- CN107615198B CN107615198B CN201580079681.8A CN201580079681A CN107615198B CN 107615198 B CN107615198 B CN 107615198B CN 201580079681 A CN201580079681 A CN 201580079681A CN 107615198 B CN107615198 B CN 107615198B
- Authority
- CN
- China
- Prior art keywords
- plc
- data
- control
- production line
- manufacturing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/05—Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
Abstract
A kind of control device and data reproducing device are provided, the control device can be applied to the control system that the control after the data for considering previous process is executed by each control device of the production line with multiple control devices, and even if without the control device of previous process, also the confirming operation etc. after being able to carry out the data for considering previous process, the data reproducing device export data to the control device.Control device according to the present invention includes the first PLC (1B), it connect with the manufacturing device (3B) of the first step in multiple processes, the data of previous process based on first step control the manufacturing device (3B) of first step;And data reproducing device (5), its by data acquired by the 2nd PLC (1a) for being controlled as the manufacturing device (3a) to other processes and not connect with the first PLC (3B), as previous process data and export to the first PLC (3B).
Description
Technical field
The present invention relates to control device and data reproducing devices.
Background technique
Currently, for the sequencing control device by the way that PLC (Programmable Logic Controller) is utilized into
The equipment of row control, uses the Fault analytical auxiliary device for being assisted Fault analytical.The Fault analytical auxiliary device
The input and output contact information for obtaining the PLC controlled manufacturing equipment, according to specified condition out, creation control information day
Will file.Control information log file be store got from PLC digitized after input and output contact information
File.
In addition, Fault analytical auxiliary device read in as recording the identical program of the PLC of object, to the movement of PLC into
Row emulation, determines the value of output contact.Fault analytical auxiliary device will control the value of the output contact of the PLC of information log file
It is compared with the value of the output contact of result obtained from emulation, its difference is detected.In simulation result and carry out day
In the case that control signal message obtained from will record is different, different information is shown (for example, referring to special in display
Sharp document 1).
Patent document 1: Japanese Unexamined Patent Publication 2000-250775 bulletin (the 0031st, 0035,0040,0041,0048 section, Fig. 1
And Fig. 3)
Summary of the invention
The control system controlled multiple manufacturing devices is made of multiple control devices sometimes.For example, production line by
Multiple control devices are connected and constitute, and each control device executes the control of the manufacturing device of each process.
Usually, in the control system as such as production line with multiple control devices, control device is from elder generation
The control device of preceding process obtains data when executing control by the control device of the previous process via signal wire etc..Control
Device executes the control after considering acquired data.Therefore, in order to execute confirming operation, Fault analytical by control device,
It is not only the control device, it is also necessary to which there are the control devices of previous process.
But in production line starting, it is seldom that the whole control devices for constituting production line, which obtain access in the phase same time,
See.Therefore, control device can not execute confirming operation, Fault analytical before the control device access of its previous process.
The present invention is exactly to propose in view of the foregoing, even if its object is to obtain a kind of control without previous process
Device processed, the control device of confirming operation after being also able to carry out the data for considering previous process etc. and exports data to this
The data reproducing device of control device.
Control device according to the present invention includes the first PLC, the manufacturing device with the first step in multiple processes
Connection, the data of the previous process based on first step control the manufacturing device of first step;And data reproduction dress
It sets, by number acquired by the 2nd PLC for being controlled as the manufacturing device to other processes and not connect with the first PLC
According to, as previous process data and export to the first PLC.
Data reproducing device according to the present invention is set in production line newly, be connected to not with the system to previous process
It makes the PLC connection that device is controlled and the manufacturing device of subsequent handling is carried out compared with the manufacturing device of the previous process
The PLC of control, obtain by with the system of the previous process for newly setting the corresponding existing production line of the previous process of production line
The data that the PLC that device is controlled is collected into are made, are exported to the PLC of the subsequent handling newly set in production line.
The effect of invention
Even if being also able to carry out in accordance with the invention it is possible to provide a kind of control device without previous process and considering elder generation
The control device of confirming operation after the data of preceding process etc. and data are exported to the data reproducing device of the control device.
Detailed description of the invention
Fig. 1 is the block diagram for indicating the structure of the control system in embodiment 1.
Fig. 2 is the block diagram for indicating the structure of the data record unit in embodiment 1.
Fig. 3 is the block diagram for indicating the structure of the log recording data reproducing device in embodiment 1.
Fig. 4 is the figure for indicating the existing food processing assembly line in embodiment 1.
Fig. 5 is the figure for indicating the existing semiconductor production line in embodiment 1.
Fig. 6 is the flow chart for indicating the motion flow of the log recording data reproducing device in embodiment 1.
Fig. 7 be in embodiment 1 control the period it is shorter than the log recording period in the case where data interpolation process
The example being illustrated.
Fig. 8 is longer than the log recording period to the control period in embodiment 1, is the feelings of the multiple in log recording period
The example that the interpolation process of data under condition is illustrated.
Fig. 9 is multiple that is longer than the log recording period to the control period in embodiment 1, not being the log recording period
In the case of data the example that is illustrated of interpolation process.
Figure 10 is the block diagram for indicating the structure of the control system in embodiment 2.
Specific embodiment
Embodiment 1.
Fig. 1 is the block diagram for indicating the structure of the control system in embodiment 1.Wherein, Fig. 1 (a) is shown to existing life
The control system that producing line is controlled.Fig. 1 (b) shows the control system controlled the production line newly set.It is right using Fig. 1
The control system of the control device in embodiment 1 has been used to be illustrated.In addition, the present invention is not by the note of present embodiment 1
State restriction.
Firstly, being illustrated to existing production line.Control system such as Fig. 1 (a) that existing production line is controlled
It is shown, comprising: PLC 1a, sensor 2a, manufacturing device 3a, PLC 1b, sensor 2b, manufacturing device 3b.In addition, this control is
System can also also have 1 or multiple PLC (not shown), sensor or manufacturing device.
PLC 1a is connect with sensor 2a and manufacturing device 3a.PLC 1a is right based on the input signal from sensor 2a
The movement of manufacturing device 3a is controlled.Sensor 2a is, for example, the devices such as the various sensors such as encoder, Operation switch.Manufacture
Device 3a is, for example, the device acted by means of the various actuators such as solenoid valve, motor.
PLC 1a includes internal bus 10a, CPU (Central Processing Unit) unit 11a, data records list
First 12a, output unit 13a, network unit 14a.Internal bus 10a is by CPU element 11a, data record unit 12a, output
Unit 13a and network unit 14a connection, for the reciprocally signal wire of sending and receiving data between each unit.
CPU element 11a is the device controlled the whole movement of PLC 1a.CPU element 11a has not in inside
The memory of diagram.CPU element 11a obtains data from sensor 2a, according to the sequencing control program stored in memory
Operation is carried out to data, the signal for being used to control manufacturing device 3a is exported.At this point, CPU element 11a is based on multiple works
The data of previous process in sequence and carry out operation, detailed content can be described below.In addition, CPU element 11a generates manufacture dress
Set the control data of 3a.
As the example of control data, enumerates when PLC 1a performs the control of manufacturing device 3a, generated by PLC 1a
Manufacturing device 3a action message, the data of the result of the action, detailed content can describe below.In addition to this, as control
The example of data enumerates the internal data for control to manufacturing device 3b required PLC 1a by PLC 1b.
Data record unit 12a obtains the control data of manufacturing device 3a, is accumulated.In addition, data record unit 12a
Generate the log record file after recording the control data of manufacturing device 3a according to timing.Data record unit 12a makes to generate
Log record file store to the exterior storage medium 4a for being installed on data record unit 12a.Exterior storage medium 4a is can
Removably it is installed on the storage unit of data record unit 12a.Exterior storage medium 4a is, for example, that SD storage card, CF card, USB are deposited
Reservoir etc..
Output unit 13a receives the output order from CPU element 11a, and control data of manufacturing device 3a etc. are outside
The instrument in portion exports.Network unit 14a is connected to the network via signal wire for connecting PLC 1a with other devices etc., with
Sending and receiving data between other devices.
PLC 1b is connect with sensor 2b and manufacturing device 3b.PLC 1b based on from sensor 2b input signal and from
The control data for the manufacturing device 3a that PLC 1a is obtained, control the movement of manufacturing device 3b.Sensor 2b and manufacture dress
Setting 3b is device identical with sensor 2a and manufacturing device 3a.
PLC 1b includes internal bus 10b, CPU element 11b, data record unit 12b, network unit 14b, input list
First 15b.Internal bus 10b, CPU element 11b, data record unit 12b and network unit 14b be respectively with internal bus 10a,
CPU element 11a, data record unit 12a and network unit 14a structure having the same and the unit for carrying out identical movement
Deng and the description is omitted.
Input unit 15b is the unit that the signal inputted from external instrument is sent to CPU element 11b.Input unit
15b is connect via signal wire etc. with the output unit 13a of PLC 1a.The system that input unit 15b will be exported by output unit 13a
Control data of device 3a etc. are made to send to CPU element 11b.That is, PLC 1a and PLC 1b are connected as follows, that is, defeated
Out between unit 13a and input unit 15b, electrically or online (online) connected via signal wire etc..
In addition, PLC 1a and PLC 1b are connected as follows, that is, between network unit 14a and network unit 14b,
Also it electrically or is online connected via signal wire etc..In addition, network unit 14a and network unit 14b is in PLC 1a and removes
Carried out when sending and receiving data between other devices other than PLC 1b using.Alternatively, network unit 14a and network unit 14b exist
Carried out when sending and receiving data between PLC 1b and other devices other than PLC 1a using.
Next, being illustrated to the production line newly set.Control system such as Fig. 1 that the production line newly set is controlled
(b) shown in, by PLC 1A, sensor 2A, manufacturing device 3A, PLC 1B, sensor 2B, manufacturing device 3B, log recording data
Transcriber 5 is constituted.But in Fig. 1 (b), PLC 1A, sensor 2A and manufacturing device 3A are not access to the production newly set
The device of line.In addition, this control system can also be also with 1 or multiple PLC (not shown), sensor or manufacture dress
It sets.
In the control system controlled the production line newly set, PLC 1A, sensor 2A and manufacturing device 3A difference
It is the device with PLC 1a, sensor 2a and manufacturing device 3a structure having the same and the identical movement of progress, therefore omits
Explanation.
PLC 1B is connect with sensor 2B and manufacturing device 3B.The detailed content of PLC 1B can be described below, the PLC
1B will be used for based on the input signal from sensor 2B and from the control data of the PLC 1a manufacturing device 3a obtained to manufacture
The signal output that the movement of device 3b is controlled.Sensor 2B is device identical with sensor 2a or sensor 2b.System
Making device 3B is device identical with manufacturing device 3a or manufacturing device 3b.
PLC 1B includes internal bus 10B, CPU element 11B, network unit 14B, input unit 15B.Internal bus
10B, CPU element 11B, network unit 14B and input unit 15B are respectively and internal bus 10b, CPU element 11b, network list
First 14b and input unit 15b structure having the same and the unit etc. for carrying out identical movement, and the description is omitted.
It electrically or is online connected between log recording data reproducing device 5 and PLC 1B via signal wire etc..Separately
Outside, exterior storage medium 4b is detachably arranged in log recording data reproducing device 5.Exterior storage medium 4b is, for example, that SD is deposited
Card storage, CF card, USB storage etc..In exterior storage medium 4b, directly or indirectly deposited via exterior storage medium 4a
The log record file that storage is generated by the data record unit 12a of PLC 1a.In addition, exterior storage medium 4b be also possible to outside
The identical storage medium of portion storage medium 4a.
Log recording data reproducing device 5 obtains log record file from exterior storage medium 4b.Log recording data are again
Existing device 5 controls data from the control data that acquired log record file reads in manufacturing device 3a, as previous process
Data and export to PLC 1B.
In addition, in the following, be directed to PLC 1a, PLC 1b, PLC 1A, PLC 1B and PLC (not shown), will be any in them
Person or referred to collectively as PLC 1.For sensor 2a, sensor 2b, sensor 2A, sensor 2B and sensor (not shown),
By any one of they or referred to collectively as sensor 2.For manufacturing device 3a, manufacturing device 3b, manufacturing device 3A, manufacture
Device 3B and manufacturing device (not shown), by any one of they or referred to collectively as manufacturing device 3.
Remember for data record unit 12a, data record unit 12b and data record unit 12A and data (not shown)
Unit 12 is recorded, by any one of they or referred to collectively as data record unit 12.
In addition, in fig. 1 it is illustrated that 1 sensor 2 of each connection of PLC 1 and manufacturing device 3, but connect with each PLC 1
The number of units of sensor 2 and manufacturing device 3 can be any.
In addition, the production line newly set shown in Fig. 1 (b) is production identical with existing production line shown in Fig. 1 (a)
Line has been introduced to the production line of other factories.Therefore, PLC 1A in production line, the sensor 2A, manufacturing device newly set
3A, PLC 1B, sensor 2B, manufacturing device 3B, log recording data reproducing device 5 etc., not respectively with existing production line
In PLC 1a, sensor 2a, manufacturing device 3a, PLC 1b, sensor 2b and manufacturing device 3b etc. it is electrical by signal wire etc.
Ground connects online.
Fig. 2 is the block diagram for indicating the structure of the data record unit in embodiment 1.Using Fig. 2, in embodiment 1
Data record unit 12a be described in detail.In addition, not only illustrating data record unit 12a in Fig. 2, also illustrating
Internal bus 10a, exterior storage medium 4a and setting terminal 6a are gone out.
In addition, data record unit 12b and data record unit 12A are and data record unit 12a knot having the same
Structure and the unit for carrying out identical movement.Therefore, the explanation about data record unit 12b and data record unit 12A is omitted.
Data record unit 12a is as shown in Figure 2, via Ethernet (registered trademark) cable with setting terminal
6a connection.The setting software of data record unit 12a is installed in setting with terminal 6a.Setting is with terminal 6a based on user's
Operation, sends the signal to data record unit 12a.Setting terminal 6a is, for example, to set to use PC (Personal
Computer)。
In data record unit 12a, there is storage unit 121a and operational part 122a as hardware configuration.Storage unit
121a is the memories such as ROM (Read Only Memory), is stored to data, program.Operational part 122a is remembered to data
The central processing unit (CPU) that the whole movement of record unit 12a is controlled.Operational part 122a use is in storage unit 121a
Data, the program of storage obtain the control data of manufacturing device 3a, are accumulated.Log recording configuration part 123a, data collection
Portion 124a, file generated portion 125a and document data saving part 126a are stored in storage unit 121a by being executed by operational part 122a
Program and in data record unit 12a with software mode realize.
Control of the log recording configuration part 123a based on the signal received from setting with terminal 6a, to record manufacturing device 3a
Data processed and set information when generating log record file are set.Log recording configuration part 123a has log recording pair
As configuration part 1231a and log recording cycle set portion 1232a.
Log recording object configuration part 1231a is to the log recording object in the set information of log recording configuration part 123a
It is set.Log recording object refer to it is in the control data of manufacturing device 3a, as what is collected by data record unit 12a
The control data of object.
Log recording cycle set portion 1232a is to the log recording period in the set information of log recording configuration part 123a
It is set.The log recording period, which refers to, receives the control data as log recording object by data record unit 12a
The period of collection.As the log recording period, other than the control period of PLC 1a, the control period being set as than PLC 1a is slow
Period.In addition, the control period of PLC 1a refers to the defined sampling period of PLC 1a.PLC 1a is single with the sampling period
Position executes defined sequencing control.
Log recording object and log recording period can operate setting with terminal 6a by user and arbitrarily set
Fixed and change.
Data collection unit 124a is received from CPU element 11a via control data of the internal bus 10a to manufacturing device 3a
Collection.At this point, data collection unit 124a is as unit of the log recording period as set by log recording cycle set portion 1232a,
Control data as the log recording object as set by log recording object configuration part 1231a are collected.It is collecting
When, data collection unit 124a adds time data in the control data being collected into.
File generated portion 125a generates log record file based on the control data being collected by data collection unit 124a.
File generated portion 125a is written data are controlled according to timing to log record file together with time data.In order to which number will be controlled
The log recording period is that unit is stored according to timing accordingly, and log record file also has the information in log recording period.
The log record file generated by file generated portion 125a is stored in exterior storage medium by document data saving part 126a
4a is stored.
Fig. 3 is the block diagram for indicating the structure of the log recording data reproducing device in embodiment 1.Using Fig. 3, to implementation
Log recording data reproducing device 5 in mode 1 is described in detail.In addition, not only illustrating log recording in Fig. 3
Data reproducing device 5 additionally illustrates exterior storage medium 4b, setting terminal 6b and PLC 1B.
Log recording data reproducing device 5 as shown in Figure 3, via Ethernet (registered trademark) cable with setting
With terminal 6b connection.The setting software of log recording data reproducing device 5 is installed in setting with terminal 6b.Terminal is used in setting
Operation of the 6b based on user, sends the signal to log recording data reproducing device 5.Setting is and above-mentioned setting with terminal 6b
With same PC of terminal 6a etc..In addition, setting can also be identical terminal with terminal 6a with setting with terminal 6b.
In log recording data reproducing device 5, there is storage unit 51 and operational part 52 as hardware configuration.Storage unit
51 be the memories such as ROM, is stored to data, program.Operational part 52 is moved to 5 entirety of log recording data reproducing device
The central processing unit (CPU) controlled.Operational part 52 is using data, the program stored in storage unit 51, from outside
Storage medium 4b obtains log record file.Operational part 52 uses data, program, reads in control from acquired log record file
Data processed, output to PLC 1B.Reproducing configuration part 53, file acquisition unit 54 and data reproduction portion 55 is by being held by operational part 52
The program that is stored in storage unit 51 of row and realized with software mode in log recording data reproducing device 5.
Configuration part 53 is reproduced based on the signal received from setting with terminal 6b, to the reading with the control data being collected into
Relevant set information is set.Reproducing configuration part 53 has output object data configuration part 531 and control cycle set portion
532。
Output object data in the set information of the 531 pairs of reproduction configuration parts 53 in output object data configuration part is set
It is fixed.Output object data refer to it is in the control data of manufacturing device 3a, should export to the control data of PLC 1B.
Control cycle set portion 532 sets the control period of PLC 1B.The control period of PLC 1B refers to PLC
The defined sampling period of 1B.PLC 1B executes defined sequencing control as unit of the sampling period.
The control period of output object data and PLC 1B can operate and any setting with terminal 6b by user
Ground setting and change.
File acquisition unit 54 obtains log recording from the exterior storage medium 4b for being installed on log recording data reproducing device 5
File.File acquisition unit 54 reads in the control data of manufacturing device 3a from acquired log record file.At this point, file obtains
The output object data as set by output object data configuration part 531 is read in portion 54.
Data reproduction portion 55 exports the output object data read in by file acquisition unit 54 to PLC 1B.At this point, data
Reproducing unit 55 is in the log recording period of the log record file as acquired by file acquisition unit 54 and by control cycle set portion
In the case that control period of PLC 1B set by 532 is different, by with after the control period of PLC 1B matchingly interpolation
Data output.
Fig. 4 is the figure for indicating the existing food processing assembly line in embodiment 1.Using Fig. 4, to by embodiment 1
In control system be illustrated in the example of food processing assembly line.In addition, below to by control system in system
The example for making the food processing assembly line of bread is illustrated, but the control system in embodiment 1 equally can also apply to
Other production lines.In addition, the control system in embodiment 1 is not limited to the example.
Existing food processing assembly line is as shown in Figure 4, comprising: PLC 1a, manufacturing device 3a, conveying device 7a,
PLC 1b, manufacturing device 3b, conveying device 7b, PLC 1c, manufacturing device 3c, conveying device 7c.In addition, PLC shown in Fig. 4
PLC 1a, manufacturing device 3a, PLC 1b and manufacture shown in 1a, manufacturing device 3a, PLC 1b and manufacturing device 3b and Fig. 1 (a)
Device 3b is identical.
Manufacturing device 3a is controlled by PLC 1a, and the metering-investment-carried out in multiple processes in food processing assembly line is mixed
Close process.Manufacturing device 3a matchingly measures the materials such as wheat flour, seasoning etc. with manufactured product, and investment is held
Device.In addition, manufacturing device 3a mixes material, seasoning etc. in container with the stipulated time.
PLC 1a controls manufacturing device 3a, executes metering-investment-mixed processes movement.For example, measuring
When, PLC 1a measures manufacturing device 3a, using based on the signal from the sensor 2a as weight sensor, by some
Material is supplied with defined weight.In addition, for example investment when, PLC 1a for manufacture midway each product and according to
Timing obtains the information of the input amount of each material.The information of the input amount of acquired each material is stored in log note by PLC 1a
Record file.In addition, the information stored in log record file is sent to display device (not shown) from PLC 1a, it is aobvious at this
It is graphically shown in showing device.
After metering-investment-mixed processes of manufacturing device 3a, conveying device 7a fills mixed material etc. to manufacture
Set 3b conveying.
Manufacturing device 3b is controlled by PLC 1b, and the kneading-carried out in multiple processes in food processing assembly line separates work
Sequence.Manufacturing device 3b will be by kneadings in container such as the mixed materials of manufacturing device 3a.In addition, manufacturing device 3b is by kneading knot
Material cutting after beam is specified size.
PLC 1b controls manufacturing device 3b, executes the movement of kneading-separation procedure.For example, PLC 1b is from previous
The PLC 1a of process obtains each material according to timing via the input unit 15b of output unit 13a and the PLC 1b of PLC 1a
Input amount information.In addition, PLC 1b obtains the information of room temperature from the sensor 2b as thermometer.PLC 1b be based on it is each
Information corresponding with the product for being currently at this process and room temperature in the information of the relevant timing of the input amount of material
Information determines the kneading time.In kneading operation, PLC 1b makes manufacturing device 3b exist during the kneading time determined
Kneading is carried out to material etc. in container.If kneading operation terminates, PLC 1b is from the sensor (not shown) 2 as viscosimeter
Viscosity information relevant to the material after kneading is obtained according to timing for each product for manufacturing midway.PLC 1b will
The information of acquired room temperature and viscosity information relevant to the material after kneading are stored in log record file.
Also, for example, PLC 1b obtains cutting according to timing for each product for manufacturing midway in separate operation
The size information of material afterwards.The size information of material after acquired cutting is stored in log record file by PLC 1b.
After kneading-separation procedure of manufacturing device 3b, conveying device 7b is defeated to manufacturing device 3c by the material after cutting
It send.
Manufacturing device 3c is controlled by PLC 1c, carries out the molding procedure in multiple processes in food processing assembly line.System
Defined shape will be shaped to by the material after manufacturing device 3b cutting by making device 3c.
PLC 1c controls manufacturing device 3c, executes the movement of molding procedure.For example, PLC 1c is from previous process
PLC 1b obtains the size information of the material after the viscosity information and cutting of the material after kneading according to timing.At this point, PLC
1c is obtained via input unit (not shown) possessed by output unit (not shown) possessed by PLC 1b and PLC 1c
State information.In addition, PLC 1c obtains the weight information of the material after cutting from weight sensor.PLC 1c is based on terminating with kneading
In the information of the information of the relevant timing of the viscosity of material afterwards and timing relevant to the size of the material after cutting
The weight information of material after information corresponding with the product for being currently at this process and cutting, controls manufacturing device 3c
System, the material after making kneading are shaped to defined shape.
After the molding procedure of manufacturing device 3c, conveying device 7c is by material after molding to next process (not shown)
Manufacturing device 3 convey.
Then, in food processing assembly line, material after molding is baked with defined temperature and is provided by manufacturing device 3c
Time etc., bread is produced eventually as product.
In existing food processing assembly line shown in Fig. 4, control data are, for example, in metering-investment-mixed processes
The input amount of each material, room temperature, in kneading-separation procedure it is specified go out size, viscosity, after separating in molding procedure
The information such as the temperature when weight of material, baking bread.That is, control data are in addition in the control for executing manufacturing device 3 by PLC 1
Condition that Shi Zhiding goes out, other than external condition or manufacturing device 3 acted after data of result etc..These control numbers
It is recorded for each product of manufacture midway according to timing according to the PLC 1 by each process, is stored in log record file.
Fig. 5 is the figure for indicating the existing semiconductor production line in embodiment 1.Using Fig. 5, to will be in embodiment 1
Control system be illustrated in the example of semiconductor production line.In addition, the control system in embodiment 1 does not limit
In the example.
Existing semiconductor production line is as shown in Figure 5, comprising: PLC 1a, manufacturing device 3a, conveying device 7a, PLC
1b, manufacturing device 3b, conveying device 7b, PLC 1c, manufacturing device 3c, conveying device 7c.In addition, PLC 1a shown in fig. 5, system
Make PLC 1a, manufacturing device 3a, PLC 1b and manufacturing device 3b shown in device 3a, PLC 1b and manufacturing device 3b and Fig. 1 (a)
It is identical.
Manufacturing device 3a is controlled by PLC 1a, carries out the pattern formation process in multiple processes in semiconductor production line.
Manufacturing device 3a burns out circuit pattern repeatedly on chip, produces a large amount of chips.PLC 1a controls manufacturing device 3a
System executes the movement of pattern formation process.
After the pattern formation process of manufacturing device 3a, conveying device 7a fills the chip for being formed with circuit pattern to manufacture
Set 3b conveying.
Manufacturing device 3b is controlled by PLC 1b, carries out the wafer inspection process in multiple processes in semiconductor production line.
Manufacturing device 3b is checked whether the circuit formed on chip normally works, to each chip on chip
It is qualified or not to be determined.
PLC 1b controls manufacturing device 3b, executes the movement of wafer inspection process.If the inspection of chip terminates,
Then PLC 1b is obtained each on the chip after checking from manufacturing device 3b for each product of manufacture midway according to timing
The qualified or not information of chip.The qualified or not information of acquired each chip is stored in log record file by PLC 1b.
After wafer inspection process, conveying device 7b conveys the chip after inspection to manufacturing device 3c.
Manufacturing device 3c is controlled by PLC 1c, carries out the cutting action in multiple processes in semiconductor production line.Manufacture
Chip after being checked by manufacturing device 3b is cut into the form of chip by device 3c.After by the cutting of each chip, manufacturing device 3c
Underproof chip removal will be judged as in previous process, that is, wafer inspection process.
PLC 1c controls manufacturing device 3c, executes the movement of cutting action.For example, PLC 1c is from previous process
PLC 1b obtains the qualified or not information of each chip on chip according to timing.At this point, PLC 1c is had via PLC 1b
Output unit and PLC 1c (not shown) possessed by input unit (not shown) and obtain above- mentioned information.PLC 1c is based on each
Qualified or not information corresponding with the chip for being currently at this process in the qualified or not information of chip, to manufacturing device 3c
It is controlled, underproof chip removal will be judged as in wafer inspection process.
After the cutting action of manufacturing device 3c, conveying device 7c will be judged as qualified core in wafer inspection process
Piece is conveyed to the manufacturing device 3 of next process (not shown).
In existing semiconductor production line shown in Fig. 5, control data are, for example, from wafer inspection process to cutter
The qualified or not information of each chip on the chip of sequence conveying.
As described above, in the control system that food processing assembly line, semiconductor production line etc. are connected by multiple PLC 1 and are constituted
In system, each PLC 1 obtains control data from the PLC 1 of the previous process in multiple processes.Each PLC 1 is based on acquired timing
Data in the control data of property, corresponding with the product for being currently at this process, control the manufacturing device 3 of this process
System.
Herein, to newly starting food processing assembly line corresponding with existing food processing assembly line shown in Fig. 4
The case where be illustrated.In the user of control system, it is desirable to by production line identical with the existing production line with actual achievement
There are many people also introduced to other factories.At this point, user wishes sometimes before the PLC 1 for constituting the production line newly set is all complete
Prestige successively executes confirming operation from the PLC 1 accessed.
But when production line newly starts, it is uncommon that the whole PLC 1 for constituting production line, which obtain access in the phase same time,
's.For example, being set in the food processing assembly line newly set as corresponding with kneading-separation procedure PLC 1b of Fig. 4
It is standby, access PLC 1B shown in Fig. 1 (b).But in the food processing assembly line newly set, as metering-throwing with Fig. 4
Enter-corresponding the equipment of PLC 1a of mixed processes, PLC 1A shown in Fig. 1 (b) is not accessed also.
Herein, kneading-separation procedure PLC 1B is based on previous process, that is, metering-investment-mixed processes PLC 1A
Control data, manufacturing device 3B is controlled.But the PLC 1A of previous process is not yet accessed.Therefore, PLC 1B can not
Control data are obtained via the input unit 15B of output unit 13A and the PLC 1B of PLC 1A from the PLC 1A of previous process.
In addition, the PLC 1B in the production line newly set leads to as described above, not with the PLC 1 etc. in existing production line
Signal wire etc. is crossed electrically or online to connect.Therefore, it is impossible to control data from the equal acquirements of the PLC 1 of existing production line.
Therefore, before each PLC 1 for constituting the food processing assembly line newly set is all complete, even if wanting from having accessed
PLC 1B rises and successively executes confirming operation, Fault analytical, and PLC 1B can not also be held before the PLC 1A access of its previous process
Row confirming operation etc..
Therefore, it for the control system of embodiment 1, carries out in the food processing assembly line of Xiang Xinshe in application, setting
Set the log recording data reproducing device 5 that log record file is obtained from exterior storage medium 4b.The PLC 1B of subsequent handling from
Log recording data reproducing device 5 is obtained via log record file by previous process i.e. metering-investment-mixed processes
Control data acquired by PLC 1a.The PLC 1B of subsequent handling is right based on the control data obtained via log record file
The movement of manufacturing device 3B is controlled, therefore even if PLC 1A without previous process, is also able to carry out and is considered previous work
Confirming operation etc. after the data of sequence.In addition, by the control system of embodiment 1 in semiconductor production line the case where
Under, it is also identical as the case where being applied to food processing assembly line.
Fig. 6 is the flow chart for indicating the motion flow of the log recording data reproducing device in embodiment 1.Using Fig. 6,
The movement of log recording data reproducing device 5 in embodiment 1 is illustrated.
Firstly, user operates setting with terminal 6b before the movement of log recording data reproducing device 5 starts,
The control period of output object data and PLC 1B is specified.Object data configuration part 531 is exported to be based on from setting with eventually
The signal that end 6b is received sets output object data.Control cycle set portion 532 is based on connecing from setting with terminal 6b
The signal received sets the control period of PLC 1B.
In addition, installing the exterior storage medium 4b for being stored with log record file in log recording data reproducing device 5.It should
Log record file is the file for generating, storing the control data of manufacturing device 3a by PLC 1a.The control data are by PLC
The data for the timing that the data record unit 12a of 1a is collected into as unit of the log recording period.
In addition, log recording data reproducing device 5 is not limited to start to act when being mounted with exterior storage medium 4b,
It can be the reception movement sign under preassembled state and start to act.
In step s in fig. 6, file acquisition unit 54 reads in output object data from output object data configuration part 531
Set information.File acquisition unit 54 obtains log record file from exterior storage medium 4b, reads in the control number of manufacturing device 3a
According to.At this point, file acquisition unit 54 reads in control number in the control data of manufacturing device 3a, being set out by output object data
According to.
In step s 2, the setting in the control period of PLC 1B is read in data reproduction portion 55 from control cycle set portion 532
Information.In addition, control data are transmitted from file acquisition unit 54 to data reproduction portion 55.
In step s3, data reproduction portion 55 is by the control period of the PLC 1B as set by control cycle set portion 532
It is compared with the log recording period of the log record file as acquired by file acquisition unit 54, whether the two is unanimously carried out
Determine.
In the case where being different the period in the control period of PLC 1B and log recording period, it is transferred to step S4.In
In step S4, data reproduction portion 55 carries out interpolation to data, so that the control in the period of acquired control data and PLC 1B
Period processed is consistent.
Herein, the interpolation of control data is illustrated.Fig. 7 is the situation shorter than the log recording period to the control period
Under data the example that is illustrated of interpolation process.Fig. 8 is longer than the log recording period to the control period, is log recording week
The example that the interpolation process of data in the case where the multiple of phase is illustrated.Fig. 9 is to the control period than the log recording period
The example that the interpolation process of data in the case where multiple that is long, not being the log recording period is illustrated.Using Fig. 7,8 and 9,
The interpolation process of control data in embodiment 1 is illustrated.
Firstly, the interpolation process of the data in the case where shorter than the log recording period to the control period of PLC 1B is said
It is bright.For example, the control period is 1ms as shown in fig. 7, being set as the log recording period is 2ms.In this case, control data are as schemed
It shown in 7 (a), is collected as unit of log recording period 2ms.
But due to control the period it is shorter than the log recording period, control the period in it is any at the time of, sometimes not
There are corresponding control data.For example, in Fig. 7 (a), control data a1, control data a2 and the interval point for controlling data a3
It is not 2ms.But there is no control data between control data a1 and control data a2.Therefore, required control data
Lazy weight, in general, PLC 1B is not available these control data.
Therefore, data reproduction portion 55 carries out data using common data interpolation method based on acquired control data
Interpolation.Specifically, in Fig. 7 (b), data reproduction portion 55 is using common data interpolation method to by each control data link
Insertion packing A1 is calculated, and interpolation goes out each control data.In addition, common data interpolation method refers to such as linear interpolation, batten
Interpolation etc..These are usual ways, therefore the description thereof will be omitted herein.
In Fig. 7 (c), data reproduction portion 55 is obtained as unit of controlling period i.e. 1ms according to calculated insertion packing A1
Control data.For example, data reproduction portion 55 obtains between control data a1 and control data a2 according to calculated insertion packing A1
Control data a4.Just it is during control data a1 is until controlling data a4, from control data a4 to control data a2
For during only, the period is respectively 1ms.Data reproduction portion 55 obtains control data a1, control data a4 and control data a2
Deng as the control data after the control period with PLC 1B matchingly interpolation.
Next, be the multiple in log recording period the case where longer than the log recording period to the control period of PLC 1B
Under the interpolation processes of data be illustrated.For example, as shown in figure 8, being set as the log recording period is 2ms, the control period is
4ms.It in this case, shown in control data such as Fig. 8 (a), is collected as unit of log recording period 2ms.In addition,
In fig. 8, further it is shown that by the real data B1 of the value connection of each control data.
But due to controlling times that the period is longer than the log recording period, PLC 1B control period is the log recording period
Number, thus while in the presence of control data corresponding with each control period, but there are the unwanted controls of the control of PLC 1B institute
Data processed.For example, control data b1 and the interval for controlling data b3 are 4ms in Fig. 8 (a).Therefore, the control number between
It is the unwanted data of control institute of PLC 1B according to b2.
Therefore, data reproduction portion 55 removes unwanted data from acquired control data, and obtains remaining
Control data.For example, data reproduction portion 55 removes unwanted control data b2 from acquired control data in Fig. 8 (b)
It removes.Data reproduction portion 55 obtains remaining control data b1, control data b3 etc., matches as the control period with PLC 1B
Control data after ground interpolation.
Next, the feelings of multiple that is longer than the log recording period to the control period of PLC 1B, not being the log recording period
The interpolation process of data under condition is illustrated.For example, as shown in figure 9, being set as the log recording period is 2ms, the control period is
5ms.It in this case, shown in control data such as Fig. 9 (a), is collected as unit of log recording period 2ms.
But since the control period is longer than the log recording period, is not the multiple in log recording period, in control week
At the time of interim any, corresponding control data are not present sometimes.For example, in Fig. 9 (a), control data c1, control data
C2, the interval for controlling data c3, control data c4, control data c5 and control data c6 are 2ms respectively.But in control number
According between c3 and control data c4, there is no control data, therefore there is no the control numbers that the interval with control data c1 is 5ms
According to.Therefore, the lazy weight of required control data, in general, PLC 1B is not available these control data.
Therefore, data reproduction portion 55 carries out data using common data interpolation method based on acquired control data
Interpolation.Specifically, in Fig. 9 (b), the case where data reproduction portion 55 and Fig. 7 in the same manner as, use common data interpolation method pair
The insertion packing C1 of each control data link is calculated, interpolation goes out each control data.
In Fig. 9 (c), data reproduction portion 55 is obtained as unit of controlling period i.e. 5ms according to calculated insertion packing C1
Control data.For example, data reproduction portion 55 obtains the control data c3 in Fig. 9 (b) and control according to calculated insertion packing C1
Control data c7 between data c4.With regard to from control data c1 until controlling data c7 during for, period 5ms.Number
Control data c1, control data c7 and control data c6 etc. are obtained according to reproducing unit 55, as the control period phase with PLC 1B
With the control data after ground interpolation.
It is the explanation of the interpolation process of the control data in embodiment 1 above.
It is back to Fig. 6, in step s 4, data reproduction portion 55 is in the control period with PLC 1B matchingly to control number
After carrying out interpolation, it is transferred to step S5.
On the other hand, in step s3, in the feelings that the control period in log recording period and PLC 1B is the identical period
Under condition, it is transferred to step S5.In this case, interpolation of the data reproduction portion 55 without acquired control data.
In step s 4, data reproduction portion 55 exports acquired control data to PLC 1B.It is log recording above
The explanation of the motion flow of data reproducing device 5.
As described above, the control device in embodiment 1 has PLC 1B and log recording data reproducing device
5.PLC 1B is connect with the manufacturing device 3B of the first step in multiple processes, the control number of the previous process based on first step
According to controlling manufacturing device 3B.Log recording data reproducing device 5 will be controlled by the manufacturing device 3a to other processes
Control data acquired by system and the PLC 1a that is not connect with PLC 1B, as previous process control data and export to
PLC 1B.Particularly, here without connection indicate, electrically or online connected not over signal wire etc..
PLC 1a in advance stores log record file in exterior storage medium 4a.Log recording data reproducing device
5 obtain log record file from exterior storage medium 4b, read in control data from acquired log record file.PLC 1B base
Manufacturing device 3B is controlled in the control data.Even if as a result, without the PLC 1A of previous process, in embodiment 1
Control device be also able to carry out the confirming operation after the control data for considering previous process, Fault analytical.
Therefore, the control device in embodiment 1 by production line identical with the existing production line with actual achievement to
When other factories introduce, in the case where the PLC 1 of the previous process of the control device can not be immediately accessed, also it is able to carry out dynamic
Work confirms.Thereby, it is possible to lavishly using access waiting time, can not effectively utilize newly set production line starting before
During.In addition, the control device in embodiment 1 also can in the case where the control device of previous process is in distant place
Execute confirming operation etc..
Also, log recording data reproducing device 5 is in the period of the control data of previous process and the control week of PLC 1B
In the case that phase is different, so that previously the period of the control data of process and the control period consistent mode of PLC 1B were to elder generation
The control data of preceding process carry out interpolation, and the data after interpolation are exported to PLC 1B.Therefore, the control dress in embodiment 1
Set the situation different from the control period of PLC 1B in the period of the control data of the previous process obtained from log record file
Under, also it is able to carry out the confirming operation etc. for having used the manufacturing device 3B of control data of previous process.
In addition, in the embodiment 1, there is PLC 1a data record unit 12a, PLC 1b to have data record unit
12b, but not limited to this.The number of units for the PLC 1 connecting with data record unit 12 can be any.
In addition, in the embodiment 1, PLC 1B has log recording data reproducing device 5, and but not limited to this.With
The number of units for the PLC 1 that log recording data reproducing device 5 connects can be any.
In addition, in the embodiment 1, explanation be PLC 1a in advance exterior storage medium 4a to log record file into
Row storage, log recording data reproducing device 5 obtain the log record file, and but not limited to this.For example, it can be,
It, should in the case where control data of other PLC 1 with manufacturing device 3a in existing production line other than PLC 1a
PLC 1 in advance stores log record file in exterior storage medium 4a.In addition, for example, it can be in the life newly set
It, should in the case where control data of the arbitrary PLC 1 with manufacturing device 3a other than PLC 1A and PLC 1B in producing line
PLC 1 in advance stores log record file in exterior storage medium 4a.In situations as mentioned above, similarly, day
Will records data reproducing device 5 and obtains log record file from exterior storage medium 4b, and PLC 1B is from acquired log recording
File reads in control data, executes the control of the control data based on reading, therefore even if PLC 1A without previous process,
Confirming operation etc. after being able to carry out the control data for considering previous process.
Embodiment 2.
Figure 10 is the block diagram for indicating the structure of the control system in embodiment 2.Using Figure 10, to having used embodiment
The control system of control device in 2 is illustrated.In addition, being labeled with name same as embodiment 1 in embodiment 2
The representation of the title and label structure identical or equivalent with embodiment 1, the description thereof will be omitted, is attached most importance to different parts
And it is illustrated.In addition, the present invention is not limited by the description of present embodiment 2.
The control system of embodiment 2 is as shown in Figure 10, is configured to, and makes the control system of embodiment 1 shown in FIG. 1 also
With external memory 8.External memory 8 is, for example, shared server, PC etc..External memory 8 is configured to
It is connect respectively with data record unit 12a and log recording data reproducing device 5 via Ethernet (registered trademark) cable.
That is, external memory 8 can be via between signal wire etc. and data record unit 12a and log recording data reproducing device 5
Electrically or online connect.
In the same manner as embodiment 1, exterior storage medium 4a is detachably arranged in data record unit 12a.It deposits outside
Storage media 4a stores the log record file for the control data for storing manufacturing device 3a.
External memory 8 is when obtaining log record file from data record unit 12a, with data record unit 12a
Connection.Whether user operates the setting (not shown) for being equipped with setting software with PC, to needing from data records list
First 12a forwards the timing of each log record file and forwarding to be specified to external memory 8.Data record unit 12a base
In the timing for whether needing to forward and forward of each log record file, the log recording that will be stored in exterior storage medium 4a
Specified log record file out in file is forwarded in specified timing out to external memory 8.
External memory 8 is when forwarding log record file to log recording data reproducing device 5, with log recording number
It is connected according to transcriber 5.Log recording data reproducing device 5 is deposited in the case where connecting with external memory 8 from outside
Storage device 8 obtains log record file.Acquired log record file is stored in by log recording data reproducing device 5 is pacified
The exterior storage medium 4b of dress.Can also from user to whether need from external memory 8 to log recording data reproduction fill
The timing for setting each log record file of 5 forwardings and forwarding is specified.
In addition, external memory 8 can be by user arbitrarily periodically relative to data record in embodiment 2
Both unit 12a and log recording data reproducing device 5 are attached or cut off.External memory 8 can always not
It is connect with data record unit 12a.In addition, external memory 8 can also not connect with log recording data reproducing device 5 always
It connects.
As described above, for the control device of embodiment 2, log recording data reproducing device 5 via from
PLC 1a achieves the external memory 8 of the control data of previous process and obtains log record file.PLC 1B is from by day
Will records log record file acquired by data reproducing device 5 and reads in control data, executes based on the control data read in
Control.Therefore, for the control device in embodiment 2, with embodiment 1 the case where in the same manner as, even if without previous
The PLC 1A of process, the confirming operation etc. after being also able to carry out the control data for considering previous process.
In addition, explanation is that external memory 8 in embodiment 2 is connect with data record unit 12a, from data note
It records unit 12a and obtains log record file, but not limited to this.For example, it can be, in existing production line, in addition to
In the case where data of other PLC 1 with manufacturing device 3a other than PLC 1a, make external memory 8 and 1 institute of PLC
The data record unit 12 having connects, and obtains log record file.In addition, for example, it can be in the production line newly set
In, in the case where data of the arbitrary PLC 1 with manufacturing device 3a other than PLC 1A and PLC 1B, make external storage
Device 8 is connect with data record unit 12 possessed by the PLC 1, obtains log record file.In situations as mentioned above,
Log recording data reproducing device 5 obtains log record file from external memory 8, and PLC 1B is from acquired log recording
File reads in control data, executes the control based on the control data read in, therefore even if PLC 1A without previous process,
Also the confirming operation etc. after being able to carry out the control data for considering previous process.
In embodiment 1 and embodiment 2, explanation is log recording data reproducing device 5 from log record file
Read in manufacturing device 3a control data and the control data as previous process, output to PLC 1B, but not limited to this.
For example, PLC 1B also uses the system of more forwardly of process sometimes not using only the control data of the manufacturing device 3A of previous process
It makes the control data of device 3 and executes the control of manufacturing device 3B.In this case, log recording data reproducing device 5 is not only
The control data of manufacturing device 3a are obtained, the control of the manufacturing device 3 of more forwardly of process compared with manufacturing device 3a is also obtained
Data and control data as previous process, output to PLC 1B.That is, log recording data reproducing device 5 can also obtain
The control data of first 2 of manufacturing device 3B or previous more processes and the control data as previous process, export extremely
PLC 1B.In situations as mentioned above, can also obtain with as previous process control data and use manufacturing device 3a
Control data the case where identical effect.
In addition, explanation is that log recording data reproducing device 5 is arranged to new in embodiment 1 and embodiment 2
If the control system that is controlled of production line possessed by control device, connect with PLC 1B, but not limited to this.Day
Will record data reproducing device 5 can also be used as with having the seperated device of the control device of PLC 1B and be arranged.Log recording
Obtained from data reproducing device 5 is also possible to such as independently being manufactured with the control device with PLC 1B.Such as
In the case where described in upper, log recording data reproducing device 5 can obtain and as control device possessed by control system
A part and the case where being arranged identical effect.
Also, log recording data reproducing device 5 can also be arranged not as the device independently of PLC 1B, but make
For a part setting of PLC 1B.As defined in log recording data reproducing device 5 for example can also be used as possessed by PLC 1B
Unit etc. and be arranged.In situations as mentioned above, can also obtain with log recording data reproducing device 5 as independently of
The device of PLC 1B and the case where being arranged identical effect.
In addition, structure shown in above embodiment is an example of structure of the invention, it certainly also can be with it
His well known technology is combined or by a part omission etc., suitably changes in the range for not departing from purport of the invention.
The explanation of label
1a, 1b, 1c, 1A, 1B PLC, 12a, 12b, 12A data record unit, 123a log recording configuration part, 1231a days
Will records object configuration part, 1232a log recording cycle set portion, 124a data collection unit, 125a file generated portion, 126a text
Part storage unit, 2a, 2b, 2A, 2B sensor, 3a, 3b, 3A, 3B manufacturing device, 4a, 4b exterior storage medium, 5 log recording numbers
Configuration parts are reproduced according to transcriber, 53,531 output object data configuration parts, 532 control cycle set portions, 54 file acquisition units,
55 data reproduction portions, 6a, 6b setting terminal, 8 external memories
Claims (8)
1. a kind of control device, which is characterized in that
It includes
PLC is set in production line newly, and the PLC not controlled with the manufacturing device to previous process is connect, with the elder generation
The manufacturing device of preceding process is compared and is controlled the manufacturing device of subsequent handling;And
Data reproducing device is obtained by newly setting the previous of the corresponding existing production line of the previous process of production line to described
The data that the PLC that the manufacturing device of process is controlled is collected into, output to the subsequent handling newly set in production line
PLC。
2. control device according to claim 1, which is characterized in that
The PLC for newly setting the subsequent handling in production line correspond to the existing production line with previous process
The PLC of the subsequent handling of PLC connection.
3. control device according to claim 1 or 2, which is characterized in that
The data reproducing device is in the period of the data and the control of the PLC for newly setting the subsequent handling in production line
In the case that period processed is different, so that the period of the data and the PLC for newly setting the subsequent handling in production line
Control period consistent mode to the data carry out interpolation, the data after interpolation are exported to described and are newly set in production line
The PLC of the subsequent handling.
4. control device according to claim 1 or 2, which is characterized in that
The data reproducing device is controlled by the manufacturing device of the previous process to the existing production line via being stored with
The exterior storage medium of data that is collected into of PLC, obtain manufacturing device by the previous process to the existing production line into
The data that the PLC of row control is collected into.
5. control device according to claim 1 or 2, which is characterized in that
The data reproducing device is controlled by the manufacturing device of the previous process to the existing production line via achieving
The external memory of data that is collected into of PLC, obtain manufacturing device by the previous process to the existing production line into
The data that the PLC of row control is collected into.
6. control device according to claim 1 or 2, which is characterized in that
The data reproducing device is obtained based on the set information for being set with the data that obtain by the existing production line
Previous process the data that are collected into of the PLC that is controlled of manufacturing device in arbitrary data, by acquired data to
The PLC output for newly setting the subsequent handling in production line.
7. control device according to claim 6, which is characterized in that
The set information is set by the external instrument that can be connect with the data reproducing device.
8. a kind of data reproducing device, which is characterized in that
It is set in production line newly, is connected to and the manufacturing device of subsequent handling is carried out compared with the manufacturing device of the previous process
The PLC of control, the PLC which is not controlled with the manufacturing device to previous process are connect,
Obtain by with the manufacturing device of the previous process for newly setting the corresponding existing production line of the previous process of production line
The data that the PLC controlled is collected into are exported to the PLC of the subsequent handling newly set in production line.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2015/065280 WO2016189704A1 (en) | 2015-05-27 | 2015-05-27 | Control device and data reproduction device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107615198A CN107615198A (en) | 2018-01-19 |
CN107615198B true CN107615198B (en) | 2019-11-08 |
Family
ID=57392621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201580079681.8A Active CN107615198B (en) | 2015-05-27 | 2015-05-27 | Control device and data reproducing device |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP6160781B2 (en) |
CN (1) | CN107615198B (en) |
WO (1) | WO2016189704A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019069436A1 (en) * | 2017-10-05 | 2019-04-11 | 三菱電機株式会社 | Monitoring device, monitoring system, and monitoring method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101079589A (en) * | 2006-05-25 | 2007-11-28 | 株式会社日立产机系统 | Electric motor drive device and electric motor drive method |
CN101815972A (en) * | 2007-10-05 | 2010-08-25 | 新日本制铁株式会社 | Plant control system and method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03286303A (en) * | 1990-04-02 | 1991-12-17 | Hitachi Ltd | Sequence control test system |
JP4424133B2 (en) * | 2004-09-24 | 2010-03-03 | 株式会社ジェイテクト | I / O data management device |
JP4659643B2 (en) * | 2006-02-28 | 2011-03-30 | 三菱電機株式会社 | Logging system |
JP5774450B2 (en) * | 2011-11-14 | 2015-09-09 | 株式会社日立産機システム | Industrial equipment control system |
JP5803633B2 (en) * | 2011-12-07 | 2015-11-04 | 東芝三菱電機産業システム株式会社 | Playback simulation test system |
-
2015
- 2015-05-27 JP JP2016556921A patent/JP6160781B2/en active Active
- 2015-05-27 WO PCT/JP2015/065280 patent/WO2016189704A1/en active Application Filing
- 2015-05-27 CN CN201580079681.8A patent/CN107615198B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101079589A (en) * | 2006-05-25 | 2007-11-28 | 株式会社日立产机系统 | Electric motor drive device and electric motor drive method |
CN101815972A (en) * | 2007-10-05 | 2010-08-25 | 新日本制铁株式会社 | Plant control system and method |
Also Published As
Publication number | Publication date |
---|---|
JP6160781B2 (en) | 2017-07-12 |
CN107615198A (en) | 2018-01-19 |
WO2016189704A1 (en) | 2016-12-01 |
JPWO2016189704A1 (en) | 2017-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6996888B2 (en) | Programmable logic controller, data acquisition device and programming support device | |
US7272458B2 (en) | Control system setting device | |
US9645572B2 (en) | Device class information support for multi-option devices | |
TW200504559A (en) | Configurable PLC and SCADA-based control system | |
CN104866249B (en) | 3D printing data generation method, processing system and 3D drawing file printing method | |
EP3376316B1 (en) | Slave device, control method of slave device, information processing program and computer readable recording medium | |
US20180011466A1 (en) | Programmable logic controller, method for controlling programmable logic controller, and control program | |
EP3428750A1 (en) | Slave device, method for controlling slave device, information processing program, and recording medium | |
CN107615198B (en) | Control device and data reproducing device | |
EP3429132A1 (en) | Master-slave control system, method for controlling master-slave control system, information processing program, and recording medium | |
JP2017188115A (en) | Program creation support apparatus, control method of program creation support apparatus, and control program of program creation support apparatus | |
CN104412189B (en) | The control system that configurable connector type server expands | |
CN103905410A (en) | Multi-channel communication protocol converter capable of converting user-defined protocol to Modbus protocol | |
US20180011467A1 (en) | Plc control data generation device, plc control data generation method, and plc control data generation program | |
JP2014002560A (en) | Machine control program creation device, machine control program creation method, program, and information storage medium | |
CN106164876B (en) | Client terminal device, data communication system and data communications method | |
CN108227526A (en) | Control device and control system | |
CN105573235B (en) | PLC system and its operating method | |
JP6996886B2 (en) | Programmable logic controller, programmable logic controller system and data acquisition device | |
JP2008165324A (en) | Program creation support device | |
JP4019946B2 (en) | Network system monitoring method, monitoring system, repeater and monitoring device | |
TWI629578B (en) | Computer updating test assisting device | |
CN110109966A (en) | Sampling of data device and sampling of data method | |
CN106716372B (en) | Programmable logic controller (PLC) | |
WO2021100071A1 (en) | Plc system construction assistance program, computing terminal-readable recording medium, and plc system construction assistance device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |