CN107620262A - A kind of pot bearing for retaining whole anchor bolts changes construction method - Google Patents

A kind of pot bearing for retaining whole anchor bolts changes construction method Download PDF

Info

Publication number
CN107620262A
CN107620262A CN201710854280.6A CN201710854280A CN107620262A CN 107620262 A CN107620262 A CN 107620262A CN 201710854280 A CN201710854280 A CN 201710854280A CN 107620262 A CN107620262 A CN 107620262A
Authority
CN
China
Prior art keywords
pot bearing
steel plate
anchor bolt
lower steel
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710854280.6A
Other languages
Chinese (zh)
Other versions
CN107620262B (en
Inventor
肖开军
张长利
杨文甫
李鸿彬
罗小聪
戴春洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Heli Civil Engineering Ltd
Original Assignee
Guangdong Heli Civil Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Heli Civil Engineering Ltd filed Critical Guangdong Heli Civil Engineering Ltd
Priority to CN201710854280.6A priority Critical patent/CN107620262B/en
Publication of CN107620262A publication Critical patent/CN107620262A/en
Application granted granted Critical
Publication of CN107620262B publication Critical patent/CN107620262B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of pot bearing for retaining whole anchor bolts to change construction method, including old pot bearing is handled;Beam body uses synchronous jacking system, and top lifting height is more than the thickness of lower steel plate;Take out old pot bearing;The processing of anchor bolt;New pot bearing processing, new pot bearing is identical with the old pot bearing structure before processing, is handled before the installation of new pot bearing;New pot bearing is installed;Synchronization of jacking up jack oil return pressure release, pot bearing are changed and finished.The construction method remains whole anchor bolts of former pot bearing, and ensures that new pot bearing is connected reliably with beam body and pinner.

Description

A kind of pot bearing for retaining whole anchor bolts changes construction method
Technical field
The present invention relates to the replacing construction method of pot bearing, in particular to a kind of benzvalene form branch for retaining whole anchor bolts Seat changes construction method.
Background technology
At present, pot bearing changes technology largely using anchor bolt is all cut off in the prior art, and entirety is taken out Old bearing, new bearing is integrally placed at former bearing, upper steel plate using being welded with the pre-buried leveling steel plate in beam bottom, adopt by lower steel basin Clogged with epoxy resin mortar, or bridge, without beam bottom pre-embedded steel slab, lower steel plate is come using filling epoxy resin mortar on pot bearing Ensure the mode that pot bearing is connected with beam bottom and pinner.
The construction technology has following disadvantage:
(1) in new pot bearing upper steel plate and the pre-buried leveling steel plate welding process in beam bottom, excessive temperature is easily to new benzvalene form branch The function of seat tetrafluoro plate causes damage, and causes intensity to decline beam body concrete;
(2) after the leveling steel plate welding pre-buried with beam bottom of new pot bearing upper steel plate, new pot bearing will not have replaceable Property;
(3) such as lower steel plate is attached with beam bottom and pinner by the way of epoxy resin is filled on pot bearing, is easily gone out Now operate it is bad cause new pot bearing to bias, occur disease again;
(4) pot bearing is arranged at the larger continuous beam of across footpath, and continuous beam is affected by temperature, and can produce larger temperature Vertically and horizontally stretch, once pot bearing can not meet vertically and horizontally stretching for continuous beam, by pot bearing and beam body and pinner Connection produces larger horizontal force, and the tensile strength of epoxy resin is not high, is easily caused pot bearing and beam body and the company of pinner Pick out existing disengaging to destroy, ultimately result in pot bearing failure.
The content of the invention
It is an object of the invention to provide a kind of pot bearing for retaining whole anchor bolts to change construction method, the construction party Method remains whole anchor bolts of former pot bearing, and ensures that new pot bearing is connected reliably with beam body and pinner.
What this purpose of the present invention was achieved through the following technical solutions:A kind of benzvalene form branch for retaining whole anchor bolts Seat changes construction method, it is characterised in that the construction method comprises the following steps:
The first step:Old pot bearing is handled;
Second step:Beam body uses synchronous jacking system, and top lifting height is more than the thickness of lower steel plate;
3rd step:Take out old pot bearing;
4th step:The processing of anchor bolt;
5th step:New pot bearing processing, new pot bearing is identical with the old pot bearing structure before processing, newly Pot bearing installation before handled;
6th step:New pot bearing is installed;
7th step:Synchronization of jacking up jack oil return pressure release, pot bearing are changed and finished.
In the present invention, the first step:Old pot bearing is handled, concrete processing procedure is as follows:
(11), the lower steel plate anchor bolt nut of old pot bearing is removed, the lower steel plate anchor bolt includes later half Part lower steel plate anchor bolt and first half lower steel plate anchor bolt;
(12), pot bearing is divided into first half and latter half, first half lower steel plate anchor with vertical removing direction The upper surface flush of fixing bolt and lower steel plate cuts off;
(13) latter half lower steel plate, is processed into anchor bolt hole and cuts into U-type groove.
In the present invention, the 3rd step:Old pot bearing is taken out, concrete processing procedure is as follows:
(31), the lower steel basin of old pot bearing is prized to high, padding steel plate under lower steel basin, padding steel plate the top padding four Fluorine plate, it need to ensure that the lower edge of lower steel plate is higher than the top surface of first half lower steel plate anchor bolt;
(32), force pulls out lower steel basin;
(33) upper steel plate anchor bolt nut, is screwed out, upper steel plate is taken out by external force, the upper steel plate anchor bolt includes Latter half upper steel plate anchor bolt and first half upper steel plate anchor bolt.
In the present invention, the 4th step:The processing of anchor bolt, the anchor bolt include latter half lower steel plate anchoring spiral shell Bolt, latter half upper steel plate anchor bolt, first half upper steel plate anchor bolt and first half lower steel plate anchor bolt, specifically Processing procedure is as follows:
(41), latter half lower steel plate anchor bolt is in old pot bearing cutting latter half lower steel plate processing anchor bolt Hole (13) is easily injured when forming U-type groove, the bolt thread need to be processed, it is ensured that its screw thread and nut phase Matching;
(42), working process first half lower steel plate anchor bolt screw thread, and by first half lower steel plate anchor bolt The tapped anchor bolt connection of first half lower steel plate anchor bolt hole size preprocessing of size and new pot bearing Groove.
In the present invention, in the 5th step, handled before the installation of new pot bearing, concrete processing procedure is as follows:
(51) the latter half lower steel plate of new pot bearing, is processed into anchor bolt hole and cuts into U-type groove;
(52), the U-type groove cut into according to the latter half lower steel plate processing anchor bolt hole of new pot bearing is processed Same material uniform thickness and the bloom to match with the U-type groove, bloom beat groove with lower steel basin contact portion.
In the present invention, the 6th step:New pot bearing is installed, concrete processing procedure is as follows:
(61), the upper steel plate of new pot bearing is separated with lower steel basin, carries out the fixation and protection of lower steel basin, installation is simultaneously Upper steel plate is fixed with nut;
(62), the lower steel basin of new pot bearing is pacified according to the inverse process of the lower steel basin with taking out old pot bearing Dress, the lower steel basin of new pot bearing is installed in place;
(63), the latter half lower steel plate processing anchor bolt hole of new pot bearing has been welded with the bloom matched It is good;
(64) the anchor bolt nut of new pot bearing, is screwed.
The pot bearing of the present invention change when construction method solves existing replacing pot bearing pot bearing and beam bottom and Pinner anchoring effect is poor, causes the use function of new pot bearing to be affected during the new pot bearing of installation, newly installs The problem of pot bearing later stage can not be changed, construction method of the invention is taken out to old pot bearing and new pot bearing installation is suitable Sequence adjust and optimized, and remains former pot bearing whole anchor bolt, new pot bearing make use of former pot bearing Whole anchor bolts, reaching being reliably connected for new pot bearing and beam body and pinner, new pot bearing is unaffected using function, The purpose that the new pot bearing later stage can be changed.
Compared with prior art, the present invention has following remarkable result:
(1) pot bearing of the invention changes the reliable anchoring that construction method ensure that pot bearing and beam body and pinner, Reach with it is newly-built when the pot bearing installed as effect, it is ensured that the performance of pot bearing functional effect.
(2) pot bearing of the invention changes construction method without special construction technique, and no special material can with fabulous Operability and practicality, there is good application prospect in old bridge reinforcement.
(3) the pot bearing of the invention replacing construction method later stage has convertibility, does not increase the work of later stage replacing Amount.
Brief description of the drawings
The present invention is described in further details with reference to the accompanying drawings and detailed description.
Fig. 1 is the plan of pot bearing latter half;
Fig. 2 is the plan of pot bearing first half;
Fig. 3 is the half-section diagram of pot bearing;
Fig. 4 is pot bearing lower steel plate machining sketch chart;
Fig. 5 is pot bearing anchor bolts screw rod schematic diagram;
Description of reference numerals
1st, upper steel plate;2nd, tetrafluoro plate;3rd, lower steel basin;4th, lower steel plate;
5th, latter half lower steel plate anchor bolt;6th, latter half upper steel plate anchor bolt;
7th, first half upper steel plate anchor bolt;8th, first half lower steel plate anchor bolt;
9th, latter half lower steel plate anchor bolt hole;10th, latter half upper steel plate anchor bolt hole;
11st, first half upper steel plate anchor bolt hole;12nd, first half lower steel plate anchor bolt hole;
13rd, latter half lower steel plate processing anchor bolt hole;14th, anchor bolt link slot.
Embodiment
The structure of pot bearing of the present invention as shown in Figures 1 to 5, including upper steel plate 1, tetrafluoro plate 2, lower steel basin 3, lower steel plate 4th, latter half lower steel plate anchor bolt 5, latter half upper steel plate anchor bolt 6, first half upper steel plate anchor bolt 7, preceding It is half part lower steel plate anchor bolt 8, latter half lower steel plate anchor bolt hole 9, latter half upper steel plate anchor bolt hole 10, preceding Half part upper steel plate anchor bolt hole 11, first half lower steel plate anchor bolt hole 12, latter half lower steel plate processing anchoring spiral shell Keyhole 13 and anchor bolt link slot 14.
A kind of pot bearing for retaining whole anchor bolts of the present invention changes construction method, and the construction method includes following step Suddenly:
The first step:Old pot bearing is handled, concrete processing procedure is as follows:
(11), the lower steel plate anchor bolt nut of old pot bearing is removed, the lower steel plate anchor bolt includes later half Part lower steel plate anchor bolt 5 and first half lower steel plate anchor bolt 8;
(12), pot bearing is divided into first half and latter half, first half lower steel plate anchor with vertical removing direction The upper surface flush of fixing bolt 8 and lower steel plate 4 cuts off;
(13) latter half lower steel plate, is processed into anchor bolt hole 13 and cuts into U-type groove;
Second step:Beam body uses synchronous jacking system, and top lifting height is more than the thickness of lower steel plate 4;
3rd step:Old pot bearing is taken out, concrete processing procedure is as follows:
(31) the lower steel basin 3 of old pot bearing, is prized into height, lower 3 times padding steel plates of steel basin, padding steel plate the top padding Tetrafluoro plate 2, it need to ensure that the lower edge of lower steel plate 4 is higher than the top surface of first half lower steel plate anchor bolt 8;
(32), force pulls out lower steel basin 3;
(33) upper steel plate anchor bolt nut, is screwed out, upper steel plate 1 is taken out by external force, the upper steel plate anchor bolt bag Include latter half upper steel plate anchor bolt 6 and first half upper steel plate anchor bolt 7;
4th step:The processing of anchor bolt, the anchor bolt include latter half lower steel plate anchor bolt 5, latter half Upper steel plate anchor bolt 6, first half upper steel plate anchor bolt 7 and first half lower steel plate anchor bolt 8, concrete processing procedure It is as follows:
(41), latter half lower steel plate anchor bolt 5 is in old pot bearing cutting latter half lower steel plate processing anchoring spiral shell Keyhole 13 easily injures when forming U-type groove, the bolt thread need to be processed, it is ensured that its screw thread and nut phase Matching;
(42), the screw thread of working process first half lower steel plate anchor bolt 8, and press first half lower steel plate anchor bolt 8 Size and new pot bearing the tapped anchor bolt of size preprocessing of first half lower steel plate anchor bolt hole 12 Link slot 14;
5th step:New pot bearing is handled, the old pot bearing knot before the new pot bearing taken and processing Structure is identical, is existing pot bearing, is handled before the installation of new pot bearing, concrete processing procedure is as follows:
(51) the latter half lower steel plate of new pot bearing, is processed into anchor bolt hole 13 and cuts into U-type groove;
(52), the U-type groove cut into according to the latter half lower steel plate processing anchor bolt hole 13 of new pot bearing adds Work same material uniform thickness and the bloom to match with the U-type groove, bloom beat groove with the lower contact portion of steel basin 3;
6th step:New pot bearing is installed, concrete processing procedure is as follows:
(61), the upper steel plate 1 of new pot bearing is separated with lower steel basin 3, carries out the fixation and protection of lower steel basin 3, is pacified Fill and fix upper steel plate 1 with nut;
(62), the lower steel basin 3 of new pot bearing is pacified according to the inverse process of the lower steel basin 3 with taking out old pot bearing Dress, the lower steel basin 3 of new pot bearing is installed in place;
(63) the latter half lower steel plate of new pot bearing, is processed into anchor bolt hole 13 to have welded with the bloom matched It is good;
(64) the anchor bolt nut of new pot bearing, is screwed;
7th step:Synchronization of jacking up jack oil return pressure release, pot bearing are changed and finished.
The construction method remains whole anchor bolts of old pot bearing, by anchor when solving routine replacement pot bearing Fixing bolt complete resection, so that the pot bearing newly installed is connected insecure with beam body and pinner, cause newly to pacify during operation There is disease, the common fault that the pot bearing normal use time limit declines again in the pot bearing of dress.
The above embodiment of the present invention is not limiting the scope of the present invention, and embodiments of the present invention are not limited to This, all this kind, according to the ordinary technical knowledge and customary means of this area, is not departing from this according to the above of the present invention Under the premise of inventing above-mentioned basic fundamental thought, modification, replacement or the change of the other diversified forms made to said structure of the present invention More, all should fall within the scope and spirit of the invention.

Claims (6)

1. a kind of pot bearing for retaining whole anchor bolts changes construction method, it is characterised in that the construction method is included such as Lower step:
The first step:Old pot bearing is handled;
Second step:Beam body uses synchronous jacking system, and top lifting height is more than the thickness of lower steel plate (4);
3rd step:Take out old pot bearing;
4th step:The processing of anchor bolt;
5th step:New pot bearing processing, new pot bearing is identical with the old pot bearing structure before processing, new Handled before pot bearing installation;
6th step:New pot bearing is installed;
7th step:Synchronization of jacking up jack oil return pressure release, pot bearing are changed and finished.
2. the pot bearing according to claim 1 for retaining whole anchor bolts changes construction method, it is characterised in that:Institute State the first step:Old pot bearing is handled, concrete processing procedure is as follows:
(11), the lower steel plate anchor bolt nut of old pot bearing is removed, the lower steel plate anchor bolt includes latter half Lower steel plate anchor bolt (5) and first half lower steel plate anchor bolt (8);
(12), pot bearing is divided into first half and latter half, first half lower steel plate anchoring spiral shell with vertical removing direction The upper surface flush of bolt (8) and lower steel plate (4) cuts off;
(13) latter half lower steel plate processing anchor bolt hole (13), is cut into U-type groove.
3. the pot bearing according to claim 1 for retaining whole anchor bolts changes construction method, it is characterised in that:Institute State the 3rd step:Old pot bearing is taken out, concrete processing procedure is as follows:
(31), the lower steel basin (3) of old pot bearing is prized to high, padding steel plate under lower steel basin (3), padding steel plate the top padding Tetrafluoro plate (2), it need to ensure that the lower edge of lower steel plate (4) is higher than the top surface of first half lower steel plate anchor bolt (8);
(32), force pulls out lower steel basin (3);
(33) upper steel plate anchor bolt nut, is screwed out, upper steel plate (1) is taken out by external force, the upper steel plate anchor bolt includes Latter half upper steel plate anchor bolt (6) and first half upper steel plate anchor bolt (7).
4. the pot bearing according to claim 1 for retaining whole anchor bolts changes construction method, it is characterised in that:Institute State the 4th step:The processing of anchor bolt, the anchor bolt include steel on latter half lower steel plate anchor bolt (5), latter half Plate anchor bolt (6), first half upper steel plate anchor bolt (7) and first half lower steel plate anchor bolt (8), it is specific treated Journey is as follows:
(41), latter half lower steel plate anchor bolt (5) is in old pot bearing cutting latter half lower steel plate processing anchor bolt Hole (13) is easily injured when forming U-type groove, the bolt thread need to be processed, it is ensured that its screw thread and nut phase Matching;
(42), working process first half lower steel plate anchor bolt (8) screw thread, and press first half lower steel plate anchor bolt (8) Size and new pot bearing the tapped anchoring spiral shell of first half lower steel plate anchor bolt hole (12) size preprocessing Tether access slot (14).
5. the pot bearing according to claim 1 for retaining whole anchor bolts changes construction method, it is characterised in that:Institute State in the 5th step, handled before the installation of new pot bearing, concrete processing procedure is as follows:
(51) latter half lower steel plate processing anchor bolt hole (13) of new pot bearing, is cut into U-type groove;
(52), the U-type groove cut into according to latter half lower steel plate processing anchor bolt hole (13) of new pot bearing is processed Same material uniform thickness and the bloom to match with the U-type groove, bloom beat groove with lower steel basin (3) contact portion.
6. the pot bearing according to claim 1 for retaining whole anchor bolts changes construction method, it is characterised in that:Institute State the 6th step:New pot bearing is installed, concrete processing procedure is as follows:
(61), the upper steel plate (1) of new pot bearing is separated with lower steel basin (3), carries out the fixation and protection of lower steel basin (3), Install and fix upper steel plate (1) with nut;
(62), the lower steel basin (3) of new pot bearing is pacified according to the inverse process of the lower steel basin (3) with taking out old pot bearing Dress, the lower steel basin (3) of new pot bearing is installed in place;
(63), latter half lower steel plate processing anchor bolt hole (13) of new pot bearing has been welded with the bloom matched It is good;
(64) the anchor bolt nut of new pot bearing, is screwed.
CN201710854280.6A 2017-09-20 2017-09-20 A kind of pot bearing replacement construction method retaining whole anchor bolts Active CN107620262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710854280.6A CN107620262B (en) 2017-09-20 2017-09-20 A kind of pot bearing replacement construction method retaining whole anchor bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710854280.6A CN107620262B (en) 2017-09-20 2017-09-20 A kind of pot bearing replacement construction method retaining whole anchor bolts

Publications (2)

Publication Number Publication Date
CN107620262A true CN107620262A (en) 2018-01-23
CN107620262B CN107620262B (en) 2019-08-16

Family

ID=61090173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710854280.6A Active CN107620262B (en) 2017-09-20 2017-09-20 A kind of pot bearing replacement construction method retaining whole anchor bolts

Country Status (1)

Country Link
CN (1) CN107620262B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108342979A (en) * 2018-04-25 2018-07-31 成都济通路桥科技有限公司 A kind of quick change method of bridge quick-replaceable bearing and bridge pad
CN108457175A (en) * 2018-03-16 2018-08-28 武汉海润工程设备有限公司 A kind of weathering steel spherical bearing being conveniently replaceable wear-resistant material
CN110983997A (en) * 2019-12-24 2020-04-10 中铁十八局集团第四工程有限公司 Replacing method for sticky steel glue fixing support in counter bore production
CN111321677A (en) * 2020-04-28 2020-06-23 丁凤景 Bridge support capable of being partially replaced and replacement method
CN111851324A (en) * 2020-07-16 2020-10-30 四川翔晖路桥工程有限公司 Method for replacing bridge support

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1130228A (en) * 1995-03-02 1996-09-04 松尾工程技术有限公司 Bridge raising/supporting method and bearing device for the method
CN103215890A (en) * 2013-04-01 2013-07-24 柳州东方工程橡胶制品有限公司 Novel seismic mitigation and absorption support and changing method thereof
KR101564721B1 (en) * 2015-04-01 2015-11-02 주식회사 해울이앤씨 Construction method for replacing bridge bearing without damaging of lower structure
CN106906738A (en) * 2017-04-20 2017-06-30 温州市龙湾区市政工程公司 A kind of pot bearing and its replacing options

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1130228A (en) * 1995-03-02 1996-09-04 松尾工程技术有限公司 Bridge raising/supporting method and bearing device for the method
CN103215890A (en) * 2013-04-01 2013-07-24 柳州东方工程橡胶制品有限公司 Novel seismic mitigation and absorption support and changing method thereof
KR101564721B1 (en) * 2015-04-01 2015-11-02 주식회사 해울이앤씨 Construction method for replacing bridge bearing without damaging of lower structure
CN106906738A (en) * 2017-04-20 2017-06-30 温州市龙湾区市政工程公司 A kind of pot bearing and its replacing options

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
肖开军等: "更换大型盆式橡胶支座保留地脚螺栓的新工艺", 《建筑工程技术与设计》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457175A (en) * 2018-03-16 2018-08-28 武汉海润工程设备有限公司 A kind of weathering steel spherical bearing being conveniently replaceable wear-resistant material
CN108342979A (en) * 2018-04-25 2018-07-31 成都济通路桥科技有限公司 A kind of quick change method of bridge quick-replaceable bearing and bridge pad
CN108342979B (en) * 2018-04-25 2024-04-16 济通智能装备股份有限公司 Bridge rapid replacement support and rapid replacement method for bridge support
CN110983997A (en) * 2019-12-24 2020-04-10 中铁十八局集团第四工程有限公司 Replacing method for sticky steel glue fixing support in counter bore production
CN110983997B (en) * 2019-12-24 2021-06-25 中铁十八局集团第四工程有限公司 Replacing method for sticky steel glue fixing support in counter bore production
CN111321677A (en) * 2020-04-28 2020-06-23 丁凤景 Bridge support capable of being partially replaced and replacement method
CN111851324A (en) * 2020-07-16 2020-10-30 四川翔晖路桥工程有限公司 Method for replacing bridge support
CN111851324B (en) * 2020-07-16 2022-05-17 四川翔晖路桥工程有限公司 Method for replacing bridge support

Also Published As

Publication number Publication date
CN107620262B (en) 2019-08-16

Similar Documents

Publication Publication Date Title
CN107620262A (en) A kind of pot bearing for retaining whole anchor bolts changes construction method
CN108951307B (en) A kind of regulation method of ballastless track roadbed arch
CN105887702B (en) A kind of method of pre-stressed carbon fiber plate and steel concrete reinforced concrete beam
CN104453268B (en) A kind of method using section steel beam to change shock insulation rubber bearing
CN104989918A (en) Method for setting large-area foundation pad iron
WO2018145623A1 (en) U-shaped structural underpinning transfer system for bridge pile foundation and construction method therefor
CN110042858A (en) A kind of installation method of skid-mounted reciprocating flow
CN206477245U (en) It is replaceable to subtract shock insulation rubber bearing
CN106381812B (en) A kind of affixed pier construction method of installation of Steel Concrete composite beam
CN104763161A (en) Beam-adding reinforced structure of a reinforced concrete floor with an opening and construction method
CN103758347B (en) Large-span RC girder plated construction late poured band support underpinning construction method
CN206337668U (en) A kind of board-like adjustable damper embedded part of full assembled
CN107558487A (en) A kind of goaf transmission line foundation bracing means and reinforcement means
CN107964978A (en) Wind driven generator base crab-bolt ruggedized construction and foundation anchor bolt fracture reinforcement means
KR100865752B1 (en) Shift method of bridge bearing of railroad
CN106902911A (en) A kind of hydraulic engineering breaker
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN202302576U (en) Adjustable foundation bolt for mounting equipment with larger vibration
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN101844604A (en) Integral hoisting and positioning method for pipe frame structure
CN101565953A (en) Method for fixing pile head in filling pile static loading test
CN202337949U (en) Bridge jacking device
CN208981019U (en) Ladder type prefabricated plate with auxiliary block
CN110863426A (en) Conical socket bracket, pier body provided with same and construction method of pier body
CN206034291U (en) Assembled bent cap is to wearing screw rod anchor structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant