft front end bias of motor 401 is connected with runner 402, the interior left and right sides of 1 upper wall of deicing vehicle is respectively connected with the first guide rail 403, and the first guide rail 403 is located at the left and right two of motor 401 Side, slidingtype is connected with the first guide sleeve 404 on the first guide rail 403, is connected with lifting frame between the first guide sleeve 404 of the left and right sides 406, it is respectively connected with spring 405 between 404 top of the first guide sleeve and 1 upper wall of deicing vehicle inside, goes up and down among 406 bottom wall of frame and cuts It is connected at the top of slashings 5.
Embodiment 4
A kind of winter bridge surface deicer, as shown in figs. 1-7, include deicing vehicle 1, regulating mechanism 2, scraper plate 3, on Lower elevating mechanism 4, chopper plate 5 and battery 17, the interior left side of 1 upper wall of deicing vehicle are connected with regulating mechanism 2, connect on regulating mechanism 2 It is connected to scraper plate 3,1 upper wall of deicing vehicle inside is intermediate to be connected with oscilaltion mechanism 4, is connected with chopper plate in oscilaltion mechanism 4 5, the outer left side of 1 upper wall of deicing vehicle is connected with battery 17, passes through between the motor 401 in battery 17 and oscilaltion mechanism 4 Electric wire connection.
Regulating mechanism 2 include the first sliding rail 201, the first sliding block 202, guide rod 203, fixed plate 204, mounting plate 205, Bolt 207 and elevating lever 209, the interior left side of 1 upper wall of deicing vehicle are connected with the first sliding rail 201, and slidingtype connects on the first sliding rail 201 There is the first sliding block 202,202 bottom of the first sliding block is connected with guide rod 203, pilot hole 208, pilot hole are provided on guide rod 203 Elevating lever 209 is equipped in 208, elevating lever 209 passes through pilot hole 208, and 209 bottom end of elevating lever is connect with scraper plate 3, a left side for scraper plate 3 The bottom right of upper lateral part and the first sliding rail 201 is respectively connected with mounting plate 205, and the left side of guide rod 203 is connected with fixed plate 204, the first threaded hole 206, the mounting plate of the left upper portion of scraper plate 3 are provided on mounting plate 205, fixed plate 204 and scraper plate 3 205 are located at the front side of fixed plate 204, and the mounting plate 205 of the bottom right of the first sliding rail 201 is located at the front side of scraper plate 3, the first spiral shell Bolt 207 is connected in pit 206 by bolted connection.
Oscilaltion mechanism 4 includes motor 401, runner 402, the first guide rail 403, the first guide sleeve 404,405 and of spring Frame 406 is gone up and down, 1 upper wall of deicing vehicle inside is intermediate to be connected with motor 401, and the output shaft front end bias of motor 401 is connected with runner 402, the interior left and right sides of 1 upper wall of deicing vehicle is respectively connected with the first guide rail 403, and the first guide rail 403 is located at the left and right two of motor 401 Side, slidingtype is connected with the first guide sleeve 404 on the first guide rail 403, is connected with lifting frame between the first guide sleeve 404 of the left and right sides 406, it is respectively connected with spring 405 between 404 top of the first guide sleeve and 1 upper wall of deicing vehicle inside, goes up and down among 406 bottom wall of frame and cuts It is connected at the top of slashings 5.
Further include having to be moved forward and backward mechanism 6 and scraping blade 7, connects on 403 bottom of the first guide rail of left side and the first guide sleeve of left side 404 It is connected to and is moved forward and backward mechanism 6, be moved forward and backward 6 bottom of mechanism and be connected with scraping blade 7, contacted at the top of 7 bottom of scraping blade and scraper plate 3, front and back Mobile mechanism 6 includes the second guide rail 601, the second guide sleeve 602, first connecting rod 603 and the second connecting rod 604, the first guide rail 403 bottoms are connected with the second guide rail 601, and slidingtype is connected with the second guide sleeve 602, the second guide sleeve 602 and on the second guide rail 601 Rotary type is connected with first connecting rod 603 between one guide sleeve 404, and 602 bottom of the second guide sleeve is connected with the second connecting rod 604, the It is connected at the top of two connecting rods, 604 bottom end and scraping blade 7.
Further include having cleaning brush 8, front and back is connected on the bottom of the first guide rail of right side 403 and the first guide sleeve of right side 404 and is moved Motivation structure 6 is moved forward and backward the mode that 6 bottom of mechanism is connected through a screw thread and is connected with cleaning brush 8.
It further include having endless glide 9, the second sliding block 10, rotary box 11, outer gear ring 12, rack gear 13 and crossing sieve 14, deicing Right side is connected with endless glide 9 in 1 upper wall of vehicle, and slidingtype is connected with the second sliding block 10,10 bottom of the second sliding block in endless glide 9 It is connected with rotary box 11,11 outer wall lower part of rotary box is connected with outer gear ring 12, is connected with rack gear on the right side of second guide sleeve 602 in left side 13, rack gear 13 is engaged with outer gear ring 12, and 11 bottom of rotary box was connected with sieve 14.
It further include having fixed link 15 and fixed blade 16, right side is connected with fixed link 15, fixed link 15 in 1 upper wall of deicing vehicle Among endless glide 9, fixed blade 16 is uniformly connected in fixed link 15, fixed blade 16 is located in rotary box 11.
Working principle: when needing the ice to bridge surface to be removed, which is transported to by staff first Required place, then staff makes scraper plate 3 downwards by regulating mechanism 2 and moves right, and makes the bottom of scraper plate 3 With ground face contact, then oscilaltion mechanism 4 drives chopper plate 5 constantly to move up and down, and the chopper plate 5 of up and down motion can incite somebody to action Ice cube is broken on bridge floor, and staff pushes to the right deicing vehicle 1, and scraper plate 3 moves right, and the scraper plate 3 moved right can The ice face being tentatively crushed is scraped from bridge floor, battery 17 can provide the power of rotation for motor 401, in this way The ice cube being secured firmly on bridge floor can be subjected to break process, accelerate the solution rate of ice cube, prevent the row for influencing vehicle Sail the walking with passerby.
Because regulating mechanism 2 includes the first sliding rail 201, the first sliding block 202, guide rod 203, fixed plate 204, mounting plate 205, bolt 207 and elevating lever 209, the interior left side of 1 upper wall of deicing vehicle are connected with the first sliding rail 201, slidingtype on the first sliding rail 201 It is connected with the first sliding block 202,202 bottom of the first sliding block is connected with guide rod 203, pilot hole 208 is provided on guide rod 203, is led Elevating lever 209 is equipped with into hole 208, elevating lever 209 passes through pilot hole 208, and 209 bottom end of elevating lever is connect with scraper plate 3, scraper plate 3 Left upper portion and the bottom right of the first sliding rail 201 be respectively connected with mounting plate 205, the left side of guide rod 203 is connected with fixation Plate 204 is provided with the first threaded hole 206, the mounting plate of the left upper portion of scraper plate 3 on mounting plate 205, fixed plate 204 and scraper plate 3 205 are located at the front side of fixed plate 204, and the mounting plate 205 of the bottom right of the first sliding rail 201 is located at the front side of scraper plate 3, the first spiral shell Bolt 207 is connected in pit 206 by bolted connection.When needing contacts scraper plate 3 and bridge floor, staff is first First scraper plate 3 is moved down, when the first threaded hole 206 and the first screw thread of 204 downside of fixed plate of 3 upper mounting plate 205 of scraper plate When hole 206 is located at same horizontal line, bolt 207 is screwed into the first threaded hole 206 by staff, at this time 3 bottom of scraper plate with Bridge floor contact, then move right the first sliding block 202, when 201 bottom, right of the first threaded hole 206 and the first sliding rail on scraper plate 3 When the first threaded hole 206 on the mounting plate 205 of side is located at same horizontal line, bolt 207 is screwed into the first spiral shell by staff In pit 206, thus scraper plate 3 is fixed, it can be quickly by ice cube under bridge floor shovel using scraper plate 3.When deicing is complete At later, first by the first screw thread on the 201 bottom right mounting plate 205 of the first threaded hole 206 and the first sliding rail on scraper plate 3 Bolt 207 in hole 206 is removed, and is moved to the left scraper plate 3, then removes the first threaded hole of 3 upper mounting plate 205 of scraper plate 206 with the bolt 207 in the first threaded hole 206 of the downside of fixed plate 204, and make the first screw thread of 3 upper mounting plate 205 of scraper plate First threaded hole 206 of hole 206 and the upside of fixed plate 204 is located at same horizontal line, and bolt 207 is screwed into corresponding the In one threaded hole 206, so when not in use will when scraper plate 3 do not contacted with bridge floor, effectively protect scraper plate 3.
Because oscilaltion mechanism 4 includes motor 401, runner 402, the first guide rail 403, the first guide sleeve 404, spring 405 are connected with motor 401 among inside with lifting frame 406,1 upper wall of deicing vehicle, and the output shaft front end bias of motor 401 is connected with Runner 402, the interior left and right sides of 1 upper wall of deicing vehicle are respectively connected with the first guide rail 403, and the first guide rail 403 is located at the left and right of motor 401 Two sides, slidingtype is connected with the first guide sleeve 404 on the first guide rail 403, is connected with lifting between the first guide sleeve 404 of the left and right sides Frame 406, the top of the first guide sleeve 404 on the inside of 1 upper wall of deicing vehicle between be respectively connected with spring 405, among lifting 406 bottom wall of frame with It is connected at the top of chopper plate 5.When needing to carry out deicing, staff controls motor 401 and runner 402 is driven ceaselessly to rotate, by It is eccentric connection in runner 402, in this way under the squeezing action of the elastic force effect of spring 405 and runner 402, lifting frame 406 is not Disconnected up and down motion, so that chopper plate 5 is driven ceaselessly to move up and down, so that the ice cube of bridge floor is subjected to break process, it is convenient The scraper plate 3 in left side scrapes ice cube, improves the effect except speed of icing.
Because further including having to be moved forward and backward mechanism 6 and scraping blade 7,403 bottom of the first guide rail of left side and the first guide sleeve of left side 404 On be connected be moved forward and backward mechanism 6, be moved forward and backward 6 bottom of mechanism be connected with scraping blade 7, contacted at the top of 7 bottom of scraping blade and scraper plate 3, Being moved forward and backward mechanism 6 includes the second guide rail 601, the second guide sleeve 602, first connecting rod 603 and the second connecting rod 604, and first 403 bottom of guide rail is connected with the second guide rail 601, and slidingtype is connected with the second guide sleeve 602, the second guide sleeve 602 on the second guide rail 601 Rotary type is connected with first connecting rod 603 between the first guide sleeve 404, and 602 bottom of the second guide sleeve is connected with the second connecting rod 604, it connects at the top of 604 bottom end of the second connecting rod and scraping blade 7.When the first guide sleeve 404 when left side moves up and down, in the first connection Under the drive of bar 603, the second guide sleeve 602 is constantly moved forward and backward on the second guide rail 601, thus before driving scraping blade 7 continuous After move because scraper plate 3, when carrying out deicing, the ice disintegrating slag under shoveling can constantly be deposited in the right wall lower part of scraper plate 3, scraper plate 3 The ice cube of right wall lower part is once accumulated more, just will affect 3 bottom of scraper plate to the crushing effect of bridge floor ice cube, and on scraper plate 3 More ice cube will increase the weight of whole device, to increase the difficulty of staff's pushing device, so what is be moved forward and backward scrapes Piece 7 can scrape the ice cube on scraper plate 3, prevent the ice cube scraped from influencing scraper plate 3 and continue to scrape the effect of ice, and alleviate whole Weight when a device moves ahead, allows staff's more easily pushing meanss.
Because further including having cleaning brush 8, before being connected on the bottom of the first guide rail of right side 403 and the first guide sleeve of right side 404 Mobile mechanism 6 afterwards are moved forward and backward the mode that 6 bottom of mechanism is connected through a screw thread and are connected with cleaning brush 8.First guide sleeve on right side 404 when moving up and down, and second guide sleeve 602 on right side can be made to be moved forward and backward on the second guide rail 601, to drive cleaning brush 8 It is moved forward and backward, the cleaning brush 8 of back-and-forth motion can clear away some stones or other harder things in ice face, in this way It is prevented that chopper plate 5 encounters during up and down motion hard thing and is damaged, when not needing using cleaning When brushing 8, the bolt 207 of fixed cleaning brush 8 is taken out, to remove cleaning brush 8, cleaning brush 8 can be effectively protected.
Because further including having endless glide 9, the second sliding block 10, rotary box 11, outer gear ring 12, rack gear 13 and crossing sieve 14, Right side is connected with endless glide 9 in 1 upper wall of deicing vehicle, and slidingtype is connected with the second sliding block 10, the second sliding block 10 in endless glide 9 Bottom is connected with rotary box 11, and 11 outer wall lower part of rotary box is connected with outer gear ring 12, is connected on the right side of second guide sleeve 602 in left side Rack gear 13, rack gear 13 are engaged with outer gear ring 12, and 11 bottom of rotary box was connected with sieve 14.So existing first before deicing Suitable Nacl is added in rotary box 11, when the second guide sleeve 602 when right side is constantly moved forward and backward, before rack gear 13 is also continuous After move, outer gear ring 12 constantly rotates clockwise and anticlockwise, and rotary box 11 constantly rotates clockwise and anticlockwise, industry Salt is constantly dropped out from 14 bottom of sieve excessively, and the solution rate of ice cube can be accelerated by dropping out the Nacl in ice face, make deicing Faster, effect is more preferable.
Because further including having fixed link 15 and fixed blade 16, right side is connected with fixed link 15 in 1 upper wall of deicing vehicle, fixed Bar 15 is located among endless glide 9, and fixed blade 16 is uniformly connected in fixed link 15, and fixed blade 16 is located at rotary box 11 It is interior.When rotary box 11 is constantly rotating clockwise and anticlockwise, fixed link 15 and fixed blade 16 play a stirring industry The effect of salt can effectively smash the salt block to agglomerate in rotary box 11.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (4)

1. a kind of winter bridge surface deicer, which is characterized in that include deicing vehicle (1), regulating mechanism (2), scraper plate (3), oscilaltion mechanism (4), chopper plate (5) and battery (17), the interior left side of deicing vehicle (1) upper wall are connected with regulating mechanism (2), it is connected with scraper plate (3) on regulating mechanism (2), it is intermediate on the inside of deicing vehicle (1) upper wall to be connected with oscilaltion mechanism (4), on It is connected with chopper plate (5) on lower elevating mechanism (4), the outer left side of deicing vehicle (1) upper wall is connected with battery (17), battery (17) It is connect between the motor (401) in oscilaltion mechanism (4) by electric wire;
Regulating mechanism (2) includes the first sliding rail (201), the first sliding block (202), guide rod (203), fixed plate (204), installation Plate (205), bolt (207) and elevating lever (209), the interior left side of deicing vehicle (1) upper wall are connected with the first sliding rail (201), and first is sliding Slidingtype is connected with the first sliding block (202) on rail (201), and the first sliding block (202) bottom is connected with guide rod (203), guide rod (203) it is provided on pilot hole (208), is equipped with elevating lever (209) in pilot hole (208), elevating lever (209) passes through pilot hole (208), elevating lever (209) bottom end is connect with scraper plate (3), the left upper portion of scraper plate (3) and the bottom right of the first sliding rail (201) It is respectively connected with mounting plate (205), is connected on the left of guide rod (203) fixed plate (204), mounting plate (205), fixed plate (204) and on scraper plate (3) it is provided with the first threaded hole (206), the mounting plate (205) of the left upper portion of scraper plate (3), which is located at, to be fixed The front side of plate (204), the mounting plate (205) of the bottom right of the first sliding rail (201) are located at the front side of scraper plate (3), the first screw thread It is connected with bolt (207) by bolted connection in hole (206);Oscilaltion mechanism (4) includes motor (401), turns Take turns (402), the first guide rail (403), the first guide sleeve (404), spring (405) and lifting frame (406), deicing vehicle (1) upper wall inside Centre is connected with motor (401), and the output shaft front end bias of motor (401) is connected with runner (402), in deicing vehicle (1) upper wall The left and right sides is respectively connected with the first guide rail (403), and the first guide rail (403) is located at the left and right sides of motor (401), the first guide rail (403) slidingtype is connected with the first guide sleeve (404) on, is connected with lifting frame between the first guide sleeve (404) of the left and right sides (406), it is respectively connected with spring (405) between deicing vehicle (1) upper wall inside at the top of the first guide sleeve (404), goes up and down frame (406) bottom It is connect among wall with chopper plate (5) top, staff controls motor (401) and runner (402) is driven ceaselessly to rotate, due to turning Taking turns (402) is eccentric connection, in this way under the squeezing action of the elastic force effect of spring (405) and runner (402), goes up and down frame (406) continuous to move up and down;
It further include having back-and-forth motion mechanism (6) and scraping blade (7), left side the first guide rail (403) bottom and the first guide sleeve of left side (404) On be connected with and be moved forward and backward mechanism (6), be moved forward and backward mechanism (6) bottom and be connected with scraping blade (7), scraping blade (7) bottom and scraper plate (3) Top contact, being moved forward and backward mechanism (6) includes the second guide rail (601), the second guide sleeve (602), first connecting rod (603) and the Two connecting rods (604), the first guide rail (403) bottom are connected with the second guide rail (601), and slidingtype connects on the second guide rail (601) Having the second guide sleeve (602), rotary type is connected with first connecting rod (603) between the second guide sleeve (602) and the first guide sleeve (404), Second guide sleeve (602) bottom is connected with the second connecting rod (604), is connect at the top of the second connecting rod (604) bottom end and scraping blade (7).
2. a kind of winter bridge surface according to claim 1 deicer, which is characterized in that further include having cleaning brush (8), it is connected with back-and-forth motion mechanism (6) on the bottom of the first guide rail of right side (403) and the first guide sleeve of right side (404), front and back is moved The mode that motivation structure (6) bottom is connected through a screw thread is connected with cleaning brush (8).
3. a kind of winter bridge surface according to claim 2 deicer, which is characterized in that further include having endless glide (9), the second sliding block (10), rotary box (11), outer gear ring (12), rack gear (13) and sieve (14) are crossed, it is right in deicing vehicle (1) upper wall Side is connected with endless glide (9), and slidingtype is connected with the second sliding block (10) in endless glide (9), and the second sliding block (10) bottom connects It is connected to rotary box (11), rotary box (11) outer wall lower part is connected with outer gear ring (12), connection on the right side of second guide sleeve (602) in left side Have rack gear (13), rack gear (13) is engaged with outer gear ring (12), and rotary box (11) bottom was connected with sieve (14).
4. a kind of winter bridge surface according to claim 3 deicer, which is characterized in that further include having fixed link (15) it is connected with fixed link (15) with fixed blade (16), the interior right side of deicing vehicle (1) upper wall, fixed link (15) is located at endless glide (9) intermediate, it is uniformly connected with fixed blade (16) in fixed link (15), fixed blade (16) is located in rotary box (11).
CN201711023304.XA 2017-10-27 2017-10-27 A kind of winter bridge surface deicer Active CN107653829B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711023304.XA CN107653829B (en) 2017-10-27 2017-10-27 A kind of winter bridge surface deicer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711023304.XA CN107653829B (en) 2017-10-27 2017-10-27 A kind of winter bridge surface deicer

Publications (2)

Publication Number Publication Date
CN107653829A CN107653829A (en) 2018-02-02
CN107653829B true CN107653829B (en) 2019-08-09

Family

ID=61095729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711023304.XA Active CN107653829B (en) 2017-10-27 2017-10-27 A kind of winter bridge surface deicer

Country Status (1)

Country Link
CN (1) CN107653829B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677864B (en) * 2018-08-08 2020-07-31 东阳市阳涛电子科技有限公司 Robot

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2420327Y (en) * 2000-03-09 2001-02-21 高彦萍 Snow cleaner for road
CN202559288U (en) * 2011-06-29 2012-11-28 张铁民 Road surface ice chopping machine
CN103276685A (en) * 2013-05-29 2013-09-04 李臣 Road surface ice removing machine
CN205259131U (en) * 2015-12-26 2016-05-25 刘汉佑 Clear ice and snow car in road surface

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6658768B1 (en) * 2001-05-19 2003-12-09 Wesley Allen Bainter Trencher

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2420327Y (en) * 2000-03-09 2001-02-21 高彦萍 Snow cleaner for road
CN202559288U (en) * 2011-06-29 2012-11-28 张铁民 Road surface ice chopping machine
CN103276685A (en) * 2013-05-29 2013-09-04 李臣 Road surface ice removing machine
CN205259131U (en) * 2015-12-26 2016-05-25 刘汉佑 Clear ice and snow car in road surface

Also Published As

Publication number Publication date
CN107653829A (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN108468303A (en) A kind of bridge snow breaker
CN106894378B (en) A kind of small-sized shovel device for expelling ice and snow
US20120248043A1 (en) Device, method and vessel for preventing oil damages and alleviating damages
CN109137812B (en) Road surface snow breaker with adjustable snow removing width
CN107653829B (en) A kind of winter bridge surface deicer
CN203807998U (en) Automatic chain-plate snow removal machine
CN202247782U (en) Trailer type railway sand-removing machine
CN101572396B (en) Impact deicing mechanism of overhead line deicing robot
CN104947625B (en) A kind of chain-plate type automatic snow remover
CN103088782A (en) Deicing device arranged in vehicle
CN207646676U (en) It is a kind of to have road surface black ice broken and the road maintenance equipment of clearing function
CN214005569U (en) Highway maintenance is with quick garrulous ice snow removal device
RU2234565C1 (en) Track ballast cleaning machine
CN114872843B (en) Icebreaker for polar scientific investigation and use method thereof
CN110512559B (en) Anti-icing road surface snow sweeping device
CN2539772Y (en) Multifunctional snow-removing ice-breaking machine
CN212582569U (en) Novel road snow removing for municipal works device
CN104631398A (en) Automatic all-weather channel ice breaking and water draining facility
CN202913391U (en) Spiral clutch ice digging machine
CN210086148U (en) Active rotary file plow type ice-breaking snow remover
CN110629722B (en) Ice breaking device for removing ice accumulated on road surface based on reciprocating motion
CN208792236U (en) A kind of bridge deicer
CN210917191U (en) Novel road ice breaking snow removing device
CN203160184U (en) Loader snow removing shovel
CN113080161A (en) Water surface floating ice cleaning boat

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190715

Address after: 221400 No. 37 Beijing West Road, Xinyi Development Zone, Xuzhou City, Jiangsu Province

Applicant after: Xuzhou Kowloon Electronic Information Technology Co.,Ltd.

Address before: 330000 Nanchang High-tech Industrial Development Zone, Nanchang City, Jiangxi Province, 313, second floor, 899 Torch Fifth Road

Applicant before: NANCHANG HUAXUE TECHNOLOGY CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231218

Address after: 221400 No. 99, Beijing West Road, Xinyi Economic Development Zone, Xuzhou City, Jiangsu Province

Patentee after: XINYI PENGLI MACHINERY Co.,Ltd.

Address before: 221400 No. 37 Beijing West Road, Xinyi Development Zone, Xuzhou City, Jiangsu Province

Patentee before: Xuzhou Kowloon Electronic Information Technology Co.,Ltd.

TR01 Transfer of patent right